© MAHLE
Scott JanowiakNumerical Simulation EngineerENDES
Lead Time Reduction using Automatic Reporting Director (ARD) for MAHLE
1
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
Agenda
Introduction of MAHLE
Background of FEA at MAHLE
Areas for Improvement
The Altair Connection
Challenges Faced
Special Developments
The Result
Video Demo
Questions
2
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
Quick Introduction of MAHLE
MAHLE is a Tier 1 automotive systems supplier
Based in Stuttgart, Germany – Over 64,000 employees
– 10 R&D centers around the world
– Over $13 Billion in sales globally in 2014
North America – Over 10,000 employees in 29 locations
– Over $2.6 Billion in sales
– N.A. Headquarters located in Farmington Hills, MI
All light vehicle and truck OEM’s with production
operations in NA are supplied by MAHLE
Business Units include:
– Engine Systems and Components
– Aftermarket and Motorsports
– Filtration and Engine Peripherals
– Thermal Management (Previously Behr)
3
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
FEA at MAHLE
Finite Element Analysis has become a major tool in the
development process
– Multiple design variants
– Several load and test cycles considered
– This leads to a lot of results to report!
Globally, MAHLE has a standard process for doing FEAs,
but no official reporting process
In FH, there are several engineers doing FEAs
– Pistons represent a bulk of the work
– Several engineers could work on the same engine
program
– Reports can take several hours to create
4
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
Areas for Improvement
Standardized reports
– Each engineer has a slightly different
way of presenting the same results
Hard to compare variants if layout
is different
Speed / Cutting down wasted time
– A lot of the reporting time is spent doing
non-engineering work
Setting up the HyperView session
Cropping/aligning pictures
Picking nodes
Results Organization
– Summary tables require extra work
Picking nodes and changing
results
5
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
The Altair Connection
6
MAHLE has been using HyperWorks for over 6 years
– Good relationship with Altair team
Altair’s Product Development (PD) team approached MAHLE
with the concept of Automated Reporting
– MAHLE brought several reports for reference at the kick-
off meeting
– Also brought a wish-list of functions for an automated tool
Table generator
View Flexibility
MAHLE Master Template
– Altair PD quoted a 4-6 week lead time for customized
solution
Project started January 2014
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
Challenges Faced
7
Some of the challenges that we encountered:
– MAHLE has some unique files and results types
Internal Lifetime/Fatigue Calculation program
Needed special consideration for the table
maker
– The first program created skewed pictures
Image had white space all around
Aspect ratio not locked in PowerPoint
interface
– The hot spot finder was rounding the results
Found minimum, but not necessarily in
correct location
Working together with the Altair PD team, the issues
were able to be solved and great tool was created
Boundary Box in PPT Template
Correct Skewed
Correct
Min=4.71
Rounded
Min=4.74
Absolute
Min=4.71
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
Special Developments
8
HyperView Automation
– Takes model and all result files
– Creates a 15 page HyperView
session
Special MAHLE page layout
– Custom legends applied
– Some pages left blank for text
– Session can be saved/reopened
later
– Director Window is easy to navigate
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
Special Developments
Hotspot Finder
– Finds local hot spot of selected nodes
User selects Max or Min
Note created in HyperView
– Adds Lifetime/Fatigue result to summary
table
Also gathers stress and temperature
results for the node
– Also can be used for other results like
Pressure or Temperature
Results not added to summary table
– Exports results in a table in PowerPoint
Table can be edited
9
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
Special Developments
Some of the other customized features are:
– A special high resolution image of our the
mesh
– A picture cropping tool that automatically
crops the white space
Separate Legend Picture
– Automatic Notes for Temperature
– A special interface with PowerPoint to
properly insert the pictures and ensure
the best quality image
– Ability to run in Batch-mode
10
High Resolution Std. Resolution
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
The Result
Working with Altair PD, the Automatic Reporting
Director was developed and customized to fit
MAHLE’s needs
– 5 weeks for delivery of final solution
The estimated reduction in lead time for a report
– From over 4 hours
– Down to less than 1 hour
Some of the other benefits are:
– Less wasted time of engineers
– Standardized layouts
– More details of the results with the
automatic table generator
The ARD tool was developed and is currently
being used in the US office, but is planned to be
deployed to the other MAHLE offices globally
11
MAHLE Industries, Incorporated, ENDES, Scott Janowiak, 15-April-2015
Lead Time Reduction using ARD for MAHLE
© MAHLE
Video Demo
12