LAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS 30.000 TON PER TAHUN Disusun sebagai Salah Satu Syarat untuk Memperoleh Gelar Kesarjanaan Strata 1 Fakultas Teknik Universitas Muhammadiyah Surakarta Oleh : Siti Nur Amanah D 500 120 058 Dosen Pembimbing : 1. Rois Fatoni, S.T., M.Sc., Ph.D. 2. Emi Erawati, S.T., M.Eng. JURUSAN TEKNIK KIMIA FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH SURAKARTA 2017

LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

  • Upload
    others

  • View
    23

  • Download
    2

Embed Size (px)

Citation preview

Page 1: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

LAPORAN

TUGAS PRARANCANGAN PABRIK

MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT

DAN ASAM SULFAT

KAPASITAS 30.000 TON PER TAHUN

Disusun sebagai Salah Satu Syarat untuk Memperoleh

Gelar Kesarjanaan Strata 1 Fakultas Teknik

Universitas Muhammadiyah Surakarta

Oleh :

Siti Nur Amanah

D 500 120 058

Dosen Pembimbing :

1. Rois Fatoni, S.T., M.Sc., Ph.D.

2. Emi Erawati, S.T., M.Eng.

JURUSAN TEKNIK KIMIA FAKULTAS TEKNIK

UNIVERSITAS MUHAMMADIYAH SURAKARTA

2017

Page 2: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

ii

Page 3: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

iii

Page 4: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

iv

KATA PENGANTAR

Assalamualaikum Wr. Wb.

Alhamdulillah segala puji bagi Allah yang telah melimpahkan rahmat dan

taufiknya, sehingga penyusun dapat menyelesaikan rangkaian-rangkaian dalam

tugas prarancangan pabrik kimia sebagai skripsi ini yang berjudul “Prarancangan

Pabrik Magnesium Sulfat dari Magnesium Karbonat dan Asam Sulfat dengan

Kapasitas 30.000 Ton per Tahun”. Sholawat serta salam selalu tercurah kepada

Nabi Muhammad SAW.

Dalam penyusunan laporan skripsi ini, penulis telah mendapat bimbingan

serta pengarahan dari memulai sampai selesai dari berbagai pihak. Karena itu

penulis menyampaikan ucapan terima kasih kepada:

1. Bapak Rois Fatoni, ST, M. Sc, Ph. D, selaku Ketua Jurusan Teknik

Kimia, Fakultas Teknik Universitas Muhammadiyah Surakarta serta

pembimbing 1 saya yang telah membantu dan mengarahkan jalannya

tugas akhir ini.

2. Ibu Emi Erawati, S.T, M. Eng selaku pembimbing 2 saya yang

senantiasa bersabar dan bersedia membantu dalam skripsi ini.

3. Keluarga tercinta yang selalu memberikan dorongan moral, tekanan, dan

financial: Bapak, Ibu (Alm), Mas Mus, Mas Win, dan Mbak Ela.

4. Sanjaya Putra Perdana yang telah bersedia menjadi partner pengerjaan

skripsi.

5. Yaka Fitra Pandu yang telah memberikan semangat dari awal hingga

berakhirnya skripsi ini.

6. Teman-teman piknik Zahra, Endah, Norma, Fani, Dyah, Danang, Adit,

Deni,Tiara, Riska.

7. Teman-teman angkatan 2012 yang saling dukung mendukung, bahu

membahu ikut membantu memecahkan masalah yang buntu, see you on

top guys.

Penyusun menyadari dalam penyusunan laporan tugas akhir ini masih

terdapat banyak kekurangan-kekurangan, karenanya kritik dan saran yang

Page 5: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

v

Page 6: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

vi

MOTTO

Sebuah tantangan akan selalu menjadi beban jika hanya dipikirkan. Sebuah cita-

cita juga akan menjadi beban jika hanya dipikirkan

Kegagalan adalah kesempatan untuk memulai kembali

Tidak ada hal yang sia-sia, karena ilmu akan bermanfaat pada waktunya

Page 7: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

vii

DAFTAR ISI

Halaman

HALAMAN JUDUL ....................................................................................... i

HALAMAN PENGESAHAN ......................................................................... ii

KATA PENGANTAR ..................................................................................... iv

MOTTO ........................................................................................................... vi

DAFTAR ISI ................................................................................................... vii

DAFTAR GAMBAR ...................................................................................... xii

DAFTAR TABEL ........................................................................................... xiii

INTISARI ........................................................................................................ xv

BAB I. PENDAHULUAN

1.1. Latar belakang ...................................................................................... 1

1.2. Kapasitas Prarancangan Pabrik ............................................................ 1

1.2.1. Proyeksi Kebutuhan Magnesium Sulfat di Indonesia ................ 1

1.2.2. Ketersediaan Bahan Baku .......................................................... 2

1.2.3. Kapasitas Pabrik yang Sudah Pernah Ada ................................ 2

1.3. Lokasi Pabrik ....................................................................................... 3

1.4. Tinjauan Pustaka ................................................................................. 4

1.4.1. Macam-Macam Proses ............................................................... 4

1.4.2. Kegunaan Produk ....................................................................... 5

1.4.3. Sifat Fisika dan Sifat Kimia Bahan Baku dan Produk ............... 6

BAB II. DESKRIPSI PROSES

2.1. Sifat dan Spesifikasi Bahan Baku dan Produk .................................... 9

2.1.1. Bahan baku ................................................................................. 9

2.1.2. Bahan pembantu ......................................................................... 9

2.1.3. Produk ........................................................................................ 9

2.2. Konsep Proses ..................................................................................... 10

2.2.1. Kondisi Operasi .......................................................................... 10

2.2.2. Sifat Reaksi ................................................................................ 10

2.2.3. Tinjauan Kinetika Reaksi ........................................................... 12

Page 8: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

viii

2.3. Diagram Alir Proses dan Tahapan Proses ........................................... 12

2.3.1. Diagram Alir Proses .................................................................. 12

2.3.2. Tahapan Proses .......................................................................... 12

2.4. Diagram Alir Neraca Massa dan Neraca Energi ................................. 16

2.4.1. Diagram Alir Neraca Massa ...................................................... 16

2.4.2. Diagram Alir Neraca Energi ...................................................... 21

2.5. Lay Out Pabrik dan Peralatan ............................................................... 28

2.5.1. Lay Out Pabrik .......................................................................... 28

2.5.2. Lay Out Peralatan ...................................................................... 30

BAB III. SPESIFIKASI PERALATAN PROSES

3.1. Tangki ................................................................................................. 33

3.1.1. Tangki Penyimpanan Bahan Baku Asam Sulfat ....................... 33

3.1.2. Tangki Penyimpanan Bahan Baku Air ...................................... 33

3.2. Silo ...................................................................................................... 34

3.2.1. Silo MgCO3 ............................................................................... 34

3.2.2. Silo MgO ................................................................................... 35

3.3. Mixer ................................................................................................... 35

3.4. Reaktor ................................................................................................ 36

3.5. Filter .................................................................................................... 37

3.5.1. Filter 1 ....................................................................................... 37

3.5.2. Filter 2 ....................................................................................... 37

3.5.3. Filter 3 ....................................................................................... 38

3.6. Tangki Penetral ................................................................................... 38

3.7. Evaporator .......................................................................................... 39

3.8. Cristallizer .......................................................................................... 39

3.9. Rotary Dryer ....................................................................................... 40

3.10. Heat Exchanger ................................................................................. 41

3.10.1. Heat Exchanger 1 .................................................................... 41

3.10.2. Heat Exchanger 2 .................................................................... 41

3.10.3. Heat Exchanger 3 .................................................................... 42

3.11. Belt Conveyor .................................................................................... 42

Page 9: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

ix

3.11.1. Belt Conveyor 01 ..................................................................... 42

3.11.2. Belt Conveyor 02 ..................................................................... 43

3.11.3. Belt Conveyor 03 ..................................................................... 43

3.11.4. Belt Conveyor 04 ..................................................................... 44

3.12. Bucket Elevator .................................................................................. 44

3.12.1. Bucket Elevator 01 .................................................................. 44

3.12.2. Bucket Elevator 02 .................................................................. 45

3.12.3. Bucket Elevator 03 .................................................................. 45

3.12.4. Bucket Elevator 04 .................................................................. 46

3.13. Hopper ............................................................................................... 46

3.13.1. Hopper 01 ............................................................................... 46

3.13.2. Hopper 02 ............................................................................... 47

3.13.3. Hopper 03 ............................................................................... 47

3.13.4. Hopper 04 ............................................................................... 48

3.14. Pompa ................................................................................................. 49

3.14.1. Pompa 01 ................................................................................ 49

3.14.2. Pompa 02 ................................................................................ 49

3.14.3. Pompa 03 ................................................................................ 49

3.14.4. Pompa 04 ................................................................................ 50

3.14.5. Pompa 05 ................................................................................ 50

3.14.6. Pompa 06 ................................................................................ 51

3.14.7. Pompa 07 ................................................................................ 51

3.14.8. Pompa 08 ................................................................................ 51

3.14.9. Pompa 09 ................................................................................ 52

3.14.10. Pompa 10 .............................................................................. 52

BAB IV. UNIT UTILITAS DAN LABORATORIUM

4.1. Utilitas .................................................................................................. 53

4.1.1. Unit Air ..................................................................................... 53

4.1.1.1. Pengolahan Air ............................................................. 54

4.1.1.2. Kebutuha Air ................................................................. 58

4.1.2. Unit Listrik ................................................................................ 60

Page 10: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

x

4.1.3. Unit Steam ................................................................................. 60

4.1.4. Unit Bahan Bakar ....................................................................... 60

4.2. Unit Pengolahan Limbah ..................................................................... 61

4.3. Laboratorium ........................................................................................ 61

4.4. Spesifikasi Peralatan Pengadaan Air .................................................... 63

4.4.1. Saringan Kasar .......................................................................... 63

4.4.2. Bak Pengendap .......................................................................... 63

4.4.3. Tangki Flokulator ...................................................................... 63

4.4.4. Clarifier ..................................................................................... 64

4.4.5. Sand Filter ................................................................................. 64

4.4.6. Bak Penampung Sementara ....................................................... 64

4.4.7. Bak Penampung Air Bersih ....................................................... 65

4.4.8. Tangki Klorinasi ........................................................................ 65

4.4.9. Kation Exchanger ...................................................................... 65

4.4.10. Anion Exchanger ..................................................................... 66

4.4.11. Deaerator ................................................................................ 66

4.4.12. Tangki Air Umpan Boiler ....................................................... 66

4.5. Spesifikasi Peralatan Pengadaan Bahan Bakar .................................... 67

4.5.1. Tangki Bahan Bakar .................................................................. 67

4.6. Spesifikasi Pompa Pengadaan Air ....................................................... 67

4.6.1. Pompa 01 (L-210) ..................................................................... 67

4.6.2. Pompa 02 (L-211) ...................................................................... 67

4.6.3. Pompa 03 (L-212) ..................................................................... 68

4.6.4. Pompa 04 (L-213) ...................................................................... 68

4.6.5. Pompa 05 (L-214) ...................................................................... 68

BAB V. MANAJEMEN PERUSAHAAN

5.1. Bentuk Perusahaan .............................................................................. 70

5.2. Struktur Organisasi ............................................................................. 70

5.3 Tugas dan Wewenang .......................................................................... 72

5.3.1. Pemegang Saham ...................................................................... 72

5.3.2. Dewan Komisaris ...................................................................... 72

Page 11: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

xi

5.3.3. Dewan Direksi ........................................................................... 73

5.3.4. Staff Ahli ................................................................................... 74

5.3.5. Kepala Bagian ........................................................................... 74

5.3.6. Kepala Seksi .............................................................................. 77

5.4 Sistem Kepegawaian dan Sistem Gaji .................................................. 77

5.5 Pembagian Jam Kerja Karyawan ......................................................... 78

5.5.1. Karyawan Non Shift .................................................................. 78

5.5.2. Karyawan Shift .......................................................................... 78

5.6 Perincian Tugas dan Keahlian .............................................................. 79

5.6.1. Pembagian Jabatan .................................................................... 79

5.6.2. Perincian Jumlah Karyawan ....................................................... 79

5.6.3. Sistem Gaji Pegawai .................................................................. 80

5.7 Kesejahteraan Sosial Karyawan ........................................................... 82

5.8 Manajemen Produksi ............................................................................ 82

5.8.1. Perencanaan Produksi ............................................................... 82

5.8.2. Pengendalian Produksi ............................................................... 84

BAB VI. ANALISIS EKONOMI

6.1. Total Capital Investment ...................................................................... 86

6.2. Working Capital ................................................................................... 87

6.3. Manufacturing Cost .............................................................................. 87

6.4. General Expanses ................................................................................. 88

6.5. Analisa Ekonomi .................................................................................. 89

KESIMPULAN ............................................................................................... 92

DAFTAR PUSTAKA

LAMPIRAN

Page 12: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

xii

DAFTAR GAMBAR

Gambar 2.1. Diagram Alir Kualitatif .............................................................. 14

Gambar 2.2. Diagram Alir Kuantitatif Pabrik ................................................. 15

Gambar 2.3. Tata Letak Pabrik ....................................................................... 32

Gambar 5.1. Struktur Organisasi Perusahaan .................................................. 85

Gambar 6.1. Grafik Perhitungan Evaluasi Ekonomi ........................................ 91

Page 13: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

xiii

DAFTAR TABEL

Tabel 1.1. Kebutuhan Magnesium Sulfat di Indonesia ................................... 2

Tabel 1.2. Pabrik Magnesium Sulfat yang Sudah Pernah Ada ....................... 2

Tabel 2.1. ΔGᵒf masing-masing komponen ..................................................... 11

Tabel 2.2. Arus Neraca Massa ........................................................................ 16

Tabel 2.3. Neraca Massa Mixer........................................................................ 16

Tabel 2.4. Neraca Massa Reaktor 1 ................................................................ 17

Tabel 2.5. Neraca Massa Reaktor 2 ................................................................. 18

Tabel 2.6. Neraca Massa Filter ....................................................................... 18

Tabel 2.7. Neraca Massa Tangki Penetral ....................................................... 19

Tabel 2.8. Neraca Massa Evaporator ............................................................... 19

Tabel 2.9. Neraca Massa Kristaliser ............................................................... 20

Tabel 2.10. Neraca Massa Filter ..................................................................... 20

Tabel 2.11. Neraca Massa Rotary Dryer ......................................................... 21

Tabel 2.12. Neraca Panas Mixer ..................................................................... 21

Tabel 2.13. Neraca Panas Heat Exchanger ..................................................... 22

Tabel 2.14. Neraca Panas Reaktor 1 ................................................................ 22

Tabel 2.15. Neraca Panas Reaktor 2 ................................................................ 23

Tabel 2.16. Neraca Panas Filter ...................................................................... 24

Tabel 2.17. Neraca Panas Tangki Penetral ...................................................... 24

Tabel 2.18. Neraca Panas Heat Exchanger ..................................................... 25

Tabel 2.19. Neraca Panas Evaporator ............................................................. 26

Tabel 2.20. Neraca Panas Heat Exchanger ..................................................... 26

Tabel 2.21. Neraca Panas Kristaliser .............................................................. 27

Tabel 2.22. Neraca Panas Filter ....................................................................... 27

Tabel 2.23. Neraca Panas Rotary Dryer .......................................................... 28

Tabel 2.24. Perincian Luas Tanah dan Bangunan Pabrik ............................... 29

Tabel 4.1. Kebutuhan Air untuk Air Pendingin .............................................. 58

Tabel 4.2. Kebutuhan Air untuk Steam ........................................................... 58

Tabel 4.3. Kebutuhan Air yang Digunakan untuk Proses ............................... 59

Page 14: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

xiv

Tabel 5.1. Perincian Jumlah Karyawan ........................................................... 79

Tabel 5.2. Perincian Golongan dan Gaji ......................................................... 81

Tabel 6.1. Fixed Capital Investment ............................................................... 86

Tabel 6.2. Working Capital ............................................................................. 87

Tabel 6.3. Manufacturing Cost ....................................................................... 87

Tabel 6.4. General Expanses .......................................................................... 88

Page 15: LAPORAN TUGAS PRARANCANGAN PABRIK ...eprints.ums.ac.id/50746/2/HALAMAN DEPAN.pdfLAPORAN TUGAS PRARANCANGAN PABRIK MAGNESIUM SULFAT DARI MAGNESIUM KARBONAT DAN ASAM SULFAT KAPASITAS

xv

INTISARI

Asam sulfat dan magnesium karbonat merupakan bahan baku yang

digunakan untuk membuat magnesium sulfat. Proses pembuatan magnesium

sulfat menggunakan dua reaktor CSTR yang dipasang seri. Fungsi dari

magnesium sulfat adalah sebagai conditioning agent pada tekstil jenis cotton dan

wool, campuran untuk obat jenis cathartic dan analgesik pada industri farmasi.

Reaksi berlangsung pada fase padat-cair, irreversible, eksotermis, dan isotermal

pada suhu 82ᵒC dan tekanan 1 atm. Ditinjau dari kondisi operasi, pabrik

magnesium sulfat termasuk pabrik berisiko rendah.

Magnesium karbonat yang diperlukan untuk pabrik ini sebanyak

2.015,9848 kg/jam dan asam sulfat sebanyak 2.164,0857 kg/jam. Pabrik ini juga

membutuhkan bahan pembantu berupa H2O sebanyak 1.457,0876 kg/jam dan

MgO sebanyak 141,2361 kg/jam. Produk berupa magnesium sulfat sebanyak

3.768,9394 kg/jam. Utilitas berupa penyediaan air sebesar 1.639,2944 kg/jam

yang diperoleh dari air sungai Brantas. Penyediaan steam 4.101,2003 kg/jam,

yang didapat dari boiler dengan bahan bakar solar sebesar 110,6033 liter/jam.

Kebutuhan udara tekan sebesar 71,064 m3/jam sedangkan untuk kebutuhan listrik

dipenuhi dari PLN dan generator set sebesar 150 kWh dengan bahan bakar solar

sebanyak 17,2 liter/jam. Pabrik magnesium sulfat didirikan di Gresik, Jawa Timur

kapasitas 30.000 ton/tahun dengan luas tanah 14.763 m2 dan jumlah karyawan

162 orang.

Pabrik direncanakan berdiri pada tahun 2020 beroperasi selama 330 hari

per tahun. Dari analisis ekonomi didapatkan pabrik ini menunjukkan keuntungan

sebelum pajak sebesar Rp 81.133.211.990 per tahun setelah dipotong pajak 50%

keuntungannya menjadi Rp 60.849.908.993 per tahun. Percent Return On

Investment (ROI) sebelum pajak 19,73% dan setelah pajak 14,80%, Pay Out Time

(POT) sebelum pajak 3,02 tahun dan setelah pajak 3,66 tahun. Break Even Point

(BEP) sebesar 52,99% dan Shut Down Point (SDP) sebesar 24,50%. Discounted

Cash Flow (DCF) sebesar 30,09%. Berdasarkan pertimbangan ROI, POT, BEP,

dan DCF untuk pabrik berisiko rendah perhitungannya memenuhi standar , maka

pabrik ini sangat layak untuk didirikan.