60
1 THE VISION A PORTFOLIO OF OUR PAST & PRESENT PROJECTS

Knauf BOOK

  • Upload
    knauf

  • View
    288

  • Download
    9

Embed Size (px)

DESCRIPTION

THE VISION: A PORTFOLIO OF OUR PAST & PRESENT PROJECTS

Citation preview

Page 1: Knauf BOOK

1

THE VISIONA PORTFOLIO OF OUR PAST & PRESENT PROJECTS

Page 2: Knauf BOOK
Page 3: Knauf BOOK
Page 4: Knauf BOOK

4

Page 5: Knauf BOOK

5

Contents from the md’s desk 7

United arab emirates 8-29

qatar 30-41

oman 42-45

bahrain 46-49

kUwait 50-51

saUdi arabia 52-53 india 54-57

Page 6: Knauf BOOK

6

Page 7: Knauf BOOK

7

to our Valued Customers,Greetings!

Knauf is a family name and a corporate group of global dimensions at the same time synonymous with a type of corporate culture which has become rare. Knauf is a typical Family firm in spite of its size and this is precisely the reason for its amazing success. It is short and direct decision-making paths, the courage to tackle new ideas, innovations, investments and the wealth of ideas contributed by all Knauf employees that characterize the company.

From its beginnings in gypsum processing, Knauf has expanded and diversified to become a corporation with worldwide activities, Knauf UAE has been active in the Middle East for more than a decade.

Knauf shows its commitment not only in the GCC, headquarters in Dubai UAE, but also in the subcontinent.We have offices based in Saudi, Qatar and India to support the market and dealers.Knauf provides value-added products and services in the following fields:• Building materials and systems based on gypsum and gypsum-related products• ASTM certified products & systems• Multi- Purpose Joint compounds• Knauf Aquapanel interior and exterior wall systems• Knauf Insulations sustainable, high-performance, cost-effective insulation solutions• Knauf Heradesign’s acoustic designs for Interior and Exterior in ceiling & partition systems• Knauf Integral’s Knauf GIFA Floor, sheet-panelled access floors• Thermal and sound insulation materials• Value engineering and technical consultancy for architects and consultants to meet specified design requirements• On site hands-on training and supervision for contractors when installing drywall systems• Knauf systems are approved by Dubai, Abu Dhabi, Ras Al Khaimah and Qatar Civil Defense

Sustainability is central to our vision of doing the right thing for our clients, our people and the communities in which we work. We maintain and provide certificates for individual products and designs to improve quality and performance. Knauf systems combine innovative products to realize speed of installation and warranted high performance-based systems as per ASTM, EN-BS and DIN Standards.

Knauf is not only committed towards it Products and System but also towards it employees. Within the framework of its four key K-Values; Partnership, Commitment, Entrepreneurship and Menschlichkeit meaning human touch Knauf looks after its people and drives a sense of passion in all its staff. This is what makes Knauf Unique and special!

Safety is something that Knauf does not compromise on again whether for its products or people and therefore all our products are tested and approved by Intertek to make sure that nothing leaves the plant which is not up to the mark.

amer Bin ahmedManaging DirectorKnauf GCC & India

From the md’s desk

Page 8: Knauf BOOK

8

Page 9: Knauf BOOK

9

UNITEd ArAb EmIrATES

Page 10: Knauf BOOK

10

UNITEd ArAb EmIrATES

BurJ khalIFaregion: Dubaiknauf systems used: D112 main Contractor: ArabtecYear of Completion: 2009

Page 11: Knauf BOOK

11

haBtoor PalaCe – duBaIregion: Dubaiknauf systems used: EN-BS Partition & Ceilings main Contractor: Habtoor Leighton GroupYear of Completion: 2016

Page 12: Knauf BOOK

12

UNITEd ArAb EmIrATES

FaIrmont hotel - aBu dhaBIregion: Abu Dhabiknauf systems used: ASTM Partition & Ceilings[Offered tailored made solution to meet the highest rated performance systems].main Contractor: Arabtec

sharJah mIlItarY hosPItalregion: Sharjah

knauf systems used: EN-BS Ceilingssub Contractor: VancouverYear of Completion: 2015

Page 13: Knauf BOOK

13

al amal PsYChIatrIC hosPItalregion: Dubaiknauf systems used: D112main Contractor: China State ConstructionYear of Completion: 2016

the address BouleVard - duBaI

region: Dubaiknauf systems used: EN-BS Partition & Ceilings with special

board PRO-HD main Contractor: Brookfield Multiplex

Year of Completion: 2016

Page 14: Knauf BOOK

14

UNITEd ArAb EmIrATES

duBaI audI shoWroomregion: Dubai

knauf systems used: Cleaneo Acoustic Ceilingmain Contractor: Al Sahel Contracting

Year of Completion: 2014

Page 15: Knauf BOOK

15

landmark toWerregion: Abu Dhabiknauf systems used: Knauf D112 Suspension Ceiling Systems, Knauf EN-BS Partition Systems + Knauf Aquapanel for wet areasmain Contractor: Arabtec / Al HabtoorYear of Completion: 2012

Page 16: Knauf BOOK

16

UNITEd ArAb EmIrATES

BaB al Qasr hotel & serVICed aPartments – aBu dhaBIregion: Abu Dhabiknauf systems used: EN-BS Partition & Ceilings main Contractor: NurolYear of Completion: 2015

Page 17: Knauf BOOK

17

IranIan hosPItal eXPansIon ProJeCt - duBaI: region: Dubaiknauf systems used: EN-BS Partition & Ceilings main Contractor: Al Sahel ContractingYear of Completion: 2013

Page 18: Knauf BOOK

18

UNITEd ArAb EmIrATES

GhaYathI hosPItalregion: Abu Dhabi

knauf systems used: ASTM Ceilingsmain Contractor: Al Amana Contracting

Year of Completion: 2015

Page 19: Knauf BOOK

19

sIla hosPItalregion: Abu Dhabiknauf systems used: ASTMmain Contractor: Al Fara’a ContractingYear of Completion: 2015

Page 20: Knauf BOOK

20

UNITEd ArAb EmIrATES

al hIlal Bankregion: Abu Dhabiknauf systems used: ENBS Ceiling/Partitionsmain Contractor: Al Fara’a ContractingYear of Completion: 2013

Page 21: Knauf BOOK

21

al muneera region: Abu Dhabi

knauf systems used: EN-BS Partition D112 Ceilings (One of the biggest Aquapanel project)

main Contractor: Al Futtaim CarillionYear of Completion: 2011

Page 22: Knauf BOOK

22

Conrad hIlton region: Dubaiknauf systems used: EN-BS Parti-tion & Ceilings main Contractor: ArabtecYear of Completion: 2011

al Bustan ComPleXregion: Abu Dhabiknauf systems used: EN-BS Partition & Ceilings main Contractor: Habtoor Leighton GroupYear of Completion: 2012

UNITEd ArAb EmIrATES

Page 23: Knauf BOOK

23

arZanah medICal Centerregion: Abu Dhabiknauf systems used: EN-BS Partition & Ceilings main Contractor: Habtoor Leighton GroupYear of Completion: 2012

JW marrIott marQuIsregion: Dubaiknauf systems used: EN-BS main Contractor: Brookfield MultiplexYear of Completion: 2012

natIon toWers region: Abu Dhabi

knauf systems used: EN-BS Partition & Ceilings + Knauf Cinema Systems

main Contractor: Arabtec & NPCYear of Completion: 2012

Page 24: Knauf BOOK

24

Yas mall region: Abu Dhabiknauf systems used: EN-BS Ceilingsmain Contractor: Six ConstructYear of Completion: 2014

UNITEd ArAb EmIrATES

IndeX toWerregion: DIFC Dubai

system used: Knauf GIFAFloor Year : June 2011

Page 25: Knauf BOOK

25

Four seasons hotelregion: Abu Dhabi

knauf systems used: EN-BS Partition & Ceilings main Contractor: Al Futtaim Carillion

Year of Completion: 2015

Page 26: Knauf BOOK

26

draGon mart eXPansIon & CInema’sregion: Dubaiknauf systems used: EN-BS Ceilings &Cinema Systemmain Contractor: UNECYear of Completion: 2015

UNITEd ArAb EmIrATES

ImG theme ParkBIGGest Indoor

theme Park In the World

region: Dubaiknauf systems used: EN-BS

Partition & Ceilings + Cinema System. (High walls)

main Contractor: Simplex Infra-structure

Year of Completion: 2016

Page 27: Knauf BOOK

27

CItY Walk resIdentIal BuIldInGsregion: Dubaiknauf systems used: Knauf Wall Lining 611 + Knauf Aquapanel Exterior Solution main Contractor: Al Shafar Contg.Year of Completion: 2016

JumeIrah Park VIllaknauf system used: Knauf D112 Ceiling Systemsmain Contractor: S.S.LootahCompletion: 2015

al shaam hosPItal – ras al khaImahknauf system used: EN-BS Partition & Ceiling Systems

main Contractor: Ali Moosa & SonsCompletion: 2015

Page 28: Knauf BOOK

28

PaddoCk CluB “Formula raCe VIP CluB“ region : Abu Dhabi-UAEsystems/Products used : Aquapanel Exterior wall main Contractor : ISGYear of Completion : 2014

UNITEd ArAb EmIrATES

masdar CItY region : Abu Dhabi-UAE

systems/Products used : Aquapanel Exterior wall main Contractor : Brookfield Multiplex

Year of Completion : 2013-2014

Page 29: Knauf BOOK

29

InFInItY toWer region : Dubai-UAEsystems/Products used : Aquapanel Exterior cladding in semi exposed areasmain Contractor : Arabtec

duBaI InternatIonal aIrPort termInal 3

region – City and Country : Dubai-UAEsystems/Products used : Aquapanel Exterior ceiling

main Contractor : AlecYear of Completion : 2010

Page 30: Knauf BOOK

30

Page 31: Knauf BOOK

31

qATArA PORTFOLIO OF OUR PAST & PRESENT PROJECTS

Page 32: Knauf BOOK

32

BarZan CamPregion: Dohaknauf system used: EN-BS Ceilings D112 & Access Panels main Contractor: REDCO AlManaYear of Completion: 2015

qATAr

FalCon toWerregion: Dohaknauf system used: BN-BS Ceilings & Aquapanelmain Contractor: Tuscana Year of Completion: 2015

Page 33: Knauf BOOK

33

World trade Center region: Doha

knauf system used: ASTM Systemmain Contractor: BluuGulf Year of Completion: 2015

42 GoVernment sChools For ashGhalregion: Dohaknauf system used: Heradesign main Contractor: JTC/AMANA/ITC/Hassanesco/Alsyraia/Tadmur/ITCC/AlDarwishYear of Completion: 2014 & 2015

Page 34: Knauf BOOK

34

asPIre Zone eXtensIon

region: Dohaknauf system used: EN-BS Ceilings

main Contractor: SEG Year of Completion: 2015

Qatar mall region: Dohaknauf system used: ASTM & EN-BS Ceilingsmain Contractor: KCT / UCCYear of Completion: 2016

qATAr

Page 35: Knauf BOOK

35

male & Female Classrooms - Qatar unIVersItY region: Dohaknauf system used: EN-BS Systems & Cleaneo D126main Contractor: Commodore Co. Year of Completion: 2016

IsF CamP region: Doha

knauf system used: EN-BS Sys-tems, Hatfurring & Aquapanelmain Contractor: QD-SBG Year of Completion: 2016

oXYGen Park Qatar FoundatIon

region: Dohaknauf system used: EN-BS Systems & Aquapanel

main Contractor: Man Enterprises Year of Completion: 2014

Page 36: Knauf BOOK

36

Banana Island (anantra)region: Dohaknauf system used: EN-BS Ceiling & Aquapanelmain Contractor: UCCYear of Completed: 2014

al WaJBa PalaCe region: Doha

knauf system used: EN-BS System & Aquapanelmain Contractor: UCC

Year of Completed: 2014

sheraton hotel renoVatIon region: Dohaknauf system used: EN-BS System main Contractor: KCT Year of Completed: 2015

qATAr

Page 37: Knauf BOOK

37

hIlton douBle treeregion: Dohaknauf system used: EN-BS System main Contractor: Derwin Year of Completed: 2015

alsadd multIPurPose hall region: Dohaknauf system used: EN-BS System & Aquapanelmain Contractor: AKTOR Year of Completed: 2014

Qatalumregion: Dohaknauf system used: D112 system main Contractor: Dicotech Year of Completed: 2014

Page 38: Knauf BOOK

38

mInIstrY oF InterIor - head Quaters region: Dohaknauf system used: D112 system & Cleaneomain Contractor: WCT Year of Completed: 2015

CommunICatIon & medIa ColleGe -

Qatar FoundatIon region: Doha

knauf system used: Ceiling/Parition & Aquapnelmain Contractor: HBK JV REC

Year of Completed: 2015

qATAr

Page 39: Knauf BOOK

39

deVeloPment & researCh Center Qatar FoundatIon region: Dohaknauf system used: ASTM Ceiling/Parition & Aquapnelmain Contractor: REDCO Al Manaa Year of Completed: 2014

sIdra medICal & researCh Centerregion: Dohaknauf system used: EN-BS Ceiling/Parition Aquapanel & Alurevo access panel main Contractor: MidmacYear of Completed: 2015

Qatar natIonal museum region: Dohaknauf system used: EN-BS Curve Drywall & Heradesign main Contractor: Hyundai Year of Completed: 2013 completion 2016 end

Page 40: Knauf BOOK

40

BarWa FInanCe dIstrICt region: Dohaknauf system used: EN-BS Ceiling/Paritionmain Contractor: Promer QatarYear of Completed: 2013

PuBlIC Works authorItY ashGhal toWer 3region: Dohaknauf system used: EN-BS Ceilings main Contractor: Promer QatarYear of Completed: 2013

qATAr

Page 41: Knauf BOOK

41

natIonal lIBrarY - Qatar FoundatIon

region: Dohaknauf system used: EN-BS Ceilings

main Contractor: Brookfield Multiplex Year of Completed: 2015

Qatar aIrWaYs CreW housInG

region: Dohaknauf system used: EN-BS Ceilings

main Contractor: REDCO Year of Completed: 2014

Page 42: Knauf BOOK

42

Page 43: Knauf BOOK

43

OmANA PORTFOLIO OF OUR PAST & PRESENT PROJECTS

Page 44: Knauf BOOK

44

GuteCh unIVersItY, musCat2014/ BS Partitions and DIN ceilings/ 40K sqr mtrsmain Contractor: L&T

ras al hamra deVeloPment, musCat2016/ DIN ceilings/ 95K sqrmtrsmain Contractor: Al Turki Enterprise

OmAN

Page 45: Knauf BOOK

45

kemPInskI hotel, musCatOn going/ BS ceilings/ 30K sqr mtrsmain Contractor: Carillion-Alawi

saraY Bander JIssa, musCatOngoing/ BS ceilings, partitions and Wall linings/ 35K sqr mtrsmain Contractor: Habtoor Leighton Group

BuraImI unIVersItY, BuraImI2015/ BS partitons and ceilings/ 25K sqr mtrs

main Contractor: L&T

Page 46: Knauf BOOK

46

Page 47: Knauf BOOK

47

bAHrAINA PORTFOLIO OF OUR PAST & PRESENT PROJECTS

Page 48: Knauf BOOK

48

bAHrAIN

Baraka Bank hQtype: Commerial

system used: EN-BS Product used: Gypsum drywall & ceilings

Year completed: 2014main Contractor: ALYUSUF Decor

location: Bahrain

Page 49: Knauf BOOK

49

draGon CItY almuhraQtype: Commerial system used: EN-BS Product used: Hat Furring EN-BS Year completed: 2015 location: Bahrain

Four seasons hotelregion – City and Country : Bahrain

systems/Products used : Aquapanel interior wallsmain Contractor : Sixo

Year of Completion : 2014

Page 50: Knauf BOOK

50

kUwAITA PORTFOLIO OF OUR PAST & PRESENT PROJECTS

Page 51: Knauf BOOK

51

mInIstrY oF eduCatIon type: Government system used: EN-BS /ASTM Product used: D112 & ASTM 12.7mmYear completed: 2015main Contractor: AlKharafi location: Kuwait

kUwAIT

Page 52: Knauf BOOK

52

SAUdI ArAbIAA PORTFOLIO OF OUR PAST & PRESENT PROJECTS

Page 53: Knauf BOOK

53

CloCk toWer meCCaOne of the largest building projects in the Arab countries, the new Clock Tower at Mecca has been under construction for 18 months.It is the central building of the unique complex that forms the holiest of all Muslim sites. When finished, the 76-floor tower will be one of the largest in the world, built at a cost of USD 1.6 billion.The first shipment of Knauf building materials for this project 80,000 square meters of gyp-sum fiber boards were sent to the site in 2009. With a strong presence in countries across the Arab world, Knauf is ideally situated to add value to this prestigious project, offering innovative building solutions through the technical competence, logistics and consulting services and high-quality system technology of individual Knauf partners.

SAUdI ArAbIA

Page 54: Knauf BOOK

54

Page 55: Knauf BOOK

55

INdIAA PORTFOLIO OF OUR PAST & PRESENT PROJECTS

Page 56: Knauf BOOK

56

rItZ Carlton mumBaI, IndIaregion: Indiasystems used: Knauf ENBS & ASTM Partition, Ceilings & Shaft wall systems with 3 layers of PRO – HD + Knauf Aquapanel Interior Solutionsmain Contractor: SamsungYear of Completion : On-going , Expected completion 2018

oBeroI esQuIreregion: India

systems used: Knauf EN- BS Partition & Ceiling Systems

main Contractor: Oberoi RealtyYear Completion: on-going

INdIA

Page 57: Knauf BOOK

57

BosCh headQuarters – BanGalore IndIaregion: Indiamain Contractor: Boschsystem used: Knauf EN- BS Partition & Ceiling SystemsCompletion: On going , expected completion 2016

shIVandra ashram - uttarkashI

knauf systems used: Knauf EN-BS Partition systems + Knauf Aquapanel Exterior Solutions

Year: 2013

Page 58: Knauf BOOK

58

Page 59: Knauf BOOK

59

Page 60: Knauf BOOK

Website : www.knauf.ae | E-Mail : [email protected]

Knauf LLC,PO BOX 112871

Dubai, UAETel: +971 4 337 7170Fax: +971 4 334 9659

Knauf RAK PlantPO BOX 50006

Ras Al Khaimah, UAETel: +971 7 221 5300Fax: +971 7 221 5301

Knauf Qatar,PO BOX 27111

Doha, State of QatarTel: +974 4452 8191Fax: +974 4452 8181