PV1
Site View
Vicinity Map
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
18°
IRONRIDGE RAIL
IRONRIDGE FLASHFOOT
24"
43"
43"
12"
12"
H
10.4
J
10.4
70"
IRONRIDGE RAIL
PV MODULE
48"
0.4xL MAX.
IRONRIDGE STOPPER SLEEVE
IRONRIDGE UNIVERSAL
FASTENING OBJECT
IRONRIDGE FLASH FOOT
IRONRIDGE UNIVERSAL
FASTENING OBJECT
1"
(E) ROOF
MEMBRANE
IRONRIDGE
FLASHFOOT
IRONRIDGE
RAIL
PV MODULE,
BY OTHERS
(E) BUILDING
STRUCTURE
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
As Noted
Drawn
By
PV2
RCSD
Ironridge Railing
NTS
B
MOUNTING SYSTEM
1. The mounting structure is an engineered product designed to mount PV modules.
2. For manufactured mounting systems, fill out information on the mounting system below:
a. Mounting System Manufacturer:
b. Total Weight of PV Modules and Rails: 52.72 LB
c. Total Number of Attachment Points: 68
d. Weight per Attachment Point (b/c): 0.95 LB
e. Maximum Spacing Between Attachment Points 48 INCH
Notes
1. Ironridge Flashfoot to be attached to roof using 5/16" x 3 1/2" Lag Screws
2. Ironridge Rail to be attached to Flashfoot using
3
8
" nuts and bolts.
3. Flashing at all roof penetrations and will be sealed with "Geocel 2300" Tripolymer roof sealant caulking
4. The maximum distance from the panel to the roof is 7.5 inches.
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
MODULE DETAIL (NTS)
39.4"
Silfab 320
320 WATT
WEIGHT 41.45 LBS
65.7"
1.26"
SITE PLAN
(36) Silfab SLA-M 320
320 Watt Modules
w/ (36) Enphase IQ7-60-2-US (240) Micro-Inverters
Roof Mount system 25° Tilt, 65°,155°, 245°, 335° Azimuth 2" x 4" Truss, 24"O.C,
Note: Per NEC 2017, Rapid Shutdown at array
ROOF PITCH = 25 AZIMUTH 65 155 245 335
1/2" PLYWOOD DECKING
ROOF MATERIAL : COMPOSITION
RAFTERS: 2"X4" TRUSS @ 24" O.C.
MOUNTS ARE ON GRID SPACING, OCCURRING AT RAFTERS, VERIFY
RAFTER LOCATIONS IN FIELD
REFER TO MODULE AND RACKING MFR'S INSTALL MANUALS
MAX SPAN BETWEEN MOUNTS: 48"
APPROX (58) MOUNTS TOTAL
ALL FASTENERS SHALL BE STAINLESS U.O.N.
CONSTRUCTION NOTES
(E) Single Family
Residence
Lisa Leclair
7341 Jasmine Blvd
Port Richey , FL 33668
Revenue Meter
PV Combiner Panel
AC Disconnect
200A OUTD Load Center 150A Main / Bus
PV-041616-003447
STAN POPEK
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
As Noted
Drawn
By
PV3
RCSD
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
ELECTRIC DIAGRAM
PV-041616-003447
STAN POPEK
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
As Noted
Drawn
By
PV4
RCSD
1. (36) SILFAB SLA-M 320 320 WATT MODULES WIRED AND LISTED TO UL1703 STANDARDS
2. (36) ENPHASE IQ7-60-2-US (240) MICRO INVERTERS ATTACHED WITH SYSTEM ELECTRICAL
SPECIFICATIONS GROUND FAULT PROTECTED & LISTED TO UL1741 STANDARDS.
3. PHOTOVOLTAI SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM DC DISCONNECT/INVERTER AS PER NEC SEC. 250.166(B). "THE GROUNDING ELECTRODE CONDUCTOR SHALL
NOT BE SMALLER THAN THE LARGEST CONDUCTOR SUPPLIED BY THE SYSTEM AND NOT SMALLER THAN
# 8AWG."
4. EQUIPMENT OPERATING150 VOLTS OR GREATER SHALL ONLY BE SERVICED OR REPLACED BY QUALIFIED PERSONNAL. FIELD PROTECTION MAY BE IN THE FORM OF CONDUIT, CLOSED CABINET OR AN ENCLOSURE WHICH REQUIRES USE OF TOOLS TO OPEN.
5. SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITH REQUIREMENTS OF ART.690 OF THE 2017 NEC.
6.
7. SYSTEM GROUNDING ELECTRODE CONDUCTOR FOR PV SYSTEM TO BE SIZED TO MEET THE REQUIREMENTS OF BOTH 250.66 (AC) AND 250.66(DC), 690.47(C) NOT SMALLER THAN #8 CU AWG.
8. AC DISCONNECT IS LOCKABLE AND HAS VISIBLE BLADES.AC
#8 COPPER EQUIPMENT GROUNDING CONDUCTOR THROUGHOUT
CONTINOUS GROUND MIN. #8, TO HOUSE GROUNDING SYSTEM
AC DISCONNECT
EQUIPMENT GROUNDING(C16.10)
SYSTEM GROUNDED
AT MAIN SERVICE PANEL
MECHANICAL GROUNDING LUG
UNDERSIDE OF RAILS
NOTE: GROUNDING DETAIL DIAGRAM SEE ELECTRICAL DIAGRAM FOR
ACTUAL NUMBER OF MODULES PER STRING
BLOW-UP DETAIL FOR MECHANICAL GROUNDING LUG(C12.8)(C16.10)
GROUNDING CONDUCTOR
STAINLESS SCREW
SIDE OF
SOLAR RAILING
ILSCO DIRECT-BURIAL RATED
GROUNDING LUG
STAINLESS STEEL
THREADING-FORMING SCREW
1. EACH MODULES AND ALL COMPONENETS SHALL BE
GOUNDED AND BONDED.
2.ALL SOLAR MODULES, EQUIPMENT, AND METALLIC
COMPONENTS ARE TO BE BONDED.
3. LIQUID-TIGHT RIGID METALLIC CONDUIT SHALL BE SUN
LIGHT RESISTANT.
4.CONDUIT TO BE PAINTED TO MATCH STRUCTURE
5. PV BREAKER TO BE MOUNTED OPPOSITE MAIN BREAKER.
6. GROUND WIRE AT PANELBOARD TO HAVE IRREVERSIBLE
CRIMP.
7. SYSTEM HAS ARC-FAULT INVERTERS INSTALLED 690.11
MAX VOLTAGE
MAX FUSE RATING
PMAX 320W
VOLTAGE @ PMAX 36.7V
CURRENT @ PMAX 9.95A
INVERTER INFORMATION
Max DC Input Voltage - 45V
Max DC Input Current - 10.5A
Nominal AC Voltage - 240
Max. AC Output Current - 1.0A
Max. DC Short Circuit Current - 15A
Maximum DC output voltage 42.8V
Maximum DC output current 9.95A
Maximum number of micro-inveretrs per branch 12
Conductor size of PV wire 12AWG
# of micro-inverters 12
Maximum inverter AC output x 1.0
Continous load x 1.25
Total Current carried by conductor 15A
Conductor size for branch circuit 10 AWG
Total # of branch circuits installed at inverter 3
Amperage from this strings 20A
Bus bar rating at sub panel N/A
A) PV to Inverters
Wire Ampacity
NEC (310.16)
#12 USE-2, 90
degrees C
(30 Amps) * (0.82) * (1.00) = 24.6A > PV Adesign
(14.72A)
B) Inverters to Combiner Box
Wire Ampacity
NEC (310.16)
# 10 THWN-2, 90
degrees C
(40 Amps) * (0.82) * (1.00) = 32.8A > PV Bdesign (14.72A)
C) AC Disconnect to Main Panel
Wire Ampacity
NEC (310.16)
# 8 THWN-2, 90
degrees C
(55amps) * (0.82) * (1.00) = 45.1A > PV Bdesign (45A)
1. PV ARRAY : (3) STRINGS SILFAB SLA-M 320 320 WATT MODULES
WITH (36) ENPHASE IQ7-60-2-US (240) MICRO INVERTERS
2. (6) 12 AWG 6 AWG SOLID BARE COPPER GROUND (240V,16(X3) <1%Vd)
3. NEMA 3R RATED ROOFTOP JUNCTION BOX OR TRANSITION BOX
4. (6) 10 AWG STRANDED(COPPER) THHN CONDUCTORS RED,BLACK,WHITE, 8 AWG STRANDED THHN GREEN IN 3/4" EMT. 40% MAX FILL(240V,15A(X3)<1%Vd)
5. COMBINER PANEL
6. (3) 8 AWG STRANDED THHN CONDUCTORS: BLACK-L1,RED-L2,WHITE NEUTRAL + 8
AWG STRANDED THHN GROUND GREEN IN 3/4" EMT.40% MAX FILL(240V,45A<1%Vd)
7. SOLAR AC NON-FUSED DISCONNECT IS SQUARE D DU222RB(OR EQUIVALENT).
2 POLE 2-WIRE, RATED 240V,60A, NEMA 3R, NEUTRAL CONTINUE THROUGH
8. GROUNDING ELECTRODE 8' X 5/8" GROUND ROD BONDED
WITH # 6 AWG-3/0 COPPER
9. EXIST SERVICE PANEL
10. UTILITY METER
+ - + - + - + - + - + -
STRING 2: 12 MODULES
2
20A
2P
Monitor
L1
L2
N
3
4
5
66
78
+ - + - + - + - + - + -
STRING 1: 12 MODULES
20A
2P
1
Note: Meter line to line
w/ PV Disconnect
Note: Solar Fusible AC 60Amp
Disconnect w/ 50 Amp Fuses
Main Service
150A Main/200A Bus
1-Phase / 240V
Tie to existing Ground Rod or UFER as applicable.
If no access to either, installer shall supply new
ground rod and tie to GEC (Refer to grounding
notes)
. .
10
KWH
8
N
9
50A
2P
+ - + - + - + - + - + -
STRING 3: 12 MODULES
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
20A
2P
COMPONENT LAYOUT
200A OUTDOOR
SERVICE PANEL
PV AC SERVICE
DISCONNECT
METER
ENPHASE ENVOY
PRODUCTION METER
AND COMBINER
KWH
3/4" EMT
GROUND LEVEL
GROUND LEVEL
GROUND
ELECTRODE
3/4" EMT TO PV ARRAYS
20A
2P
KWH
20A
2P
20A
2P
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
As Noted
Drawn
By
PV5
RCSD
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
WARNING
DUAL POWER SOURCES: SECOND SOURCE
IS PHOTO-VOLTAIC SYSTEM
WARNING
PANEL CONTAINS D.C. SOLAR POWER
SYSTEM DISCONNECT MAY NOT
DE-ENERGIZE ALL POWER SOURCES
CAUTION:
PHOTOVOLTAIC SYSTEM
CIRCUIT BREAKER IS BACKFED
PHOTOVOLTIAC AC DISCONNECT
WARNING: PHOTOVOLTAIC POWER SOURCE
WARNING:
INVERTER OUTPUT CONNECTION. DO NOT
RELOCATE THIS OVERCURRENT DEVICE
1. Install on main service
3. Install on back-fed breaker
5. Install on all disconnects.
7. Install on A/C service section and all A/C
sub-panels
9. Install on inverter(s)
2.
4. Install on AC disconnect
6. Place every 10 feet on all interior and exterior DC
conduits, raceways, enclosures, and cable assemblies, at
turns, above and /or below penetrations, all DC combiners,
and junction boxes.
8. Install at Inverter(s) output connection
10.
SIGNAGE
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
Drawn
By
PV6
RCSD
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
SITE PICTURES
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
As Noted
Drawn
By
PV7
RCSD
PV Disconnect
Combiner
3/4" Raceway
to array
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
As Noted
Drawn
By
PV8
RCSD
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
As Noted
Drawn
By
PV9
RCSD
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
As Noted
Drawn
By
PV10
RCSD
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT
Scale
Date
Sheet
Revision/Issue
No.
Date
DE
SC
RIP
TIO
N O
F W
OR
K:
SO
LA
R P
V S
YS
TE
M
Project
As Noted
Drawn
By
PV11
RCSD
08/11/20
LECLAIR
Lisa Leclaire
7341 Jasm
ine B
lvd
P
ort R
ichey, F
L 34668
727-967-4030
11.52 kW
R
OO
F M
OU
NT