23
INTERNATIONALE TITRE : PONT SUR LE BALE 1:1000 ECHELLE DESSIN N° BA-1 ETUDE DU CONCEPT DE BASE DIRECTEUR NATIONAL ADJOINT DES ROUTES REPUBLIQUE DU MALI SUR LE PROJET DE CONSTRUCTION DES PONTS DU CORRIDOR SUD DAKAR~BAMAKO AGENCE JAPONAISE DE COORPERATION COORDONNEES DES ELEMENTS COORDONNEES DES PROFILS No. PROFILS PK COORDONNEE X (m) COORDONNEE Y (m) OBSERVATION 1 236+748.531 338,912.76520 77,812.59150 2 236+760.000 338,924.15298 77,813.95007 3 236+800.000 338,963.84855 77,818.87070 4 236+900.000 339,060.00011 77,844.93513 5 236+981.039 339,128.48086 77,887.80548 6 237+000.000 339,142.69226 77,900.35397 7 237+050.000 339,177.75775 77,935.98230 POINT ORIGINE DU PROJET 8 237+056.039 339,181.88153 77,940.39408 9 237+061.100 339,185.33648 77,944.09234 CULLEE 10 237+100.000 339,211.89201 77,972.51792 PONT 11 237+171.450 339,260.66817 78,024.72893 CULEE 12 237+182.000 339,181.88153 77,940.39408 FIN DU PROJET 13 237+200.000 339,280.15816 78,045.59141 14 237+286.539 339,339.23492 78,108.82839 15 237+300.000 339,348.43900 78,118.65113 16 237+400.000 339,417.72741 78,190.75317 COORDONNEES ET ALTITUDES DES BORNES (x,y ,z) REPERE COORDONNEE X (m) COORDONNEE Y (m) ALTITUDE (m) PP23 339,073.580 77,882.769 253.4 PP22 339,201.828 77,919.824 250.596 PP21 339,300.923 77,916.220 248.248 PP20 339,321.458 18,085.888 253.703 C1 339,186.240 77,973.988 249.997 C2 339,249.920 78,025.941 251.355 LISTE DES ELEMENTS DU TRACE EN PLAN COORDONNEE X COORDONNEE Y GISEMENT ANGLE INTERSECTION PARAMETRE RAYON DE COURBE (m) (m) (DEGRE) (DEGRE) A(m) (m) BP 338,912.7652 77,812.5915 IP-1 339,081.2666 77,832.6938 6-48-11.7 40-08-41.2(R) 150.000 300.000 IP-2 339,450.6574 78,228.0973 46-56-52.9 4-09-16.1(L) -4500.000 100.000 EP 339,615.9978 78,381.1696 42-47-36.8 Note: LE NOMBRE NEGATF INDUQUE LA COURBE DE SENS DES AIGUILLES DE MONTRE. DE LA CONCEPTION KATAHIRA & ENGINEERS INTERNATIONAL 2-79

JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

INTE

RN

ATIO

NAL

ETI

TRE

: P

ON

T S

UR

LE

BAL

E

1:10

00

EC

HEL

LED

ESSI

N N

°

BA-1

ETU

DE

DU

CO

NC

EPT

DE

BASE

DIR

ECTE

UR

NAT

ION

AL

ADJO

INT

DE

S R

OU

TES

RE

PU

BLIQ

UE

DU

MAL

IS

UR

LE

PRO

JET

DE

CO

NST

RU

CTI

ON

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

DA

KAR

~BAM

AKO

AG

EN

CE

JA

PO

NA

ISE

DE

CO

OR

PER

ATIO

N

CO

OR

DO

NN

EES

DES

ELE

MEN

TS

CO

OR

DO

NN

EES

DES

PR

OFI

LS

No.

PR

OFI

LS P

KC

OO

RD

ON

NEE

X(m

)C

OO

RD

ON

NEE

Y(m

)O

BSER

VATI

ON

123

6+74

8.53

133

8,91

2.76

520

77,8

12.5

9150

223

6+76

0.00

033

8,92

4.15

298

77,8

13.9

5007

323

6+80

0.00

033

8,96

3.84

855

77,8

18.8

7070

423

6+90

0.00

033

9,06

0.00

011

77,8

44.9

3513

523

6+98

1.03

933

9,12

8.48

086

77,8

87.8

0548

623

7+00

0.00

033

9,14

2.69

226

77,9

00.3

5397

723

7+05

0.00

033

9,17

7.75

775

77,9

35.9

8230

PO

INT

OR

IGIN

E D

U P

RO

JET

823

7+05

6.03

933

9,18

1.88

153

77,9

40.3

9408

923

7+06

1.10

033

9,18

5.33

648

77,9

44.0

9234

CU

LLEE

1023

7+10

0.00

033

9,21

1.89

201

77,9

72.5

1792

PO

NT

1123

7+17

1.45

033

9,26

0.66

817

78,0

24.7

2893

CU

LEE

1223

7+18

2.00

033

9,18

1.88

153

77,9

40.3

9408

FIN

DU

PR

OJE

T

1323

7+20

0.00

033

9,28

0.15

816

78,0

45.5

9141

1423

7+28

6.53

933

9,33

9.23

492

78,1

08.8

2839

1523

7+30

0.00

033

9,34

8.43

900

78,1

18.6

5113

1623

7+40

0.00

033

9,41

7.72

741

78,1

90.7

5317

CO

OR

DO

NN

EES

ET

ALT

ITU

DES

DES

BO

RN

ES (x

,y ,z

)

REP

ERE

CO

OR

DO

NN

EE X

(m)

CO

OR

DO

NN

EE Y

(m)

ALT

ITU

DE

(m)

PP

2333

9,07

3.58

077

,882

.769

253.

4

PP

2233

9,20

1.82

877

,919

.824

250.

596

PP

2133

9,30

0.92

377

,916

.220

248.

248

PP

2033

9,32

1.45

818

,085

.888

253.

703

C1

339,

186.

240

77,9

73.9

8824

9.99

7

C2

339,

249.

920

78,0

25.9

4125

1.35

5

LIS

TE D

ES E

LEM

EN

TS D

U T

RA

CE

EN

PLA

N

CO

OR

DO

NN

EE

XC

OO

RD

ON

NE

E Y

GIS

EMEN

TA

NG

LE

INTE

RS

ECTI

ON

PAR

AMET

RE

RAY

ON

DE

CO

UR

BE(m

)(m

)(D

EG

RE)

(DE

GR

E)A

(m)

(m)

BP33

8,91

2.76

5277

,812

.591

5

IP-1

339,

081.

2666

77,8

32.6

938

6-48

-11.

740

-08-

41.2

(R)

150.

000

300.

000

IP-2

339,

450.

6574

78,2

28.0

973

46-5

6-52

.94-

09-1

6.1(

L)-4

500.

000

100.

000

EP33

9,61

5.99

7878

,381

.169

642

-47-

36.8

Not

e: L

E N

OM

BR

E N

EGAT

F IN

DU

QU

E LA

CO

UR

BE

DE

SEN

S D

ES

AIG

UIL

LES

DE

MO

NTR

E.

DE

LA

CO

NC

EPTI

ON

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

2-79

Page 2: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

PLA

N D

'EN

SEM

BLE

TITR

E:

1:50

0

EC

HEL

LED

ESSI

N N

°

L.W

.L 2

41.8

0

H.H

.W.L

250.

76

110150

233

50235

00400

00

A1

P1

P2

P3

A2

10000

7500

3500

125

0

250

2.0%

350

0250

C L

1250

2.0%

2.0%

250

2.0%

250

3500

10000

7500

1250 250

350

0

LC

1500

1250

250

350

03500

125

07500

1250

10000

250

8000

DRAINAGE φ

150

4@

2100=8400

800

800

180105

1535

1200

PO

NT

SUR

LE

BAL

E

233

00

BH-4

251.30

250.20

BH-3

BH-2 248.20

BH-1

249.90

1030

50

237+61.10

237+171.45 8000

FM

▽25

5.26

7▽

255.596

COUPE LONGITUDINALE ECHELLE 1:500

PLAN D'ENSEMBLE DU PONT SUR LE BALE

ECHELLE 1:200

PILIERS

ECHELLE 1:200

CULEES

ECHELLE 1:100

COUPE TRANSVERSALE DU PONT

A1

P2

P1

250

FF

FM

FF

L=1

3.0m

8-CCP ?1000

650

0

8-C

CP ?

1000

L=11

.0m

700

0

L=19.0m

3-CCP ?1000

3-C

CP ?

1000

L=1

9.0m

L=1

9.0m

3-CCP ?1000

30

1050

3050

1030

50

10

L=1

3.0m

8-CCP ?1000

10000

1000

3@2666=8000

1000

8000

140049531647

10000

1200

2@3800=7600

1200

L=1

9.0m

3-C

CP ?

1000

LC

L=19.0m

3-CCP ?1000

10000

125

0750

0

3500

250

125

0

350

0250

C LP3

2. 0

%

350

0

7500

10000

125

0

250

105

250

3500

2.0

%2.0%

220

250

125

0

250 2.

0%

COUPE TRANSVERSALE DU PONT

ECHELLE 1:100

10000

2@3

800=

7600

120

0

1500

2767

100

0100

0

100

00

3@2

666=

8000

L=1

1.0m

8-C

CP ?

1000

1400

C LA2

100

00

350

0

750

0

3500

125

0 250

250125

0

8000

37042896

▽255.267

▽253.620

▽248.267

▽25

5.59

6

▽24

7.59

6

▽255.337(P

1)

255.407(P

2)

▽25

3.77

8(P2

▽25

3.70

8(P1

▽25

5.47

6

▽25

2.58

0

▽25

3.84

7

255.267

255.596

450

300

391

001000

225

00100

0225

00

22500

350

450

4500

4500

950

950

3@2700=8100

2200

1250

125

0

C LL

C L

▽25

2.70

0

2972

2190

PO

NT

A PO

UTR

ES

ME

TALL

IQU

ESC

AT

EG

OR

IE D

E R

OU

TE

RO

UTE N

AT

ION

ALE

VIT

ES

SE D

E B

ASE

V=

80k

m/h

TY

PE D

E S

UP

ER

STR

UC

TU

RE

PO

NT A

PO

UTR

E M

ET

ALLIQ

UE

LO

NG

UEU

R D

U P

ON

T40.0

00m

LO

NG

UEU

R D

E T

RA

VEE

39.9

00m

CH

AR

GE M

OB

ILE S

UR

CH

AR

GE

Type A

:B

PEL 9

1 C

HA

RG

E M

OB

ILE

LA

RG

EU

R D

E C

HA

USSEE

7.5

00m

LA

RG

EU

R D

ES

TRO

TT

OIR

S2×

1.2

50m

2%

2%

FA

CT

EU

R S

ISM

IQU

Ekh

=0.0

5

CO

NT

RA

INTE

Aci

erSS

400、

SM

400,S

M490

,F10

T

AD

MIS

SIB

LE

BET

ON

DA

LLE

σck

=25N

/mm

2

Arm

ature

B A

fy=

295N

/mm

2 (S

D295A

)Y

IELD

STRESS

NO

RM

ES

DE C

ON

CEP

TIO

NS

PEC

IFIC

ATIO

N P

OU

R P

ON

T R

OU

TIE

R

ASS

OC

IATIO

N J

AP

ON

AIS

E (

Mars

2002)

CO

ND

ITIO

NS

DE

CO

NC

EPT

ION

RO

UTE N

AT

ION

ALE

V=

80k

m/h

PO

NT

A P

OU

TR

ES

EN

BET

ON

PR

EC

ON

TR

AIN

TE A

VEC

3 T

RA

VEES

40.0

0m

39.9

00m

7.5

00m

1.2

50m

kh=

0.0

5

BET

ON

PO

UTR

ES

σck

=36N

/m

m2

BET

ON

DA

LLE

σck=

30N

/m

m2

BET

ON

PO

UTR

ES

TR

AN

SV

ER

SA

LES

σck=

24N

/m

m2

FIL

DE P

REC

ON

TR

AIN

TES

fpy=

160

0N/m

m2

Arm

ature

B A

fy=

295N

/mm

2

(SD

295A

)

2070

REV

ETEM

ENT

BETON

t=3

0mm(

min)

DALLE COMPOSEE t=180mm

REVE

TEME

NT B

ENTO

N t=

30mm

(min

)DAL

LE C

OMPO

SEE

t=22

0mm

500

VP 200

φ100

RESERVATION COMMUNICATION

RESE

RVAT

ION

COM

MUNI

CATI

ON

200

VP φ100

1629

2896

1629

PEN

TES

TR

AN

SV

ER

SA

LES

ECHELLE 1:30

DETAILS

2%

2%

510

660

1200

200230420150200

225

225

150

210

150

500

250

22500

233

50

ORIGINE DU PROJET

237+54.60

237+61.10

252

350

165

00

237+45.00

251

450

225

00

300

233

00237+120.00

225

00

235

00

1000

249

248

244

243

100

0

242

243

245

237+150.00

237+171.45

FIN DU PROJET

391

00

400

00

241242243

241

241

245

450

135

50

250

251

252

237+185.00

237+178.45

FIN DU PROJET

165

00

237+45

POINT ORIGINE DU PROJET

135

50

237+185

255.383 247.91 +100

255.308

255.337

255.251

255.267

255.233

255.218

255.084

255.027

255.009

COTE PROJET

255.159

PENT

ES E

T RAM

PES

COTE TN

PROFIL

+981.039

R=3

00L=1

36.7

01

+975

253.17

253.02

L=7

5.00

0

PEN

TE 3

.0%

NO.237252.48

A=150

+25251.73

+54.60

+61.10+61.300

+56.039

+50

+45

EC

A1

250.83

250.85

250.87

250.80

+84.650

+75

P1250.36

249.47

240.00

PRO

FIL

EN L

ONG

DL=230.00

260.00

250.00

255.084

i=0.299%

L=224.118m

255.756

255.681

255.753

255.636

255.606

255.596

255.532

255.457

255.407

255.476

PENTE 2.0%

+108.150P2

+125

247.00

242.20

+131.450P3

+150

243.55

241.15

+171.45

+178.45

252.05 +185

+171.450A2

+175

250.93

251.20

+200252.87

+224.118+225253.39

253.39

BA

-2

TY

PE B

CH

AR

GE M

OB

ILE

COURBES

PENTE 3.0%

PLAN ECHELLE 1:500

MA

TER

IAU

X

PO

NT

A PO

UTR

ES

PR

EC

ON

TRAI

NTE

SC

AT

EG

OR

IE D

E R

OU

TE

VIT

ES

SE D

E B

ASE

TY

PE D

E S

UP

ER

STR

UC

TU

RE

LO

NG

UEU

R D

U P

ON

T

LO

NG

UEU

R D

E T

RA

VEE

LA

RG

EU

R D

E C

HA

USSEE

LA

RG

EU

R D

ES

TRO

TT

OIR

S

PEN

TES

TR

AN

SV

ER

SA

LES

FA

CT

EU

R S

ISM

IQU

E

CO

NT

RA

INTE

AD

MIS

SIB

LE

MA

TER

IAU

X

NO

RM

E D

E C

ON

CEP

TIO

N

Typ

e A

:B

PEL 9

1 C

HA

RG

E M

OB

ILE

TYP

E B

CH

AR

GE M

OB

ILE

SP

EC

IFIC

ATIO

N P

OU

R P

ON

T R

OU

TIE

R

AS

SO

CIA

TIO

N J

AP

ON

AIS

E (

Mar

s 2002)

CO

ND

ITIO

NS

DE

CO

NC

EPTI

ON

CH

AR

GE M

OB

ILE S

URC

HA

RG

E

AGE

NC

E J

APO

NA

ISE

DE

CO

OR

PER

ATIO

N

DIR

ECTE

UR

NAT

ION

AL

ADJO

INT

DES

RO

UTE

SE

TUD

E D

U C

ON

CEP

T D

E BA

SES

UR

LE

PRO

JET

DE

CO

NST

RU

CTI

ON

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

DA

KAR

~BAM

AKO

INTE

RN

ATI

ON

ALE

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

255.753

L=2

30.5

00R=∞

pasteclip

REP

UB

LIQ

UE

DU

MAL

I

2-80

Page 3: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

DIR

ECTE

UR

NAT

ION

AL

ADJO

INT

DE

S R

OU

TES

RE

PU

BLIQ

UE

DU

MAL

I

PO

NTS

UR

LE

BALE

TITR

E:

EC

HEL

LE

1:15

0

DES

SIN

CL10000

800210021001250 250 3500

10000

9502700135035002501250

P1

P2

P3

110150

5070100

50399

0050

233

0023500

233

0039950

300

22500

500

500

22500

500

500

22500

300

400

391

00400

3050

8@80

00=6

4000

3050

2950

5950

300

7450

7600

7450

300400300

745

07600

745

0300

400

300

7450

760

0745

0300

50400

485

06@4900=29400

4850

400

892

5735

07350

7350

8925

1000

150

150

300150

150

300

150

150

300

150

150

300

150

150

300

150

150

300

150

1000

150

150

100

01000

150

150100

0100

0150

A1

A2

P1

P2

P3

A1

PLAN SUPERSTRUCTURES

PLA

N S

UPE

RS

TRU

CTU

RE

A2

110150

50399

0050

70100

50

233

0023500

233

0039950

300

22500

500

500

22500

500

500

22500

300

400

400

391

00

1502400

26@2500=65000

2400 15

0200225

014

@250

0=3

5000

225

0200

1200

100

435900

2200100435

900

300

7450

7600

7450

300

400

300

745

07600

745

0300

400300

7450

760

0745

0300

50400

8525

7350

7350

735

0852

5400

100

0150

150300150

150

300

150

150

300

150

150

300

150

150

300

150

150

300

150

150100

01000

150

150

100

01000

150

100

0150

330

330

330

330

CENTRE

EXTREMITE

ECHELLE 1:60

COUPE DU PONT

STANDARD

ECHELLE 1:30

ECHELLE 1:150

DETAIL

PLAN

ECHELLE 1:150

COUPE LONGITUDINALE

Et=180mm

DAL

LE C

OMPO

SEE

REV

ETEM

ENT

BETO

N E=

30mm

(min

)

2.0%

2. 0

%C L

100

00

1250

750

01250

250

350

03500

250

800

4@2

100=

8400

800

1200100435

900

30250

180105

30250

900

100435 1200

4@2

100=

8400

800

800

3500

750

0

10000

2. 0

%

DAL

LE C

OMPO

SEE

E= 1

80mm

350

0

REV

ETEM

ENT

BETO

N E=

30m

m(mi

n)

250

1250 900

250 30

2.0%

180105

C L

250

1250

30250

900

112

BOULON D'ANCRAGE D28

900

100

00

125

0750

0125

0

3500

350

0250

250 30

2.0%

LC

105 220

2.0

%

30250

900

250

COUPE DU PONT

ECHELLE 1:60

525 80 2200 330

950

3@2

700=

8100

950

2200

CENTRE

EXTREMITE

STANDARD

510

660

1200

200230420150200

225

225

150

150

125

0

1230

20

250

980

2.0%

30250

□100x100x3.2

□90x90x3.2(2.50m ctc)

□50x50x3.2(0.15m ctc)

□75x75x3.2

ECHELLE 1:20

DETAIL

3@8

000=2

4000

7000

DRA

INAG

Eφ 1

50mm

DRAINAGE

φ 150mm

VP

φ10

0

VP

φ10

0

250900

200600100

200

VP φ

100

VP

φ10

0VP φ

100

VP

φ10

0VP

φ10

0

50

φ180

750

500

TRANSVERSAL

INTER

MEDI

AIRE

POU

TRE

PRIN

CIPA

LEPOU

TRE

DE R

ENFO

RCEME

NT

COU

VRE-

JOIN

T

1S1

9.3

600

1600

160

0600

0.300%

0.3

00%

BA

-3

DRAINAGE

φ 1

50mm

DRAI

NAGE

φ 1

50mm

DAL

LE C

OMPO

SEE

E= 2

20mm

REV

ETEM

ENT

BETO

N E=

30m

m(m

in)

DRAINAGE

φ 150mm

POUTR

E DE

REN

FORC

EMEN

T RENFORCEMENT

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

ALIN

TER

NA

TIO

NAL

EAG

EN

CE

JAP

ON

AIS

E D

E C

OO

RPE

RAT

ION

DA

KAR

~BAM

AKO

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

NE

TUD

E D

U C

ON

CEP

T D

E BA

SE

2-81

Page 4: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

PLAN DE REPERAGE

G1

J-1

J-2

J-3

J-4

400

39100

400

8925

7350

7350

7350

8925

4850

6@4900=29400

4850

G2

G3

G4

3@2700=8100

3@2700=8100

P3

MA2

F

90゚0'0"

90゚0'0"

SW-1

SW-2

SW-3

SW-4

CR-5

SW-6

SW-7

SW-8

SW-9

1-FLG PL 620X25X8925(SM490A)

1-FLG PL 620X31X7350(SM490B)

1-FLG PL 620X31X7350(SM490B)

620

90゚

0'0"

2-FILL PL 610X6X382(SS400)

60-HTB M22X100(F10T)

2-SPL PL 280X14X765(SM490A)

1-SPL PL 610X13X765(SM490A)

5@75

=375

855@75

=375

72-HTB M22X105(F10T)

2-SPL PL 280X18X915(SM490A)

1-SPL PL 610X16X915(SM490A)

8-PL 90X9X300

7-PL 90X9X300

7-PL 90X9X300

88

8

78

8

2200

1-WEB PL 2200X17X8925(SM490A)

1-WEB PL 2200X17X7350(SM490A)

1-WEB PL 2200X17X7350(SM490A)

2-PL 280X22X2200

1-PL 130X12X2165

1-PL 130X12X2200

1-PL 130X12X2165

1-PL 130X12X2200

1-PL 130X12X2165

1-PL 130X12X2200

1-PL 130X12X2165

1-PL 130X12X2200

84

8

48

48

48

LON

GU

EU

R D

E P

OU

TRE 39900

400

LON

GU

EU

R D

E T

RA

VE

E 39100

LON

GU

EUR

DE

BA

RR

E 8925

LON

GU

EU

R D

E B

AR

RE 7350

LON

GU

EUR

DE

BA

RR

E 7350

2@2425=4850

2@2450=4900

2@2450=4900

2@2450=4900

10020@100=2000100

2-SPL PL 2080X9X765(SM490A)

210-HTB M22X75(F10T)

J-1

4@75

=300

85 4@75

=300

10020@100=2000100

2-SPL PL 2080X9X765(SM490A)

210-HTB M22X75(F10T)

J-2

600

9-RB 16φX600(SS400)

7-RB 16φX600(SS400)

7-RB 16φX600(SS400)

7

230

1-FLG PL 620X19X8925(SM490A)

1-FLG PL 620X31X7350(SM490B)

1-FLG PL 620X31X7350(SM490B)

1-FILL PL 610X12X457(SS400)

48-HTB M22X100(F10T)

2-SPL PL 280X14X915(SM490A)

1-SPL PL 610X12X915(SM490A)

7@75

=525

85

7@75

=525

72-HTB M22X115(F10T)

2-SPL PL 280X22X1215(SM490A)

1-SPL PL 610X19X1215(SM490A)

1-SOLE PL 270X22X450 ----- P3 SIDE

(1-SOLE PL 270X22X340 ----- A2 SIDE)

PLAQUE SEMELLE ECHELLE 1:10

SW-2

SW-3

SW-4

CR-5

40 100100 130

10010040

40 100 100 40100130100

40 100 100 40100130100

100

450

100

SW-8

SW-7

SW-6

2@2450=4900

2@2450=4900

2@2450=4900

2@2450=4900

2@2450=4900

2@2450=4900

1225

1225

1225

1225

CC L

1112.5

1112.5

1212.5

1212.5

1225

1225

4@1225=4900

4@1225=4900

4@75

=300

85 4@75

=300

840

645

645

5@75

=375

855@75

=375

6@1000=6000

840

40100

100130

10010040

992

720

720

955

4@1000=4000

4@1000=4000

993

4@75

=300

85 4@75

=300

620

450

270 450

40

370

40

270

112φ

340

40

260

40

270

BRIDGE AXIS RIGHT-ANGLED DIRECTION

DIRECTION DE L'AXE DU PONT

22

22

7-PL 100X9X120

7-PL 100X9X120

7-PL 100X9X120

642

642

RANGE OF F.P.

583

583

(340)

600 (340)

40 40190

40 40190

567

658

567

658

BRIDGE AXIS RIGHT-ANGLED DIRECTION

4-27φ

4-27φ

A2

P3

112φ

SW-1

SW-9

RE

PU

BLIQ

UE

DU

MAL

ID

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SD

ESSI

N N

°P

ON

T SU

R L

E B

ALE

TITR

E:

1:30

EC

HEL

LE

DETAIL DES POUTRES METALLIQUES PRINCIPALES G1, G4

ECHELLE 1:30

BA-

4

DIRECTION DE L'AXE DU PONT

G1,

G4

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

ALIN

TER

NA

TIO

NAL

EAG

EN

CE

JAP

ON

AIS

E D

E C

OO

RPE

RAT

ION

DA

KAR

~BAM

AKO

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

NE

TUD

E D

U C

ON

CEP

T D

E BA

SE

LES PIECES DE RENFORCEMENT "SCALLAP" ONT UNE COURBE DE 35R.

LE BOULON DE HAUTE RESISTANCE M22(F10T) EST INDIQUE PAR "◆"

SAUF INDICATIONS CONTRAIRES,LES ACIERS SERONT DU TYPE SM400A

ON UTILISE LE MATERIEL INDIQUE DANS CE DESSIN ,OU UN MATERIAL EQUIVALENT.

LES PIECES INDIQUEES AVEC LA MENTION NE DOIVENT PAS ETRE SOUDEES.

POUR LES DETAILS SUR LA POUTRE PRINCIPALE

,SE REFERER AUX "DETAILS COMMUNS DE POUTRE PRINCIPALE"

5 6

NOTE 2 431

2-82

Page 5: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

PLAN DE REPERAGE

G1

J-1

J-2

J-3

J-4

400

39100

400

8925

7350

7350

7350

8925

4850

6@4900=29400

4850

G2

G3

G4

3@2700=8100

3@2700=8100

P3

MA2

F

90゚0'0"

90゚0'0"

SW-1

SW-2

SW-3

SW-4

CR-5

SW-6

SW-7

SW-8

SW-9

1-FLG PL 620X25X8925(SM490A)

1-FLG PL 620X31X7350(SM490B)

1-FLG PL 620X31X7350(SM490B)

620

90゚

0'0"

2-FILL PL 610X6X382(SS400)

60-HTB M22X100(F10T)

2-SPL PL 280X14X765(SM490A)

1-SPL PL 610X13X765(SM490A)

5@75

=375

855@75

=375

72-HTB M22X105(F10T)

2-SPL PL 280X18X915(SM490A)

1-SPL PL 610X16X915(SM490A)

15-PL 100X9X120

14-PL 100X9X120

16-PL 100X9X120

88

8

78

8

2200

1-WEB PL 2200X17X8925(SM490A)

1-WEB PL 2200X17X7350(SM490A)

1-WEB PL 2200X17X7350(SM490A)

2-PL 280X22X2200

1-PL 130X12X2165

2-PL 130X12X2200

1-PL 130X12X2165

2-PL 130X12X2200

1-PL 130X12X2165

2-PL 130X12X2200

1-PL 130X12X2165

2-PL 130X12X2200

84

8

4

8

4

8

4

8

LON

GU

EU

R D

E P

OU

TRE 39900

400

LON

GU

EU

R D

E T

RA

VE

E 39100

LON

GU

EU

R D

E B

AR

RE 8925

LON

GU

EU

R D

E B

AR

RE 7350

LON

GU

EUR

DE

BA

RR

E 7350

2@2425=4850

2@2450=4900

2@2450=4900

2@2450=4900

4@75

=300

85 4@75

=300

10020@100=2000100

2-SPL PL 2080X9X765(SM490A)

210-HTB M22X75(F10T)

J-1

2-SPL PL 2080X9X765(SM490A)

210-HTB M22X75(F10T)

J-2

600

9-RB 16φX600(SS400)

7-RB 16φX600(SS400)

7-RB 16φX600(SS400)

230

1-FLG PL 620X19X8925(SM490A)

1-FLG PL 620X31X7350(SM490B)

1-FLG PL 620X31X7350(SM490B)

5@75

=375

855@75

=375

1-FILL PL 610X12X457(SS400)

48-HTB M22X100(F10T)

2-SPL PL 280X14X915(SM490A)

1-SPL PL 610X12X915(SM490A)

7@75

=525

85

7@75

=525

72-HTB M22X115(F10T)

2-SPL PL 280X22X1215(SM490A)

1-SPL PL 610X19X1215(SM490A)

SW-1

SW-2

SW-3

SW-4

CR-5

4010010013010010040

4010010013010010040

4010010013010010040

4@75

=300

4@75

=300

85

SW-9

SW-8

SW-7

SW-6

100 20@100=2000 100

1225

1225

1225

1225

C LC L

200

1125

1125

200

4@75

=300

85 4@75

=300

40100

100130

10010040

840

6@1000=6000

840

645

645

993

4@1000=4000

992

720

720

955

4@1000=4000

642

583

583

600

620

567

658

658

1112.5

1112.5

1212.5

1212.5

642

1125

1125

1225

567

1075

1075

300

300

15012

1808 22010

1025

200

1-SOLE PL 270X22X450 ----- P3 SIDE

(1-SOLE PL 270X22X340 ----- A2 SIDE)

PLAQUE SEMELLE ECHELLE 1:10

450

40

370

40

270

112φ

340

40

260

40

270

BRIDGE AXIS RIGHT-ANGLED DIRECTION

DIRECTION DE L'AXE DU PONT

DIRECTION DE L'AXE DU PONT

22

22

40 40190

40 40190

BRIDGE AXIS RIGHT-ANGLED DIRECTION

4-27φ

A2

P3

112φ

4-27φ

450

(340)

270

7

100

450

(340)

100

RANGE OF F.P.

RE

PU

BLIQ

UE

DU

MAL

ID

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SD

ESSI

N N

°

DE

TAIL

DES

PO

UTR

ES M

ETAL

LIQ

UES

PO

NT

SUR

LE

BAL

ETI

TRE

:

1:30

EC

HEL

LE

DETAIL DES POUTRES METALLIQUES RINCIPALES G2 et G3

ECHELLE 1:30

BA-5

POUR LA PARTIE "A" ,SE REFERER A "LOWER LATERAL".

7

,SE REFERER AUX "DETAILS COMMUNS DE POUTRE PRINCIPALE"

6POUR LES DETAILS SUR LA POUTRE PRINCIPALE

LES PIECES INDIQUEES AVEC LA MENTION NE DOIVENT PAS ETRE SOUDEES.

5

LE BOULON DE HAUTE RESISTANCE M22(F10T) EST INDIQUE PAR "◆"

432ON UTILISE LE MATERIEL INDIQUE DANS CE DESSIN ,OU UN MATERIAL EQUIVALENT.

LES PIECES DE RENFORCEMENT "SCALLAP" ONT UNE COURBE DE 35R.

SAUF INDICATIONS CONTRAIRES,LES ACIERS SERONT DU TYPE SM400A

1NOTE

IL EST A NOTER QU'ILYA UNE DIFFERENCE ENTRE LES POUTRES G2 ET G3

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

ALIN

TER

NA

TIO

NAL

EAG

EN

CE

JAP

ON

AIS

E D

E C

OO

RPE

RAT

ION

DA

KAR

~BAM

AKO

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

NE

TUD

E D

U C

ON

CEP

T D

E BA

SE

PRIN

CIP

ALE

S G

2,G

3

2-83

Page 6: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

FIXATION DE DALLE AVEC POUTRE ECHELLE 1:10

PIECE DE RENFORT 

ECHELLE 1:20

PIECE DE RENFORT

COMPRESSION

PIECE DE RENFORT

PIECE DE RENFORT A PANNEAU

COMPRESSION

F.P.

8

CHANGEMENT DE DIRECTION DE SEMELLE

2200

ECLISSAGE 

ECHELLE 1:20

SEMELLE SUPERIEURE

200

100

200

50

15゚

45゚

(BENDING IN FIELD)

1-RB 16φX600(SS400)

16φ

300

75759035

20

90

4050

20

30X65

1-PL 90X9X300

4

ECHELLE 1:10

24.5φ

1-PL 100X9X120

20C

60Φ

10060 60

120

5050

100

TYPE B

35 160

ROUTRE EXTERIEURE

POUTRE INTERIEURE

ECHELLE 1:20

TENSION

TENSION

8

R=35

R=35

4

35

160 160

DHDT

D4D3D2D1

SURELEVATION

39100

G1

D1

D2

D3

D4

DT

DH

G2

D1

D2

D3

D4

DT

DH

G3

D1

D2

D3

D4

DT

DH

G4

D1

D2

D3

D4

DT

DH

0.0

7.4

13.4

17.2

18.5

17.2

13.4

7.4

0.0

0.0

15.5

28.0

36.2

39.0

36.2

28.0

15.5

0.0

0.0

5.2

9.3

11.6

12.3

11.6

9.3

5.2

0.0

0.0

2.8

5.2

6.7

7.3

6.7

5.2

2.8

0.0

0.0

30.9

55.9

71.7

77.1

71.7

55.9

30.9

0.0

0.0

14.5

29.2

43.9

58.6

73.3

88.0

102.7

117.3

0.0

7.3

13.3

17.1

18.5

17.1

13.3

7.3

0.0

0.0

15.4

28.0

36.1

38.8

36.1

28.0

15.4

0.0

0.0

4.1

7.7

10.2

11.2

10.2

7.7

4.1

0.0

0.0

3.1

5.5

7.0

7.5

7.0

5.5

3.1

0.0

0.0

29.9

54.5

70.4

76.0

70.4

54.5

29.9

0.0

0.0

14.5

29.2

43.9

58.6

73.3

88.0

102.7

117.3

0.0

7.3

13.3

17.1

18.5

17.1

13.3

7.3

0.0

0.0

15.4

28.0

36.1

38.8

36.1

28.0

15.4

0.0

0.0

4.1

7.7

10.2

11.2

10.2

7.7

4.1

0.0

0.0

3.1

5.5

7.0

7.5

7.0

5.5

3.1

0.0

0.0

29.9

54.5

70.4

76.0

70.4

54.5

29.9

0.0

0.0

14.5

29.2

43.9

58.6

73.3

88.0

102.7

117.3

0.0

7.4

13.4

17.2

18.5

17.2

13.4

7.4

0.0

0.0

15.5

28.0

36.2

39.0

36.2

28.0

15.5

0.0

0.0

5.2

9.3

11.6

12.3

11.6

9.3

5.2

0.0

0.0

2.8

5.2

6.7

7.3

6.7

5.2

2.8

0.0

0.0

30.9

55.9

71.7

77.1

71.7

55.9

30.9

0.0

0.0

14.5

29.2

43.9

58.6

73.3

88.0

102.7

117.3

SURELEVATION

NOTE D1: DEFLEXTON DE POIDS D'ACIER(mm)

 

D2:

: DEFLEXTON DE DALLE EN BA ET REIN(mm)

DEFLEXTON DE GARDE-CORPS(mm)

DEFLEXTON DE REVETEMENT(mm)

DEFLEXTON DE TOUTES LES CHARGES(mm)

DEFLEXTON DE PENTE LONGITUDINALE(mm)

SW-1

SW-3

SW-4

SW-9

SW-2

CR-5

SW-7

SW-8

SW-6

SW-1

SW-9

SW-2

SW-3

SW-4

CR-5

SW-6

SW-7

SW-8

NIVEAU

NOTE

AME

SEMELLE SUPERIEURE

AME

SEMELLE INFERIEURE

5 5

SEMELLE INFERIEURE

PLAN DE REPERAGE

G1

J-1

J-2

J-3

J-4

400

39100

400

4850

6@4900=29400

4850

G2

G3

G4

SW-1

SW-2

SW-3

SW-4

CR-5

SW-6

SW-7

SW-8

SW-9

3@2700=8100

3@2700=8100

P3

M

A2

F

5 5

4

DETAILS DE SUSPENTE

POSITION DE SUSPENTE

TYPE A

22

TYPE A

TYPE A

2

D3

DT

DH

D4

TYPE A

2TYPE B

SOUDURE ET

APPUI 15C

SOUDURE ET

APPUI 15C

SOUDURE ET

APPUI 15C

RE

PU

BLIQ

UE

DU

MAL

ID

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SD

ESSI

N N

°P

ON

T SU

R L

E B

ALE

TITR

E :

EC

HEL

LE

SURELEVATION / DETAILS COMMUNS DE POUTRE PRINCIPALE

BA-6

AGE

NC

E J

APO

NA

ISE

DE

CO

OR

PER

ATIO

N

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

ETU

DE

DU

CO

NC

EPT

DE

BASE

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

ND

ES P

ON

TS D

U C

OR

RID

OR

SU

DD

AK

AR~B

AMAK

O

INTE

RN

ATI

ON

ALE

AU BOUT

INTERMEDIASRE

LES PIECES DE RENFORCEMENT "SCALLAP" ONT UNE COURBE DE 35R.

LE BOULON DE HAUTE RESISTANCE M22(F10T) EST INDIQUE PAR "◆"

ON UTILISE LE MATERIEL INDIQUE DANS CE DESSIN ,OU UN MATERIAL EQUIVALENT.

SAUF INDICATIONS CONTRAIRES,LES ACIERS SERONT DU TYPE SM400A

2 3 41

2-84

Page 7: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

2700

2700

2700

G1

G2

G3

G4

98.5

2503

98.5 98.5

2503

98.5 98.5

2503

98.5

1350

1350

1350

1350

1350

1350

2200

2401800160

30016@105=1680220

2401800160

1800

2200

2401800160

30016@105=1680220

6 6

1-PL 110X10X1800

4

1-PL 110X10X1800

1-PL 110X10X1800

PLAN DE REPERAGE

G1

J-1

J-2

J-3

J-4

400

39100

400

4850

6@4900=29400

4850

G2

G3

G4

SW-1

SW-2

SW-3

SW-4

CR-5

SW-6

SW-7

SW-8

SW-9

3@2700=8100

3@2700=8100

P3

M

A2

F

CR-5

4

3@75

=225 10075 68.568.5 75100 3@75

=225

40150

40

4075150

7540

3@75

=225 10075 68.568.5 75100 3@75

=225

40150

40

4075150

7540

1-FLG PL 230X10X2338

1-SPL PL 480X12X380(SS400)

2-CONN PL 175X12X155

16-HTB M22X65(F10T)

1-FLG PL 230X10X2293

2-SPL PL 480X12X380(SS400)

4-CONN PL 175X12X155

32-HTB M22X65(F10T)

1-FLG PL 230X10X2338

1-SPL PL 480X12X380(SS400)

2-CONN PL 175X12X155

16-HTB M22X65(F10T)

1-WEB PL 1800X12X2583

34-HTB M22X65(F10T)

1-WEB PL 1800X12X2583

34-HTB M22X65(F10T)

1-WEB PL 1800X12X2583

34-HTB M22X65(F10T)

4

40150

40

1-FLG PL 230X10X2383

1-GUSS PL 455X10X400

8-HTB M22X60(F10T)

1-FLG PL 230X10X2383

3@75

=225

3@75

=225

40150

401-FLG PL 230X10X2383

1-GUSS PL 455X10X400

8-HTB M22X60(F10T)

3@75

=225

2-GUSS PL 455X10X400

158.5

2338

20 183.5183.5 20

2293

20 183.5183.5 20

158.5

2338

158.5

2383

158.5 158.5

2383

158.5 158.5

2383

35R

8723063

4015040

3@75

=225

100

7568.5

480

20 17

380

40751507540

DETAIL"a" ECHELLE 1:10

15

20

20R

20

60

40

”a”

15

20

20R

”b”

DETAIL"b" ECHELLE 1:10

DETAIL"c" ECHELLE 1:10

DETAIL"d" ECHELLE 1:10

15570155

1212

175

7540

7560

40

”c”

”d”

160 240

16-HTB M22X60(F10T)

20R

15

20

DIRECTION DE CONSTRUCTION

3@75

=225

198.5198.5

198.5198.5

4020

60

2040

60

230 155

4035

3540 40

75

4

A

14

A-A

1:1

A

1800

158.5

SOUDURE ET

APPUI 15C

DES

SIN

PO

UTR

E T

RA

NSV

ERSA

LE P

OU

R

PO

NT

SUR

LE

BAL

ETI

TRE

:

1:20

EC

HEL

LE

POUTRE TRANSVERSALE POUR DISTRIBUTION DES CHARGES

ECHELLE 1:20

BA-

7KA

TAH

IRA

& E

NG

INE

ERS

INTE

RN

ATIO

NAL

AGE

NC

E J

APO

NA

ISE

DE

CO

OR

PER

ATIO

N

DIR

ECTE

UR

NAT

ION

AL

ADJO

INT

DE

S R

OU

TES

RE

PU

BLIQ

UE

DU

MAL

ID

AK

AR~B

AMAK

OD

ES P

ON

TS D

U C

OR

RID

OR

SU

DS

UR

LE

PRO

JET

DE

CO

NST

RU

CTI

ON

ETU

DE

DU

CO

NC

EPT

DE

BASE

INTE

RN

ATI

ON

ALE

DIS

TRIB

UTI

ON

DES

CH

ARG

ES

LE BOULON DE HAUTE RESISTANCE M22(F10T) EST INDIQUE PAR "◆"

SAUF INDICATIONS CONTRAIRES,LES ACIERS SERONT DU TYPE SM400A

ON UTILISE LE MATERIEL INDIQUE DANS CE DESSIN ,OU UN MATERIAL EQUIVALENT.

LES PIECES DE RENFORCEMENT "SCALLAP" ONT UNE COURBE DE 35R.

1 432

NOTE

2-85

Page 8: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

1-CH 300X90X9X13X2083(SS400)

3-RB 16φX600(SS400)

2700

G1

G2

248.5

1101.5

1101.5

248.5

308.5

308.5

220

1630

111

1961

111

1630

220

1961

6030

7

6

6

2200

2901623287

29060

2200

2901623287

29060

4-HTB M22X75(F10T)

1-GUSS PL 305X9X300

4-HTB M22X75(F10T)

1-GUSS PL 305X9X300

1-GUSS PL 485X9X450

1-GUSS PL 480X9X335

5-HTB M22X75(F10T)

1-GUSS PL 480X9X335

5-HTB M22X75(F10T)

1-L 130X130X12X1630(SS400)

1-L 130X130X12X1630(SS400)

1-L 90X90X10X2083(SS400)

200

100

200

50

45゚

FIXATION DE DALLE AUEC POUTRE ECHELLE 1:10

(BENDING IN FIELD)

1-RB 16φX600(SS400)

PLAN DE REPERAGE

G1

J-1

J-2

J-3

J-4

400

39100

400

4850

6@4900=29400

4850

G2

G3

G4

SW-3

SW-4

CR-5

SW-6

SW-7

3@2700=8100

3@2700=8100

MF

1-L 90X90X10X2383

2700

G1

G2

98.5

1251.5

1251.5

98.5

158.5

158.5

180

1860

111

2151

111

1860

180

2151

6030

3060

6

2200

2901750160

2907575160

2200

2901750160

2907575160

4-HTB M22X65(F10T)

1-GUSS PL 365X9X270

4-HTB M22X65(F10T)

1-GUSS PL 365X9X270

1-GUSS PL 230X9X250

3-HTB M22X65(F10T)

1-GUSS PL 230X9X250

3-HTB M22X65(F10T)

1-L 90X90X10X1860(SS400)

1-L 90X90X10X1860(SS400)

1-L 90X90X10X2383(SS400)

1-GUSS PL 295X9X360

3@75=225

3@75=225

DIRECTION

SW-1

SW-2

SW-8

SW-9

(QUANTITE :18)

DETAIL "a" ECHELLE 1:10

(QUANTITE:6)

6565

45 45

1225 4@100=400

4@100=400

1225

13153@95=285

3@95=285

1315

66

"a"

20

20

10

20R

POUTRES DE RENFORCEMENT SW 2,3,4,5,6,7 et 8

POUTRES DE RENFORCEMENT AU BOUT SW1 et 9

A2

P3

750

600

750

600

16φ

WELDING AND

BACK-FILLING 15C

WELDING AND

BACK-FILLING 15C

289

301

289

301

213

213

213

213

DA

KAR

~BA

MAK

O

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

NE

TUD

E D

U C

ON

CEP

T D

E BA

SE

RE

PU

BLIQ

UE

DU

MAL

ID

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SIN

TER

NAT

ION

ALE

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

DES

SIN

PO

UTR

ES D

E R

EN

FOR

CEM

ENT

PO

NT

SUR

LE

BAL

ETI

TRE

:

1:20

EC

HEL

LE

POUTRES DE RENFORCEMENT ECHELLE 1:20

BA-

8AG

EN

CE

JAP

ON

AIS

E D

E C

OO

PER

ATIO

N

ECHELLE 1:10

LE BOULON DE HAUTE RESISTANCE M22(F10T) EST INDIQUE PAR "◆"

SAUF INDICATIONS CONTRAIRES,LES ACIERS SERONT DU TYPE SM400A

ON UTILISE LE MATERIEL INDIQUE DANS CE DESSIN ,OU UN MATERIAL EQUIVALENT.

LES PIECES DE RENFORCEMENT "SCALLAP" ONT UNE COURBE DE 35R.

1 432

NOTE

2-86

Page 9: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

R=25

92

SCALLAP ECHELLE 1:10

SUPPORT AU BOUT

R=20

82

POSITION INTERMEDIAIRE

PLAN DE REPAERAGE

G1

J-1

J-2

J-3

J-4

400

39100

400

4850

6@4900=29400

4850

G2

G3

G4

SW-1

SW-2

SW-3

SW-4

CR-5

SW-6

SW-7

SW-8

SW-9

3@2700=8100

3@2700=8100

DIRECTION DE CONSTRUCTION

4850

4900

4900

4900

4850

4900

4900

4900

2700 2700 2700

2700 2700 2700

3629

180 75

75

2965

75 75184

3629

1847575

2875

757527

0

1-L 130X130X12X3345(SS400)

1-L 130X130X12X3255(SS400)

3646

180 75

75

2985

75 75181

3646

1817575

2895

757527

0

1-L 130X130X12X3365(SS400)

1-L 130X130X12X3275(SS400)

3646

180 75

75

2985

75 75181

3646

1817575

2895

757527

0

1-L 130X130X12X3365(SS400)

1-L 130X130X12X3275(SS400)

3646

180 75

75

2985

75 75181

3646

1817575

2835

7575

330

1-L 130X130X12X3365(SS400)

1-L 130X130X12X3215(SS400)

3629

2700

1-L 130X130X12X3285(SS400)

1-L 130X130X12X2380(SS400)

3629

1807575

2965

757518

4

3629

184 75

75

2875

75 75

270

1-L 130X130X12X3345(SS400)

1-L 130X130X12X3255(SS400)

3646

1807575

2985

757518

1

3646

181 75

75

2895

75 75

270

1-L 130X130X12X3365(SS400)

1-L 130X130X12X3275(SS400)

3646

1807575

2985

757518

1

3646

181 75

75

2895

75 75

270

1-L 130X130X12X3365(SS400)

1-L 130X130X12X3275(SS400)

3646

1807575

2985

757518

1

3646

181 75

75

2835

75 75

330

1-L 130X130X12X3365(SS400)

1-L 130X130X12X3215(SS400)

1-GUSS PL 455X9X500

3-HTB M22X65(F10T)

2-HTB M22X60(F10T)

1-GUSS PL 385X9X655

6-HTB M22X65(F10T)

3-HTB M22X60(F10T)

1-GUSS PL 385X9X655

6-HTB M22X65(F10T)

3-HTB M22X60(F10T)

1-GUSS PL 385X9X655

6-HTB M22X65(F10T)

3-HTB M22X60(F10T)

1-GUSS PL 420X9X795

※6-HTB M22X65(F10T)

1-GUSS PL

455X9X400

2-HTB M22

X60(F10T)

1-GUSS PL

455X9X500

3-HTB M22

X65(F10T)

2-HTB M22

X60(F10T)

1-GUSS PL

315X9X595

6-HTB M22

X65(F10T)

1-GUSS PL

385X9X400

3-HTB M22

X65(F10T)

6-HTB M22X65(F10T)

6-HTB M22X65(F10T)

1-GUSS PL 310X9X595

6-HTB M22X65(F10T)

1-GUSS PL

455X9X400

2-HTB M22

X60(F10T)

1-GUSS PL

455X9X400

2-HTB M22

X60(F10T)

1-GUSS PL

385X9X540

6-HTB M22

X65(F10T)

1-GUSS PL

315X9X595

6-HTB M22

X65(F10T)

1-GUSS PL 310X9X595

6-HTB M22X65(F10T)

1-GUSS PL 310X9X595

6-HTB M22X65(F10T)

1-GUSS PL 310X9X595

6-HTB M22X65(F10T)

1-GUSS PL 455X9X500

3-HTB M22X65(F10T)

2-HTB M22X60(F10T)

1-GUSS PL 385X9X655

6-HTB M22X65(F10T)

3-HTB M22X60(F10T)

1-GUSS PL 385X9X655

6-HTB M22X65(F10T)

3-HTB M22X60(F10T)

1-GUSS PL 385X9X655

6-HTB M22X65(F10T)

3-HTB M22X60(F10T)

6

75348.5

7575198.5

7575198.5

7575198.5

9595198.5

348.575 75348.5 348.575 75348.5 348.575

198.57575

198.57575

198.57575

198.595

95

SW-1

SW-2

SW-3

SW-4

CR-5

201.5 198.5

244

180

1-GUSS PL 310X9X595

1-GUSS PL 310X9X595

65 65

50

40

▽LA SUNFACE

DE GOUSSET

230

POSITION DE GOUSSET ECHELLE 1:10

40 50

SW-9

6-HTB M22X60(F10T)

G1

G2

G3

G4

40

40

150

2905

7575

75 75

7575

20007575

13013

0

1212

P3

M

A2

F

CC L

SW-8

SW-7

SW-6

330

3646

75 75

2835

3646

330

7575

2835

1-GUSS PL 420X9X795

※6-HTB M22X65(F10T)

6-HTB M22X60(F10T)

DES

SIN

PEN

FOR

CEM

ENT

TRAN

SVER

SAL

1:20

,1:3

0

EC

HEL

LE

PENFORCEMENT TRANSVERSAL

ECHELLE 1:20,1:30

BA

-9P

ON

T SU

R L

E B

ALE

TITR

E:

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

DIR

ECTE

UR

NAT

ION

AL

ADJO

INT

DE

S R

OU

TES

RE

PU

BLIQ

UE

DU

MAL

I

ETU

DE

DU

CO

NC

EPT

DE

BASE

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

ND

ES P

ON

TS D

U C

OR

RID

OR

SU

DD

AK

AR~B

AM

AKO

INTE

RN

ATIO

NAL

E

LE BOULON DE HAUTE RESISTANCE M22(F10T) EST INDIQUE PAR "◆"

SAUF INDICATIONS CONTRAIRES,LES ACIERS SERONT DU TYPE SM400A

ON UTILISE LE MATERIEL INDIQUE DANS CE DESSIN ,OU UN MATERIAL EQUIVALENT.

LES PIECES DE RENFORCEMENT "SCALLAP" ONT UNE COURBE DE 35R.

1 432

NOTE

2-87

Page 10: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

SYSTEME D'APPUI (FIXE)

PO

NT

SUR

LE

BAL

ETI

TRE

:

1:10

EC

HEL

LED

ESSI

N N

°

SYSTEME D'APPUI (FIXE)

BA-1

0

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

RE

PU

BLIQ

UE

DU

MAL

ID

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

S

DA

KAR

~BA

MAK

O

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

NE

TUD

E D

U C

ON

CEP

T D

E BA

SEIN

TER

NAT

ION

ALE

2-88

Page 11: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

PO

NT

SUR

LE

BAL

ETI

TRE

:

1:10

SYSTEME D'APPUI (MOBILE)

BA-1

1IN

TER

NAT

ION

ALE

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

DIR

ECTE

UR

NAT

ION

AL

ADJO

INT

DE

S R

OU

TES

RE

PU

BLIQ

UE

DU

MAL

I

ETU

DE

DU

CO

NC

EPT

DE

BASE

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

ND

ES P

ON

TS D

U C

OR

RID

OR

SU

DD

AK

AR~B

AM

AKO

EC

HEL

LED

ESSI

N N

°

2-89

Page 12: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

INTE

RN

ATIO

NAL

EKA

TAH

IRA

& E

NG

INEE

RS

INTE

RN

ATIO

NAL

RE

PU

BLIQ

UE

DU

MAL

ID

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

S

DA

KAR

~BA

MAK

O

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

N

ETU

DE

DU

CO

NC

EPT

DE

BASE

TITL

E :

DE

TAIL

DES

GA

RD

E-C

OR

PS S

T D

RAI

NAG

E

TITR

E P

ON

T S

UR

LE

BALE

1:10

EC

HEL

LED

ESSI

N N

°

□10

0x10

0x3.

2□

90x90x3.2

□50

x50x3

.2

□75

x75x

3.2

P3A1

70100

150

240

02400

150

16@150=2400

125

15@

150=

2250

125

250

025@

2500

=625

00

16@150=2400

50399

00

200

2250

13@

2500

=325

002500

225

0200

15@

150=

225

0125

15@150=2250

125

15@

150=

2250

A2

900

12575600100

250 50

□75x75x3.2

□100x100x3.2

□50

x50x

3.2

□90x90x3.2

900 250 50

12575600100

DETAILS DES GARDE-CORPS ET DRAINAGE

ELEVATION ECHELLE 1:30

DETAILS ECHELLE 1:10

COUPE ECHELLE 1:10

1 - 1

2 - 2

□90x90x3.2

□75x75x3.2

□100x

100x

3.2

□50x50x3.2

L-5

0x50

x5

BN M6

BT

M6

BT

M6

BN M6

L-50x50x5

900 250 50

100 600 75 125

100

90 75 ?180

100

3 - 3

50

BT M4

775

75600100

75

□75x75x3.2

□100x100x3.2

BT M4

1 1

2 2

BN

M6

L-5

0x50

x5

BT M6

1200

100 600 75 125 250 50

END PL

100x3x100

L-5

0x50

x5

BT M6

L-50x50x5

BT M6

BN M6

33

50

50

□50

x50x

3.2

BT

M4

90 5

90 5L-5

0x50

x5

BN

M6

BT

M6

□100

x100x

3.2

□90x90x3.2

□75x75x3.2

□50

x50x

3.2

150

3(200) ?1

80?18

0

DRAINAGE ECHELLE 1:20

COUPE PL

AN

4 - □

100x100x3.2x148

4 - □

100x100x3.2x198

4 - □

100x100x3.2x2395

4 - □

100x100x3.2x2245

80 - □100x100x3.2x2495

4 - □75x75x3.2x2300

55

5

4 - □75x75x3.2x2150

80 - □75x75x3.2x2400

92 - □90x90x3.2x1050

1396 - □50x50x3.2x600

5584 - BT M4

180 - BN M6

368 - BT M6

364 - L-50x50x5x50

8 - END PL 100x3x100

Con

cret

e Pa

ve.

150

A(SG

P)DRA

INAG

E

13mmφ

x 150mm

FIXEE AVEC BOULON D'ECLISSE (PIPE SUPPORT)

3mm x 50mm

SGP

A 15

0

734

R=454

2.0%

250

980

2042165.2

200

500

900

435 100 1200

150

575

VP

?100

2.0%

REVE

TEM

ENT

BETO

N

250

980

20

42165.2

900

200

VP ?100

500

525 80 2200

425

150

SGP

A 15

0 DRAINAGE

150A(SGP)

BARREAU CARRE DE 10 x10

SOUDE

PLAQUE D'ACEER (PIPE SUPPORT)

FIXEE AVEC BOULON D'ECLISSE 13mmφ

x 150mm

3mm x 100mm

(A1~P3)

(P3~A2)

COUPE

BA-

12

BARR

EAU

CAR

RE D

E 10

x10

SOUDE

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

2-90

Page 13: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

112.5

11 @ 150 = 1650

1800

1800

245.5

600

275

125

37.5

70

50

275125

245.5

66

109

80

2023

80

100

70

13

200

202366

109200

200 100

60

200 109

13 83 13

6040

100

COUPE TRANSUERSALE ECHELLE 1:3

PLAN ECHELLE 1:10

70 100

1980

1980

250

2 @ 1800 = 3600

110150

0.3 %

125075001250

10000

M

A1

50

F

P1F

A2F

50

PLAN DE REPERAGE

MATERIAL DE JOINT DE DILATATION

250

ELEMENT DE BLOCAGE

BETON

SCELLEMENT

74 531 2No.

MATERIAL

SD345

SS400

SS400

CLASSE DE MATERIAUX

KMSⅡ-35

CK

m0.50

kgm3

UNITE

m Set

49.92

0.49

σ

2.00

7.56

QUANTITY

 

=24N/mm

OBSERUATION

1250

3750

3750

1250

2.0%

2.0%

2.0%

ARMATURE

D16×L

D'ETANCHEITE

CAOUTCHOUC

D'ETANCHEITE

BANDE

(σck=2

4N/mm2)

BETON

BOULON D'ANCRAGE

(SD345)

10000

20 30

30

20

JOINT CAOUTCHOUC POUR CHAUSSEE 7560

JOINT CAOUTCHOUC POUR TROTTOIR

1230

JOINT CAOUTCHOUC POUR TROTTOIR

1230

SS400

m2.46

6SD345

kg

14.35

KMSⅡ-35

P2

FF

FM

P3

8BARRE D'ANCRAGE

SD345

kg

72.54(

1JEU/

10m)

SOUDURE INTERIEURE DE BOULON D'ANCRAGE

Silicon

SCELLEMENT

ELEMENT DE BLOCAGE

SCELLEMENT

ELEMENT DE BLOCAGE

2.0%

70075

39925

50

(SD

345)

DES

SIN

JOIN

T D

E D

ILAT

ATI

ON

DET

AILS

TITR

E :

1:30

JOINT DE DILATATION DETAILS

ECHELLE 1:30

BA-

13AG

EN

CE

JAP

ON

AIS

E D

E C

OO

PER

ATIO

N

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

ALIN

TER

NAT

ION

ALE

DIR

ECTE

UR

NAT

ION

AL

ADJO

INT

DE

S R

OU

TES

RE

PU

BLIQ

UE

DU

MAL

I

ETU

DE

DU

CO

NC

EPT

DE

BASE

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

N

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

DA

KAR

~BA

MAK

O

PO

NT

SUR

LE

BAL

EE

CH

ELLE

2-91

Page 14: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

ETU

DE

DU

CO

NC

EPT

DE

BASE

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

DA

KAR

~BA

MAK

O

SU

R L

A PR

OJE

T D

E C

ON

STR

UC

TIO

ND

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SR

EP

UBL

IQU

E D

U M

ALI

EC

HEL

LE

1:10

0

DES

SIN

PLA

N D

E S

TRU

CTU

RES

CU

LEE

A1

PLAN STRUCTURES CULEE A1 ECHELLE 1:100

C L

LON

GITU

DINA

L

TRA

NSVE

RSAL

E

DETAIL ECHELLE 1:20

10000

250

1000

7500

1000

250

350

0250

350

0250

250

250

105

100 200

1400

3

100

1000

100

0 100

10000

3@2

666=

800

0

1000

1000

1400

100 200

▽255

.467 4

4

255.267

▽REVETEMENT BETON

253

.620

248

.667

▽ ▽247

.267

3

5 5

180

0150

01200

100

450

0100

100

0250

01000

8000

1400105

1400

100 200

500

500 21

21

▽255.267

▽253

.620

247

.267

▽▽248

.667

1 - 1

2 - 2

3 - 3

8-CC

P ?1

000

L=13

.000

m

10000

25001000 1000

1200 500 6000

4500

500

1800

6000

130

01300

500

500

500

500

7500

700020

C L

4 - 4

2.0

%2.0%

2.0

%2.0

%

255.265

PLI

NTHE

EN

BETO

N

▽253

.620

500

20

255

.267

500

7000

DETAIL ECHELLE 1:30

1647

REVETEMENT BETON

20 300800

400400

253.620

PLAQUE D'APPUI ELASTOMERE

560×

360×

62

SUPAIRU D12×

2200

A

□100×20

RD

PACK

ING

B - B

A

760

5050

5050

112

5062

760

5050

50

50

560

50 50 5050

62 501535

350

250 60

0650

1400

1400

2500

4500

10010

00

100

1000

180

0

5 - 5

125

4@2

100=

840

0800

800

8-C

CP ?

1000

L=

13.0

00m

4953

8200

4953 1400

1847

1847

8200

250

3500

250

350

0

250

1000

7500

1000

250

100

00

3@2666=8000

100

00

250

8200

248.667

4953

1400

200100

1400

100

247.267

100

0

1847

1000

253.620

2.0%

REVETEMENT BETON

255.467

2.0%

250

255

.265

2.0%

105

LC

8200

4953

100 8-CCP ?1000 L=13.000m

200100

1400

1000

1847

1000

2.0

%

150

0 650

350

7000

400 400

7999

105 6494

820

300

500

1542 4953

560

560

360

1200

130

0800

1300

800

130

0800

1300

120

0

650

600

350250

2@2000=40001875

1252@2000=40001875

1542 4953 1400

8000

200

600500 150

7500

500600

150

1200

1000

650 350

1500

8400

800

800

800

800

1200

130

0800

1300

120

0

120

01500

200

1542

8000

4953

100

1400105

255.267

253

.620

248

.667

247

.267

▽ ▽

1:1.5

▽255.467

2001000

255

.049

255

.249

▽□

75×

75×

3.2(

STK400)

800

1000

7981

2800 2781

4200

500

6500

600

0

125

2@2000=4000

1875

3.55

%

210

0

1500

350

650

PLINTHE EN BETON

300

700

50 280 92 258

□100×

20

RD

PACK

ING

B

2050

B

A - A

BOULON D'ANCRAGE

50A

×33

0

▽253.620

50A×

330

SUP

AIRU

D12

×22

00

ECHELLE 1:30

700

2589228020

50

BOULON D'ANCRAGE

350

600

500

1050

105

0

90°0'0"

LONGITUDINAL

BOU

CHON

D'A

NCRA

GE50A

×33

0

39.6

2 3.8 FOURRURE

BOULON D'ANCRAGE D28

MOBILE

BOUCHON D'ANCRAGE

2 28

32.

8

28

72.

4

3.8

18.

4

3.8

16

3.8

18.4 16

ECHELLE 1 : 2

50030020400400

1000

650

500

300

BA-

14

PLI

NTH

E EN

BET

ON

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

INTE

RN

ATI

ON

ALE

KAT

AH

IRA

& E

NG

INE

ERS

INTE

RN

ATIO

NAL

TITR

E:

PON

T SU

R L

E BA

LE

BOU

CHON

D'A

NCR

AGE

BOUCHON D'ANCRAGE

2-92

Page 15: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

INTE

RN

ATIO

NAL

EAG

EN

CE

JAP

ON

AIS

E D

E C

OO

PER

ATIO

ND

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SR

EP

UBL

IQU

E D

U M

ALI

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

N

DA

KAR

~BA

MAK

O

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

ETU

DE

DU

CO

NC

EPT

PLA

N S

TRU

CTU

RES

CU

LEE

A2

PO

NT

SUR

LE

BAL

ETI

TRE

:

1:10

0

EC

HEL

LED

ESSI

N N

°

PLAN STRUCTURES CULEE A2 ECHELLE 1:100

1 - 1

2 - 2

3 - 3

DETAIL ECHELLE 1:20

▽255.596

REV

ETEM

ENT

BETO

N

LC

105

250

2.0%

2.0

%2.0

%

250

2.0

%

252

.700

4

250

1000

10000

1000

250

350

0250

250

7500

350

0

8-C

CP ?

1000

L=

11.0

00m

8200

1400

8000

1400370427913@2

700=

810

0950

950

8200

1400

100

00

1000

250

2.0

%

8001

8200

250

105

250

350

0

7500

250

250

350

0

1000

6800 1400

6496 1400

2.0%

250

▽255.796

C L

2.0%

2.0%

255

.598

8200

8-CCP ?1000 L=11.000m

6800 1400

5

4

35

255

.796

247

.596

▽▽248

.996

248.996

▽ ▽247.596

400

500600

150

500

600

150

8000

100

0

1500

300500

1400

100

8-CCP ?1000 L=11.000m

100

200

100

450

0

1000

100

02500

1400

1200

180

01500

105

7000

500

500

200

100

4500

100

100

4 - 4

5 - 5

1400

2500

180

0 1000

1400 1400

1000

1200

1500

252.700

400

800 50030020

400

DETAILS ECHELLE 1:30

20

500

REV

ETEM

ENT

BETO

N

7000

▽255.596

8002

105 6497

▽252.700

248.996

▽ ▽247.596

255

.598

450

550

400 400

821

4500

1800

6000 500

1200

1000

1500

250350

350250

600

650

600

650

2500

6000

125

1000

500 1200

1000

125

500

500

7000

500

20

500

10000

450 550

▽252

.700

248

.996

▽ ▽247

.596

255

.796

500

□ 75

×75

×3.

2(STK

400)

▽255

.596

255

.417

255

.617

1500

450

550

LON

GITU

DINA

L

TRAN

SVER

SALE

1:1.5

700

0

650

0

125

217

52@

2100=

4200

800

1000 24883133

8021

470

0

2001000 8000

105

7500

2@2100=4200 2175

2@2100=4200 2175

90°0'0"

50030020

400

1000

3@2

666=

800

0100

0

100

10000

100

1000

3@2

666=

800

0100

03@2666=8000

100

00

100

0

100

100

1000

3096 3704

37043096

2791 3704

37042791

540

115 310 115

440

440

310

540

115

115

200 50 40

Φ142

115

310

115

90 460

550 100

540

50

440

50

BOU

LON

D'A

NCRA

GE O

42

MOR

TIER

100 200

100 200

BA-1

5

REVETEMENT BETON

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

2-93

Page 16: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

ECHELLE 1:30

DETAIL

P1

P2

BOULON D'ANCRAGE

1:10

0

EC

HEL

LE

3-CCP ?1000

PO

NT

SUR

LE

BAL

ETI

TRE

:

100

00

1500

DES

SIN

ECHELLE 1:30

A - A

PLI

NTH

CONC

RETE

LC

3 4

3 4

100

00

2 2

3-CCP ?1000

ECHELLE 1:100

PLAN DE STRUCTURES PALEES P1 ET P2

180

0

▽PH

400

400

1000 LC

PH1

1500

▽PH2

▽PH1

1 - 1

2 - 2 1 1

100

00

PLI

NTHE

EN

BETO

N

3 - 3

1800

400 4001000

10000

1800

900 900

C L

4 - 4

PH

PH1

PH2

L

19000

REPERE

PIER P1

P2

255

.337

253.708

252.208

255

.407

253.

778

252

.278

1900

0

LCPH

PH1

CUL

EE A

2CUL

EE A

1

C L

180

0

100

0400

400

250

300

700 250

300

ECHELLE 1:20

DETAIL

560

×31

0×44

PLA

QUE

D'AP

PUI E

LAST

OMER

E

PH1

PLI

NTHE

EN B

ETON

A

BOU

CHON

D'A

NCRA

GE

RD PACKING

BOU

LON

D'AN

CRAG

E D2

8□100×

20

32A×

300

SUP

AIRU

D12

×22

00

B - B

A

H

H

760

LONGITUDINAL

5050

5050

560

50

50

560

50

TRA

NSVE

RSE

94

44

5050

5050

760

510

50 50310

2100

L

4@2

100=

8400

800

800

4@2

100=

8400

800

800

2@3

800=

7600

1200

120

0

2@3800=7600

120

0120

0

1629

▽PH2

500

105

01050

600

300

400

PLI

NTHE

EN

BETO

N

□100×20

RD PACKINGPH1

32A

×33

0

SUPAIRU D12×

2200

BOUC

HON

D'AN

CRAG

E

BOULON D'ANCRAGE D28

276

300

700

B

400

300

300

400

207450 280

600

B

200

200

500

105

01050

50

700

280 2074

276

90°0'0"

90°0'0"

C L

ECHELLE 1:2

BOUCHON D'ANCRAGE

FIXE

L1(PIER) L2(PILE)

1000

L

L1(PILIER) L2(PIEU)

1000

L1L2

400

0

700

0

15000

12000

TABLEAU DES DIMENSIONS

BA-

16

28

3.8

542.

7

3.5

FOU

RRUR

EBOUCHON D'ANCRAGE

32A×

330

BOU

LON

D'AN

CRAG

E D2

8

3.5

3.85

DIR

ECTE

UR

NAT

ION

AL

ADJO

INT

DE

S R

OU

TES

RE

PU

BLIQ

UE

DU

MAL

IKA

TAH

IRA

& E

NG

INEE

RS

INTE

RN

ATIO

NAL

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

INTE

RN

ATIO

NAL

ED

ES P

ON

TS D

U C

OR

RID

OR

SU

DD

AK

AR~B

AM

AKO

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

N

ETU

DE

DU

CO

NC

EPT

DE

BASE

2-94

Page 17: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

115

115

325

400

BOULON D'ANCRAGE φ

30

115

115

540

310

440

310 115

540

115

TRA

NSVE

RSE

100

130

440

LONGITUDINAL

MORTIER

ECHELLE 1:20

5050

440

540

75

200 50 40

DETAILS

PLAN STRUCTURES PALEE P3

9000

9000

19000

19000

5003@2

700=

8100

100

00

2 3 - 3

4@2

100=

8400

100

00

800

700

300

450550

10001000

2000

950

90°0'0"

105

01050

VERS CULEE A1

900

1800

800

PLI

NTHE

EN

BETO

N

900

550300150

1000

950

C L

VERS CULEE A2

LC

2@3800=7600

10000

120

0120

0

LC

4 - 4

1

3@2

700=

8100

1 - 1

2

4@2

100=

8400

2@3

800=

7600

100

00

100

00

950

800

120

0

252.580

251.080

253.847

1267

2767

1500

▽▽ ▽

43

700

300

550

450100

01000

950

200

0

800

10000

1200

3-CCP ?1000 1000

4

C L

3

10000

200

0

1000

3-C

CP ?

1000

2767

1500

251.080

1267

253.847

252.580

▽ ▽

2 - 2 1 LC

▽255

.476

SUPAIRU D12×

2200

105

01050

PLA

QUE

D'AP

PUI

ELAS

TOME

RE500

50

700

2074

276280

560×

310×

44

253

.84

7▽

PLI

NTHE

EN

BETO

N

BOU

CHON

DE

BOULO

N

BOULON D'ANCRAGE D28

PO

NT

SUR

LE

BAL

E

A TITR

E :

RD

PACK

ING

□100×20

32A

×30

0

650

1000

300

210

0

B□100×20

PLINTHE EN BETON

700

280

700

50

RD PACKING

▽253.847

276

300

2074

B

1000

450

550

B - B

A

252.580

▽SUP

AIRU

D12

×22

00

ANCHOR BOLT D28

32A×

300

BOU

CHON

D'A

NCRA

GE

EC

HEL

LE

1:10

0

DES

SIN

ECHELLE 1 : 2

BOUCHON D'ANCRAGE

FIXE

2897

1628

A - A

BOULON

C

VERS CULEE A1

253

.847

VERS CULEE A2

L

ECHELLE 1:30▽

252.580

550

1000

2000

255

.476

ECHELLE 1:30

1000

300

700

450

C L

DETAILSECHELLE 1:100

50

505050

760

560

LON

GITU

DINA

L

31050

510

50 5050

ECHELLE 1:20

5050

44

94

5050

560

760

50

TRANSVERSE

DETAILS

90°0'0"

310

BA-

17IN

TER

NAT

ION

ALE

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

ETU

DE

DU

CO

NC

EPT

DE

BASE

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

N

DA

KAR

~BA

MAK

O

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

28

3.85

42.

7

3.5

FOURRURE

BOU

CHON

D'A

NCRA

GE

32A

×33

0

BOULON D'ANCRAGE D28

3.5

3.8

5

DIR

ECTE

UR

NAT

ION

AL

ADJO

INT

DE

S R

OU

TES

RE

PU

BLIQ

UE

DU

MAL

I

2-95

Page 18: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

CO

UP

E D

U S

OL

TITR

E:

EC

HEL

LED

ESSI

N N

°

BA-

181:

30C

OU

PE

DE

SOL

PO

NT

SUR

LE

BAL

E

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

INTE

RN

ATIO

NAL

ED

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SR

EP

UBL

IQU

E D

U M

ALI

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

DA

KAR

~BA

MAK

O

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

N

ETU

DE

DU

CO

NC

EPT

DE

BASE

2-96

Page 19: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

TITR

E :

EC

HEL

LED

ESSI

N N

°

BA-

19C

OU

PE

TR

AN

SVE

R S

ALE

DE

RO

UTE

PO

NT

SUR

LE

BAL

E

1:10

0K

ATAH

IRA

& E

NG

INE

ER

S IN

TER

NAT

ION

AL

AG

EN

CE

JAP

ON

AIS

E D

E C

OO

PER

ATIO

NIN

TER

NA

TIO

NAL

ED

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES R

OU

TES

RE

PUB

LIQ

UE

DU

MAL

ID

ES P

ON

TS D

U C

OR

RID

OR

SU

DD

AK

AR~B

AMAK

O

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

N

ETU

DE

DU

CO

NC

EPT

DE

BASE

2-97

Page 20: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

INTE

RN

ATIO

NAL

E

TITR

E:

EC

HEL

LED

ESSI

N N

°

BA-2

0E

TUD

E D

U C

ON

CEP

T D

E BA

SED

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SR

EP

UBL

IQU

E D

U M

ALI

SU

R L

A PR

OJE

T D

E C

ON

STR

UC

TIO

ND

ES P

ON

TS D

U C

OR

RID

OR

SU

DD

AK

AR~B

AM

AKO

AGEN

CE

JAP

ON

AIS

E L

E C

OO

PER

ATIO

N

CO

UPE

TR

AN

SVE

RS

ALE

DE

RO

UTE

(2)

PO

NT

SUR

LE

BAL

E

1:10

0K

ATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

2-98

Page 21: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

2

1 1

2

1-1

CO

UPE

ECH

=1:2

52-

2 C

OU

PE

EC

H=1

:25

INTE

RN

ATIO

NAL

ETI

TRE

:

SU

S-IN

DIQ

UE

EC

HEL

LED

ESSI

N N

°

BA-

21E

TUD

E D

U C

ON

CEP

T D

E BA

SED

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SR

EP

UBL

IQU

E D

U M

ALI

SU

R L

A PR

OJE

T D

E C

ON

STR

UC

TIO

ND

ES P

ON

TS D

U C

OR

RID

OR

SU

DD

AK

AR~B

AM

AKO

AGEN

CE

JAP

ON

AIS

E L

E C

OO

PER

ATIO

N

DET

AIL

PRO

TEC

TIO

N T

ALU

S

PO

NT

SUR

LE

BAL

E

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

2-99

Page 22: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

INTE

RN

ATIO

NAL

ED

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SR

EP

UBL

IQU

E D

U M

ALI

DES

PO

NTS

DU

CO

RR

IDO

R S

UD

DA

KAR

~BA

MAK

O

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

N

ETU

DE

DU

CO

NC

EPT

DE

BASE

TITR

E :

PO

NT

SUR

LE

BAL

E

BA-

22S

US

-IND

IQU

E

EC

HEL

LED

ESSI

N N

°

2-100

Page 23: JICA報告書PDF版(JICA Report PDF)L.W.L 241.80 110150 H.H.W.L 250.76 23350 23500 40000 A1 P1 P2 P3 A2 10000 7500 3500 1250 250 2. 0 % 3500 250 C L 1250 2. 0 % 2. 0 % 250 2. 0 % 250

BA

ND

E J

AN

E

BA

ND

E J

AU

NE

INTE

RN

ATI

ON

NAL

ES

US

-IND

IQU

E

EC

HEL

LED

ESSI

N N

°

BA-2

3E

TUD

E D

U C

ON

CEP

T D

E BA

SED

IREC

TEU

R N

ATIO

NA

L AD

JOIN

T D

ES

RO

UTE

SR

EP

UBL

IQU

E D

U M

ALI

SU

R L

E PR

OJE

T D

E C

ON

STR

UC

TIO

ND

ES P

ON

TS D

U C

OR

RID

OR

SU

DD

AK

AR~B

AM

AKO

AGE

NC

E J

APO

NA

ISE

DE

CO

OPE

RAT

ION

ET P

OTE

AU I

ND

ICAT

EU

R

TITR

E:

PO

NT

SUR

LE

BALE

KATA

HIR

A &

EN

GIN

EER

S IN

TER

NAT

ION

AL

DET

AIL

S D

ES G

ARD

E-C

OR

PS

2-101