Upload
jaden-childress
View
219
Download
5
Embed Size (px)
Citation preview
Measured Progress ©2013
1
New Mexico iTest System Practice Test Training Fall 2013
Scott Duquette
Technical Product Support
Measured Progress ©2013
2
Training Topics
Help Desk Information iTest System Components
DAS PTW STW
Best Practices Training Test Administrators Resource Availability Technical Requirements Key Dates & Scheduling Q&A
Measured Progress ©2013
3
New Mexico Help DeskFor questions relating to policy or the New Mexico Standards Based Assessment in generalMonday–Friday, 7 AM to 3 PM MTExtended hours: March 3, 2014 – April 11, 2014, 7 AM to 5 PM [email protected]
Measured Progress Technical Product SupportFor questions relating to the iTest software or any technical issuesMonday–Friday, 7 AM to 3 PM MTExtended hours: December 10, 2013 – April 11, 2014, 7 AM to 5 PM MT877-676-6722 [email protected]
Help Desk Information
Measured Progress ©2013
4
Three web-based components requiring secure logins:Data Administration System (DAS)
Proctor Test Workstation (PTW)
Student Test Workstation (STW) Referred to as the kiosk
Introduction to iTest Components
Measured Progress ©2013
5
Data Administration System (DAS)https://nm.measuredprogress.org/dasAccess documentationAccess technical requirements and kiosk installation filesManage staff and student dataAssign tests to staff and studentsAssign read-aloud accommodations Print Student Login TicketsAccess reports
iTest Components – DAS
Measured Progress ©2013
6
Online Resources
DAS Welcome pageOnline Administration Materials
Quick Start Guide Show Me Videos Training Materials (including recordings of
previous training sessions)Administration Manuals (DFAs and TCMs)Technology page
Technical Requirements Installation files and instructions
Online HelpSystem Announcements
Measured Progress ©2013
7
Staff Management drop-down menuTest Administrator Accounts page displays any created Test Administrators
Test Administrator Roster link – PDF report of Test Administrators and their login information; use this to distribute logins to Test Administrators
Create New User link – create new Test Administrators
Selected Items dropdown – delete Test Administrators or make them active or inactive
iTest Components – DAS
Measured Progress ©2013
8
Staff Management drop-down menu (continued)
Create New User page – create new Test Administrators Create user names and passwords for Test
Administrators Assign tests
iTest Components – DAS
Measured Progress ©2013
9
Student Management drop-down menuStudent Roster page displays students by grade
Download Student Roster link – PDF report of students and their login information NOTE: The report is considered secure material
Create New Student link – create new students; links to Create/Edit Student page
Red Ticket icon – generate Student Login Tickets (PDF) that students use to log in to test
Selected Items dropdown – Print Student Login Tickets for selected students
iTest Components – DAS
Measured Progress ©2013
10
Student Management drop-down menu
(continued) Create/Edit Student page – create new
students Student Information – Enter demographic
information including state-assigned student identifier or SASID
Test Information – Tests are pre-assigned by grade (additional tests can be assigned manually, if needed)
iTest Components – DAS
Measured Progress ©2013
11
One of the three read-aloud accommodation codes must be selected for each student’s test, as appropriate
# 4 – Read-Aloud Test Items # 20 – Read-Aloud in English # 27 – Read-Aloud Test Items in Spanish
Read-Aloud Accommodation Options
Measured Progress ©2013
12
Reportingdrop-down menu Test Status Report page – PDF report shows test status of all students on rosters, broken out by session
1=tested/0=not tested
iTest Components – DAS
Measured Progress ©2013
13
Proctor Test Workstation (PTW)https://nm.measuredprogress.org/tds/proctorUsed by Test Administrators to administer tests to students
Start, pause, and end test sessions Monitor student progress during test Print test receipts
Allows Test Administrators to print a record of the students that participated in a particular test session
iTest Components – PTW
Measured Progress ©2013
14
You can toggle between test events, or test sessions, if you are administering multiple test events
Each test session has a different PTW screen, a unique Test Access Code, and a unique student roster
Administering Multiple Sessions
Measured Progress ©2013
15
Student Test Workstation (STW)Accessed via a kiosk that must be installed onto each student computer
Prevents access to other programs or websitesUsed by students to take tests
Requires a secure login using Student Login Tickets
Use of virtual tools such as rulers, calculators, and/or Text-to-Speech
NOTE: A paper answer document will be used in conjunction with the STW for math, science, and writing. When administering the Practice Tests, please pass out scrap paper to simulate the use of a paper answer document.
iTest Components – STW
Measured Progress ©2013
16
Students should use the TTS tool for read-aloud to ensure standardization of test presentation and read-aloud policies
Students may choose the speed at which the text is read
Headphones should be distributed and the computer volume level should be adjusted prior to starting the kiosk
Text-to-Speech (TTS) Tool
Measured Progress ©2013
17
TTS is available on all training tests and all math, science, and writing tests of the SBA if the appropriate accommodation code (4, 20, or 27) is marked for the student prior to their login to each test
TTS is available for both the English and the Spanish tests
Text-to-Speech (TTS) Tool
Measured Progress ©2013
18
Download the STW from Measured Progress iServices§Go to http://iservices.measuredprogress.org
§From the state/contract dropdown menu, select New Mexico and click Enter
§On the next screen, New Mexico Online Services, click Online Test Resources
§Click the Technology button
Downloading the STW
Measured Progress ©2013
19
The Technology page is also accessible from the DAS home page
Save this page to your Favorites or Bookmarks if desired:https://nm.measuredprogress.org/das/support/nm/stw-portal.htm
In order to access the DAS, a Technology Coordinator must have a Test Administrator account created by the principal or Test Coordinator at the school
Downloading the STW
Measured Progress ©2013
20
WindowsThe STW will appear as a shortcut onthe desktop and will be added to the Start menu. Start the STW to get to the student login screen.
MacintoshThe STW will appear on the dock. The student must log out and log in as another user to access the application:
User: mpsc_01 Password: secure
From the dock, open the My Applications folder and click the Portable Firefox icon
Macintosh Note: Once testing is complete, the computer should be logged out / logged in under its normal account
Starting the STW
Measured Progress ©2013
21
Best Practices
Configure network and download kiosk from iServices or the DAS
Simulate testing in advance Schedule labs in advance Take advantage of practice tests for both staff
and students
Measured Progress ©2013
22
Test Coordinators are expected to train Test Administrators on the online test system components (PTW and STW)
The training should provide time for staff to practice logging into the PTW and performing all actions to start and end a test
Training students have been created in the system for staff use during training
Test Administrators are expected to administer the computer-based test in the same manner as the paper-based test
Training Test Administrators
Measured Progress ©2013
23
Training resources and help accessible via iServices or DAS Home Page:
*Operational testing only
Available Material Where? Description
Quick Start GuideOnline Administration Materials
A summary of basic facts and resources for all components of the test administration
STW-PTW Interaction VideoOnline Administration Materials
A brief video demonstration of the virtual interaction between the student and the proctor systems during a test session
Student Training VideoOnline Administration Materials
A brief video demonstration of the student system during a test session
Training PresentationsOnline Administration Materials
Recorded training presentation webinars
Directions for Administration (DFA)*
Administration Manuals
Grade-specific manuals, including scripts, used to administer the test
Test Coordinators Manual (TCM)*
Administration Manuals
Manual for District or School Test Coordinators listing test security measures and packing instructions
User GuideOnline Administration Materials
A complete guide to all components of the iTest system and the test administration
Online Help Feature DASA searchable version of the User Guide, located exclusively on the Data Administration System (DAS)
Training Test Administrators
Measured Progress ©2013
24
Technical Resources Lab meeting technical requirements including
network specifications Staff Engagement
Availability of Test Administrator(s) Technical Rep available during testing
Resource Availability
Measured Progress ©2013
25
Operating System Microsoft® Windows® XP®, Vista®, or Windows 7 Macintosh® 10.5, 10.6, 10.7, or 10.8
Internet Browser – DAS/PTW Firefox® 17 ESR (Extended Support Release) Windows: Internet Explorer® 7, 8, 9, or 10 Macintosh: Safari® 5 or 6
Internet Browser – STW Firefox Portable Kiosk is installed with STW software
Memory Configurations 512 MB or greater minimum,
1 GB or greater recommended Internet Speed
Upload: 15 kbps per student Download: 55 kbps per student
Technical Requirements
Measured Progress ©2013
26
Key Dates & Scheduling
August 21, 2013 Introductory Training
September 19, 2013 Second Introductory Training
October 4, 2013 Technology Readiness Tool (TRT) and School Speed Test (SST) Deadline;Footprint Snapshot Collected by PED
October 14, 2013 iServices opens for access to online resources
October 14, 2013 – October 18, 2013
On-Site Technical Support & Training
October 16, 2013 DAS opens for Practice Testing
October 21, 2013 Practice Test Training
November 4, 2013 – November 8, 2013
On-Site Technical Support & Training
November 15, 2013 CBT or PBT Decision Deadline
February 3, 2014 Final Training prior to 2014 SBA Administration
March 3, 2014 – April 4, 2014
Operational Testing
Measured Progress ©2013
27
Q&A
Measured Progress ©2013
28
October 28, 20139–10 AM MT 4–5 PM MT
Q&A Sessions
Measured Progress ©2013
29
P.O. Box 1217, Dover, NH 03821-1217 | Web: MeasuredProgress.org | Office: 603.749.9102 It’s all about student learning. Period.
Thank you!