PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V LAPORAN PERTANGGUNGJAWABAN PEMBANGUNAN GEDUNG POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI

Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

  • Upload
    others

  • View
    31

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

LAPORAN PERTANGGUNGJAWABAN

PEMBANGUNAN GEDUNG POSYANDU DAHLIA XVIII

KANTOR RW &

SEKRETARIAT PKK

RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU

BEKASI

Page 2: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

KATA PENGANTAR

Assalamu’alaikum Wr.Wb. Puji Syukur kehadirat Allah SWT yang telah melimpahkan rahmat, taufik, dan hidayah-Nya, sehingga kami dapat menyelesaikan penyusunan laporan pertanggung jawaban Dana bantuan Desa Burangkeng dalam rangka kegiatan pembangunan gedung Posyandu Dahlia XVIII, Kantor RW dan Sekretariat PKK dapat selesai pada waktu yang sudah direncanakan. Terima kasih yang tak terhingga kami ucapkan kepada Pemerintah Desa Burangkeng yang telah memberikan bantuan dana untuk pembangunan Gedung Posyandu Dahlia XVIII. Terima kasih pula kami sampaikan kepada semua pihak yang telah ikut membantu baik materiil maupun moril dalam rangka mensukseskan pembangunan ini. Semoga Allah SWT memberikan kekuatan dan bimbingan kepada kita sekalian sehingga mampu menjalankan tugas dengan sebaik baiknya. Wassalamu’alaikum Wr.Wb. Bekasi, 27 Januari 2018 Ketua Panitia Pembangunan Posyandu Dahlia XVIII Yus Warsono

Page 3: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

A. LAPORAN KEGIATAN Nama Kegiatan : Pembangunan Gedung Posyandu Dahlia XVIII, Kantor RW011 dan

Sekretariat PKK RW011 Tempat Kegiatan : Lingkungan RW.011 Ds. Burangkeng, Kec. Setu Waktu Kegiatan : Bulan November 2017 – Bulan Januari 2018 Hasil/Dampak : Bahwa setelah diadakan Pembangunan Gedung Posyandu Dahlia XVIII di Lingkungan RW.011, maka warga RW.011 saat ini memiliki tempat untuk kegiatan Posyandu dan tidak terganggu lagi oleh panas dan hujan karena sebelumnya tidak memiliki tempat. Hal ini dapat mendukung terciptanya suasana kegiatan Posyandu menjadi tenang dan nyaman. Dan juga telah dibangun Kantor RW011 dan Sekretariat PKK RW011, sehingga pelayanan masyarakat menjadi lebih baik dan mampu meningkatkan semangat dan kinerja pengurus RW dan PKK dalam mengemban amanah warga.

B. LAPORAN KEUANGAN

Rincian penggunaan dana pembangunan dapat dilihat sebagai berikut:

1. Pemasukan : a. Dana bantuan desa : Rp 20.000.000,- b. Dana subsidi Kas RW : Rp 7.000.000,- c. Sumbangan dana dari warga (perorangan) :

Bp.Rudi – RT07 : Rp 300.000,- Hamba Allah : Rp 5.000.000,- Bp.Sarjito – RT01 : Rp 500.000,- Bp.Endro – RT01 : Rp 500.000,- Bimba – RT04 : Rp 500.000,- Hamba Allah – RT02 : Rp 400.000,-

Sub Total : Rp 7.200.000,- d. Sumbangan dana dari warga (kolektif) :

RT02 : Rp 605.000,- RT03 : Rp 700.000,- RT04 : Rp 600.000,- RT05 : Rp 500.000,- RT06 : Rp 1.340.000,- RT07 : Rp 2.710.000,-

Sub Total : Rp 6.455.000,-

Total Pemasukan Dana : Rp 40.655.000,-

Page 4: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

e. Sumbangan material dari warga : Bp. Sidik – RT01 : 7 M3 Pasir Bp. Sidik – RT01 : 3 Klg Cat tembok Bp. Heri – RT01 : 1 Unit Pompa Air Bp. Endro – RT01 : 1 Unit Toren Air Bp. Iwan – RT07 : 1 Set Papan Nama Acrylic

2. Pengeluaran :

a. Biaya material dan konstruksi : Rp 39.975.810,- b. Biaya tenaga kerja : Rp 16.105.000,-

Total Pengeluaran : Rp 56.080.810,-

3. Kekurangan Biaya (Rp 40.655.000 – Rp 56.080.810 = Rp 15.425.810) : a. Biaya material dan konstruksi : Rp 9.100.500,- → TB Era Bangun b. Biaya material rangka nama : Rp 453.000,- → Sahabat G. c. Pengembalian dana talangan : Rp 5.382.560,- → HA d. Pengembalian dana talangan : Rp 489.750,- → HA

Total Kekurangan biaya : Rp 15.425.810,-

C. KESIMPULAN Pekerjaan pembangunan gedung Posyandu Dahlia XVIII, Kantor Sekretariat RW011 dan PKK sudah selesai dikerjakan dengan total Biaya Rp. 56.080.810 (LimaPuluh Enam Juta Delapan Puluh Ribu Delapan Ratus Seppuluh Rupiah), dimana dana tersebut menggunakan dana bantuan Desa Burangkeng sebesar Rp. 20.000.000 (Dua Puluh Juta Rupiah) dan dana subsidi kas RW serta sumbangan warga sebesar Rp 19.445.000 (Sembilan Belas Juta Empat Ratus Empat Pulih Lima Ribu Rupiah), sehingga dana bantuan Desa sudah dipergunakan untuk pembangunan gedung Posyandu sesuai dengan Proposal yang diajukan sebelumnya dan menyisakan sisa hutang sebesar Rp 15.425.810 (LimaBelas Juta Empat Ratus Dua Puluh Lima Ribu Delapan Ratus Sepuluh Rupiah) dan akan diselesaikan dari Kas RW dengan cara diangsur ke pihak terkait.

D. PENUTUP Dengan telah direalisasikannya pembangunan ini, kami menyampaikan terima kasih yang sebesar besarnya kepada pemerintah Desa Burangkeng, semoga apa yang telah dilaksanakan merupakan bentuk ikhtiar kita bersama dalam membangun warga Desa Burangkeng yang sehat, Beriman dan Berdaya Saing. Demikian laporan ini kami sampaikan untuk dapat dipergunakan sebagaimana mestinya.

Page 5: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

Bekasi, 27 Januari 2018 Ketua Panitia Pembangunan Posyandu Dahlia XVIII Mengetahui, Ketua RW.011 Ttd. Ttd. Yus Warsono Sudiyo ST.

Page 6: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

Lampiran 1 : Rincian Pengeluaran A. BIAYA MATERIAL DAN KONSTRUKSI

No Tgl Vendor Rincian Qty Unit Harga/Unit Total

1 03-Nov-17 Toko Listrik MCB Domale 25A 1 Pcs 63,000 63,000 2 03-Nov-17 Toko Listrik Bow 1 G 2 Pcs 5,000 10,000 3 03-Nov-17 Toko Listrik Stop Kontak 3 Lb 1 Pcs 20,000 20,000 4 03-Nov-17 Toko Listrik Stecker Lampu 1 Pcs 15,000 15,000 5 04-Nov-17 Tukang Pantek Bayar pompa pantek + konsumsi 1 Lot 1,580,000 1,580,000 6 04-Nov-17 TB. Era Bangun Pipa PVC 3/4" 5 Btg 27,000 135,000 7 04-Nov-17 TB. Era Bangun Pipa PVC 1/2" 3 Btg 20,000 60,000 8 04-Nov-17 TB. Era Bangun Keni 1/2" 2 Pcs 3,000 6,000 9 04-Nov-17 TB. Era Bangun Keni 3/4" 3 Pcs 3,500 10,500 10 04-Nov-17 TB. Era Bangun Lem isarplas 1 Pcs 8,000 8,000 11 04-Nov-17 TB. Era Bangun Solatip ONDA 1 Pcs 5,000 5,000 12 04-Nov-17 TB. Era Bangun Kawat 1 Kg 23,000 23,000 13 04-Nov-17 TB. Era Bangun Paku 5x7 2 Kg 15,000 30,000 14 04-Nov-17 TB. Era Bangun Benang 2 Roll 5,000 10,000 15 04-Nov-17 TB. Era Bangun Kaso 4x6 10 Btg 38,000 380,000 16 04-Nov-17 TB. Era Bangun Papan cor 10 Btg 13,000 130,000 17 04-Nov-17 TB. Era Bangun Batu kali 1 Colt 220,000 220,000 18 04-Nov-17 TB. Era Bangun Semen 5 Sack 50,000 250,000 19 04-Nov-17 TB. Era Bangun Batu split 1 Colt 210,000 210,000 20 04-Nov-17 TB. Era Bangun Bodem 1 Pcs 55,000 55,000 21 04-Nov-17 TB. Era Bangun Besi jadi 4m 4 Pcs 62,500 250,000 22 04-Nov-17 TB. Era Bangun Kawat 1 Kg 23,000 23,000 23 04-Nov-17 TB. Era Bangun Besi siku 4cm 1 Btg 75,000 75,000 24 04-Nov-17 TB. Era Bangun Batu kali 1 Kol 220,000 220,000 25 04-Nov-17 TB. Era Bangun Besi jadi 4m 2 Pcs 62,500 125,000 26 05-Nov-17 TB. Era Bangun Bodem 10 lp 1 Pcs 90,000 90,000 27 05-Nov-17 TB. Era Bangun Besi siku 3 x 3 1 Btg 65,000 65,000 28 05-Nov-17 TB. Era Bangun Sdi 1/2 2 Pcs 3,000 6,000 29 05-Nov-17 TB. Era Bangun Tusen clep 1/2 1 Pcs 8,000 8,000 30 05-Nov-17 TB. Era Bangun Selop 1 Pcs 5,000 5,000

Page 7: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

No Tgl Vendor Rincian Qty Unit Harga/Unit Total

31 05-Nov-17 TB. Era Bangun Saringan tusen klep 1 Pcs 7,500 7,500 32 05-Nov-17 TB. Era Bangun Batu kali 2 Colt 210,000 420,000 33 05-Nov-17 TB. Era Bangun Ember cor 5 Pcs 7,000 35,000 34 07-Nov-17 TB. Era Bangun Besi jadi 4 m 10 Btg 62,500 625,000 35 07-Nov-17 TB. Era Bangun Besi jadi 3 m 5 Btg 48,000 240,000 36 07-Nov-17 TB. Era Bangun Pipa 4" 1 Btg 132,500 132,500 37 07-Nov-17 TB. Era Bangun Pipa 2½" 1 Btg 67,500 67,500 38 08-Nov-17 TB. Era Bangun Semen tiga roda 5 Sak 51,000 255,000 39 08-Nov-17 TB. Era Bangun Batu Kali 1 Colt 220,000 220,000 40 08-Nov-17 TB. Era Bangun Besi jadi 4 m 1 Btg 62,500 62,500 41 08-Nov-17 TB. Era Bangun Papan cor 12 Lbr 13,000 156,000 42 08-Nov-17 TB. Era Bangun Paku 5x7 1 kg 15,000 15,000 43 10-Nov-17 TB. Era Bangun Paku 5 1 kg 15,000 15,000 44 10-Nov-17 TB. Era Bangun Triplek 6mm 1 Lbr 85,000 85,000 45 10-Nov-17 TB. Era Bangun Paku 2 1 Kg 2,000 2,000 46 10-Nov-17 TB. Era Bangun Clamper 1 Pcs 30,000 30,000 47 11-Nov-17 TB. Era Bangun Triplek 9mm 1 Lbr 135,000 135,000 48 11-Nov-17 TB. Era Bangun Paku 1 Kg 3,000 3,000 49 13-Nov-17 Toko Besi Baja Ringan C 75 X 0,75 mm 40 btg 68,000 2,720,000 50 13-Nov-17 Toko Besi Reng 0,4 mm 40 btg 27,000 1,080,000 51 13-Nov-17 Toko Besi Skrup 10 x 19 200 pcs 145 29,000 52 16-Nov-17 Toko Besi Genteng Metal pasir 2x4 merah 120 Lbr 27,000 3,240,000 53 16-Nov-17 Toko Besi Nock C merah 10 Lbr 16,000 160,000 54 16-Nov-17 Toko Besi Skrup Gypsum 1000 Pcs 55 55,000 55 17-Nov-17 TB. Era Bangun Paku 3 0.25 Kg 20,000 5,000 56 17-Nov-17 TB. Era Bangun Tambang 15 M 3,000 45,000 57 17-Nov-17 TB. Era Bangun WD 3 Pcs 5,000 15,000 58 17-Nov-17 TB. Era Bangun Hebel 75 2 Kubik 650,000 1,300,000 59 17-Nov-17 TB. Era Bangun MU 380 2 Sa 95,000 190,000 60 17-Nov-17 TB. Era Bangun WG16 300 Ptg 200 60,000 61 17-Nov-17 TB. Era Bangun Mata Gergaji 1 Pcs 15,000 15,000 62 17-Nov-17 TB. Era Bangun WG16 200 Ptg 200 40,000 63 17-Nov-17 TB. Era Bangun Reng baja ringan 17 Pcs 32,000 544,000 64 17-Nov-17 TB. Era Bangun Mata obeng 1 Pcs 10,000 10,000 65 17-Nov-17 TB. Era Bangun Mesin bor maktec 1 Pcs 400,000 400,000

Page 8: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

No Tgl Vendor Rincian Qty Unit Harga/Unit Total

66 17-Nov-17 TB. Era Bangun Mata obeng 1 Pcs 15,000 15,000 67 17-Nov-17 TB. Era Bangun Kni 6x1 1/4 1 Pcs 50,000 50,000 68 19-Nov-17 Toko Listrik Sew 1 Pcs 40,000 40,000 69 19-Nov-17 Toko Listrik Sew 1 Pcs 40,000 40,000 70 20-Nov-17 Toko Listrik Kabel NYY 2 x 1,5 Sp 1 Roll 275,000 275,000 71 20-Nov-17 Toko Listrik Stecker Cs 1 Pcs 16,000 16,000 72 20-Nov-17 Toko Listrik tngko g 3 Pcs 11,000 33,000 73 20-Nov-17 Toko Listrik S/K CF 6 pcs 12,000 72,000 74 20-Nov-17 Toko Listrik Kabel NYY 2 x 1,5 Sp 1 Roll 275,000 275,000 75 20-Nov-17 Toko Listrik Stecker Cs 1 Pcs 16,000 16,000 76 20-Nov-17 Toko Listrik tngko g 3 Pcs 11,000 33,000 77 20-Nov-17 Toko Listrik S/K CF 6 pcs 12,000 72,000 78 20-Nov-17 TB. Era Bangun Hebel 75 2 Kbk 640,000 1,280,000 79 20-Nov-17 TB. Era Bangun Nok metal 2 Pcs 20,000 40,000 80 20-Nov-17 TB. Era Bangun Besi jadi 3mm 6 Pcs 48,000 288,000 81 21-Nov-17 TB. Era Bangun MU 380 1 Sack 95,000 95,000 82 21-Nov-17 TB. Era Bangun Pintu sisco biru 1 Set 280,000 280,000 83 21-Nov-17 Toko Besi Besi siku untuk dudukan toren 1 Lot 480,000 480,000 84 21-Nov-17 Toko Besi Impala 1 Klg 23,000 23,000 85 22-Nov-17 Hannochs Fitting Broco 1210 6 Pcs 11,000 66,000 86 22-Nov-17 Hannochs Ibdus O 10 Pcs 1,000 10,000 87 22-Nov-17 Hannochs MCB 10 A 1 Pcs 60,000 60,000 88 22-Nov-17 Hannochs Isolasi Unitto 1 Pcs 8,000 8,000 89 22-Nov-17 Hannochs MCB 4 A 1 Pcs 20,000 20,000 90 22-Nov-17 TB. Era Bangun Hebel 75 2 Kbk 640,000 1,280,000 91 22-Nov-17 TB. Era Bangun Closet toto biru 1 Pcs 280,000 280,000 92 22-Nov-17 TB. Era Bangun Kni 3 2 Pcs 15,000 30,000 93 22-Nov-17 TB. Era Bangun Kni 4 1 Pcs 25,000 25,000 94 22-Nov-17 TB. Era Bangun Pipa 20mm 10 Btg 12,500 125,000 95 22-Nov-17 TB. Era Bangun Isarplas 1 Pcs 8,000 8,000 96 24-Nov-17 TB. Era Bangun Semen tiga roda 4 Sack 51,000 204,000 97 24-Nov-17 TB. Era Bangun Papan cor 8 Pcs 13,000 104,000 98 24-Nov-17 TB. Era Bangun Besi 10 1 Pcs 58,000 58,000 99 25-Nov-17 TB. Era Bangun Hebel 75 0.5 Kbk 640,000 320,000 100 25-Nov-17 TB. Era Bangun Pipa 20mm 1 Pcs 52,500 52,500

Page 9: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

No Tgl Vendor Rincian Qty Unit Harga/Unit Total

101 25-Nov-17 TB. Era Bangun Kni 2 1 Pcs 8,000 8,000 102 25-Nov-17 TB. Era Bangun Tee 2 1 Pcs 10,000 10,000 103 25-Nov-17 TB. Era Bangun Scrup 16x20 200 Pcs 200 40,000 104 25-Nov-17 TB. Era Bangun Hebel 75 112 Pcs 2,875 322,000 105 25-Nov-17 TB. Era Bangun Pipa 2" 1 Btg 52,500 52,500 106 25-Nov-17 TB. Era Bangun Knee 2" 1 Pcs 8,000 8,000 107 25-Nov-17 TB. Era Bangun T 2" 1 Pcs 10,000 10,000 108 25-Nov-17 TB. Era Bangun P16-Ro 200 Pcs 2,000 400,000 109 25-Nov-17 TB. Era Bangun Knee 2" 2 Pcs 9,000 18,000 110 25-Nov-17 TB. Era Bangun GRC 4 Lbr 60,000 240,000 111 25-Nov-17 TB. Era Bangun Besi Holow 2 x 4 4 Btg 18,000 72,000 112 25-Nov-17 TB. Era Bangun Paku GRC 0.25 Kg 28,000 7,000 113 25-Nov-17 TB. Era Bangun WD 2 Pcs 5,000 10,000 114 25-Nov-17 TB. Era Bangun Reng 2 Pcs 32,000 64,000 115 25-Nov-17 TB. Era Bangun Baja Ringan 2 Btg 74,000 148,000 116 25-Nov-17 TB. Era Bangun Reng baja ringan 1 Btg 32,000 32,000 117 25-Nov-17 TB. Era Bangun Gecap 1 Pcs 15,000 15,000 118 27-Nov-17 TB. Era Bangun Hebel 75 0.5 Kbk 640,000 320,000 119 27-Nov-17 TB. Era Bangun Baja ringan 6 Pcs 74,000 444,000 120 27-Nov-17 TB. Era Bangun MU 380 1 Sack 95,000 95,000 121 27-Nov-17 TB. Era Bangun Besi hollow 2x4 4 Pcs 18,000 72,000 122 27-Nov-17 TB. Era Bangun Paku GRC 0.25 Pcs 28,000 7,000 123 27-Nov-17 TB. Era Bangun WD 2 Pcs 5,000 10,000 124 27-Nov-17 TB. Era Bangun Reng baja ringan 2 Pcs 32,000 64,000 125 27-Nov-17 TB. Era Bangun Baja ringan 2 Pcs 74,000 148,000 126 27-Nov-17 TB. Era Bangun Ring baja 1 Pcs 32,000 32,000 127 27-Nov-17 TB. Era Bangun Gegep 1 Pcs 15,000 15,000 128 27-Nov-17 Sinar Bintang FajarGenteng Metal pasir 2x4 merah 45 Lbr 27,000 1,215,000 129 27-Nov-17 Klauss T Dus 5 Pcs 2,500 12,500 130 27-Nov-17 Klauss Flexible 2 m 3,000 6,000 131 29-Nov-17 TB. Era Bangun BCP 1 Pcs 200,000 200,000 132 29-Nov-17 TB. Era Bangun Selang timbang 10 Mtr 4,000 40,000 133 29-Nov-17 TB. Era Bangun MU 200 2 Sack 125,000 250,000 134 29-Nov-17 TB. Era Bangun Semen tiga roda 1 Sack 51,000 51,000 135 29-Nov-17 TB. Era Bangun Amplas 1 Mtr 8,000 8,000

Page 10: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

No Tgl Vendor Rincian Qty Unit Harga/Unit Total

136 29-Nov-17 TB. Era Bangun Kawat halus 1 Mtr 22,000 22,000 137 29-Nov-17 Ceria Abadi Kramik 20 x 20 4 Pcs 57,000 228,000 138 29-Nov-17 Ceria Abadi Saw 2 x 1,5 1 Pcs 10,000 10,000 139 29-Nov-17 Ceria Abadi Tem 2" 1 Pcs 15,000 15,000 140 29-Nov-17 TB. Era Bangun BRP 1 Pcs 200,000 200,000 141 29-Nov-17 TB. Era Bangun Selang timbang 10 m 4,000 40,000 142 29-Nov-17 TB. Era Bangun MU 200 2 Sak 125,000 250,000 143 29-Nov-17 TB. Era Bangun Semen tiga roda 1 Sak 51,000 51,000 144 29-Nov-17 TB. Era Bangun Amplas 1 m 8,000 8,000 145 29-Nov-17 TB. Era Bangun Kawat Halus 1 m 22,000 22,000 146 29-Nov-17 TB. Era Bangun Semen tiga roda 3 Sak 51,000 153,000 147 29-Nov-17 TB. Era Bangun Nat 66 1 Bks 12,500 12,500 148 29-Nov-17 TB. Era Bangun Pipa 0,5" 3 Btg 12,500 37,500 149 29-Nov-17 TB. Era Bangun Floor drain 1 Pcs 30,000 30,000 150 01-Dec-17 TB. Era Bangun Semen tiga roda 3 Sack 51,000 153,000 151 01-Dec-17 TB. Era Bangun Nat 66 1 Pcs 12,500 12,500 152 01-Dec-17 TB. Era Bangun Pipa 20mm 3 Btg 12,500 37,500 153 01-Dec-17 TB. Era Bangun Floor drain 1 Pcs 30,000 30,000 154 01-Dec-17 Kawachi Kabel 3 x 1,5 10 m 9,000 90,000 155 01-Dec-17 Kawachi T Dus Putih 5 Pcs 5,000 25,000 156 01-Dec-17 Ali Tanah urug 1 Lot 200,000 200,000 157 02-Dec-17 Ali Tanah urug 1 Lot 100,000 100,000 158 03-Dec-17 Hannochs T Dus C3 Putih 5 Pcs 3,500 17,500 159 03-Dec-17 TB. Era Bangun MCB 6A 3 Pcs 50,000 150,000 160 03-Dec-17 TB. Era Bangun Kabel 2 x 1,5 25 m 6,500 162,500 161 03-Dec-17 TB. Era Bangun Kabel 4 x 3 1 m 20,000 20,000 162 03-Dec-17 TB. Era Bangun Kabel 3 x 1,5 5 m 9,000 45,000 163 03-Dec-17 TB. Era Bangun Stop Kontak 1 Pcs 17,500 17,500 164 03-Dec-17 TB. Era Bangun Mankok Bulat 1 Pcs 2,000 2,000 165 03-Dec-17 TB. Era Bangun Klem Mertor 1 pcs 10,000 10,000 166 03-Dec-17 TB. Era Bangun Nito 1 Pcs 8,000 8,000 167 03-Dec-17 TB. Era Bangun Cable Tis 1 Pak 32,500 32,500 168 03-Dec-17 TB. Era Bangun lampu Hanoch LED 12 W 8 Pcs 42,500 340,000 169 05-Dec-17 TB. Era Bangun Pasir 2 Kol 220,000 440,000 170 05-Dec-17 TB. Era Bangun Semen tiga roda 5 Sack 50,000 250,000

Page 11: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

No Tgl Vendor Rincian Qty Unit Harga/Unit Total

171 05-Dec-17 TB. Era Bangun Ember cor 2 Pcs 7,000 14,000 172 05-Dec-17 TB. Era Bangun Kikir baiho 1 Pcs 35,000 35,000 173 07-Dec-17 TB. Era Bangun Semen tiga roda 2 Sack 50,000 100,000 174 07-Dec-17 TB. Era Bangun Semen MU 1 Sack 125,000 125,000 175 07-Dec-17 TB. Era Bangun Pasir 1 Kol 210,000 210,000 176 08-Dec-17 TB. Era Bangun Pipa 1/2 1 Btg 20,000 20,000 177 08-Dec-17 TB. Era Bangun Kran onda 2 Pcs 57,500 115,000 178 08-Dec-17 TB. Era Bangun Kni 1/2 5 Pcs 2,500 12,500 179 08-Dec-17 TB. Era Bangun Sdi 1/2 2 Pcs 5,000 10,000 180 08-Dec-17 TB. Era Bangun Lem isarplas 1 Pcs 8,000 8,000 181 08-Dec-17 TB. Era Bangun Baut 1 Pcs 2,000 2,000 182 08-Dec-17 TB. Era Bangun Selip 1 Pcs 5,000 5,000 183 09-Dec-17 TB. Era Bangun Tee 1/2 2 Pcs 5,000 10,000 184 09-Dec-17 TB. Era Bangun Sdi 1/2 1 Pcs 5,000 5,000 185 09-Dec-17 TB. Era Bangun Kni 1/2 5 Pcs 2,500 12,500 186 09-Dec-17 TB. Era Bangun Kni 4 2 Pcs 25,000 50,000 187 09-Dec-17 TB. Era Bangun Kran onda 1 Pcs 5,750 5,750 188 09-Dec-17 TB. Era Bangun Pipa 41D 2 Pcs 132,500 265,000 189 09-Dec-17 TB. Era Bangun Semen tiga roda 2 Sack 50,000 100,000 190 11-Dec-17 TB. Era Bangun Pasir Mundu 1 Colt 210,000 210,000 191 11-Dec-17 TB. Era Bangun Semen Tiga Roda 3 Sak 50,000 150,000 192 11-Dec-17 TB. Era Bangun Triplek 4 mm 4 Lbr 66,000 264,000 193 11-Dec-17 TB. Era Bangun Rel Sliding 18 2 Pcs 180,000 360,000 194 11-Dec-17 TB. Era Bangun Kunci Sliding Soligen 2 Pcs 95,000 190,000 195 11-Dec-17 TB. Era Bangun Kunci K Mundi 1 Pcs 50,000 50,000 196 11-Dec-17 TB. Era Bangun Tee 0,5" 1 Pcs 5,000 5,000 197 11-Dec-17 TB. Era Bangun Pipa 0,5" 2 Btg 20,000 40,000 198 11-Dec-17 TB. Era Bangun Knee 0,5" 5 Pcs 2,500 12,500 199 11-Dec-17 TB. Era Bangun Besi Holow 4 x 4 4 Btg 22,000 88,000 200 11-Dec-17 TB. Era Bangun Besi Holow 2 x 4 2 Btg 18,000 36,000 201 11-Dec-17 TB. Era Bangun Viser 58 + Skrup 10 Pcs 1,000 10,000 202 11-Dec-17 TB. Era Bangun Baja Ringan 1 Btg 74,000 74,000 203 11-Dec-17 TB. Era Bangun Dudukan Sleding 2 Btg 45,000 90,000 204 11-Dec-17 TB. Era Bangun Natlu 3 x 4 2 Pcs 22,500 45,000 205 12-Dec-17 TB. Era Bangun Paku Riped 100 Pcs 2,000 200,000

Page 12: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

No Tgl Vendor Rincian Qty Unit Harga/Unit Total

206 12-Dec-17 TB. Era Bangun Kunci My 1 Pcs 27,000 27,000 207 12-Dec-17 TB. Era Bangun Semen Tiga Roda 2 Sak 50,000 100,000 208 12-Dec-17 TB. Era Bangun Kisal Slo 1 Pcs 3,000 3,000 209 12-Dec-17 TB. Era Bangun Selot 2 Pcs 5,000 10,000 210 12-Dec-17 TB. Era Bangun Matek 4 kg 2 Klg 48,000 96,000 211 12-Dec-17 TB. Era Bangun Ketu 1 Pcs 8,000 8,000 212 12-Dec-17 TB. Era Bangun Kape K 1 Pcs 3,000 3,000 213 12-Dec-17 TB. Era Bangun Kran 0,5 " 1 Pcs 15,000 15,000 214 12-Dec-17 TB. Era Bangun Toples 1 Pcs 8,000 8,000 215 14-Dec-17 Yus Kaca riben 95.5x59.5216 14-Dec-17 Yus Kaca riben 96x59217 14-Dec-17 Hannochs Stop Galgow 2 Pcs 16,000 32,000 218 14-Dec-17 Hannochs F segi 4 1210 3 Pcs 11,500 34,500 219 16-Dec-17 Yus Siku L 1x1 1 Lot 40,000 40,000 220 17-Dec-17 TB. Era Bangun Nachi 4" 1 Pcs 25,000 25,000 221 17-Dec-17 TB. Era Bangun Alpet 1 Pcs 10,000 10,000 222 19-Dec-17 TB. Era Bangun Keramik 40 x 40 65 m 45,000 2,925,000 223 19-Dec-17 TB. Era Bangun Dop 2" 2 Pcs 6,000 12,000 224 19-Dec-17 TB. Era Bangun Semen Tiga Roda 5 Sak 50,000 250,000 225 19-Dec-17 TB. Era Bangun Roll Cat 1 Pcs 30,000 30,000 226 19-Dec-17 TB. Era Bangun Bak Cat Hitam 1 Pcs 17,500 17,500 227 19-Dec-17 TB. Era Bangun Amplas 1 Lbr 8,000 8,000 228 19-Dec-17 TB. Era Bangun Pasir Mundu 1 Colt 220,000 220,000 229 19-Dec-17 TB. Era Bangun Semen tiga roda 5 Sak 50,000 250,000 230 19-Dec-17 TB. Era Bangun Nat 01 5 Pcs 12,500 62,500 231 19-Dec-17 TB. Era Bangun Nat 2 Pcs 12,500 25,000 232 19-Dec-17 TB. Era Bangun Kuku Macan 10 Pcs 1,500 15,000 233 12-Jan-18 TB. Era Bangun Kabel 2 x 1,5 15 m 7,500 112,500 234 12-Jan-18 TB. Era Bangun Cat Aviant (1 kg) 2 Klg 55,000 110,000 235 12-Jan-18 TB. Era Bangun Fitting Lampu WD 1 Pcs 17,500 17,500 236 12-Jan-18 TB. Era Bangun Lampu Hanoch 12 watt 1 Pcs 40,000 40,000 237 12-Jan-18 TB. Era Bangun Thiner Impala 1 Klg 23,000 23,000 238 12-Jan-18 TB. Era Bangun Isolasi Daimas 1 Pcs 8,000 8,000 239 12-Jan-18 TB. Era Bangun Kuas 2,5 Inchi 3 Pcs 10,000 30,000 240 12-Jan-18 TB. Era Bangun Cat Aviant (100 cc) 1 Klg 10,000 10,000

1 Lot 216,000 216,000

Page 13: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

No Tgl Vendor Rincian Qty Unit Harga/Unit Total 241 12-Jan-18 TB. Era Bangun Kuas 1,5 Inchi 1 Pcs 10,000 10,000 242 12-Jan-18 TB. Era Bangun Cat Avian 389 1 Klg 55,000 55,000 243 14-Jan-18 TB. Era Bangun Cat Avian 1 Klg 55,000 55,000 244 14-Jan-18 TB. Era Bangun Thiner Impala 1 Klg 23,000 23,000 245 14-Jan-18 TB. Era Bangun Pasir Mundu 0.5 Colt 210,000 105,000 246 14-Jan-18 TB. Era Bangun Semen 1 Sak 50,000 50,000 247 14-Jan-18 TB. Era Bangun Cat Vinilex 948 1 gln 110,000 110,000 248 14-Jan-18 TB. Era Bangun Saklar double bow 1 Pcs 22,500 22,500 249 14-Jan-18 TB. Era Bangun Cat Vinilex 30055 1 gln 110,000 110,000 250 14-Jan-18 TB. Era Bangun Benang 1 Pcs 4,000 4,000 252 18-Jan-18 Bukalapak Meja kantor 1 set 339,000 339,000 253 18-Jan-18 Bukalapak Frame acrilic A3 1 1 Pcs 336,000 336,000 254 18-Jan-18 Bukalapak Frame acrilic A4 1 1 Pcs 173,200 173,200 255 18-Jan-18 Bukalapak Rak buku 1 set 212,360 212,360

256 23-Jan-18 Bukalapak Foto presiden, wakil presiden & lambang garuda 1 set 405,000 405,000

Total 39,975,810 B. BIAYA TENAGA KERJA

No Tgl Vendor Rincian Qty Unit Harga/Unit Total 1 11-Nov-17 Tukang Bayar Tukang (Imam) 7 Hari 150,000 1,050,000 2 11-Nov-17 Tukang Bayar Kenek (Budi) 7 Hari 100,000 700,000 3 11-Nov-17 Tukang Bayar Tukang (Engkus) 2 Hari 150,000 300,000 4 18-Nov-17 Tukang Bayar Tukang (Imam) 5 Hari 150,000 750,000 5 18-Nov-17 Tukang Bayar Kenek (Budi) 7 Hari 100,000 700,000 6 25-Nov-17 Tukang Bayar Tukang (Imam) 6 Hari 150,000 900,000 7 25-Nov-17 Tukang Bayar Tukang (Afif) 6 Hari 150,000 900,000 8 25-Nov-17 Tukang Bayar Kenek (Budi) 6 Hari 100,000 600,000 9 25-Nov-17 Tukang Kopi tukang 6 Hari 10,000 60,000 10 02-Dec-17 Tukang Bayar Tukang (Imam) 5 Hari 150,000 750,000 11 02-Dec-17 Tukang Bayar Tukang (Afif) 7 Hari 150,000 1,050,000 12 02-Dec-17 Tukang Bayar Kenek (Budi) 7 Hari 100,000 700,000 13 02-Dec-17 Tukang Kopi tukang 6 Hari 10,000 60,000 14 09-Dec-17 Tukang Bayar Tukang (Imam) 5.5 Hari 150,000 825,000 15 09-Dec-17 Tukang Bayar Tukang (Afif) 7 Hari 150,000 1,050,000

Page 14: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

No Tgl Vendor Rincian Qty Unit Harga/Unit Total 16 09-Dec-17 Tukang Bayar Kenek (Budi) 7 Hari 100,000 700,000 17 16-Dec-17 Tukang Bayar Tukang (Imam) 5 Hari 150,000 750,000 18 16-Dec-17 Tukang Bayar Tukang (Afif) 7 Hari 150,000 1,050,000 19 16-Dec-17 Tukang Bayar Kenek (Budi) 7 Hari 100,000 700,000 20 22-Dec-17 Tukang Bayar tukang 4 Hari 150,000 600,000 21 28-Dec-17 Tukang Bayar tukang 11 Hari 150,000 1,650,000 22 4-Jan-18 Tukang Bayar tukang 2 Hari 130,000 260,000

SUB TOTAL 16,105,000

Page 15: Laporan Pembangunan Posyandu Dahlia XVIII - RW · POSYANDU DAHLIA XVIII KANTOR RW & SEKRETARIAT PKK RW.011 BEKASI TIMUR REGENSI DESA BURANGKENG KECAMATAN SETU BEKASI . PEMERINTAH

PEMERINTAH KABUPATEN BEKASI DESA BURANGKENG, KECAMATAN SETU

RUKUN WARGA 011 BEKASI TIMUR REGENSI BLOK K&V

Lampiran 2 : Foto-foto bangunan Gedung Posyandu sebelum dan sesudah dibangun

1. Kondisi awal (5 November 2017)

2. Progress 80% (2 Desember 2017)

3. Progress 100% (27 Januari 2018)