8/12/2019 LASERscanning Company
1/26
www.pdengineers.biz
plant designengineers sdn bhd
Ron Bouman
Technical Director
Kuala LumpurMalaysia
8/12/2019 LASERscanning Company
2/26
www.pdengineers.biz
r
ofi
l
comp
anySp e c ia list Se rvic e s to the O il & Ga s a nd Pe tro c hem ic a l Ind ustrie s
Estab lishe d 1999 in Kua la Lum p ur, Ma laysia
pdmsmodelingoffshorelivingquartersengneeringservicesas builtsurveying
Catalogues, Specifications, Intelligent P&IDs and Pipe Spooling
Specialising in Architectural & Interior Design Works
Structural, Piping, Mechanical and E&I Services Design
plant designengineers sdn bhd
8/12/2019 LASERscanning Company
3/26
www.pdengineers.biz
ro
ec
t
select
clients include:
major projects:
2004 MalaysiaAs-built Laser Scan survey and 3D PDMS modelling of Bintulu Stabiliser Plant 1 & 2for MMC Oil & Gas Engineering& Shell Sarawak Berhad
2004 IndonesiaAs-built Laser Scan survey and 3D PDMS modelling of Central Gathering Station I in Duri, Riau, Sumatra
for Caltex Pacific Indonesia
2003/2004 Malaysia/VietnamAs-built Laser Scan survey and 3D PDMS modelling of riser tie-ins & Deck extension plus flow line/manifold modifications.
for Talisman Malaysia Limited
2003 MalaysiaAs-built Laser Scan survey and 3D PDMS modelling of Pulai A offshore process platform.
for MMC Oil & Gas Engineering & Petronas Carigali Sdn Bhd
2002 SingaporeAs-built Laser Scan survey, 3D modelling & verification with PDMS model of combined cycle power station.
for Alstom Power Sdn Bhd & Senoko Power Station Ltd
8/12/2019 LASERscanning Company
4/26www.pdengineers.biz
Gas Manifold Extentionfor
TALISMAN ENERGYBS A PLATFORM
l ysi
project case study
8/12/2019 LASERscanning Company
5/26www.pdengineers.biz
Project background:
Talisman Energy BS-A Platform
Location about 200km offshore Kota Baru(Malaysia
Vietnam Joint Development Area)
Better then expected production
Additional flow lines needed to be installed and existing
Gas manifolds needed to be extended.
plant designengineers sdn bhd
8/12/2019 LASERscanning Company
6/26www.pdengineers.biz
Client requirements:
No shutdown during installation of deck extension and
pipe spools
Installation window small
No work barge/boat available for any rework
Especially the deck extension had to fit. No room for any
mismatch.
plant designengineers sdn bhd
8/12/2019 LASERscanning Company
7/26
8/12/2019 LASERscanning Company
8/26www.pdengineers.biz
Coordination:
Provide appointed Design Consultant with 3D As-Built
PDMS Model. (Eng ine e ring PDMS Mod e l wa s a va ila b le )
Verify and resolve any clashes between 3D As-Built
PDMS Model and Design consultants new design.
Dimensional verification of Fabricated (Tag welded)
Deck extension by appointed Fabricator.
Dimensional verification of Fabricated critical pipe
spools
plant designengineers sdn bhd
8/12/2019 LASERscanning Company
9/26www.pdengineers.biz
plant designengineers sdn bhd
Planning and Logistics
Kuala Lumpur Kota BaruAirport (1 hour flight)
Kota BaruHelibase BS-A Platform (1 Hour Helicopter flight)
Depart 06.00 KL Arrive on the Platform 12.00 noon
Did it work out?
8/12/2019 LASERscanning Company
10/26www.pdengineers.biz
plant designengineers sdn bhd
Well no.
8/12/2019 LASERscanning Company
11/26www.pdengineers.biz
plant designengineers sdn bhd
2 Days later we arrived
8/12/2019 LASERscanning Company
12/26www.pdengineers.biz
plant designengineers sdn bhd
8/12/2019 LASERscanning Company
13/26
8/12/2019 LASERscanning Company
14/26
www.pdengineers.biz
plant designengineers sdn bhd
Wellhead Area
8/12/2019 LASERscanning Company
15/26
www.pdengineers.biz
plant designengineers sdn bhd
Drain VesselWater Injection Area
8/12/2019 LASERscanning Company
16/26
www.pdengineers.biz
ca
se
s
tudWork flow
laser scanning at site
registering survey data onplatform
point cloud processing in
home office
3D model in cyclone
import to PDMS
8/12/2019 LASERscanning Company
17/26
www.pdengineers.biz
ca
se
s
tud
plant designengineers sdn bhd
l ysi
8/12/2019 LASERscanning Company
18/26
www.pdengineers.biz
plant designengineers sdn bhd
Drain Vessel Area
8/12/2019 LASERscanning Company
19/26
www.pdengineers.biz
plant designengineers sdn bhd
Manifold Area
8/12/2019 LASERscanning Company
20/26
www.pdengineers.biz
plant designengineers sdn bhd
Manifold Area
8/12/2019 LASERscanning Company
21/26
www.pdengineers.biz
plant designengineers sdn bhd
Manifold Area
8/12/2019 LASERscanning Company
22/26
www.pdengineers.biz
plant designengineers sdn bhd
Turn around time for the Survey and Modeling:
3D Laser Scan Survey - 5 days (3 days of scanning, about 60 scans)
3D Modeling in Cyclone - 3 weeks
Transfer to PDMS and Labelling of objects 3 days
Clash Check 2 days (35 clashes/misalignments)
Completed within 6 weeks as per Schedule
8/12/2019 LASERscanning Company
23/26
www.pdengineers.biz
plant designengineers sdn bhd
Survey at the fabrication yard
8/12/2019 LASERscanning Company
24/26
l t d i
8/12/2019 LASERscanning Company
25/26
www.pdengineers.biz
plant designengineers sdn bhd
Installation of Deck extention:
Perfect fit
Installation of Pipe spools:
Installation of the pipe spools is ongoing
8/12/2019 LASERscanning Company
26/26
www.pdengineers.biz
Thank you