MEASUREMENT 4 Bachelor Of Quantity Surveying Semester 4, March 2015

CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH RUMAH KEDIAMAN KEKAL 3, TINGKAT DI ATAS NO LOT 29089 (GRN 140455) BANDAR SEREMBAN, DAERAH SEREMBAN, NEGERI SEMBILAN.

Tan Cheng WengJeffrey TanKhew sze haoQuinnie Tan Tan yong mingWong kim wan

MEASUREMENT 4Bachelor Of Quantity SurveyingSemester 4, March 2015

JOB SCOPETan Cheng Weng (Leader)

Building Works ElementsPilling / FoundationInternal Wall Finishes Internal Floor Finishes External Works ElementsFencing and Gates Other Parts of Tender Documents Content PageForm of non-collusionArrangement of whole tender documentAny other miscellaneous parts not allocated to other team membersOther DutiesAll correspondences with other consultants, internal memos to group members, allocation of duties, etc. Any other duties not allocated to other team members

JOB SCOPEJeffrey Tan

Building Works ElementsWork below lowest floor finishes Sanitary FittingsBuilders work in connection with servicesMechanical and Electrical Service including Plumbing Works (P.C.Sums)Miscellaneous workExternal Works ElementsSewarage WorksOther Parts of Tender DocumentsForm of Contract

JOB SCOPEKhew Sze Hao

Building Works Elements Frame ( including roof beams)Upper Floor SlabExternal Works ElementsRoads and Pavement Other Part of Tender DocumentsAll appendices of Tender Documents

JOB SCOPEQuinnie Tan

Building Works Elements RC Roof slab and Rain Water Down Pipe Staircase and Staircase Finishes External Works ElementsWater ReticulationsOther Part of Tender DocumentsPreambles Materials and workmanship

OthersPresent the projectJOB SCOPETan Yong Ming

Building Works Elements Window DoorInternal Ceiling FinishesExternal Works ElementsRefuse Chamber / Letter Boxes Miscellaneous (any other works not under element)

Other Part of Tender DocumentsPreliminariesJOB SCOPEWong Kim Wan

Building Works Elements External WallInternal Wall External FinishesExternal Works ElementsSurface Water Drainage Other Part of Tender DocumentsInstruction to Tendering and Conditions to tenderOther Duties Preparing the Power Point Presentation SlidesPROJECT INFORMATIONEMPLOYER Yap Kim Lian No 41, Taman Megah, 72100, Bahau, Negeri Sembilan

ARCHITECT Arkitek Zafwan Farid No 1920, Tingkat Atas Kedai Pejabat Taman Bukit Bayas Indah, Jalan Pasir Panjang, 21100, Kuala Terrenganu, Terrenganu Daurul Iman

CIVIL & STRUCTURAL ENGINEER Perundingan Delima Sdn.Bhd. Taman Tun Dr.Ismail, 60000 Kuala Lumpur.MECHNANICAL & ELECTRICAL ENGINEERM/S Juru Perundingan M & E Sdn Bhd. Wisma Hup Peng, No. 23, Block A, Tingkat 8, Jalan Damansara Baru, 46700 Petaling Jaya, Selangor Darul Ehsan.

QUANTITY SURVEYOR TANS Quantity Surveyor Sdn Bhd Block B2, Level 6 , East Wing , Lot-22 8, Jalan PJS 9 / 11 47152 Petaling Jaya, Selangor Darul Ehsan.PROJECT DETAILSBuilding Type: Three-Storey Bungalow (8 bedrooms, 6 washrooms)Location: Negeri SembilanClient: Private

SITE LOCATION

LOT 29089 (GRN 140455) BANDAR SEREMBAN, DAERAH SEREMBAN, NEGERI SEMBILAN.Front and Rear Elevation

Left and Right Elevation

Sectional Plan

Floor Plan

Drain Section

Door Section

Staircase Plan

Work Below Lowest Floor Level

Tender DocumentVolume I: Contract DocumentsVolume II: DrawingsVolume III: Taking OffVolume IV: CorrespondenceSchedule of Finishes

Example :Schedule of FinishesExample :