JSC «Energy solutions»

Project reference

Page 2: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

JSC «Energy solutions» provide costumers with a list of service:

• all kinds of design and engineering work;

• turnkey construction of power plants and energy facilities (ЕРС);

• project management of power plants and energy facilities construction (ЕРСМ);

• start-up and commissioning works carried out by department within the company.

Development of design and working

documentation , construction

supervision

Supply of Russian and foreign

manufacturers

Construction and

installation work

Start-up and commissioning

works

Feasibility study and investment

feasibility study

EPC/EPCM

JSC «Energy solutions» - EPC|EPCM contractor

2

Page 3: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

23

History of the company

JSC «Energy Solutions» was founded in 2011 as a construction management

enterprise with specialization on conduct comprehensive pre-commissioning. The first

successful projects of the company are:

• Reconstruction of turbine house KTC TPP - 3 BF of the «Group Ilim» , Bratsk;

• Implementation of commissioning works in the construction of 150 MW Exhaust

CHP NLMK in Lipetsk;

• Organization of procurement and supply of main and auxiliary equipment at the

construction of CCGT - CHP " GSR Energo" of 110 MW in Kolpino.

High-quality , timely and cost-effective project execution enabled the company to

successfully establish itself in the energy market and to expand the staff by 2012 ,

including in the engineering units , expanding their competence carry out the functions

of the management company for the development of design and working documents .

Company activity spread to the implementation of projects for industrial plants and

utilities.

JSC «Energy solutions» - EPC|EPCM contractor

Page 4: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

Advantages of JSC «Energy solutions»

The presence of highly qualified personnel with experience in implementing major projects;

Minimal terms of design by:

– use complex PDMS AVEVA,

– the availability of an extensive database of equipment 3d- models.

Mandatory supervision on the construction site;

Rapid response to changes in the project through the use of cloud technologies;

Partnerships with a number of Russian main and auxiliary equipment manufacturers;

The presence of internal standards of the company:

– project management control,

– quality control of equipment and construction materials.

Using the modern software for monitoring projects in real time.

The quality management system for compliance with the quality standard ISO 9001 : 2008 .

24

Page 5: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

Object: TPP - 3 BF of «Ilim Group», Bratsk

Customer: JSC «Ilim Group»

Contract: reconstruction of the turbine house KTC TPP - 3:

implementation of the management functions of the company to

develop the project and working documentation, supply of main

equipment (incl. supervision of erection and commissioning

supervision)

Terms: April 2011 - October 2013

Main equipment:

• Back pressure turbine with pressure steam 90 bar , the

turbine of the type P - 32 and P - 27 , JSC "KTZ" - 2 pcs .

• Steam turbine generator of the type TTC - 32 , LLC

"Electrotyazhmash - Privod " - 2 pcs.

Projects of JSC «Energy solutions»

25

RECONSTRUCTION OF THE TURBINE HOUSE KTC TPP - 3

Page 6: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

Object: TPP-1 . Arhangelsk region

Customer: JSC «Arkhangelsk PPM»

Contract: range of works on the development of design and

working documentation under the project of technical re-

equipment with the replacement of turbine unit №5 TPP-1

Terms: October 2011 - June 2012

Main equipment:

• Steam turbine PT- 25 / 30-8,8 / 1,0-1 , produced by JSC

"KTZ", Kaluga, - 1 pc.

26

Projects of JSC «Energy solutions»

Page 7: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

NOVOGORKOVSKAYA CHP , CCGT - 350MV

Customer:

JSC «TGC-6»

EPC contractor:

JSC «PDC «SOYUZ»

Project management:

JSC «Energy solutions»

The contract was signed:

July 20 , 2012

Project completed:

2015

Main equipment:

• HRSG E- 293/84.02-14/1.5-560/294

production of " Podolsky

Machine-Building Plant " - 2 pcs.

• Block three-phase transformer

TDC- 225000/220 and TDC- 225000/110

with a capacity of 225 MVA - 2 pcs.

• The gas turbine GT13E2 production

Alstom ( France) nominal rating power of

185 MW - 2 units.

• Gas turbine generator TOPAIR

50WY21Z- 095 production Alstom

nominal rating power of 225 MW - 2 units.

27

Projects of JSC «Energy solutions»

Page 8: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

• Steam turbine type T- 25 / 33-7,6 / 0,12

produced by JSC «Kaluga Turbine Plant»

35 MW - 1 pc.

• HRSG type PC- 64 (E -116 / 162-8,16 /

0,7-535 / 218) produced by JSC " ZIO "

(Podolsk ) - 1 pc.

• Gas turbine type PG6111FA

production of «General Electric»

electrical capacity of 75 MW - 1 pc.

• Gas turbine generator type ELIN 6FA

production of «General Electric» - 1pc.

28

Projects of JSC «Energy solutions»

Customer:

CJSC «GSR Energo»

EPC contractor:

JSC «PDC «SOYUZ»

Project management:

JSC «Energy solutions»

The contract was signed:

November 18, 2010

Project completed:

July 25, 2014

CCGT CHP «GSR ENERGO» PSU - 110MW is completed

Main equipment:

Page 9: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

EXHAUST CHP NLMK, 150МW is completed

• Steam boiler E - 220-9,8-54OGD with a

single steam capacity 220t / h Production

JSC " Sibenergomash" - 3 pcs.

• The steam turbine PT -40 / 50-8,8 / 1.3

50 MW production JSC «Kaluga Turbine

Plant» - 3 pcs.

• Generator TTK - 50-2UZ -P production

LLC "Electrotyazhmash - Privod " - 3 pcs.

29

Projects of JSC «Energy solutions»

Customer:

JSC «NLMK»

EPC contractor:

JSC «PDC «SOYUZ»

Commissioning works:

JSC «Energy solutions»

The contract was signed:

December 2011

Project completed:

June 2012

Main equipment:

Page 10: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

CHP - 4, ULAANBAATAR, MONGOLIA is completed

• Steam turbine generator TVF- 125-2U3

nominal rating power of 125 MW

production NPO "ELSIB" - 1 pc.

• Steam turbine T- 120/130 -130-8 MO

nominal rating power of 120 MW production

JSC " Ural Turbine Plant " - 1pc.

210

Projects of JSC «Energy solutions»

Customer:

CJSC «Ural Turbine Plant»

EPC contractor:

JSC «PDC «SOYUZ»

Project management:

JSC «Energy solutions»

The contract was signed:

August 2013

Project completed:

March 2015

Main equipment:

Page 11: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

CONSTRUCTION of TWO BOILERS in the REPUBLIC OF TYVA,

50 Gcal/h EACH

RECONSTRUCTION of HEAT SUPPLY SYSTEM

of Ak-Dovurak and Shagonar (project works)

• The coal boiler KV - TC - 10-150P

manufactured by JSC " TEP - Holding"

- 2 pcs .

• The coal boiler KV - TC- 20-150P

manufactured by CJSC " TEP - Holding"

- 4 pcs .

211

Projects of JSC «Energy solutions»

Customer:

Ministry of Energy,

Tyva Republic

EPC contractor:

JSC «Energy solutions»

The contract was signed:

December 2014

The project is

under implementation

Project completed:

April 2017

Main equipment:

Page 12: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

REPLACING the 60 MW TURBINE TG # 5

on CHP - PVA

212

Object: CHP – PVA

Customer: JSC «NLMK»

Contract: development of technical

specifications for the design , supply of turbine

generator , auxiliary equipment and process

control , supervision services

Terms: July 2015 - October 2017

The project is under implementation

Main equipment:

Steam turbine 60 MW – PT 60-8,9/1,9

manufactured by JSC " UTZ "

Generator - TF-60-2U3 manufactured by NPO

"ELSIB"

Projects of JSC «Energy solutions»

Page 13: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

Projects of JSC «Energy solutions»

CONSTRUCTION of COAL CHP 16 MW,

heat supply 77 MW

213

Object: CHP field Gross, Yakutia

Customer: LLC «Neryungri Metallic» (Severstal)

Contract:

1.Development of working documentation of CHP,

2.General Contracting services for construction of

CHP (EPCM)

Terms: January 2015 – February 2018

The project is under implementation

Main equipment:

Boilers 5-25T/h produced by JSC "TEP-HOLDING“

Steam turbine 2x8 MW produced by JSC "KTZ"

Generator – 2x8 MW produced by RusElprom

Page 14: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

Projects of JSC «Energy solutions»

CONSTRUCTION of TPP, 7 MW

214

Object: PPM Volga

Customer: OJSC «Volga»

Contract:

Construction of TPP, 7 MW to cover its own energy

needs of OJSC «Volga» in the city of Balakhna,

Russian Federation

Terms: July 2016 – August 2017

The project is under implementation

Main equipment:

Back pressure turbine, SST-110 (Siemens)

Page 15: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

2

Licenses and Certificates of JSC «Energy solutions»

JSC "Energy Solutions " has the following licenses and certificates :

• Certificate of SRO dated 20.11.2015 №С-089-08-02695 of admission to work ( according to the list

specified in the SRO), running on particularly dangerous and technically complex capital construction,

up to 3 billion rubles

• Certificate of SRO dated 19.11.2015 №0128-03-15 of admission to work on the design,

up to 300 million rubles

• The certificate of registration of electrical laboratory dated 03.10.2014. №4187-2

• License of the Ministry of emergency situations dated 31.08.2015, №77-Б/02635 for realization of

activity on installation, maintenance and repair of means of maintenance of fire safety of buildings and

structures.

• The certificate of authority of LLC TekhnoPlast Service dated 18.03.2016 №02-16 in the field of

promotion, sales and application of protective and restoration photopolymer materials, «MATERIUM»

• The certificate of authority of LLC MATERIUM-RUS dated 18.03.2016 №18/03/16-02 in the field of

promotion, sales and application of protective and restoration photopolymer materials, «MATERIUM»

215

Page 16: JSC Energy solutions Project referenceener-solutions.ru/wp-content/uploads/2016/10/... · 2016-10-07 · JSC «Energy Solutions»was founded in 2011 as a construction management enterprise

1915

Contacts

JSC «Energy solutions»

Russian Federation, 117246

Moscow,

Nauchniy driveway , Building 8 ,

Housing 1

Cell: +7-495-134-20-41

[email protected]

www.ener-solutions.ru

Contact person:

Sales Director

Pavlikov V.

[email protected]