23
© LANCO Group, All Rights Reserved © LANCO Group, All Rights Reserved Lanco Infratech Ltd Investor Presenta>on POWER EPC INFRASTRUCTURE SOLAR NATURAL RESOURCES

Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

Embed Size (px)

Citation preview

Page 1: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved© LANCO Group, All Rights Reserved

LancoInfratechLtd

InvestorPresenta>on

POWER EPC  INFRASTRUCTURE SOLAR  NATURAL RESOURCES 

Page 2: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

Agenda

2

1CompanyOverview

3IndustryOverview

4PowerBusiness

5EPCBusiness

7NaturalResourceBusiness

8InfrastructureBusiness

9PropertyDevelopmentBusiness

10ExperiencedManagementTeam

6SolarBusiness

2Financials

Page 3: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

1.Mission,VisionandValues

Mission: Development of Society through Leadership, Entrepreneurship, Ownership

Vision: Most Admired Integrated Infrastructure Enterprise

Values: Integrity

Humility & Respect

Achievement Drive Accountability

Continuous Learning

Teamwork Organization before Self

3 Positive Attitude

Page 4: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

1.India’slargestIntegratedPowerDeveloper

4

Infrastructure Property Development 

Subsidiaries / Affiliates

Lanco Power  Natural Resources Solar 

Lanco Infratech Limited (LITL) 

•  Listed Holdco of the group •  Promoters Holding ~ 70.2% •  Adj. Net Worth US $832 mn (including Minority) 

•  AllbusinessesofthegroupareunderLITL•  Powerprojectsof9,358MWin12statesofIndia(4,722MW*underopera>on&4,636underconstruc>on)

*732MWge^ngreadyforopera>ons

EPC Construc>on

Thermal  Hydro  Roads Lanco Hills EPC 

GeneraTon 

Manufacturing 

AllCoalandGasbasedSPVs

AllHydrobasedSPVs

AssumedUS$/INR=50

•  Devihalli•  Hosekote•  Kanpur‐

Aligarh

•  Griffin•  Mahatamil•  Rampia/Dip

side•  Tasra

Coal 

Page 5: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

2.Financials–P&L

Cash Profit: PAT + Depreciation + Profit Eliminated

Adj. PAT= Reported PAT + Profit Eliminated

* Revenue : Before intersegment revenue elimination

5

Note:1.  AssumedUS$/INR=502.  Mnindicatemillion

US$ Mn 

Revenue  EBITDA 

Adj. Profit  Cash profit 

 2,244  

 3,080    3,059  

 2,175  

 ‐    

 500  

 1,000  

 1,500  

 2,000  

 2,500  

 3,000  

 3,500  

FY11  FY12  FY13  FY14 

 430  

 370  

 531  

 334  

 ‐    

 100  

 200  

 300  

 400  

 500  

 600  

FY11  FY12  FY13  FY14 

 189   137  

 ‐214  

 ‐458   ‐500  

 ‐400  

 ‐300  

 ‐200  

 ‐100  

 ‐    

 100  

 200  

FY11  FY12  FY13  FY14 

 244   276  

 47  

 ‐149   ‐200   ‐150   ‐100   ‐50   ‐     50  

 100   150   200   250   300  

FY11  FY12  FY13  FY14 

Page 6: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

2.Financials–BalanceSheet

* Fixed Assets : Gross Block + CWIP

6 Note:1.  AssumedUS$/INR=502.  *AsperAS‐21/AS‐28

US$ Mn 

Cash & Cash Equivalents 

Key  Balance Sheet Figures (asonMar31,2014)NetWorth(includingMinorityInterest) 531Add:ProfitEliminated(asperAS21) 300Adjusted Net Worth 831GrossDebt(ofcompany,subsidiaries&associates) 7,325

Grossdebtofprojectsunderopera>on 3,619Grossdebtofprojectsunderconstruc>on 3,706

CashandCashEquivalent(includingsubsidiariesandassociates) 121Net Debt 7,204NetDebt/GrossAdjustedNetWorth 8.66

Above debt figures excludes acquisition debt of Griffin and working capital loans of Power companies

Fixed Assets 

 3,521  

 7,081   7,727  

 8,138  

 ‐    

 1,000  

 2,000  

 3,000  

 4,000  

 5,000  

 6,000  

 7,000  

 8,000  

 9,000  

FY11  FY12  FY13  FY14 

 258   282  

 116    121  

 ‐    

 50  

 100  

 150  

 200  

 250  

 300  

FY11  FY12  FY13  FY14 

Page 7: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

3.IndustryOverviewa)StrongPushtoDriveInfrastructureGrowth

7

XII Plan spending (FY13-FY18)

Source: World Bank Data 2010, (http://data.worldbank.org/indicator/EG.USE.ELEC.KH.PC)

Expenditure on Infrastructure is required to keep growth momentum of Indian economy

XII Five Year Plan expected target ~88 GW (as per draft document).

Per capita consumption of electricity

Total - US$1,126bn

Installed Power Capacity Growth (GW)

Source: Planning commission (XIIth five year Draft plan) (INR/USD:50)

105 108 113 118 124 132 143 148 159 174200

288

100

150

200250

300

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2017e

616

2944

0

500

1000

1500

2000

2500

3000

3500

India China

In BRIC countries, India’s per capita consumption lowest. China’s per capita consumption of power is 4.8x of India.

In order to achieve 8% growth, India should attain atleast 7% growth in total power sector.

300

64

194189

104

25

101

51 40

1830

12 -

50

100

150

200

250

300

350

Central State Private

Page 8: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

Peak Power Deficit (FY13 Actual) Source:CEA

Per Capita Consumption Growth (Units) Power Capacities (GW)

Peak Deficit (%) 

3.IndustryOverviewb)PowerScenarioinIndia

Source: CEA

8

Source: CEA

Growing share of Private players Per capita consumption of electricity ~ growing at brisk pace

Recent Policy Ini-a-ves:

1.  Policy push towards regular tariff increase byDISCOMs~mostDISCOMshikingtariffs

2.  Ini>a>ve by Government of India to allow pass‐through of addi>onal cost of imported coalsuppliedunderFSA

3.  Modifica>ontoCaseIandCaseIIstandardbiddingdocuments 12.3

13.6

18.4

18.9

21.0

21.7

22.3

24.0

Tamil Nadu

Uttar Pradesh

Karnataka

Andhra Pradesh

Himachal Pradesh

J&K

Bihar

Punjab

591 613 632 672 717 735 779 819 

879 

2004 2005 2006 2007 2008 2009 2010 2011 2012 

Central,30%

State,42%

Private,29%

Sep‐12 

Central,28%

State,38%

Private,35%

Apr‐14 

Page 9: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

4.LancoPowerBusiness‐ProjectStatusUpdate

9

Plant Fuel Capacity (MW) Oeake Udupi ImportedCoal 1,200 PPA Anpara Coal 1,200 PPA KondapalliI Gas 368 PPA KondapalliII Gas 366 ShortTerm KondapalliIII* Gas 732 ShortTermAmarkantakI Coal 300 PPA AmarkantakII Coal 300 PPA Tanjore Gas 120 PPA OtherRenewable Wind,Solar,Hydro 136 PPA Total 4,722

* kondapalli III (732 MW) is getting ready for operations.

Power Projects under OperaTon 

Plant Fuel Financial closure  Capacity (MW)

oeake EsTmated compleTon

LancoUoaranchal Hydro Y 76 ShortTerm FY16

Teesta Hydro Y 500 PPA FY16

AmarkantakIII&IV Coal Y 1,320 PartPPA FY16

Vidarbha Coal Y 1,320 PartPPA FY16

Babandh Coal(PartlyCap>ve) Y 1,320 PartPPA FY16

Solar Solar Y 100 PPA FY16

Total 4,636

Power Projects under ConstrucTon 

34%

65%

1%Fuel Diversification

Gas Coal RenewablesincludingHydro

Page 10: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

4.PowerBusinessPresenceAcrossValueChainDe‐riskingtheBusiness

Fuel (Coal mining) EPC Generation and O&M Trading

•  Griff in coal, Coll ie region in Western Austral ia, currently produces 4 MTPA with resources of 1.2 bn

•  Rampia and Dip side of Rampia, captive coal mine allocated by Govt. of India to Lanco and five others with reserve base of 112 MT (our portion)

•  M a h a t a m i l , a n integrated project with power plant , has reserves of 768 MT

•  Selected as MDO by SAIL for Tasra Open C a s t m i n e w i t h geological reserves of approximately 250 mn tons in Jharkhand. Includes development of a captive power plant as well.

•  Completed projects with capacity of 4,732 MW

•  4,636 MW projects under construction

•  St rong eng inee r i ng capability

•  O v e r 1 0 y e a r s o f experience in design and development of Power Projects

•  Handles global suppliers selection and sourcing of diverse materials like high-pressure fabricated e q u i p m e n t , s k i d s , i n s t r u m e n t a t i o n & electrical systems

•  Operating capacity of 4,722MW*

•  Kondapalli III (732 MW) is getting ready for operations.

•  4,636 MW projects under construction.

•  One of largest private sector player in Indian power trading market

•  Traded 2,089 mm units i n y e a r e n d e d March 31, 2014

•  Holding 5% stake in the Indian Energy Exchange floated by Financial Technologies Ltd and Power Trading Corporation

Transmission and Distribution

•  St ra tegy i n c l udes possible expansion into transmission and distribution

Integrated presence across value chain capturing value addition across the businesses

10

Type   MW 

Thermal&Gas 4,586

Renewable(Hydro,Solar,Wind)

136

TOTAL  4,722 

*732MWge^ngreadyforopera>ons

Page 11: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

5.EPCBusiness:In‐houseexper>seenhancesmargins

11

Construction

Executing a wide range of projects spanning Thermal Power Plants, Hydro Power Plants, Highways, Airports, Industrial Structures, Transmission and Distribution, Chimneys and Cooling Towers, Water Infrastructure and Heavy Civil Structures.

EPC

EPC order book of USD 5.24 billion as on Mar’14 Major EPC / Construction order executed

Kondapalli 1,214 MW Udupi 1,200 MW Anpara 1,200 MW Amarkantak (I & II) 600 MW Tanjore Power 120 MW

Budhil 70 MW External orders under execution EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC of 250 MW Gas based Power plant in Iraq

EPC

Construction

Order Book (USD Mn) 

Revenue (USD Mn) 

 6,032   6,140  

 5,260   5,236 

 4,400  

 4,800  

 5,200  

 5,600  

 6,000  

 6,400  

FY11  FY12  FY13  FY14 

 1,174  

 1,734  

 869  

 451  

 ‐    

 400  

 800  

 1,200  

 1,600  

 2,000  

FY11  FY12  FY13  FY14 

Page 12: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

6.SolarScenario

12

  Addition of capacities:   2009 – 7.2 GW   2010 – 16.6 GW

  Price decreases that have brought PV close to grid parity in several countries have encouraged new investors

  Expected Growth in the market 3.3-4.8x of current capacity by 2015

Source: EPIA – Global Market Outlook for PV Until 2015

Glo

bal S

cena

rio

Indi

an P

ersp

ectiv

e

Source: MNRE - Renewable Energy in India: Progress, Vision and Strategy

  Under the MNRE policy:   New grid projects through NVVN   Small grid projects through IREDA   Off-grid solar

  MNRE - Phase I   Batch I 620 MW   Batch II 350 MW

  Gujarat 365 MW   Rajasthan 200 MW

  RPO requirement

Page 13: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

6.SolarBusiness:FullyIntegratedStrategyenableslowestRs/kWh

13

EPC   Project Development  Integrated 

Manufacturing 

Targetin4Yrs

500MW/PA

Aim to be a Global player, as a developer and a third party EPC player. Current Solar EPC Order Book USD $ 590mn (included in EPC order book) Current Solar farm development portfolio – 143 MW (Operating 43 MW and Under Construction 100 MW)

400MW/PA 250MW/PA

Targetin3Yrs

Manufacturing- Phase I

Capex US$ 305 Mm

Debt: Equity 70:30

Capacity- Phase I

Polysilicon 1250 MT

Wafer 80 MW

Module Line 50 MW

Policy Capacity (MW) Tariff- Rs/Unit Project Cost

(USD mm) PPA Duration

(Yrs)

Solar PV Farm

Gujarat Policy 35 Rs 15 for 12 yrs, Rs 5 for next 13 Yrs 125 25

JNNSM 5 11.5 18 25

RPSSGP 1 16.5 4 25 Solar Thermal Farm JNNSM 100 10.5 400 25

Foray into manufacturing to support internal requirements and reduce margin volatility, through the cycle

Page 14: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

7.NaturalResources(Coal):Outlook

  Around70%ofdemandfromPowerSector

  Uncertaintyindomes>csupply

  ExpectedImportofcoalby2017>150MT

  Increasingcompe>>onforoverseasassets

  Limitedopera>onalassets

  Uptrendinprices

DomesTc supply falls short of demand Coal Demand 

Securing coal: a need; an opportunity 

336

362

397

419

445

458

128 143 152 164 180 192

0

500

1000

2006‐07 2007‐08 2008‐09 2009‐10 2010‐112011‐12Anti.

MillionTones

Other

Power

Source: Ministry of Coal Annual Report 2011-12

14

InternaTonal Coal Price 

Source: Bloomberg

431

457

493

533

533

540

575

795464

504

549

582

625

640 773 98

1

020040060080010001200

FY07 FY08 FY09 FY10 FY11 FY12Prov

FY13BEFY17BE

Produc>on Demand(inldmiddlings)

Source: Planning Commission (XII Plan draft document)

Page 15: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

7.NaturalResources(Coal)

15

Griffin Coal 

Largest opera>onal thermal coal mines in Western Australia,withResourcebaseof1.2bnTonne

Strategicloca>on–Bunburyport<100kmfrommine

Goodconnec>vityofrailandport.

Current producTon:‐capacityof4mtpaofcoal.

Expansion : Planstorampupproduc>ontoamaxof18MTPAbyFY18

Rampia and DIP side of Rampia  

AllocatedtoLancoalongwithfiveotherIPPs

Lanco’sshareinthecoalblockswouldcatertothedevelopmentofapprox.1,000MWpowerplant.

Mahatamil 

Es>matedCoalReserves768MTandspreadover24.95sqkmMiningplansubmioed&presenta>onmadetoMoCandMoEFapprovedTOR(EC)•  23%ofcoalproduced–Maharashtrastate•  Remainingcoal(77%)tobeconvertedtoPower

•  Homestateshare‐37.5%ofpower•  Remaining power shared between Tamil Nadu state

andLancoat50:50ra>o.•  Coalminingfeesof112Rs/TontobepaidbyLanco.

Capacity that can be built : ‐ •  Coalminecapacityaround15MTPA•  PowerGenera>onofabout2000MW

Tasra Open Cast Project (SAIL) 

•  Selected asMine Developer and Operator (MDO) by SteelAuthority of India (SAIL) for Tasra Open Cast Project anddevelopmentofassociatedcap>vepowerproject.

•  Located in Jharia coalfield of Dhanbad (Jharkhand) havinggeologicalreservesofapproximately250milliontons

•  Se^ngupofcoalwasheryandopera>onofpowerplantof200‐300 MW capacity based on the secondary productsarisingfromtheproposedTasraWashery.

Page 16: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

8.InfrastructureBusiness:LeveragingConstruc>onExper>setoBuildInfrastructure

16

Lanco has moved into selective infrastructure projects to leverage its EPC experience

Awarded two NaTonal highway projects in Karnataka 

c.81kmstretchconnec>ngBangalore–Hoskote–Mudbagal

c.82kmstretchconnec>ngNeelamangla–Devihalli

Concessionperiodsof20yearsand25yearsrespec>velyduringwhichtollwillbecollected

CapexofUSD$360mn

GrantfromNHAIUSD$73mn

CODofDevihalliaoainedonJune25th2012andtollcollec>onstarted

CODofHoskoteaoainedonDecember19th2013andtollcollec>onstarted

Awarded one NaTonal highway projects in Uiar Pradesh 

C.280Kmstretchconnec>ngAligarhtoKanpur

ProjectinvestmentofaroundUSD$200mm

GranttobereceivedUSD$57mm

FinancialClosureachieved,Stage‐IIForestclearancefromMoEFreceived

Also built jetty at Mangalore port for Udupi Power Plant

Page 17: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

9.PropertyDevelopmentBusiness

17

Lanco Hills is the group’s foray into property development, located in Hyderabad, spread over 100 acres and comprises residential space, office space and IT SEZ

Lanco Hills

Residential •  Towers under Phase I are ready for occupation, 97% units sold out, 57% occupied •  In addition to high rise towers, 56 Villas will also be constructed

Office space •  IT tower - 0.59 mn sqft ready for occupation, lease deed signed for 80,000 sqft. •  SEZ : 0.06 mn sqft incubation space – leased out to IT companies

Property Development is restricted to Hyderabad only

Page 18: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

10.ExperiencedManagementTeam

18

L. Madhusudhan Rao 

Execu&ve Chairman 

G. Bhaskara Rao Execu&ve Vice Chairman 

L Sridhar Vice Chairman 

G. Venkatesh Babu Managing Director 

P. Abraham Director 

LANCO Board  

P. Kotaiah Director 

U.K. Kohli Director 

Finance  Power 

Lanco Group Senior Management Team 

    T. Adi Babu     Sharad Jhingan     T. N. Subramaniyan 

   P. Panduranga Rao    K. Raja Gopal 

ConstrucTon & EPC 

  S. C. Manocha   Ravi Kapoor 

Property Development 

  S. Pochendar  

Solar 

 V. Saibaba  

S. C. Manocha Director 

R. Krishnamoorthy Director 

Page 19: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

PanIndiaPresence

19

Chitradurga

Tanjore power

Amarkantak – I & II Amarkantak – III & IV

Kondapalli I & II Kondapalli III

Udupi I Udupi II

Teesta

Lanco Uttaranchal

Anpara

Babandh

Lanco Hills

Plants under construction

Plants under operation

Plants under construction

Plants under operation

Plants under construction

Plants under operation

Property development

Road development

Vamshi

Vamshi Industrial

Lanco Green

81 km Bangalore – Hoskote – Mudbagal 82 km Neelamangla – Devihalli

Coal Based

Hydro

Gas

Wind

Registered office

Corporate Office

Hyderabad

Gurgaon

Coal mine

Vidarbha

Plants under operation

Solar

Solar Power Plants Manufacturing at Rajnandgaon- Chattisgarh

Gujarat Solar

Rajasthan Solar

Mahatamil Mine

Aligarh –Kanpur Road

Tasra mine

Page 20: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

Wecarefortheworldwelivein

Lanco Foundation

•  Member of the UN Global Compact

•  Operating in 11 Indian States at 13 locations

•  Covering 140 villages & 200,000 population beneficiaries

•  we have a number of initiatives in place that help us to make a difference…

•  Focused work in the areas of:

  Disability

  Education

  Safe Drinking water

  Mobile Health Services

  Support of traditional arts & crafts

20

Page 21: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

RecentAwards

  Lanco Amarkantak wins “Greentech Safety Award 2013” in Gold category in Thermal Power sector

  Lanco Anpara wins “PowerLine Award” for the Best Thermal Project

  Lanco Amarkantak wins “Golden Peacock Occupational Health & Safety Award” for the Year 2013

  Lanco Solar Wins “IESA Award For Most Innovative Product” for 2012

  Lanco Kondapalli Wins “Golden Peacock Environment Management Award for corporate Social responsibility” for 2012

  8th Construction World- Annual Award for “Fastest Growing Construction Company”

  Tanjore Power received TERI Corporate Award for “ Environmental Excellence and Corporate Social Responsibility”

  Tanjore Power received GreenTech silver award in Power sector for “Safety Management”

  IKU II received IEEMA award for “Excellence in Fast Track Commissioning of Small Hydro Projects”

  Lanco Infratech Ltd received PRSI Golden Jubilee Award for the “Most Impressive Public Relations Initiatives”

21

Page 22: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

Disclaimer

Norepresenta>onorwarranty,expressor implied, ismadeas to,andnorelianceshouldbeplacedon, the fairness,accuracy,completenessorcorrectnessoftheinforma>onoropinionscontainedinthispresenta>on.Suchinforma>onandopinionsareinalleventsnotcurrentaterthedateofthispresenta>on.Certainstatementsmadeinthispresenta>onmaynotbebasedonhistoricalinforma>onorfactsandmaybe"forwardlookingstatements"basedonthecurrentlyheldbeliefsandassump>onsofthemanagementoftheCompany,whichareexpressedingoodfaithandintheiropinionreasonable,including those rela>ng to the Company's general business plans and strategy, its future financial condi>on and growthprospectsandfuturedevelopmentsinitsindustryanditscompe>>veandregulatoryenvironment.

Forward‐lookingstatementsinvolveknownandunknownrisks,uncertain>esandotherfactors,whichmaycausetheactual

results,financialcondi>on,performanceorachievementsoftheCompanyorindustryresultstodiffermateriallyfromtheresults, financial condi>on, performance or achievements expressed or implied by such forward‐looking statements,includingfuturechangesordevelopmentsintheCompany'sbusiness,itscompe>>veenvironmentandpoli>cal,economic,legal and social condi>ons. Further, past performance is not necessarily indica>ve of future results. Given these risks,uncertain>esandotherfactors,viewersofthispresenta>onarecau>onednottoplaceunduerelianceontheseforward‐looking statements. The Company disclaims any obliga>on to update these forward‐looking statements to reflect futureeventsordevelopments.

Thispresenta>onisforgeneralinforma>onpurposesonly,withoutregardtoanyspecificobjec>ves,financialsitua>onsor

informa>onalneedsof anypar>cularperson. Thispresenta>ondoesnot cons>tuteanofferor invita>on topurchaseorsubscribeforanysecuri>esoftheCompanybyanypersoninanyjurisdic>on,includingIndiaandtheUnitedStates.Nopartofitshouldformthebasisoforberelieduponinconnec>onwithanyinvestmentdecisionoranycontractorcommitmenttopurchaseorsubscribeforanysecuri>es.TheCompanymayalter,modifyorotherwisechangeinanymannerthecontentof this presenta>on, without obliga>on to no>fy any person of such change or changes. This presenta>onmay not becopiedordisseminatedinanymanner.

22

Page 23: Lanco Infratech Ltdlancogroup.com/pdf/ir/IR_PPT_ May14.pdf · Lanco Infratech Ltd ... EPC of Moser Baer Thermal Power Plant (600 MW x 2) BoP of Koradi Thermal Power (3 x 660 MW) EPC

©LANCOGroup,AllRightsReserved

23

Thank You