Objective/Sasaranj
Memahami konsep-konsep Komplesi sumur dan kerja ulangsumur
Memahami teknik perencanaan dan penyelesaian sumur Memahami penerapannya di dunia Perminyakan
Daftar Pustaka
Allen S.O. and Robert A.P. Production Operation, Vol. I Oil and Gas Consultant International Inc.
Chip Claiborne,Unocal Completions Training Perforating, 2005
Peter E. Clark,Well Completions : Stimulation and Work Over.
Pertamina Hulu, Teknik Produksi, Jakarta, 2003 H.K. Van Poolen,Well Completion and Stimulations
Program.g Peter E. Clark,Well Completions : Stimulation and Work
Over. Jonathan Billary,Well Completions Design,
PetroleumElsevier 2009PetroleumElsevier, 2009 Semua buku perihal Komplesi dan uji Sumur Semua Jurnal tentang Komplesi dan uji Sumur
What is a Completion?
Equipment Installed in a Well to Allow Hydrocarbons to be Produced
Control Production Interval Control Production Rate Isolate Wellbore from Producing ZoneIsolate Wellbore from Producing Zone Isolate Formation Damage Isolate Non-Producing Zones
Drilling Completion Production
InformationManagement,Drilling Engineering,
CompletionFluids Automated Production
Systemsg g g,Data Mudlogging,Rig-Site Supervision
Drilling Dynamics
Drilling Fluid Systems
Pumping,Stimulation,Filtration
Safety Systems
PerformanceChemicals
Systems
Formation Evaluation MWD
HighPerformance Bits
Filtration
CompletionHook-ups
Tubing ConveyedPerforating
Packers
GravelPackingServices
Flow ControlEquipment
PackersCementingEquipment
SteerableDrillingSystems
Performance Bits
Pre-Pack WellScreens
Packer
1 Packer adalah penyekat untuk completion/WO Dibagi 2 : 1)1. Packer adalah penyekat untuk completion/WO. Dibagi 2 : 1) Production Packer. 2) Treating/testing Packer
2. Pemisahan ruang di well tujuannya :1. Melindungi casing dr P tinggi baik dari well atau injeksi
dan fluida penyebab karat2. Isolasi thd bocor yg ada di casing, perforasi yg di
squezed atau interval produksi yg lebih dari Satu3. Menghilangkan efek heading & surging gas krn adanya
gas yg terakumulasi di annulus4. Penggunaan untuk peralatan artificial lift4. Penggunaan untuk peralatan artificial lift5. Akan dipasang safety valve6. Menahan packer fluid di annulus
3. Jenis PackerUmumnya dari karet dipadatkan u/ penyekat dg slip, i fl t bl k t k d k b ( li h dinflatable packer, cement packer, dan packer bore(polished bore) receptacle atau PBRS
1. permanent packer : u/ permanent completion, dimanapacker adalah bagian dr casing, tubing dipisahkanruangnya & dpt diangkatg y p g
2. retrievable packer : adalah bagian dr tubing & tubing tdk dpat dilepas dg packernya. Tubing akan melekat kecasing selama packer belum lepas
Bagian-bagian dari Packer
bagian2 Packerbagian2 Packer1. Seal element : yg menyekat anulus tubing/casing.
Dibuat dr elastomer atau asbestos yg dpt ditekan untukberubah bentuk waktu packer dipaki u/ mengisi ruangantara mandrel dg dinding casing
2. Packer mandrel : badan utama packer yg terdiri drmetal u/ jadi pegangan seluru komponen packer
3. Slips : Komponen mekanis packer dg bentuk gigigerigi yg menyentuh ID casing & mencegah gerakanPackerPacker
4. Cone : silinder tersusun (tappered) tempat masuknyaslip untuk menekan gerigi pd dinding casing
5. J slot: permukaan bergerigi berbentuk J ygmengontrol gerakan slip relatif thd cone
6 H d li H ld D B tt l t h d li t6. Hydraulic Hold Down Button : alat hydraulistpencegah gerakan umtuk memegang mandrel ditempatnya saat slip mulai kerja & memberi kekuatanpenahan tambahan
7. Backup Ring : per metal yg bisa mengembang diatasp g p yg g gdan/atau dibawah seal element yg dipakai u/ menahanpengembangan seal secr berlebihan
Packer Systems Applications
I l t d i Isolate producing zone
Tubing-to-casing seal
Increase well flow velocity
Well control
Corrosion control
A Typical BOT Packer
Permanent Packers Retrievable Packers Seal Assemblies Production Assemblies
Production ValvesS tti T l Setting Tools
Seal Bores
Remedial Systems
Retrievable PackersC t R t iCement RetainersBridge PlugsWash ToolsWash ToolsAccessories
Running toolsgRetrieving toolsSetting assembliesManifolds
BlastJ i tJoint
Thru-Tubing Inflatable Packers
Tool can be set in casing below the production tubingproduction tubing
Can run on coiled tubing, threaded tubing, or E-lineg,
Cased Hole Completions
Safety Systems
A Typical BOT Flow Control Device
Sliding Sleeves- controls flow between workstring and annulusP fil Ni l ll t l t b l d i th Profile Nipples- allows tools to be placed in the string by pumping or wireline
Blanking Plugs/Chokes- isolates or controls fluid flow up workstring
Accessories Running toolsRunning tools Retrieving tools Shifting tools
Sliding Sleeve Applications
Plug the tubingI l t Isolate zones
Check flow in either direction Choke the flow in either Choke the flow in either
direction Selectively communicate
between the tubing and the annulus
A Typical Subsurface Safety Valve
Subsurface Safety systems are installed in the wellbore as part of the completion.
Typically they are installed in the completion tubing string a few hundred feet below the seafloor in offshore applications. If the production platform were damaged or destroyed, the well would be shut in below the seafloor, preventing loss of the well and pollution of the environment.
Controlled by surface hydraulic pressure, preset flow differential, pressure drop.
Safety System Applications
Automatic Production Shut Down in an EmergencyDown in an Emergency
Prevents catastrophic lossPrevents catastrophic loss of the Wellbore Environmental protectionEnvironmental protectionPersonnel protection
W ll fl it iWell flow monitoring
Allows for safe remote operation of the well
A Typical Surface Safety SystemShut In Controls: Manual & Remote Loss of Control Pressure Pressure DropPressure Drop
Well Requirements Evolution
Technology Progression
Single Zone Completion
Common simple completion
Single zone of interest isolated
Production of oil and gas through theProduction of oil and gas through the completion
Technology Progression
Multiple Zone / Commingled ProductionAllows the operator to produce fromAllows the operator to produce from more than one zone at the same timeA cost effective method of completionp
Technology Progression
Dual Zone CompletionfProduction from more than one
zone in the wellbore
M li t d l tiMore complicated completion requirements
Horizontal Completion
Production from a Horizontal Production from a Horizontal Wellbore
Greater Exposure to the Producing Formation
Reduces the number of wells requiredrequired
Multilateral Completion
P d ti f lti l Production from multiple zones and multiple wellbore
Significantly more complicated completion requirementsp q
Emerging technology in t d k ttodays market
Thru-Tubing Application
Run through existing tubing and set inside the larger casing below
Eliminates the need toEliminates the need to remove the Completion equipment
Ability to build a new Wellbore without a rigWellbore without a rig
Technology Advancements
The Future of Completions..
A Vision for the Next Century