31
71 DAFTAR PUSTAKA Arief M.Sc., Dr. Ir. Irwandy dan Adisoma Ph.D, Ir Gatut S, 2002.  Buku Ajar  Perencana an Tambang , Departemen teknik Pertambangan. Bandung: ITB. Arief M.Sc., Dr. Ir. Irwandy, 2003. Diktat Kuliah Manajemen Tambang , Departemen teknik Pertambangan. Bandung: ITB. Caterpillar Handbook Performance a CAT publication by Caterpillar Inc., Peoria, Illinois, U.S.A. October 2003 Chironis, Nicholas P., 1987. “Coal Age Operating Handbook of Coal Surface Mining and Reclamation”, vol. 2, Mc Graw-Hill, Inc., New York, N.Y. 10020. Eddy R. Sumaatmadja & Agus Pujobroto.  Pemetaan Sebaran Batubara dan  Penentuan Titik Api di Kawasan Hutan Wisata Bukit Suharto dan Sekitarnya, Propinsi Kalimantan Timur, Subdit. Eksplorasi Batubara dan Gambut, DSM. Fergusson A., Mc Clay K., 1997. “Structural modeling within the Sanga-sanga PSC, Kutai Basin, Kalimantan: its application to paleochannel orientation studies and timing of hydrocarbon entrapment”, Indonesian Petroleum Association. FX. Harkins HP, JA. Prihandono, A. Setiya Budhi, D. Kusnida (PPGL), 1999. Studi Regional Cekungan Batubara Daerah Pesisir Kalimantan Timur , Pemaparan Hasil Kegiatan Lapangan DIK-S Batubara, DSM. Gautama, Dr. Ir. Rudy Sayoga, 1999.  Diktat Kuliah Sistem Penyaliran Tambang, Departemen Teknik Pertambangan. Bandung: ITB. Hartman, H. L., 1987. “Introductory Mining Engineering”, A Wiley Interscience Production, John Wiley and Sons Inc., New York. Komatsu Spesifications and Application Handbook. Japan. March 2005 Martin, J. W., T. J. Martin, T. P. Bennett, and K. M. Martin, 1982. “Surface Mining Equipment,” Martin Consultants, Golden, CO.

Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

Embed Size (px)

Citation preview

Page 1: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 1/31

71

DAFTAR PUSTAKA

Arief M.Sc., Dr. Ir. Irwandy dan Adisoma Ph.D, Ir Gatut S, 2002.  Buku Ajar

 Perencanaan Tambang , Departemen teknik Pertambangan. Bandung: ITB.

Arief M.Sc., Dr. Ir. Irwandy, 2003.  Diktat Kuliah Manajemen Tambang ,

Departemen teknik Pertambangan. Bandung: ITB.

Caterpillar Handbook Performance a CAT publication by Caterpillar Inc., Peoria,

Illinois, U.S.A. October 2003

Chironis, Nicholas P., 1987. “Coal Age Operating Handbook of Coal Surface

Mining and Reclamation”, vol. 2, Mc Graw-Hill, Inc., New York, N.Y.

10020.

Eddy R. Sumaatmadja & Agus Pujobroto.  Pemetaan Sebaran Batubara dan

 Penentuan Titik Api di Kawasan Hutan Wisata Bukit Suharto dan

Sekitarnya, Propinsi Kalimantan Timur, Subdit. Eksplorasi Batubara dan

Gambut, DSM.

Fergusson A., Mc Clay K., 1997. “Structural modeling within the Sanga-sanga

PSC, Kutai Basin, Kalimantan: its application to paleochannel orientation

studies and timing of hydrocarbon entrapment”, Indonesian Petroleum

Association.

FX. Harkins HP, JA. Prihandono, A. Setiya Budhi, D. Kusnida (PPGL), 1999.

Studi Regional Cekungan Batubara Daerah Pesisir Kalimantan Timur ,

Pemaparan Hasil Kegiatan Lapangan DIK-S Batubara, DSM.

Gautama, Dr. Ir. Rudy Sayoga, 1999.  Diktat Kuliah Sistem Penyaliran Tambang,

Departemen Teknik Pertambangan. Bandung: ITB.

Hartman, H. L., 1987. “Introductory Mining Engineering”, A Wiley Interscience

Production, John Wiley and Sons Inc., New York.

Komatsu Spesifications and Application Handbook. Japan. March 2005

Martin, J. W., T. J. Martin, T. P. Bennett, and K. M. Martin, 1982. “Surface

Mining Equipment,” Martin Consultants, Golden, CO.

Page 2: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 2/31

72

Pfleider, E. P., ed., 1973a. “Open  pit  and Strip Mining Systems and Equipment,”

sec. 17 in SME Mining Engineering Handbook , A. B. Cummins and I. A.Given, eds., Soc. Mng. Engr. AIME, New York.

Pfleider, E. P., ed., 1973b. “Surface Haulage and Storage,” Sec. 18 in SME

Mining Engineering Handbook , A. B. Cummins and I. A. Given, eds., Soc.

Mng. Engr. AIME, New York.

Prodjosumarto, Partanto, 1993.  Diktat Kuliah Pemindahan Tanah Mekanis.,

Departemen Teknik Pertambangan. ITB. Bandung.

Skelly and Loy, 1975, “Economic Engineering Analysis of U.S. Surface Coal

Mines and Effective Land Reclamation,” US Bureau of Mines Contract

Report SO 241049, February.

Stefanko, R., 1983. “Coal Mining Technology, Theory and Practice,” Society of

Mining Engineers, American Institute of Mining, Metalurgical, and

Petroleum Engineers, Inc., New York.

Stefanko, R., Ramani, R. V., and Ferko, M. R., 1973, “An Analysis of Strip

Mining Methods and Equipment Selection, ” Research Report, Contract No.

14-01-0001-390 to Office of Coal Research, US Dept. Of the Interior, May

29.

Page 3: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 3/31

LAMPIRAN A

DATA PENGUKURAN CURAH HUJAN

Page 4: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 4/31

   G  r  a   f   i   k   d  a  n   D  a   t  a   C  u  r  a   h   H  u

   j  a  n   T  a   h  u  n   2   0   0   5  -   2   0   0   7

   2   0

   0   5   R  a   i  n   D  a   t  a   (   T  o   D  a   t  e   )

   0

   5   0   0

   1   0   0   0

   1   5   0   0

   2   0   0   0

   2   5   0   0

   J

   F

   M

   A

   M

   J

   J

   A

   S

   O

   N

   D

   M  o  n   t   h

   R  a i  n  f  a l l  (   m   m  )

   0 .   0

   1   0   0 .   0

   2   0   0 .   0

   3   0   0 .   0

   4   0   0 .   0

   5   0   0 .   0

   6   0   0 .   0

  r  a i  n  d  e l  a  y  s  (  h   o  u  r  s  )

  r  a   i  n   f  a   l   l   (  m  m   )

  r  a   i  n   d  e   l  a  y  s

  r  a   i  n   f  a   l   l   M   T   D   (  m

  m   )

  r  a   i  n   d  e   l  a  y  s   M   T   D

   (   h  r  s   )

   2   0   0   6   R   a   i   n   D   a   t   a   (   T   o   D   a   t   e   )

   0

   2   0   0

   4   0   0

   6   0   0

   8   0   0

   1   0   0   0

   1   2   0   0

   1   4   0   0

   1   6   0   0

   1   8   0   0

   2   0   0   0

   J

   F

   M

   A

   M

   J

   J

   A

   S

   O

   N

   D

   M   o   n   t   h

    R  a i  n  f  a l l  (   m   m )

   0   1   0   0

   2   0   0

   3   0   0

   4   0   0

   5   0   0

   6   0   0

   7   0   0

   8   0   0

   R  a i  n  d  e l  a  y  s  (  h  o  u  r  s )

   r   a   i   n   f   a   l   l

   (   m   m   )

   r   a   i   n   d   e   l   a  y   s   (   h   r   s   )

   r   a   i   n   f   a   l   l

   M   T   D   (   m   m   )

   r   a   i   n   d   e   l   a  y   s   M   T   D

   (   h   r   s   )

 

   D  a   t  a   t  a   h  u  n   2   0   0   5

   M  o  n   t   h

   J  a  n  -   0   5

   F  e   b  -   0   5

   M  a  r  -   0   5

   A  p  r  -   0   5

   M  a  y  -   0   5

   J  u  n  -   0   5

   J  u   l  -   0   5

   A  u  g  -   0   5

   S  e  p  -   0   5

   O  c   t  -   0   5

   N  o

  v  -   0   5

   D  e  c  -   0   5

  r  a   i  n   d  e   l  a  y  s

   1   2 .   2

   1   8 .   2

   5   6 .   0

   7   4 .   4

   5   0 .   8

   2   3 .   8

   4   6 .   3   5

   1   7 .   8

   6 .   9

   7   8 .   7

   7

   7 .   8

   1   4   3 .   9

  r  a   i  n   d  e   l  a  y  s   M   T   D   /  c  u  m    (   h

  r  s   )

   1   2 .   2   2

   3   0 .   3   8

   8   6 .   3   8

   1   6   0 .   7   8

   2   1   1 .   5   8

   2   3   5 .   3   8

   2   8   1 .   7   3

   2   9   9 .   5   3

   3   0   6 .   4   3

   3   8   5 .   1   3

   4   6

   2 .   9   3

   5   4   0 .   7

  r  a   i  n   f  a   l   l   (  m  m   )

   4   3 .   4

   8   9 .   4

   1   4   8 .   6

   3   1   1 .   8

   1   3   8 .   5

   8   7 .   5

   1   8   7 .   0

   4   9 .   5

   4   3 .   3

   2   8   2 .   0

   3   2

   2 .   0

   2   4   4 .   5

  r  a   i  n   f  a   l   l   M   T   D   /  c  u  m    (  m  m

   )

   4   3 .   4

   1   3   2 .   8

   2   8   1 .   4

   5   9   3 .   2

   7   3   1 .   7

   8   1   9 .   2

   1   0   0   6 .   2

   1   0   5   5 .   7

   1   0   9   9 .   0

   1   3   8   1 .   0

   1   7

   0   3 .   0

   1   9   4   7 .   5

    D  a   t  a   t  a   h  u  n   2   0   0   6

   M  o  n   t   h

   J  a  n  -   0   6

   F  e   b  -   0   6

   M  a  r  -   0   6

   A  p  r  -   0   6

   M  a  y  -   0   6

   J  u  n  -   0   6

   J  u   l  -   0   6

   A  u  g  -   0   6

   S  e  p  -   0   6

   O  c   t  -   0   6

   N  o

  v  -   0   6

   D  e  c  -   0   6

  r  a   i  n   d  e   l  a  y  s   (   h  r  s   )

   8   6 .   0

   8   0 .   0

   6   1 .   1

   5   2 .   2

   9   9 .   2

   1   2   0 .   5

   1   0 .   5

   4   1 .   1

   4   7 .   0

   7 .   5

   6

   1 .   7

   7   3 .   4

  r  a   i  n   d  e   l  a  y  s   M   T   D   /  c  u  m    (   h

  r  s   )

   8   6 .   0   0

   1   6   6 .   0   0

   2   2   7 .   1   0

   2   7   9 .   3   0

   3   7   8 .   5   0

   4   9   9 .   0   0

   5   0   9 .   5   0

   5   5   0 .   6   0

   5   9   7 .   6   0

   6   0   5 .   1   0

   6   6

   6 .   8   0

   7   2   8 .   5

  r  a   i  n   f  a   l   l   (  m  m   )

   2   9   5 .   0

   2   6   3 .   5

   8   3 .   5

   1   4   2 .   0

   1   3   8 .   8

   1   4   3 .   5

   1   2 .   5

   9   2 .   3

   1   2   3 .   0

   1   5 .   5

   1   3   9 .   0

   3   3   0 .   5

  r  a   i  n   f  a   l   l   M   T   D   /  c  u  m    (  m  m

   )

   2   9   5 .   0

   5   5   8 .   5

   6   4   2 .   0

   7   8   4 .   0

   9   2   2 .   8

   1   0   6   6 .   3

   1   0   7   8 .   8

   1   1   7   1 .   1

   1   2   9   4 .   1

   1   3   0   9 .   6

   1   4

   4   8 .   6

   1   7   7   9 .   1

Page 5: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 5/31

   S

  u   m   m   a   r  y   R   a   i   n   D   e   l   a  y   s   2   0   0   7

   0

   5   0   0

   1   0   0   0

   1   5   0   0

   2   0   0   0

   2   5   0   0

   J

   F

   M

   A

   M

   J

   J

   A

   S

   O

   M   o   n   t   h

   R  a i  n  F  a l l  (   m   m )

   0 .   0

   2   0   0 .   0

   4   0   0 .   0

   6   0   0 .   0

   8   0   0 .   0

   1   0   0   0 .   0

   1   2   0   0 .   0

   R  a i  n   D  e l  a  y  s  (  h  o  u  r  s )

   R   a   i   n   F   a   l   l   (   m   m   )

   R   a   i   n   /   D   e   l   a  y   s   (   h   r   s   )

    r   a   i   n   f   a   l   l   M   T   D   (   m

   m   )

   r   a   i   n   d   e   l   a  y   s   M   T   D

   (   h   r   s   )

 

   D  a   t  a   t  a   h  u  n   2   0   0

   7

   M  o  n   t   h

   J  a  n  -   0   7

   F  e   b  -   0   7

   M  a  r  -   0   7

   A  p  r  -   0   7

   M  a  y  -   0   7

   J  u  n  -   0   7

   J  u   l  -   0   7

   A  u  g  -   0   7

   S  e  p  -   0   7

   O  c   t  -   0   7

   R  a   i  n   /   D  e   l  a  y  s   (   h  r  s   )

   1   6   7 .   0

   9   2 .   5

   9   6 .   0

   1   0   8 .   0

   1   1   8 .   0

   1   7   0 .   8

   1   2

   9 .   0

   6   7 .   5

   6   3 .   5

   3   3 .   7

  r  a   i  n   d  e   l  a  y  s   M   T   D   /  c  u  m

    (   h  r  s   )

   1   6   7 .   0   0

   2   5   9 .   5   0

   3   5   5 .   5   0

   4   6   3 .   5   0

   5   8   1 .   5   0

   7   5   2 .   2   5

   8   8   1 .   2   5

   9   4   8 .   7   5

   1   0   1   2 .   2   5

   1   0   4   5 .   9   5

   R  a   i  n   F  a   l   l   (  m  m   )

   3   5   3 .   0

   2   0   9 .   5

   2   1   1 .   0

   1   0   8 .   0

   3   2   3 .   0

   2   7   3 .   7

   1   8

   3 .   7

   1   1   8 .   5

   1   6   3 .   5

   1   2   5 .   5

  r  a   i  n   f  a   l   l   M   T   D   /  c  u  m 

   (  m  m   )

   3   5   3 .   0

   5   6   2 .   5

   7   7   3 .   5

   8   8   1 .   5

   1   2   0   4 .   5

   1   4   7   8 .   2

   1   6   6   1 .   9

   1   7   8   0 .   4

   1   9   4   3 .   9

   2   0   6   9 .   4

Page 6: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 6/31

LAMPIRAN B

TAHAPAN PENAMBANGAN

Page 7: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 7/31

OB removed

A

B

B'B

A'A

 3  5 2 7  5  0 E

 3  5 2 7  5  0 E

9111500N

9111750N

9112000N

9112250N

9112500N

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

-225RL -225RL

-200RL -200RL

-175RL -175RL

-150RL -150RL

-125RL -125RL

-100RL -100RL

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

200RL 200RL

225RL 225RL

250RL 250RL

275RL 275RL

300RL 300RL

325RL 325RL

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

-225RL -225RL

-200RL -200RL

-175RL -175RL

-150RL -150RL

-125RL -125RL

-100RL -100RL

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

200RL 200RL

225RL 225RL

250RL 250RL

275RL 275RL

300RL 300RL

325RL 325RL

SURPAC_VISION - SURPAC Software International

design boundaryOB removed

surface

coal seamcoal mined out

design boundary

surface

coal seamcoal mined out

Penampang Melintang Section AA'

Penampang Melintang Section BB'

Page 8: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 8/31

SURPAC_VISION - SURPAC Software International

225RL225RL

200RL200RL

175RL175RL

150RL150RL

125RL125RL

100RL100RL

75RL75RL

50RL50RL

25RL25RL

0RL0RL

-25RL-25RL

-50RL-50RL

-75RL-75RL

-100RL-100RL  7 

 5  0 E

7  5  0 E

 5  0  0 E

 5  0  0 E

2  5  0 E

2  5  0 E

225RL225RL

200RL200RL

175RL175RL

150RL150RL

125RL125RL

100RL100RL

75RL75RL

50RL50RL

25RL25RL

0RL0RL

-25RL-25RL

-50RL-50RL

-75RL-75RL

-100RL-100RL   7  5  0 E

7  5  0 E

 5  0  0 E

 5  0  0 E

2  5  0 E

2  5  0 E

200RL200RL

175RL175RL

150RL150RL

125RL125RL

100RL100RL

75RL75RL

50RL50RL

25RL25RL

0RL0RL

-25RL-25RL

-50RL-50RL

-75RL-75RL

-100RL-100RL

-125RL-125RL7  5  0 E

7  5  0 E

 5  0  0 E

 5  0  0 E

2  5  0 E

2  5  0 E

9112500N

9112250N

9112000N

9111750N

9111500N

 3  5 2 7  5  0 E

 3  5 2 7  5  0 E

 3  5 2  5  0  0 E

 3  5 2  5  0  0 E

coal seam

surface

Penampang Melintang Section CC'

coal mined out

OB removeddesign boundary

surface

Penampang Melintang Section DD'

design boundary

OB removed

coal mined out

coal seam

C C'

D D'

coal seam

surface

Penampang Melintang Section EE'E

coal mined out

OB removeddesign boundary

E'

E

D

C

Page 9: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 9/31

inpit disposal dump area

H

sump area

 3  5 2 2  5  0 E

 3  5 2 2  5  0 E

 3  5 2  5  0  0 E

 3  5 2  5  0  0 E

9111250N

9111500N

9111750N

9112000N

9112250N

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

-100RL -100RL

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

-100RL -100RL

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

SURPAC_VISION - SURPAC Software International

OB removed

coal mined out coal seam

surface

F Penampang Melintang Section FF' F'

coal seam

design boundary

Penampang Melintang Section GG'G

OB removeddesign boundary

coal mined out

G'

surface

Penampang Melintang Section HH'H H'design boundary

OB removed

coal mined out coal seam

surface

Penampang Melintang Section II' I'IOB removed

coal mined outcoal seam

surface

design boundary

I

F

G

Page 10: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 10/31

 3  5 2 2  5  0 E

 3  5 2 2  5  0 E

 3  5 2  5  0  0 E

 3  5 2  5  0  0 E

9111000N

9111250N

9111500N

9111750N

9112000N

9112250N

 0 E

 0 E

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

1  0  0  0 E

1  0  0  0 E

-125RL

-100RL -100RL

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

200RL 200RL

 0 E

 0 E

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

1  0  0  0 E

1  0  0  0 E

-125RL -125RL

-100RL -100RL

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

200RL 200RL

225RL

 0 E

 0 E

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

1  0  0  0 E

1  0  0  0 E

-125RL

-100RL -100RL

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

200RL

SURPAC_VISION - SURPAC Software International

design boundaryOB removed

coal mined out coal seam

surface

Penampang Melintang Section JJ'

J J'

design boundary

surface

coal seamcoal mined out

OB removed

Penampang Melintang Section KK'

K K'

coal seam

OB removed design boundary

surface

coal mined out

Penampang Melintang Section LL'

L L'

L

K

J

Page 11: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 11/31

 3  5 2  0  0  0 E

 3  5 2  0  0  0 E

 3  5 2 2  5  0 E

 3  5 2 2  5  0 E

9110750N

9111000N

9111250N

9111500N

9111750N

9112000N

9112250N

 0 E

 0 E

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

1  0  0  0 E

1  0  0  0 E-200RL -200RL

-175RL -175RL

-150RL -150RL

-125RL -125RL

-100RL -100RL

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

200RL 200RL

225RL 225RL

250RL 250RL

275RL 275RL

 0 E

 0 E

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

1  0  0  0 E

1  0  0  0 E

-200RL -200RL

-175RL -175RL

-150RL -150RL

-125RL -125RL

-100RL -100RL

-75RL -75RL

-50RL -50RL-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

200RL 200RL

225RL 225RL

250RL 250RL

275RL 275RL

300RL 300RL

 0 E

 0 E

2  5  0 E

2  5  0 E

 5  0  0 E

 5  0  0 E

7  5  0 E

7  5  0 E

1  0  0  0 E

1  0  0  0 E-200RL -200RL

-175RL -175RL

-150RL -150RL

-125RL -125RL

-100RL -100RL

-75RL -75RL

-50RL -50RL

-25RL -25RL

0RL 0RL

25RL 25RL

50RL 50RL

75RL 75RL

100RL 100RL

125RL 125RL

150RL 150RL

175RL 175RL

200RL 200RL

225RL 225RL

250RL 250RL

275RL 275RL

SURPAC_VISION - SURPAC Software International

Penampang Melintang Section MM'

M

surface

design boundary

OB removed M'

coal mined out

coal seam

Penampang Melintang Section NN'

N OB removeddesign boundary

surface

N'

coal seam

coal seam

Penampang Melintang Section OO'

Odesign boundary

OB removedO'

surface

coal mined out

coal mined out

M

N

O

Page 12: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 12/31

LAMPIRAN C

HASIL PERHITUNGAN PRODUKTIVITAS ALAT

Page 13: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 13/31

EQUIPMENT PRODUCTIVITY

Waste Coal Fleet

Jan-08 Feb-08 Mar-08

Calendar Days 31 29 31 Calendar Days

Non-Production Days 2 1 3 Non-Production Days

Production Days 29 28 28 Production Days

Hours per day 24.0 24.0 24.0 hrs/day Hours per day

Delays Delays

Maintenance Delays Maintenance Delays

Scheduled Maintenance Scheduled Maintenance

Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc

Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift

Unscheduled Maintenance Unscheduled Maintenance

30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift

Idle Time Idle Time

Weather: Jan -120 hrs, Feb - 90 hrs, Mar - 60 hrs 4.1 3.2 2.1 hrs/day Weather: Jan -120 hrs, Feb - 90 hrs, Mar -

Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift

Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift

Operating Delays Operating DelaysBlasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day

Effective Working Hours per day 14.2 15.1 16.2 hrs/day Effective Working Hours per day

Effective Working Hours per month 413.1 423.1 454.7 hrs/month Effective Working Hours per month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385

Backhoe EX710 Komatsu PC3000 1 1 units/month Backhoe EX415 Caterpillar Cat345

Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 745 745 895 bcm/hr Caterpillar Cat345 + 6 Hino

Komatsu PC3000 + 7 Cat 777D 745 895 bcm/hr  

Komatsu PC1250 + 3 Cat 777D 250 250 300 bcm/hr  .

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 307,772 315,227 406,986 bcm Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 315,227 406,986 bcm Caterpillar Cat345 + 6 Hino

Komatsu PC1250 + 3 Cat 777D 103,279 105,781 136,420 bcm

Total Production Capacity 411,051 736,236 950,393 bcm Total Production Ca

Month Month

Page 14: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 14/31

EQUIPMENT PRODUCTIVITY

 Waste Coal Fleet

Apr-08 May-08 Jun-08

Calendar Days 30 31 30 Calendar Days

Non-Production Days 0 2 0 Non-Production Days

Production Days 30 29 30 Production Days

Hours per day 24.0 24.0 24.0 hrs/day Hours per day

Delays Delays

Maintenance Delays Maintenance Delays

Scheduled Maintenance Scheduled Maintenance

Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc

Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift

Unscheduled Maintenance Unscheduled Maintenance

30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift

Idle Time Idle Time

Weather: Apr -90 hrs, May 60- hrs, Jun - 60 hrs 3.0 2.1 2.0 hrs/day Weather: Apr -90 hrs, May 60- hrs, Jun -

Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift

Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift

Operating Delays Operating DelaysBlasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day

Effective Working Hours per day 15.4 16.3 16.4 hrs/day Effective Working Hours per day

Effective Working Hours per month 461.5 471.5 491.5 hrs/month Effective Working Hours per month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX415 Caterpillar Cat345

Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 745 895 895 bcm/hr Caterpillar Cat345 + 6 Hino

Komatsu PC3000 + 7 Cat 777D 745 895 895 bcm/hr  

Komatsu PC1250 + 3 Cat 777D 250 300 300 bcm/hr  

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 343,818 421,948 439,893 bcm Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 343,818 421,948 439,893 bcm Caterpillar Cat345 + 6 Hino

Komatsu PC1250 + 3 Cat 777D 115,375 141,435 147,450 bcm

Total Production Capacity 803,010 985,331 1,027,235 bcm Total Production Ca

Month Month

Page 15: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 15/31

EQUIPMENT PRODUCTIVITY

Waste Coal Fleet

Jul-08 Aug-08 Sep-08

Calendar Days 31 31 30 Calendar Days

Non-Production Days 1 1 0 Non-Production Days

Production Days 30 30 30 Production Days

Hours per day 24.0 24.0 24.0 hrs/day Hours per day

Delays Delays

Maintenance Delays Maintenance Delays

Scheduled Maintenance Scheduled Maintenance

Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc

Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift

Unscheduled Maintenance Unscheduled Maintenance

30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift

Idle Time Idle Time

Weather: Jul - 60 hrs, Aug - 60 hrs, Sep - 60 hrs 2.0 2.0 2.0 hrs/day Weather: Jul - 60 hrs, Aug - 60 hrs, Sep -

Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift

Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift

Operating Delays Operating DelaysBlasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day

Effective Working Hours per day 16.4 16.3 16.4 hrs/day Effective Working Hours per day

Effective Working Hours per month 491.5 489.8 491.5 hrs/month Effective Working Hours per month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX415 Caterpillar Cat345

Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 895 895 895 bcm/hr Caterpillar Cat345 + 6 Hino

Komatsu PC3000 + 7 Cat 777D 895 895 895 bcm/hr  

Komatsu PC1250 + 3 Cat 777D 300 300 300 bcm/hr  

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 439,893 438,349 439,893 bcm Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 439,893 438,349 439,893 bcm Caterpillar Cat345 + 6 Hino

Komatsu PC1250 + 3 Cat 777D 147,450 146,933 147,450 bcm

Total Production Capacity 1,027,235 1,023,632 1,027,235 bcm Total Production Ca

Month Month

Page 16: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 16/31

EQUIPMENT PRODUCTIVITY

Waste Coal Fleet

Oct-08 Nov-08 Dec-08

Calendar Days 31 30 31 Calendar Days

Non-Production Days 2 2 1 Non-Production Days

Production Days 29 28 30 Production Days

Hours per day 24.0 24.0 24.0 hrs/day Hours per day

Delays Delays

Maintenance Delays Maintenance Delays

Scheduled Maintenance Scheduled Maintenance

Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc

Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift

Unscheduled Maintenance Unscheduled Maintenance

30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift

Idle Time Idle Time

Weather: Oct -90 hrs, Nov - 90 hrs, Dec - 120 hrs 3.1 3.2 4.0 hrs/day Weather: Oct -90 hrs, Nov - 90 hrs, Dec - 1

Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift

Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift

Operating Delays Operating DelaysBlasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day

Effective Working Hours per day 15.3 15.1 14.4 hrs/day Effective Working Hours per day

Effective Working Hours per month 443.1 423.1 431.5 hrs/month Effective Working Hours per month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX415 Caterpillar Cat345

Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 895 745 745 bcm/hr Caterpillar Cat345 + 6 Hino

Komatsu PC3000 + 7 Cat 777D 895 745 745 bcm/hr  

Komatsu PC1250 + 3 Cat 777D 300 250 250 bcm/hr  

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 396,589 315,227 321,468 bcm Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 396,589 315,227 321,468 bcm Caterpillar Cat345 + 6 Hino

Komatsu PC1250 + 3 Cat 777D 132,935 105,781 107,875 bcm

Total Production Capacity 926,114 736,236 750,810 bcm Total Production Ca

Month Month

Page 17: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 17/31

EQUIPMENT PRODUCTIVITY

Waste Coal Fleet

Jan-09 Feb-09 Mar-09

Calendar Days 31 28 31 Calendar Days

Non-Production Days 1 0 0 Non-Production Days

Production Days 30 28 31 Production Days

Hours per day 24.0 24.0 24.0 hrs/day Hours per day

Delays Delays

Maintenance Delays Maintenance Delays

Scheduled Maintenance Scheduled Maintenance

Service 40 mins per fortnight/exc 1.2 1.2 1.2 hrs/day Service 10 hrs per fortnight/exc

Refuelling 30 mins per shift 1.0 1.0 1.0 hrs/day Refuelling 30 mins per shift

Unscheduled Maintenance Unscheduled Maintenance

30 mins per shift 1.0 1.0 1.0 hrs/day 30 mins per shift

Idle Time Idle Time

Weather: Jan -120 hrs, Feb - 90 hrs, Mar - 60 hrs 4.1 3.2 2.1 hrs/day Weather: Jan -120 hrs, Feb - 90 hrs, Mar -

Shift Change, Prestart, Toolbox 15 mins per shift 0.5 0.5 0.5 hrs/day Shift Change, Prestart, Toolbox 15 mins per shift

Meal, Prayers 60 mins per shift 2.0 2.0 2.0 hrs/day Meal, Prayers 60 mins per shift

Operating Delays Operating DelaysBlasting 0 mins per day 0.0 0.0 0.0 hrs/day Blasting 0 mins per day

Effective Working Hours per day 14.2 15.1 16.2 hrs/day Effective Working Hours per day

Effective Working Hours per month 427.4 423.1 503.5 hrs/month Effective Working Hours per month

Production Excavators Production Excavators

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX509 Caterpillar Cat385

Backhoe EX710 Komatsu PC3000 1 1 1 units/month Backhoe EX415 Caterpillar Cat345

Backhoe EX606 Komatsu PC1250 1 1 1 units/month

Production Fleets Production Fleets

Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 745 745 895 bcm/hr Caterpillar Cat345 + 6 Hino

Komatsu PC3000 + 7 Cat 777D 745 745 895 bcm/hr  

Komatsu PC1250 + 3 Cat 777D 250 250 300 bcm/hr  

Target Production Target Production

Komatsu PC3000 + 7 Cat 777D 318,385 315,227 450,592 bcm Caterpillar Cat385 + 14 Hino

Komatsu PC3000 + 7 Cat 777D 318,385 315,227 450,592 bcm Caterpillar Cat345 + 6 Hino

Komatsu PC1250 + 3 Cat 777D 106,841 105,781 151,036 bcm

Total Production Capacity 743,610 736,236 1,052,220 bcm Total Production Ca

Month Month

Page 18: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 18/31

LAMPIRAN D

SPESIFIKASI ALAT

Page 19: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 19/31

Excavator Komatsu PC 3000

Page 20: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 20/31

Excavator Komatsu PC 3000

Page 21: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 21/31

Excavator Komatsu PC 3000

Page 22: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 22/31

Hydraylic Excavator Komatsu PC 1250

Page 23: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 23/31

Hydraylic Excavator Komatsu PC 1250

Page 24: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 24/31

Ekskavator Caterpillar 385 B

Page 25: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 25/31

Ekskavator Caterpillar 345 B

Page 26: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 26/31

Page 27: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 27/31

Dump Truck Caterpillar 777D

Page 28: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 28/31

Dump Truck Caterpillar 777D

Page 29: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 29/31

Page 30: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 30/31

Page 31: Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

8/10/2019 Jbptitbpp Gdl Yugahayubr 30937 8 2008ta A

http://slidepdf.com/reader/full/jbptitbpp-gdl-yugahayubr-30937-8-2008ta-a 31/31

Boks Berpendingin O

Bak Terbuka O

Crane O

Mobil Derek O

Sky Lift -

Tangki O

Los Bak O

Angkut Kendaraan -

Truk Logging O

Molen -

Tangki High Blow O

Arm Roll -

Mobil Pemadam -

Ambulance -

Truk Sampah -

Mobil Penarik -