96
1 Almer Almer í í a, 19 de mayo de 2011 a, 19 de mayo de 2011 I+D fp7 I+D fp7 I+D fp7 I+D fp7 I+D fp7 I+D fp7 I+D fp7 I+D fp7 - - - - - - TEMA 6: TEMA 6: TEMA 6: TEMA 6: TEMA 6: TEMA 6: TEMA 6: TEMA 6: Medio Ambiente Medio Ambiente (incluido Cambio Clim (incluido Cambio Clim á á tico) tico) Programa de Trabajo 2012 Programa de Trabajo 2012 Carolina Rodríguez Rodríguez

Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

1

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

I+D fp7I+D fp7I+D fp7I+D fp7I+D fp7I+D fp7I+D fp7I+D fp7 -------- TEMA 6:TEMA 6:TEMA 6:TEMA 6:TEMA 6:TEMA 6:TEMA 6:TEMA 6:

Medio AmbienteMedio Ambiente

(incluido Cambio Clim(incluido Cambio Climáático)tico)

Programa de Trabajo 2012Programa de Trabajo 2012

Carolina Rodríguez Rodríguez

Page 2: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

2

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Objetivos

1. 1. Incentivar la participaciIncentivar la participaci óónn de entidades espade entidades espa ññolas y el olas y el liderazgo de proyectos.liderazgo de proyectos.

2. Determinar 2. Determinar ááreas de I+D medioambientales en las que reas de I+D medioambientales en las que EspaEspa ñña tiene potenciala tiene potencial , para trasladar nuestros intereses a , para trasladar nuestros intereses a la Comisila Comisi óón Europea de cara a futuras convocatorias. n Europea de cara a futuras convocatorias.

3. 3. Alinear las prioridades de I+DAlinear las prioridades de I+D del sector medioambiental a del sector medioambiental a nivel nacional y europeo.nivel nacional y europeo.

Page 3: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

3

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

CIPCIP

3.620 M3.620 M€€

COOPERACIÓN (32.413)

1. Salu

d

(6.1

00)

2. A

lim

enta

ción, agri

cult

ura

y p

esc

a, y b

iote

cnolo

gía

(1.9

35)

3. Tecn

olo

gía

s de la

info

rmaci

ón

y las

com

unic

aci

ones

(9.0

50)

4. N

an

ote

cnolo

gía

s,

nanom

ate

riale

s y p

roducc

ión

(3.4

75)

5. En

erg

ía

(2.3

50)

6. M

edio

am

bie

nte

(in

cluid

o

el ca

mbio

clim

áti

co)

(1

.890)

7. Tra

nsp

ort

e (

incl

uid

a la

aero

náuti

ca)

(4.1

60)

8. C

ienci

as

soci

oeco

nóm

icas

y h

um

anid

ades

(623)

9. Esp

aci

o

(1.4

30)

10. Segu

ridad

(1.4

00)

IDEAS (7.510) Consejo Europeo de Investigación

PERSONAS (4.750) Acciones Marie Curie

Infraestructuras de investigación (1.715)

Investigación en beneficio de las PYME (1.336)

Regiones del conocimiento (126)

Potencial de investigación (340)

La ciencia en la sociedad (330)

Desarrollo Coherente de las Políticas de Investigación (70)

CAPACIDADES

(4.097)

Actividades de cooperación internacional (180)

Acciones no nucleares del Centro Común de Investigación (1.751)

(Datos en M EUR)

1.ENV en todos los Temas + 1 específico

2. Comp. ENE

3. ENV Gestionado por DG RTDi

4. (- 5 convocatorias)

5. Estructura

ESQUEMA DEL VII PROGRAMA MARCOESQUEMA DEL VII PROGRAMA MARCO

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 4: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

4

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• promover la gestión sostenible del medio ambiente y sus recursos

• avance en el conocimiento de las interacciones entre el clima, la biosfera, los ecosistemas y la actividad humana, y el desarrollo de nuevas tecnologías, herramientas y servicios

• tratar, de forma integrada, los acuciantes problemas medioambientales.

• Casi todas las problemáticas ambientales a resolver afectar a la cuenca mediterránea (casos piloto).

• Inundaciones, gestión del agua, cambios radiación solar, afectación al clima, monitorización de recursos naturales, gestión sostenible de ecosistemas, desertización, tecnologías ambientales, patrimonio cultural.

• herramientas y tecnologías para monitorizar, prevenir, mitigar y adaptarse a las amenazas y presiones medioambientales, incluyendo tanto las relacionadas con la salud humana como con la sostenibilidad del medio ambiente natural y artificial

PECULIARIDADES de PECULIARIDADES de PECULIARIDADES de PECULIARIDADES de PECULIARIDADES de PECULIARIDADES de PECULIARIDADES de PECULIARIDADES de ÁÁÁÁÁÁÁÁreas de Investigacireas de Investigacireas de Investigacireas de Investigacireas de Investigacireas de Investigacireas de Investigacireas de Investigacióóóóóóóón Medioambiental en ESn Medioambiental en ESn Medioambiental en ESn Medioambiental en ESn Medioambiental en ESn Medioambiental en ESn Medioambiental en ESn Medioambiental en ES

OBJETIVOS CONCEPTUALES DE MA

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 5: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

5

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

DEFINICIONES

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 6: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

6

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

¿¿CUCUÁÁNTO?NTO?

INCREMENTO DESTACADO A PARTIR DE 2011

M€Año 2006 2007 2008 2009 2010 2011 2012 2013

225 200 217 233 246 250 318 356

EN 2013,GASTO 60% MÁS ELEVADO QUE EN 2006

9. Espacio9. Espacio

10. 10. SeguridSegurid. .

8. 8. SocioecoSocioeco,,

7. 7. TranspTransp

6. Medio 6. Medio AmbienteAmbiente

5. Energ5. Energííaa

4. 4. NanoNano

3. TIC3. TIC

2. 2. AlimentAliment..

1. Salud1. Salud

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

FECHA DE PUBLICACIÓN: 20 DE JULIO DE 2011INFO-DAY: 17 DE JUNIO DE 2011

DEADLINE 1ª FASE: 20 DE OCTUBRE DE 2011 Y GENERALDEADLINE 2ª FASE: 8 DE MARZO DE 2011

¿¿ FP8 ??ERA Study

Green Paper

Page 7: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

7

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Page 8: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

8

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Page 9: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

9

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Jo int Programming

EIP Raw Materials,

WaterERANET+

ERANETJTI / PPP

Art. 169

JTI PPP

PEOPLE

INFRASTRUCTURES

HEALTH

NMPSPA

SEC

CSH

ELSA

SETPLANSETPLAN

SETPLAN

ICT

ENV

ENE

TRS

EUROSTARS

Fundamental Research

AppliedResearch

Innovation Deployment

Market set upDevelopment

ICT-FET (Flag Ships)

ERC SMEs and SME Associations

EC Funds

NationalNational

andand

Regional Regional

FundsFunds

eHealtheIdentityICT for TTEnergy efficiency

Programmes

Instruments

New thematicinitiatives

Wind EnergySolar EnergyBioenergyCarbon Capture and StorageElectricity GridSustainable Nuclear EnergySmart Cities

PPPEnergy Efficient BuildingsFuture of FatoriesGreen carsFuture Internet

•Alzheimer•Agriculture, Food Security& Climate change•Health and Diet•Cultural Heritage

eHealthSmart gridTT, mobility & logisticsContentLarge Scale Demos & trials

Ageing Society Climate KnowledgeSeas and OceansAntimicrobial resistanceUrban EuropeWater challenges

PANORAMA ACTUAL EN TORNO A LA I+D EUROPEAPANORAMA ACTUAL EN TORNO A LA I+D EUROPEA

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 10: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

10

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

PECULIARIDADES: POLICY RELEVANTPECULIARIDADES: POLICY RELEVANT

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 11: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

11

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

ANTECEDENTES CUANTITATIVOSANTECEDENTES CUANTITATIVOS

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 12: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

12

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

•The world market of environmental products and services is growing. According to an OECD study. GREENNOVATE, goods and services provided by eco-industries is estimated to represent around 2.5% of the EU GDP. SMEs play a major role in the world economy, but also as important innovators. Clearly, eco-innovation represents a key opportunity to establish Europe's leading role to overcomingthe world's sustainability challenges, and a sizeable business opportunity that can make Europe'seconomy even stronger and more competitive in the future.

ANTECEDENTES CUANTITATIVOS Y CUALITATIVOSANTECEDENTES CUANTITATIVOS Y CUALITATIVOS

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 13: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

13

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• http://cordis.europa.eu/fp7/environment/library_en.html• http://ec.europa.eu/research/environment/index_en.cfm• https://www.fp7-4-sd.eu/index.php

OTROS ANTECEDENTES: FINANCIACIOTROS ANTECEDENTES: FINANCIACIÓÓN PASADAN PASADA

FP7. PROYECTOS COLABORATIVOS:4SP text: Changes in atmospheric composition and in the water cycle will be studied and risk based approaches will be developed taking into account changes in droughts, storms and floods patterns. Selected projects:ACQWA – Assessment of climatic change and impacts on the quantity and quality of water (CP-IP)Shiva – Stratospheric ozone: Halogen Impacts in a Varying Atmosphere (CP-FP)IMPRINTS – Flash floods and debris flow events (see also 6.1.3.)WASSERMed - Water Availability and Security in Southern EuRope andthe Mediterranean (CP-FP-SICA)CLIMB Climate Induced Changes on the Hydrology of Mediterranean Basins:Reducing Uncertainty and Quantifying Risk through an Integrated Monitoring and Modelling System (CP-FP-SICA), HighNoon – Adaptation to changing water resources availability in northern India with Himalayan glacier retreat and changing monsoon pattern (CP-SICA) IMPRINTS - Improving Preparedness and Risk Management for flash floods and debris flow events (CP-FP)

1

2

3

4

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 14: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

14

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

4SP text: Changes in atmospheric composition and in the water cycle will be studied and risk based approaches will be developed taking into account changes in droughts, storms and floods patterns. Selected projects:

• ACQWA – Assessment of climatic change and impacts on the quantity and quality of water (CP-IP)

• IMPRINTS – Flash floods and debris flow events (see also 6.1.3.)• WASSERMed - Water Availability and Security in Southern EuRope and the

Mediterranean (CP-FP-SICA)• CLIMB Climate Induced Changes on the Hydrology of Mediterranean Basins:

Reducing Uncertainty and Quantifying Risk through an Integrated Monitoring and Modelling System (CP-FP-SICA)

• ClimateWater – Bridging the gap between adaptation strategies of climate change impacts and European water policies (CSA-SA)

OTROS ANTECEDENTES: FINANCIACIOTROS ANTECEDENTES: FINANCIACIÓÓN PASADAN PASADA

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 15: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

15

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

AURORA BOREALIS

EURO-ARGO

EUFAR

LIFEWATCH

ICOS

EMSO

IAGOS-ERI

The European Strategy Forum on Research Infrastruct ures (ESFRI) has been set-up to help facing important challenges

ANTECEDENTES Y APOYOS: ESFRIANTECEDENTES Y APOYOS: ESFRI

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 16: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

16

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• The Strategic Forum for International Cooperation• mandate and how it works

• The India Pilot Initiative on water related challenges– Objectives– Building blocks– EU instruments– The stakeholder conference in Delhi 2010– Towards a strategic research and innovation agenda

• Next steps

SFICSFIC--FORO ESTRATFORO ESTRATÉÉGICO DE COOPERACIGICO DE COOPERACIÓÓN INTERNACIONALN INTERNACIONAL

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 17: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

17

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Member StatesEuropean Union

EU and Member States cooperation

PILOT India PILOT China

DE FR

DKUK

ITFIN

GR ES

European COMAT

PT

SFICSFIC--FORO ESTRATFORO ESTRATÉÉGICO DE COOPERACIGICO DE COOPERACIÓÓN INTERNACIONALN INTERNACIONAL

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 18: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

18

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

The India Pilot Initiative

• SFIC developed a concept for a geographical pilot initiative on India on ‘water related challenges’

• The IPI has been based on previous work, in particular within the CREST OMC working group on “Internationalisation of R&D” (2007-2008);

• The development of the IPI strongly coordinated with EU & MS Science Counsellor network in Delhi;

• The SFIC-Task Force prepared the ground for further decisions through the analyses on “why, what and how” cooperation with India is supported at bilateral level;

• The IPI is build around a series of different planned activities such as a conference in India held on 11/12 November 2010;

• The IPI is developed with a view to establishing a strategic EU/Member States research agendavis-à-vis and with India in the longer term;

SFICSFIC--FORO ESTRATFORO ESTRATÉÉGICO DE COOPERACIGICO DE COOPERACIÓÓN INTERNACIONALN INTERNACIONAL

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 19: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

19

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Continue exchanging information (mapping, etc)• Synchronising priorities and topics at EU and Member States level and with

Indian authorities • Defining the research and innovation agenda (in cooperation with JPI Water

Challenges for a Changing World)• Organise an India-EU and Member States Ministerial meeting in May 2012

SFICSFIC--FORO ESTRATFORO ESTRATÉÉGICO DE COOPERACIGICO DE COOPERACIÓÓN INTERNACIONALN INTERNACIONAL

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 20: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

20

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

¿¿PROGRAMAS COMPLEMENTARIOS? PROGRAMAS COMPLEMENTARIOS? ¿¿VVÍÍNCULOS?NCULOS?

EIT – CLIMATE KIC. EIT=25% (120 M EUR, 2010-2013) . Total. 764,5 M EUR. Posibilidad de financiación del FP7, grupos de trabsjo de agua, low-carbon, mobilidad; convocatoria en marcha

INNOVATION PARTNERSHIP (MATERIAS PRIMAS-PTE MINERALES-FORO CDTI 01.06.2011, AGUA-WSSTP GENERAL ASEMBLY-FORO CDTI 09.2011…)

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 21: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

21

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Basic researchResearch & Technology

Development

Demonstration(prototypes)

ERC (European Research Council)

Market replication

LIFE+ (DG Environment)

CIP (Competitiveness and Innovation programme)FP7 (DG Research)

Proposals ONLYONLY addressing stage CC and/or stage DD are out of scope

DIFERENCIAS CONCEPTUALESDIFERENCIAS CONCEPTUALES

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 22: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

22

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Differences between Differences between Differences between Differences between CIP CIP CIP CIP and FP7and FP7and FP7and FP7

• Research and development phase completed

• Aims at market uptake and exploitation of more 'mature' eco-innovative solutions with a clear business strategy

• Funds first application/ First commercial deployment /market replication, real-scale, market demonstrations/ industrialisation/ upscaling/ full production

• Predefined priorities (although not exclusive):

– Material Recycling– Food and Drink (agricultural practices

excluded)– Sustainable Construction Material– Green business (focus on tools excluded)

• Focus on the research phase, but the medium term market potential of the proposed eco-innovation should be demonstrated

• Aims at development of new eco-innovative technologies or system solutions

• Funds feasibility studies/research/knowledge gathering/prototyping/technical demonstrations/ development of new technologies/tools

• No predefined priorities, excludes energy and transport

DIFERENCIAS CONCEPTUALESDIFERENCIAS CONCEPTUALES

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 23: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

23

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

PRINCIPALES CONDUCTORES POLPRINCIPALES CONDUCTORES POLPRINCIPALES CONDUCTORES POLPRINCIPALES CONDUCTORES POLPRINCIPALES CONDUCTORES POLPRINCIPALES CONDUCTORES POLPRINCIPALES CONDUCTORES POLPRINCIPALES CONDUCTORES POLÍÍÍÍÍÍÍÍTICOS Y LEGALESTICOS Y LEGALESTICOS Y LEGALESTICOS Y LEGALESTICOS Y LEGALESTICOS Y LEGALESTICOS Y LEGALESTICOS Y LEGALES

�EU Innovation policy, key issue of the EU2020 strategy�IPCC�European Eco-innovation Action Plan – futuro�Estrategia Marina Marítma de la UE- Comunicación 11 de Septiembre de 2009 (MED, MN)�Biodiversidad. 2010 es el año de la biodiversidad de Naciones Unidas. Debates actualmente durante presidencia Española de la UE y se espera que para principios de 2011 se presenteuna política de la UE europea ambiciosa en esta materia, proponiendo temas clave como: los bosques (libro verde sobre protección de los bosques y una próxima consulta pública en esta materia) y especies invasivas (Comunicación a finales de 2010 y Acto comunicativo posterior).�Panel internacional sobre Biodiversidad (debate en Bali).�Eficiencia de recursos y uso sostenible.�Eco-innovación y tecnología medio ambiental, infraestructura verde y promoción del crecimiento verde. Compra verde.�Estrategia global de residuos. Economía circular (3R).�Ciclo de vida desde el principio del proceso (materias primas).�Calidad del aire. Revisión de la Directiva de los umbrales de emisión.�Agua y calidad del agua (fechas clave: 2012, Revisión de la Directiva del agua y límites de calidad del agua y 2015)�Suelo.�Directiva del suelo actualmente bloqueada siendo la Presidencia española la que estáintentando activar estos debates.�La tierra y su uso.Sustancias Químicas y nanotecnología (REACH).

POLICY DRIVERSPOLICY DRIVERS

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 24: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

24

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

El futuro del Programa Marco: ¿Programa de Programas?

• Iniciativas operativas (ERA-NETs, ERA-Nets +, JPI, JTI, Art. 185, EIP)

• Programación Conjunta (Joint Programming)Agricultura y Cambio ClimáticoCambio climáticoOcéanos Agua Patrimonio Cultural …

• Plan Estratégico Europeo de Tecnologías Energéticas (SET Plan)

• Plan Europeo de Recuperación Económica

• Innovation Partnership

¿¿EL FUTURO PROGRAMA MARCO?EL FUTURO PROGRAMA MARCO?

DESCRIPCIDESCRIPCIÓÓN DEL ESTADO ACTUAL, ANTECEDENTESN DEL ESTADO ACTUAL, ANTECEDENTES

Page 25: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

25

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

NUEVA ESTRUCTURA DEL PROGRAMA DE TRABAJO 2012NUEVA ESTRUCTURA DEL PROGRAMA DE TRABAJO 2012

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Sub-activity 6.4.1 Earth and ocean observation systems and monitoring methodsSub-activity 6.4.2 Forecasting methods and assessment tools for SDSub-activity 6.5.1 Dissemination and horizontal activities

(5) Mobilizing (5) Mobilizing (5) Mobilizing (5) Mobilizing environmental environmental environmental environmental knowledge for policy, knowledge for policy, knowledge for policy, knowledge for policy, industry and societyindustry and societyindustry and societyindustry and society

Sub-activity 6.1.3 Natural hazardsSub-activity 6.1.2 Environment and healthSub-activity 6.3.1 Environmental technologiesSub-activity 6.4.1 Earth and ocean observation systems and monitoring methods

(4) Protecting citizens (4) Protecting citizens (4) Protecting citizens (4) Protecting citizens from environmental from environmental from environmental from environmental hazardshazardshazardshazards

Sub-activity 6.3.1 Environmental technologiesSub-activity 6.3.3 Technology assessment, verification and testingSub-activity 6.4.2 Forecasting methods and assessment tools for SD

(3) Improving resource (3) Improving resource (3) Improving resource (3) Improving resource efficiencyefficiencyefficiencyefficiency

Sub-activity 6.2.1 Conservation and sustainable management of natural and man-made resources and biodiversitySub-activity 6.2.2 Management of marine environmentsSub-activity 6.3.2 protection, conservation and enhancement of cultural heritage, including human habitatSub-activity 6.4.1 Earth and ocean observation systems and monitoring methods

(2) Sustainable use and (2) Sustainable use and (2) Sustainable use and (2) Sustainable use and management of land and management of land and management of land and management of land and seasseasseasseas

Sub-activity 6.1.1 Pressures on environment and climateSub-activity 6.3.1 Environmental technologiesSub-activity 6.4.1 Earth and ocean observation systems and monitoring methods

(1) Coping with climate (1) Coping with climate (1) Coping with climate (1) Coping with climate changechangechangechange

Page 26: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

26

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• - Europe 2020 Strategy and the "Innovation Union" Flagship: Innovation Partnerships notably in the area of water.

• - "Resource Efficient Europe" Flagship Initiative and ERA objectives including Joint Programming Initiatives are of key strategic importance for the EU environment research.

• - A challenge driven approach and establish stronger linkages to innovation• - Overarching theme "Transformative and Responsible Innovation"[1]• - Promote high-impact projects and involve a broad number of both public

and private stakeholders.

• Strategic inputs from relevant policy DGs have been reflected in the chosen priorities.

– GEOSS (Global Earth Observation System of Systems)– WCRP (World Climate Research Programme)– DIVERSITAS (International Programme of Biodiversity science)

• Activities of the ETPs (European Technology Platforms)– Water Supply and Sanitation (WSSTP)– Sustainable Chemistry (SusChem)– European Construction Technology Platform (ECTP)– Forest-based Sector Technology Platform.

CONDUCTORESCONDUCTORES

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Advisory Board

Relevant policy DGs

SRAs European Techn. Platforms

Page 27: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

27

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• As such, projects could strengthen future innovation in their projects by considering the inclusion of pre- and co-normative research tasks and the integration of standardisation organisations to support standardisation.

• SME relevant research : In the 2012 work programme efforts are made to encourage industry/SME participation notably through bottom-up approaches and SME-targeted topics. Mandatory level of SME-participation is introduced as an additional eligibility criterion. This approach is particularly applied in the areas of resource efficient technologies, processes and services in support of the Resource Efficiency Initiative and demonstration of most promising prototypes and tools derived from previous European environmental research activities in the areas of water and waste applications. SME participation is further encouraged through various SME-friendly topics across the work programme.

• Dissemination actions are tackled throughout the work programme.

• Open access in FP7Open access in FP7Open access in FP7Open access in FP7: Beneficiaries are required to deposit peer-reviewed articles resultin g from projects in an institutional or subject-based repository, and to make their best efforts to ensure that readers have open access to these articles within six months of publication.

• Each proposal under this Theme should allocate appropriate efforts and resources to dissemination to promote the use and uptake of the results.

• Specific dissemination topics to strengthen science-policy interface are introduced in the area of geo-engineering, air quality and marine research.

• A feasibility study: to explore opportunities to extend open access to data in order to enhance transparency, credibility and efficiency of research and further promote the use of data and results for policy and/or business purposes.

• Overall expected impact: It is expected that the 2012 work programme through its research and innovation actions will boost European competitiveness by promoting novel applications and tools for improved resource efficiency of natural resources (e.g. water, land, marine). It is expected that the work programme will stimulate the SME participation notably in the area of environmental technologies. In addition, the results obtained will provide support for evidence-based decision making notably for EU policies in the field of environment e.g. air, marine, water, chemicals policies and support to Resource Efficiency initiative.

CONDUCTORESCONDUCTORES

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 28: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

28

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Funding limits will be applied as eligibility criteria. Proposals that do not respect this limit will be considered ineligible.

• The minimum number of applicants in funding schemes is specified in the section III of this work programme. The duration of the project and the requested EU contribution should be in line with a realistic planning of the project. The budget request should also be in line with the needs of the consortia, within the maximum EU contribution, but not necessarily at it.

CONDUCTORESCONDUCTORES

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 29: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

29

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• More topics: pilot, demonstration and validation activities.

• Addressing technical and commercial risks, building capabilities for innovation and disseminating and optimising the knowledge generated (protection including patenting, preparing standardspatenting, preparing standardspatenting, preparing standardspatenting, preparing standards, etc).

• RSFFRSFFRSFFRSFF, brokerage events with investors.

• Bottom-up topic on innovative resource efficient technologiesresource efficient technologiesresource efficient technologiesresource efficient technologies, processes and services in support of the Resource Efficiency Initiative

• Bottom-up topic to support demonstration and exploitation of most promising demonstration and exploitation of most promising demonstration and exploitation of most promising demonstration and exploitation of most promising prototypesprototypesprototypesprototypes and tools derived from previous European environmental research activities (e.g in the areas of water and waste applications)

• Exploring opportunities to extend open access to dataaccess to dataaccess to dataaccess to data in order to enhance transparency, credibility and efficiency of research and promote the use of data and results for policy and/or business purposes. Following the FP7 pilot action on open access to peer reviewed scientific publications in the environment field (among others), it is suggested to introduce in WP 2012 - a transition phase towards FP8 - a feasibility study on open access to environmental information and data."

RESUMENRESUMEN

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 30: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

30

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

¿CUÁNTO?

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

271.84Estimated total budget

3.90

Other actions:•Evaluations (EUR 2.00 million)•Monitoring and reviews (EUR 400 000) •Actions implemented through public procurements, ex perts groups and grants to identified beneficiaries (EUR 1.50 million)Total

2.94General activities (cf. Annex 4)

38.00217.005.005.00265.00

Call FP7-ENV-2012- one-stageCall FP7-ENV-2012- two-stageCall FP7-2012-NMP-ENV-ENERGY-ICT-EeBCall FP7-2012-GC-ELECTROCHEMICAL-STORAGETotal

2012[1] Budget EUR Million [2]

Activities

[1] Under the condition that the draft budget for 2012 is adopted without modifications by the budget auth ority.[2] The budget figures given in this table are rounded to two decimal points.

Page 31: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

31

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Call title: ENVIRONMENT 2012: TWO-STAGE• Call identifier : FP7-ENV-2012-two-stage• Date of publication : 20 July 2011[1]• Deadline : 20 October 2011[2] at 17.00.00, Brussels local time• Indicative budget [3]: EUR 217 million[4]

• 39• 6.5 Mobilising environmental knowledge for

policy, industry and society

• 42• 6.4 Protecting citizens from environmental

hazards

• 50• 6.3 Improving resource efficiency

• 38• 6.2 Sustainable use and management of land

and seas

• 48• 6.1 Coping with climate change

Indicative budget (EUR million)Challenge/activity

Page 32: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

32

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Carbon, resource efficient and climate resilient society and economy• Geo-engineering• Mitigation potential of key economic sectors• Earth climate system (ecological cycle)• The EU ETS, a system based on the "cap and trade" principle. Launched in

2005, the EU ETS works on the "cap and trade" principle. This means there is a "cap", or limit, on the total amount of certain greenhouse gases that can be emitted by the factories, power plants and other installations in the system. Within this cap, companies receive emission allowances which they can sell to or buy from one another as needed. The limit on the total number of allowances available ensures that they have a value.

Challenge 6.1 Coping with climate change

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 33: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

33

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Challenge 6.1 Coping with climate change

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 6 000 000

ENV.2012.6.1-3 Strategies, costs and impacts of adaptation to climate change One or more proposals can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 6 000 000

ENV.2012.6.1-2 Development of advanced techno-economic modelling tools for assessing costs and impacts of mitigation policies One or more proposals can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 9 000 000

ENV.2012. 6.1-1 Seasonal-to-decadal climate predictions towards climate services One or more proposals can be selected.

Challenge 6.1 Coping with climate change

Page 34: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

34

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• European Biodiversity Observation Network to the global scale within the GEO framework

• Good Environment Status - Ocean of Tomorrow

• Estrategia Marina Marítima de la Union. Comunicación Atlántico

Challenge 6.2 Sustainable use and management of landand seas

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 35: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

35

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Challenge 6.2 Sustainable use and management of landand seas

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 6 000 000

ENV.2012.6.2-4 Management and potential impacts of litter in the marine and coastal environment ("The Ocean for Tomorrow")Up to one proposal can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 6 000 000

ENV.2012.6.2-3 Innovative Tools for Understanding and Assessing Good Environmental Status (GES) of Marine Waters ("The Ocean for Tomorrow")Up to one proposal can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 9 000 000Projects will only be selected for funding on the condition that the estimate EU contribution going to SMEs is 15% or more of the total estimated EU contribution for the project as a whole. This will be assessed at the end of the negotiation, before signature of the grant agreement. Proposals not fulfilling this criterion will not be funded.

ENV.2012.6.2-2 Assessing global biological resources: the European contribution to the Global Earth Observation Biodiversity Observation Network[1] (GEO BON) Up to one proposal can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 9 000 000

ENV.2012.6.2-1 Exploration of the operational potential of the concepts of ecosystem services and natural capital to systematically inform sustainable land, water and urban management One or more proposals can be selected.

Challenge 6.2 Sustainable use and management of land and seas

[1] This topic will provide knowledge and information on biological resources complementary to the actions conducted in GMES initiative (Global Monitoring for Environment and Security) e.g. GMES Land Monitoring Services.

Page 36: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

36

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Environmental Technology Action Plan

•• RTD:WorkshopRTD:Workshop "Strengthening the role of R&D in "Strengthening the role of R&D in boosting ecoboosting eco--innovation and ecoinnovation and eco--efficiency" (13/11/09).efficiency" (13/11/09).http://circa.europa.eu/Public/irc/rtd/wseco/libraryhttp://circa.europa.eu/Public/irc/rtd/wseco/library

•• ResourceResource EfficiencyEfficiency RoadmapRoadmap (DG ENV)(DG ENV)

Challenge 6.2 Sustainable use and management of landand seas

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 37: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

37

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Challenge 6.3 Improving resource efficiency

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

SME-targeted Collaborative ProjectProjects will only be selected for funding on the condition that the estimate EU contribution going to SMEs is 30% or more of the total estimated EU contribution for the project as a whole. This will be assessed at the end of the negotiation, before signature of the grant agreement. Proposals not fulfilling this criterion will not be funded.

ENV.2012.6.3-1 Innovative resource efficient technologies, processes and services One or more proposals can be selected.

6.3 Improving resource efficiency

Page 38: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

38

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Extreme events

• Parma Declaration on Environment and Health

• Exposome

• Supersite

Challenge 6.4 Protecting citizens from environmentalhazards

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 39: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

39

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Challenge 6.4 Protecting citizens from environmentalhazards

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 9 000 000

ENV.2012.6.4-3 Integrating environmental and health data to advance knowledge of the role of environment in human health and well-being in support of a European exposome initiative One or more proposals can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 6 000 000Projects will only be selected for funding on the condition that the estimate EU contribution going to SMEs is 15% or more of the total estimated EU contribution for the project as a whole. This will be assessed at the end of the negotiation, before signature of the grant agreement. Proposals not fulfilling this criterion will not be funded.

ENV.2012.6.4-2 Long-term monitoring experiment in geologically active regions of Europe prone to natural hazards: the Supersite concept[1]One or more proposals can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 6 000 000

ENV.2012.6.4-1 Improving the resilience of society to catastrophic natural hazards through new risk-management partnerships One or more proposals can be selected.

6.4 Protecting citizens from environmental hazards

[1] This topic will conduct long-term monitoring experiments in European areas prone to geohazards complementary to the actions conducted in the GMES initiative (Global Monitoring for Environmental and Security) e.g. GMES emergency management services.http://supersites.earthobservations.org/main.php

Page 40: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

40

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• SMEs

• Global citizen observatory

• Demostrators

• Open access

Challenge 6.5 Mobilising environmental knowledge forpolicy, industry and society

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 41: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

41

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Challenge 6.5 Mobilising environmental knowledge forpolicy, industry and society

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

SME-targeted Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 3 000 000Projects will only be selected for funding on the condition that the estimate EU contribution going to SMEs is 30% or more of the total estimated EU contribution for the project as a whole. This will be assessed at the end of the negotiation, before signature of the grant agreement. Proposals not fulfilling this criterion will not be funded.

ENV.2012.6.5-2 Demonstration and exploitation of most promising prototypes and tools derived from European research activities One or more proposals can be selected.

SME-targeted Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 9 000 000Projects will only be selected for funding on the condition that the estimate EU contribution going to SMEs is 30% or more of the total estimated EU contribution for the project as a whole. This will be assessed at the end of the negotiation, before signature of the grant agreement. Proposals not fulfilling this criterion will not be funded.

ENV.2012.6.5-1 Developing community-based environmental monitoring and information systems using innovative and novel earth observation applications[1]One or more proposals can be selected.

6.5 Mobilising environmental knowledge for policy, industry and society

[1] This topic will explore new approaches to complete the global network of in-situ sensors necessary to monitor the environment complementary to the actions conducted in the GMES initiative (Global Monitoring for Environment and Security).

Page 42: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

42

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

•Call title: ENVIRONMENT 2012: one-STAGE•Call identifier : FP7-ENV-2011-one-stage•Date of publication : 20 July 2011[1]•Deadline : 8 March 2012[2] at 17.00.00, Brussels local time•Indicative budget [3]: EUR 38 million[4]

• 10• 6.6 Horizontal and cross-thematic activities

• 2• 6.5 Mobilising environmental knowledge for policy, industry and society

• -• 6.4 Protecting citizens from environmental hazards

• 12• 6.3 Improving resource efficiency

• 7• 6.2 Sustainable use and management of land and seas

• 7• 6.1 Coping with climate change

Indicative budget (EUR million)

• Challenge/activity

Page 43: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

43

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

SME-targeted Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 3

000 000Projects will only be selected for funding on the condition that the estimate EU

contribution going to SMEs is 30% or more of the total estimated EU contribution for the project as a whole. This will be assessed at the end of the negotiation, before signature of the grant agreement. Proposals not fulfilling this criterion will not be funded.

ENV.2012.6.2-6 Development of advanced technologies and tools for mapping, diagnosing, excavating, and securing underwater and coastal archaeological sites

One or more proposals can be selected.

Coordination and Support Action (supporting action)The requested European Union contribution per project shall not exceed EUR 1

000 000

ENV.2012.6.2-5 Improve scientific knowledge base to support the implementation of the Marine Strategy Framework Directive ("The Ocean for Tomorrow")

Up to one proposal can be selected.

Challenge 6.2 Sustainable use and management of land and seas

Coordination and Support Action (supporting action)The requested European Union contribution per project shall not exceed EUR 1

000 000

ENV.2012.6.1-5 Explore opportunities, risks, feasibility and policy implications associated with key geo-engineering options

Up to one proposal can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 3

000 000

ENV.2012.6.1-4 Exploiting the full potential of economic instruments to achieve the EU's key greenhouse gas emissions reduction targets for 2020 and 2050

One or more proposals can be selected.

Challenge 6.1 Coping with climate change

Page 44: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

44

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Coordination and Support Action (supporting action)The requested European Union contribution per project shall not exceed EUR 1 000 000

ENV.2012.6.3-4 Support for standardisation needs in the field of environment Up to one proposal can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 3 000 000

ENV.2012.6.3-3 Development of resource efficiency indicators One or more proposals can be selected.

Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 3 000 000

ENV.2012.6.3-2 Policy options for a resource efficient economy One or more proposals can be selected.

6.3 Improving resource efficiency

Coordination and Support Action (coordinating action)The requested European Union contribution per project shall not exceed EUR 1 000 000

ENV2012.6.5-4 Integrated assessment of air pollution supporting the revision of EU air quality legislation Up to one proposal can be selected.

Coordination and Support Action (supporting action)The requested European Union contribution per project shall not exceed EUR 1 000 000

ENV.2012.6.5-3 Exploring opportunities for open access to primary environmental data Up to one proposal can be selected.

6.5 Mobilising environmental knowledge for policy, industry and society

SME-targeted Collaborative ProjectThe requested European Union contribution per project shall not exceed EUR 3 000 000Projects will only be selected for funding on the condition that the estimate EU contribution going to SMEs is 30% or more of the total estimated EU contribution for the project as a whole. This will be assessed at the end of the negotiation, before signature of the grant agreement. Proposals not fulfilling this criterion will not be funded.

ENV.2012.6.6-1 EU-India cooperation in water technology and management: research and innovation One or more proposals can be selected.

6.6 Horizontal and cross-thematic activities

Page 45: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

45

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• PPP – Plan Europeo de Recuperación Económica, EeB, GC

• India-EU and MMSS Partnership for an Strategic Roadmapin Research and Innovation

• Innovation Union

• Joint Programming Initiatives:– Water

– Climate Change

6.6. Other activities

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 46: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

46

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Coordination and SupportAction (coordinating action)

ENV.2012….. Support for Programme coordination and cooperation in the context of the European Research Area in the field of climate change research

Coordination and SupportAction (coordinating action)

ENV.2012….. Support for Programme coordination and cooperation in the context of the European Research Area in the field of water research

Collaborative Project (small ormedium-scale focusedresearch project)

ENV.2012….. EU-India cooperation in water technology and management: research and innovation

Collaborative Project GC. 2012……. Public-Private Partnership

"European Green Cars Initiative

Collaborative Project (largescale integrating project)

EeB.ENV.2012……. Concepts and solutions for improving energy efficiency of historic buildings at district level

6.6. 24 M EUR24 M EUR24 M EUR24 M EUR

6.6. Other activities

ESTRUCTURA DEL PROGRAMA DE TRABAJOESTRUCTURA DEL PROGRAMA DE TRABAJO

Page 47: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

47

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Carolina Rodríguez. Representante. CDTIBegoña Artiñano. Experta. CIEMATMiguel Guilarranz Experto. UAMBeatriz Morales. Experta. IMEDEA -CSICAlfredo Cadórnigo Experto. EREN

Delegación EspañolaCOMISIÓN EUROPEADG RESEARCH

DIRECTORATE I. ENVIRONMENT

Carolina Rodríguez. CDTI

Punto Nacional de Contacto. España.

COMITÉ DE GESTIÓN DEL PROGRAMA

COMISIÓN EUROPEADG ENVIRONMENT

ESFRI, ...

ADVISORY BOARDENVIRONMENT

EUROPEAN TECHNOLOGYPLATFORMS

SRA

PLATAFORMASTECNOLÓGICAS

ESPAÑOLAS

AGENDASESTRATÉGICAS

PARTICIPANTES

Begoña Artiñano. CIEMAT

DELEGACIÓN ESPAÑOLA

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 48: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

48

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

CONSULTA INICIAL DELEGACIONESCONSULTA INICIAL DELEGACIONES

ESTRATEGIA DE MEDIO ESTRATEGIA DE MEDIO

AMBIENTE/ POLAMBIENTE/ POLÍÍTICASTICAS

HOJA DE RUTA DE PROGRAMAS DE HOJA DE RUTA DE PROGRAMAS DE TRABAJO 2009TRABAJO 2009--20132013

PROPUESTAS DE TOPICS /ESQUEMAS COLABORATIVOSPROPUESTAS DE TOPICS /ESQUEMAS COLABORATIVOS

BORRADOR PROGRAMA DE TRABAJO 2012BORRADOR PROGRAMA DE TRABAJO 2012

PROGRAMA PROGRAMA DE TRABAJO DE TRABAJO

20122012

08.12.201008.12.2010

14.02.201114.02.2011

24.03.201124.03.2011

PROCESO DE ELABORACIÓN DE UN PT

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 49: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

49

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

1. Análisis de proyectos del plan nacional de I+D, CENIT, etc.

2. Recepción de inputs por parte de las plataformas tecnológicas

3. Recepción y análisis de topics “espontáneos” y memorias de I+D

4. Encuestas de muestras de interés

5. Análisis de políticas y estudios de evaluación del VI Programa Marco

6. Consenso con grupo informal de Delegaciones del Mediterráneo, Balcanes y otras delegaciones concretas con intereses comunes en ámbitos concretos.

•Máxima cobertura•Histórico de tópics financiados y proyectos de I+D en ejecución del PM

PREPARACIÓN DE LA POSICIÓN ESPAÑOLA. DELEGACIÓN

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 50: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

50

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

12ENV.2012.6.5-3 Exploring opportunities for open access to primary environmental data

12ENV.2012.6.2-4: Assessing global biological resources: the European contribution to the Global Earth Observation Biodiversity Observation Network (GEO BON)

12ENV.2012.6.2-2 Innovative Tools for Understanding and Assessing Good Environmental Status ofMarine Waters to Support Ecosystem-based Management

12ENV.2012.6.1-2 Options and pathways towards effective mitigation and adaptation

13ENV.2012….. Support for Programme coordination and cooperation in the context of the European Research Area in the field of water research

16ENV.2012.6.5-2 Demonstration and exploitation of most pr omising prototypes and toolsderived from European research activities

17ENV.2012.6.5-1: Developing community-based environmen tal monitoring and informationsystems using innovative and novel earth observation appl ications

18ENV.2012.6.3-3 Development of resource efficiency indic ators

22

ENV.2012.6.2-1 Exploration of the operational potential of the concepts of ecosystemservices and natural capital to systematically inform su stainable land, water and urbanmanagement

27ENV.2012.6.3-1 Innovative resource efficient technolog ies, processes and services

ResultsTOPICS

RESULTADOS ENCUESTA57 ENTIDADES RESPONDEN

ENCUESTA

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 51: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

51

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

4ENV.2012.6.4-2 Long-term monitoring experiment in geol ogically active regions of Europe proneto natural hazards: the Supersite concept

5ENV.2012….. Support for Programme coordination and cooperation in the context of the European Research Area in the field of climate chan ge research

5ENV.2012.6.2-3 Improve scientific knowledge base to sup port the implementation of the Marine strategy framework directive

6ENV.2012.6.2-5 Development of advanced technologies and tools for mapping, diagnosing, excavating, and securing underwater and coastal archaeol ogical sites

8GC. 2012……. Public-Private Partnership "European Green Cars Initiative

8ENV.2012.6.4-1 Improving the resilience of society to catastrophic events through new risk-managementpartnerships

8ENV.2012. 6.1-1 Climate predictions towards climate services

9ENV.2012.6.4-3 Integrating environmental and health data to advance knowledge of the role of environment in human well-being: the European exposome initiative

9ENV.2012.6.1-3 Exploiting the full potential of economic instruments to achieve the EU's key greenhouse gas emissions reduction targets for 2020 and 2050

10ENV.2012….. EU-India cooperation in water technology and management: research and innovation

10EeB.ENV.2012……. Concepts and solutions for improving energy efficiency of historic buildings at district level

11ENV.2012.6.3-2 Policy options for a resource efficient economy

ENCUESTA

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 52: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

52

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

"There are three kinds of lies : lies , damned lies , and statistics ."

Benjamin Disraeli

ENCUESTA

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 53: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

53

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Topics cerrados 5ª Convocatoria.20111.1.4. Future Climate

2.1.3. Soil research and desertification2.2.1. Marine resources3.1.2. Soil3.1.4. Clean Technologies3.1.6. Marine environment3.1.7. Air technologies3.1.8. Technologies for climate3.2.3 Environment technologies for archaeology and landscapes3.2.4 Fostering the integration of cultural heritage in urban and rural settings3.3.1 Risk assessment of chemicals and alternative strategies for testing3.3.2 Technology Assessment3.3.3 Environmental Technologies Verificationand Testing4.1.2. Cross-cutting research activities relevant to GEO (not open)

GAPS PASADOS

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 54: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

54

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Green Paper 'From Challenges to Opportunities: Towards a Common StrategicFramework for EU research and innovation funding' (COM(2011)48). This Green Paperlaunches a public consultation on the key issues to be taken into account for future EU research and innovation funding programmes. The outcome of the consultation willsubsequently feed into the preparation of the Commission's formal proposals for theseprogrammes, which are due to be adopted before the end of 2011. The consultation websiteis available at: http://ec.europa.eu/research/csfri/index_en.cfm. Submissions can be made until 20 May 2011.

• The Second Earth Observation-Global Monitoring for Environment and SecurityOperational Capacity Workshop will take place on the 17 - 18 March, 2011 in Sheraton Hotel, Sofia, Bulgaria. You can participate in the event by registering on the workshop web-site: http://gmes-bg.org/workshop_2/registration.phtml. Poster session. The deadline forsubmission of abstracts is extended to 10 March 2011. More information is available at: http://gmes-bg.org/workshop_2/postersession.php . At the event web site you can find thepreliminary programme: http://gmes-bg.org/workshop_2/index.php. E-mail: [email protected].

EVENTOS ESTRATÉGICOS

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 55: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

55

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

PublicaciPublicacióón: 22 dic. 2006 / Cierre: 03 may. 2007n: 22 dic. 2006 / Cierre: 03 may. 200772 72 topicstopics

Resultados preliminaresResultados preliminares

CallCall 20072007-- 200 M EUR200 M EUR

PublicaciPublicacióón: 30 nov. 2007 / Cierre: 25 feb. 2008n: 30 nov. 2007 / Cierre: 25 feb. 200852 52 topicstopics (1 conjunto)(1 conjunto)

Resultados preliminaresResultados preliminares

CallCall 20082008-- 217 M EUR217 M EUR

FP7FP7--ENVENV--20092009--1. 1. 49 topicsPublicación: 03 sep. 2008 / Cierre: 08 ene. 2009

FP7FP7--20092009--BIOREFINERY. 2BIOREFINERY. 2 topicsPublicación: 03 sep. 2008 / Cierre: 02 dic. 2009

FP7FP7--NMP/ENVNMP/ENV--20092009--2. 12. 1 topicPublicación: nov. 2008 / Cierre: feb. 2009

CallCall 20092009-- 215 M EUR215 M EUR

FP7FP7--ENVENV--20102010--1. 1. 49 topicsPublicación: julio 2009 / Cierre: enero 2010

CallCall 20102010-- 220 M EUR aprox.220 M EUR aprox.

CallCall 20112011-- 250 M EUR250 M EUR

FP7-ENV-2011 – 175 M EURFP7-ECO-INNOVATION-2011 – 50 M EUR

FP7-OCEAN-2011- 45 M EURPF7 PPPs 2011 – 5 M EUR

51 topicsPublicación:30 julio 2010 /

Cierre: nov 2010, enero de 2011, abril 2011

ANTECEDENTES PARTICIPACIÓN ESPAÑOLA

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 56: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

56

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0

HUNGRIA

IRLANDA

PORTUGAL

ESLOVENIA

FINLANDIA

GRECIA

SUECIA

AUSTRIA

BELGICA

DINAMARCA

ESPAÑA

ITALIA

HOLANDA

FRANCIA

REINO UNIDO

ALEMANIA

0

2

4

6

8

10

12

14

16

DE FR UK IT NL NO AT BE EL FI HU SE CH DK IE PT RO RU SI

Gráfico de Nº propuestas por países coordinadores.

¿¿¿¿¿¿¿¿CCCCCCCCóóóóóóóómo se repartimo se repartimo se repartimo se repartimo se repartimo se repartimo se repartimo se repartióóóóóóóó????????

retornos provisionales: retornos provisionales: 5,1 % (UE5,1 % (UE--27)27)

Gráfico de % Retornos por países

ANTECEDENTES PARTICIPACIÓN ESPAÑOLA 2007

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 57: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

57

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Coordinadas por ES 5 1

FP7-ENV-2008-1

retornos retornos provprov: : 6,8 % (UE6,8 % (UE--27)27)

Gráfico de % Retornos por países

FP7-ENV-NMP-2008-2

retornos retornos provprov: : 10,8 % (UE10,8 % (UE--27)27)

Gráfico de % Retornos por paísesEstimated share of EC proposed contribution

to participants in rank listed proposalsEC Member States and Associated Countries

0,0%

5,0%

10,0%

15,0%

20,0%

25,0%

BE-Be

lgium

CZ-Cze

ch R

epub

licDE-

Germ

any

EL-Gre

ece

ES-Sp

ain

FR-F

ranc

eIT

-Ital

yLT

-Lith

uani

a

NL-Net

herla

nds

PT-Po

rtuga

lSE-

Swed

en

UK-Uni

ted

Kingdo

m

CH-Switz

erlan

dIL

-Isra

elNO-N

orway0.0%

2.0%

4.0%

6.0%

8.0%

10.0%

12.0%

14.0%

Austria

Belgium

Bulgaria

Cyprus

Czech Republic

Germ

any

Denmark

Estonia

Greece

Spain

Finland

France

Hungary

Ireland

Italy

Lithuania

Luxembourg

Latvia

Malta

Netherlands

Poland

Portugal

Romania

Sweden

Slovenia

Slovakia

United Kingdom

ANTECEDENTES PARTICIPACIÓN ESPAÑOLA 2008

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 58: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

58

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

FP7FP7FP7FP7FP7FP7FP7FP7--------ENVENVENVENVENVENVENVENV--------20092009200920092009200920092009

0

5

10

15

20

25

30

35

AT-Au

stria

BE-Be

lgiu

mBG

-Bul

garia

CY-

Cypru

s

CZ-

Czech

Rep

ublic

DE-

Ger

man

y

DK-

Denm

ark

EE-Es

toni

aEL-

Gre

ece

ES-Sp

ain

FI-F

inla

ndFR

-Fra

nce

HU-H

unga

ryIE

-Irel

and

IT-It

aly

LT-L

ithua

nia

LU-L

uxem

bour

gLV

-Lat

via

MT-

Mal

ta

NL-

Nethe

rland

sPL-

Polan

dPT-

Portu

gal

RO

-Rom

ania

SE-Sw

eden

SI-Slo

veni

a

SK-Sl

ovak

ia

UK-

Unite

d Kin

gdom

Countries

Req

uest

ed E

C C

ontribu

tion

(M€)

Coordinadas por ES 5 (2 EMPRESAS!) – SE PASA DE 6ª A 5ª POSICIÓN

retornos retornos provprov: : 7,6 % (UE7,6 % (UE--27)27)

ANTECEDENTES PARTICIPACIÓN ESPAÑOLA 2009

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 59: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

59

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

% participación en Propuestas financiadas

39%

18%

16%

9%

4%

4%

4%

2%

2%

2%CATALUÑA

PAIS VASCO

MADRID (COMUNIDADde)

COMUNIDADVALENCIANA

ANDALUCIA

ARAGON

BALEARS (ILLES)

CANARIAS

CASTILLA Y LEON

MURCIA (REGION de)

ANTECEDENTES PARTICIPACIÓN ESPAÑOLA POR CCAA

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 60: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

60

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• ALTUALMENTE, CONVOCATORIAS ENV 2011, 8,54% RETORNO UE-27, 9 COORDINADORES ESPAÑOLES

• TASA DE ÉXITO: 17%

• CONVOCATORIA MARINA-MARÍTIMA: DE 3,5% DE RETORNO EN 2010 SE HA PASADO AL 14,6%DE RETORNO EN 2011 CON 3 PROPUESTAS LIDERADAS POR ES.

ANTECEDENTES PARTICIPACIÓN ESPAÑOLA POR CCAA

EL RETO, CEL RETO, CÓÓMO CONSEGUIRLOMO CONSEGUIRLO

Page 61: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

61

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• ¿tenemos claro qué queremos hacer?

• ¿cómo de claro? -> detalles

• ¿todos los socios lo tienen claro? “common understanding”

• innovación

• más allá del estado del arte

• ¿sirve para algo?

• convencer a terceros

CLAVES

1 ETAPA1 ETAPA1 ETAPA1 ETAPA

1.Calidad Científico-Técnica (3/5). Concepto, objetivos y plan de trabajo.

2. Implementación y gestión (3/5). Participantes individuales y consorcio, distribución de recursos.

3. Impacto (3/5). Contribución al impacto esperado, planes de difusión y explotación.

• Total (10/15)Umbral (mín/max)

2 ETAPAS. Distintos umbrales m2 ETAPAS. Distintos umbrales m2 ETAPAS. Distintos umbrales m2 ETAPAS. Distintos umbrales míííínimos, mnimos, mnimos, mnimos, máááás restrictivoss restrictivoss restrictivoss restrictivos

(Primera etapa: sólo criterios 1 y 3. Segunda etapa: los tres criterios)

CRITERIOS GENERALES DE EVALUACIÓN

CUESTIONES PRCUESTIONES PRÁÁCTICAS PARA LA PREPARACICTICAS PARA LA PREPARACIÓÓNNDE PROPUESTASDE PROPUESTAS

Page 62: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

62

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

PERIODIC REPORT

ISSUES/REQUESTS/REMINDERS

CONSOLIDATE TECHNICAL,EXPLOITATION &FINANCIAL DATA

PARTNERCONTRIBUTIONS

TASKLEADER

R&DTEAM

TASKLEADER

R&DTEAM

TASKLEADER

R&DTEAM

Co-ordinator Early reminders

Partners

Be aware of deadlines !

COMMISSION PARTNERS

Co-ordinator

Responsabilidades. REPORTING2.2. CONCEPTOS

Page 63: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

63

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

CUESTIONES PRCUESTIONES PRÁÁCTICAS PARA LA PREPARACICTICAS PARA LA PREPARACIÓÓNNDE PROPUESTASDE PROPUESTAS

Page 64: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

64

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

4.4.4.4. Labor creativa: Labor creativa: Labor creativa: Labor creativa: ananananáááálisis lisis lisis lisis del del del del topictopictopictopic, estructuraci, estructuraci, estructuraci, estructuracióóóón. n. n. n. El lEl lEl lEl lííííder decide quder decide quder decide quder decide quééééinstituciinstituciinstituciinstitucióóóón necesita y n necesita y n necesita y n necesita y cucucucuáááál serl serl serl seráááá su su su su contribucicontribucicontribucicontribucióóóón.n.n.n.

5. ¿Competencia?

1. Identificar 1. Identificar 1. Identificar 1. Identificar topicstopicstopicstopics de interés en el Programa de Trabajo (CORDIS). Borradores de convocatorias (miembros de la Delegación española)

2. Determinar cuál sería la contribucila contribucila contribucila contribucióóóón n n n concretaconcretaconcretaconcreta a la futura propuesta en base al topic

3. “MarketingMarketingMarketingMarketing”:– Info-days específicos , flash

presentations– Informar a Punto Nacional de

Contacto– Contacto con consorcios de

proyectos ejecutados en anteriores Programas Marco, LIFE, etc. Detalles en CORDIS.

– Búsqueda pasiva : partner searchtools de CORDIS

ROL: SOCIO

ROL: COORDINADOR

CUESTIONES PRCUESTIONES PRÁÁCTICAS PARA LA PREPARACICTICAS PARA LA PREPARACIÓÓNNDE PROPUESTASDE PROPUESTAS

Page 65: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

65

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

EJERCICIO. 1111. DESGLOSE, 2. QUÉ TIPO DE ACTIVIDAD-RESULTADO POSIBLE, 3.3.3.3. QUIÉN EJECUTA

CADA ACTIVIDAD, 4. CÓMO SE ARTICULAN LAS ACTIVIDADES (WP COORDINACIÓN AFRICA, ETC), 5. TECHO DE

FINANCIACIÓN, 6. IMPACTO –POLICY DRIVERS, 7. CONSULTAR EJEMPLOS

CUESTIONES PRCUESTIONES PRÁÁCTICAS PARA LA PREPARACICTICAS PARA LA PREPARACIÓÓNNDE PROPUESTASDE PROPUESTAS

Area 6.1.3.3 Risk assessment and managementENV.2011.1.3.3-1 Better prevention and management of volcanic eruptions

Content/scope: Eruptions likely to occur are always preceded by volcanic unrest period and pre-eruptive precursor signals. How to distinguish between unrest leading to eruption from unrest which doesn't. The research should therefore develop and improve the predictability and the knowledge related to pre -eruptive processes for representative and dangerous volcanoes. Advances in modelling and monitoring capacity need to be assured within a mul tidisciplinary collaboration framework . From the analysis of volcanic unrest taking into account uncertainties , the project should develop and produce better probabilistic assessments leading to better plans for the management of volcanic crisis and the improvement of forecasting and communication proce dures .

Funding scheme: Collaborative Project (small or medium-scale focused research project) for specific cooperation actions (SICA) dedicated for international cooperation partn er countries (focus on Latin America).

Expected impact: Improve preparedness and warning capacity in collaboration with end users through the establishment of reliable precursors for relevant volcano types; provide better hazard probabilities and quantitative levels of alert ; enable improvement of near real time data processing .

Page 66: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

66

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Colaborative project CSA(supporting) CSA (coordinating)

Instrucciones generales

•Tamaño de página: A4. Tamaño de letra mínimo: 11. •Márgenes: como mínimo 15 mm.•Tipo de letra: Arial /Times New Roman.•Máximo 5000-6000 caracteres por página.

•Tamaño de página: A4. Tamaño de letra mínimo: 11. •Márgenes: como mínimo 15 mm.•Tipo de letra: Arial /Times New Roman.•Máximo 5000-6000 caracteres por página.

•Tamaño de página: A4. Tamaño de letra mínimo: 11. •Márgenes: como mínimo 15 mm.•Tipo de letra: Arial /Times New Roman.•Máximo 5000-6000 caracteres por página.

Portada •Título completo/acrónimo/tipo de esquema de financiación/topic al que se presenta/nombre de la persona de contacto/lista de participantes (en tabla).

•Título completo/acrónimo/tipo de esquema de financiación/topic al que se presenta/nombre de la persona de contacto/lista de participantes (en tabla).

•Título completo/acrónimo/tipo de esquema de financiación/topic al que se presenta/nombre de la persona de contacto/lista de participantes (en tabla).

1. Calidad científico-técnica

•1.3 S/T methodology and associatedwork plan: overal strategy of the workplan (1 página máximo). Utilizar las tablas 1.3.a-e).•Extensión máxima de toda la sección: 20 páginas (sin incluir Gantt chart 1.3.ii, tablas 1.3.a-e y el diagrama Pert 1.3.iv).

•1.2 S/T, overal strategy of the work plan (1 página máximo). Utilizar las tablas 1.2.a-e).•Extensión máxima de toda la sección: 20 páginas (sin incluir Gantt chart 1.2.ii, tablas 1.2.a-e y el diagrama Pert 1.2.iv).

•1.3 S/T methodology and associatedwork plan: overal strategy of the workplan (1 página máximo). Utilizar las tablas 1.3.a-e).•Extensión máxima de toda la sección: 20 páginas (sin incluir Gantt chart 1.3.ii, tablas 1.3.a-e y el diagrama Pert 1.3.iv).

2.Implementación •2.1 (extensión máxima: 5 páginas)•2.2 (extensión máxima: 1 página por participante)•2.3 (sin limitación de extensión)•2.4 (extensión máxima: 5 páginas)

•2.1 (extensión máxima: 5 páginas)•2.2 (extensión máxima: 1 página por participante)•2.3 (sin limitación de extensión)•2.4 (extensión máxima: 5 páginas)

•2.1 (extensión máxima: 5 páginas)•2.2 (extensión máxima: 1 página por participante)•2.3 (sin limitación de extensión)•2.4 (extensión máxima: 5 páginas)

3. Impacto •Extensión máxima para toda la sección: 10 páginas.

•Extensión máxima para toda la sección: 10 páginas.

•Extensión máxima para toda la sección: 10 páginas.

4.Consideraciones éticas

• sin limitación de extensión. • sin limitación de extensión. •sin limitación de extensión.

•5.Consideraciones de género

•Extensión máxima: 1 página N.A N.A

PF7- ENV-2010. Guide for applicants. Annex 4. Instrucciones de formato

Page 67: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

67

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

BSG-CSO

Instrucciones generales

•Tamaño de página: A4. Tamaño de letra mínimo: 11. •Márgenes: como mínimo 15 mm.•Tipo de letra: Arial /Times New Roman.•Máximo 5000-6000 caracteres por página.

Portada •Título completo/acrónimo/tipo de esquema de financiación/topic al que se presenta/nombre de la persona de contacto/lista de participantes (en tabla).

1. Calidad científico-técnica

•Extensión máxima de toda la sección: 15 páginas (sin incluir Gantt chart 1.3.ii, tablas 1.3.a-e y el diagrama Pert 1.3.iv).

2.Implementación •2.1 (extensión máxima: 5 páginas)•2.2 (extensión máxima: 1 página por participante)•2.3 (extensión máxima: 3 páginas)•2.4 (extensión máxima: 4 páginas)

3. Impacto •Extensión máxima para toda la sección: 10 páginas.

4.Consideraciones éticas

• sin limitación de extensión.

•5.Consideraciones de género

•Extensión máxima: 1 página

PF7- ENV-2010. Guide for applicants. Annex 4. Instrucciones de formato (continuación)

Page 68: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

68

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

PatentesPatentes http://ep.espacenet.com/

ProyectosProyectos http://cordis.europa.eu/search/index.cfm?dbname=proj

Sólo se financia la 1ª vez

ESTADO DEL ARTEESTADO DEL ARTECONCEPTOS. CRITERIO 1

CatCatáálogo de Proyectos del VI PMlogo de Proyectos del VI PM (Global Change, Ecosystems and Sustainable Development)http://cordis.europa.eu/fp7/environment/library_en. html

CUESTIONES PRCUESTIONES PRÁÁCTICAS PARA LA PREPARACICTICAS PARA LA PREPARACIÓÓNNDE PROPUESTASDE PROPUESTAS

Page 69: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

69

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Relación con los impactos citados en el WP, relación con los objetivos europeos (CO2, Libro Blanco, Directiva Marco del Agua)– Ambiciosos pero justificados

• Impacto: industrial (comercial, explotación), académico (publicaciones)• Impacto económico, comercial, tamaño de mercado, posibilidades de acceso a ese

mercado (tampoco se trata de meter un estudio de mercado en la propuesta)• Implicar en la diseminación a todos los agentes clave (audiencia objetivo)• “Two ways communication”• Vínculos con otros proyectos, grupos externos…• ¿Y después del proyecto? Patentes, productos, comercialización, difusión o

uso gratuito de resultados…

IMPACTO Y DIVULGACIÓN

CUESTIONES PRCUESTIONES PRÁÁCTICAS PARA LA PREPARACICTICAS PARA LA PREPARACIÓÓNNDE PROPUESTASDE PROPUESTAS

Page 70: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

70

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Acuerdos verbales iniciales • Reunión formal de definición de proyecto

– Plan de proyecto– Distribución de tareas– Definición de responsabilidades

• Coordinador (Jefe de Proyecto)• Socios principales• Socios asociados

– Asignación de presupuesto• Equilibrio entre socios• Equilibrio entre países

– Definición plan de explotación– Acuerdo sobre gestión de la propiedad intelectual ( IPR)

• Redacción conjunta de la propuesta (en inglés)

RESUMEN PLANIFICACIÓN

CUESTIONES PRCUESTIONES PRÁÁCTICAS PARA LA PREPARACICTICAS PARA LA PREPARACIÓÓNNDE PROPUESTASDE PROPUESTAS

Page 71: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

71

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

1. No recoge los objetivos del topic.

2. Los conceptos no son innovadores (ESTADO DEL ARTE). El consorcio deberíacontar con el Estado del Arte (el proyecto no debería estudiar el Estado del Arte deltema propuesto). La excelencia científica no es visible.

3. Deben considerarse SIEMPRE riesgos e imprevistos, nunca existe nada que secontrole totalmente (Plan de Contingencias)

4. Propuesta no focalizada. Carece de puntos fuertes: modelos, conceptos, teoría.

5. Carencia de máximo grado de detalle en las tareas.

6. El consorcio no de estar compuesto por gran número de partners si no estájustificado.

7. Indicadores: falta propósito, quién los va a utilizar y para qué.

8. Dificultades para entender la implementación del proyecto.

9. Enfasis en la metodología empleada (descripción insuficiente)

10. Mala redacción, repetición.

OBSERVACIONES “EVALUACION SUMMARY REPORT”. Criterio 1

LOS 40 ERRORES MÁS FRECUENTES

Page 72: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

72

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

1. No recoge los objetivos del topic.

2. Los conceptos no son innovadores (ESTADO DEL ARTE). El consorcio deberíacontar con el Estado del Arte (el proyecto no debería estudiar el Estado del Arte deltema propuesto). La excelencia científica no es visible.

3. Deben considerarse SIEMPRE riesgos e imprevistos, nunca existe nada que secontrole totalmente (Plan de Contingencias)

4. Propuesta no focalizada. Carece de puntos fuertes: modelos, conceptos, teoría.

5. Carencia de máximo grado de detalle en las tareas.

6. El consorcio no de estar compuesto por gran número de partners si no estájustificado.

7. Indicadores: falta propósito, quién los va a utilizar y para qué.

8. Dificultades para entender la implementación del proyecto.

9. Enfasis en la metodología empleada (descripción insuficiente)

10. Mala redacción, repetición.

3.3.OBSERVACIONES “EVALUACION SUMMARY REPORT”. Criterio 1

LOS 40 ERRORES MÁS FRECUENTES

Page 73: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

73

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

OBSERVACIONES “EVALUACION SUMMARY REPORT”. Criterio 1

11. El ámbito o campo de trabajo tiene que quedar claro.

12. El cronograma (schedule) tiene que ser apropiado. CUIDAR EL SCHEDULE DELOS PAQUETES DE TRABAJO.

13. Gaps en vínculos interdisciplinares (e.g. servicios ecosistemicos, biodiversidad ycapacidad).

14. WP Gestión debe reflejarse o apuntarse vínculos con stakeholders.

15. Existe duplicación de esfuerzos (e.g. no estudiar el mismo taxon varias veces sino aporta valor añadido).

16. Si se hace referencia a un aspecto productivo que va a cambiar de algunamanera, es IMPRESCINDIBLE identificar a los beneficiados y perdedores en elnuevo sistema.

17. No se cuantifican inputs y outputs. CUANTIFICAR. (E.g. Si se van a hacerencuestas es necesario estimar el input y output de las mismas).

18. Falta de VISIÓN INTEGRADORA DE DISTINTAS DISCIPLINAS.

19. Es FUNDAMENTAL identificar a usuarios y agentes. PROPUESTA PRÁCTICA.

LOS 40 ERRORES MÁS FRECUENTES

Page 74: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

74

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• 20. Estado del arte científico OK, pero falla el estado del arte industrial

• 21. Se echan en falta sinergias con proyectos relacionados en marcha

• 22. Objetivos poco ambiciosos

• 23. Estructura de gestión genérica, sin adaptar al proyecto en caso necesario

• 24. Presupuestos excesivo

• 25. El compromiso de algunos socios no queda claro

OBSERVACIONES “EVALUACION SUMMARY REPORT”. Criterio 1

LOS 40 ERRORES MÁS FRECUENTES

Page 75: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

75

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

..OBSERVACIONES “EVALUACION SUMMARY REPORT”. Criterio 2

1. Falta complementariedad Senior-Junior y de balance de género.2. La estructura de gestión debe estar descrita ampliamente y adecuadamente (ESQUEMAS):

• Gestión del día a día (herramientas de trabajo)• Involucrar agentes• External Advisory Group• Procedimientos de control de la calidad• Gestión de riesgos

3. Demasiadas instituciones (16 instituciones, 11 países sería un ejemplo de consorciodemasiado grande para un CPSmall).

4. 1 meeting/año por parte de los líderes es demasiado poco.5. Carencia de implementación cercana y vínculo entre: Workshops, Fieldworks y Desk Studies.6. Falta de análisis de las cuestiones económicas, sociales, resolución de conflictos políticas y

gobernanza en profundidad.7. Las person/month parecen excesivas (duplicación de esfuerzos).8. La composición de cada elemento de gestión no está descrito:

• Indicar el rol de todos• No basta el esquema• No deben de tener las mismas competencias

9. Ambigüedad en fuentes y cantidad de datos (CLARIFICAR AL MÁXIMO).

LOS 40 ERRORES MÁS FRECUENTES

Page 76: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

76

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

1048358231812Total

66Pr 7

181125Pr 6

193214Pr 5

28122212Pr 4

33Pr 3

12222222Pr 2

184410Pr 1

WP6WP5WP4WP3WP2WP1WPs

Socios

..E.g.

LO QUE NO SE DEBE HACER

El que no sabe qué hacer

La PYME

El políticamente correcto

El que le gusta a todos y todos

hacen demasiado

El que no le gusta a ninguno

Page 77: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

77

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

..

OBSERVACIONES “EVALUACION SUMMARY REPORT”. Criterio 3

1. Falta diversidad de casos de estudio.

2. No hay multidisciplinariedad.

3. Los outputs no son relevantes.

4. Plan de diseminación no bien documentado (descri pción de agentes finalesexhaustiva, identificación clara de usuarios finale s. (E.g. Si el formato dediseminación es multimedia, hay que tener claro que los usuarios finalesdeben contar con los recursos mínimos necesarios pa ra poder visualizarlos).

5. No sólo papers y publicaciones científicas (prop oner deliverables que tenganvalor práctico). No sobrepasar un número determinad o de deliverables. (Eg.50 pueden ser demasiados).

6. Es necesario que los agentes estén realmente imp licados (no sólo se les hade requerir para que faciliten su experiencia y con ocimiento).

7. La divulgación pública no debe de ser irreal con la interfaz ciencia-sociedad.Resulta necesario involucrar a ONGs para la mejor a ceptación por parte deun público amplio.

LOS 40 ERRORES MÁS FRECUENTES

Page 78: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

78

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

1048358231812Total

66Pr 7

181125Pr 6

193214Pr 5

28122212Pr 4

33Pr 3

12222222Pr 2

184410Pr 1

WP6WP5WP4WP3WP2WP1WPs

Socios

3.3.E.g.

LO QUE NO SE DEBE HACER

El que no sabe qué hacer

La PYME

El políticamente correcto

El que le gusta a todos y todos

hacen demasiado

El que no le gusta a ninguno

Page 79: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

79

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

• Proyectos que abren nuevos caminos, posibilitan desarrollos futuros. El proyecto seguirá “vivo”...

• Incluyen una “visión” a futuro y una “hoja de ruta”

• El consorcio demuestra saber lo que quiere hacer y poder hacerlo

• Equilibrio entre riesgo e innovación.

• Experiencia de cada socio (y en particular del coordinador) suficientemente demostrada para las tareas asignadas

• Los socios tienen amplia experiencia y su trayectoria de I+D es evidente y reconocida

• Equilibro entre empresas, CTs, universidades, proveedores de tecnología, usuarios

CARACTERCARACTERCARACTERCARACTERÍÍÍÍSTICASSTICASSTICASSTICAS

PROPUESTA DE PROYECTO SOBRESALIENTEPROPUESTA DE PROYECTO SOBRESALIENTE4.4.

Page 80: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

80

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

E.G. INDICE DESGLOSADO

1. Background: Explica la problemática del sector, complementando con datos concretos.

2. Hace referencia a las Plataformas Tecnológicas y a la legislación vigente.

3. Incluye gráficos de aproximación sistemática del proyecto.

(descargar vía webde manera gratuita, CORDIS, CDTI)

PROPUESTA DE PROYECTO SOBRESALIENTEPROPUESTA DE PROYECTO SOBRESALIENTE

Page 81: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

81

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

E.G. VISIÓN INTEGRADORA

Propuesta

Definición

Tecnologías

Gestión sostenible

Casos piloto

4. Define las soluciones aportadas de forma multisectorial.

PROPUESTA DE PROYECTO SOBRESALIENTEPROPUESTA DE PROYECTO SOBRESALIENTE

Page 82: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

82

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

5. Explica la relevancia del proyecto para el topic.

6. Descripción exhaustiva del Estado del Arte (proyectos anteriores), identificando los gaps que resolverá la propuesta.

7. Incluye cuadros en el que se resumen las contribuciones del proyecto a cada uno de los gaps identificados.

E.G. TABLAS ACLARATORIAS

PROPUESTA DE PROYECTO SOBRESALIENTEPROPUESTA DE PROYECTO SOBRESALIENTE

Page 83: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

83

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

8. Se estructura la realización del proyecto en Sub -programas, donde se ubican los WP, claramente descritos y entendibles .9. Incluye diagramas explicativos en los WP más complejos.

10. Muestra los diagramas de proceso de transferencia de conocimiento.11. Todos los WP aparecen en el Schedule.12. En la descripción de los WP vincula las actividades con los deliverables.

E.G. GRÁFICOS TÉCNICOS

PROPUESTA DE PROYECTO SOBRESALIENTEPROPUESTA DE PROYECTO SOBRESALIENTE

Page 84: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

84

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

E.G. INFORMES DEL PROGRESO DEL PROYECTO

PROPUESTA DE PROYECTO SOBRESALIENTEPROPUESTA DE PROYECTO SOBRESALIENTE

Page 85: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

85

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

E.G. HERRAMIENTAS DE COLABORACIÓN

PROPUESTA DE PROYECTO SOBRESALIENTEPROPUESTA DE PROYECTO SOBRESALIENTE

Page 86: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

86

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

¿Hasta?(EPSS)

Page 87: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

87

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Resultados de evaluación de FP7-ENV-ECO-INNOVATION-2011-TwoStage

Presupuesto: 43 M EUR.

Resumen de los aspectos más importantes. 134 presentadas, de las cuales 44 han pasado a la segunda fase.

Se han cubierto los siguientes sectores (ordenados por número de propuestas que han superado la primera fase): residuos, aplicaciones industriales, biotecnologías (6 cada uno), materiales y TIC (5 cada uno), agricultura (4), agua (3), aire y construcción (2 cada uno), energía, lodos, suelo, biocombustibles y otros sectores (1 cada uno). Por parte de los evaluadores se ha echado de menos, sobretodo, el planteamiento de planes de negocio suficientemente argumentados. La financiación solicitada media ha estado entre 2,5 y 3,5 M EUR.

Evaluadores: 77.

Estimaciones para ES: ES lidera el número de socios totales en propuestas (47) y el número de propuestas coordinadas que han pasado a la segunda fase, que han sido 17 de las 44 totales.

..ECO-INNOVATION 2011. TWO STAGES

ESR 1ST STAGE

Page 88: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

88

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Evaluación S/T. Principales puntos de mejora

..ECO-INNOVATION 2011. TWO STAGES

ESR 1ST STAGE

Page 89: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

89

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

..ECO-INNOVATION 2011. TWO STAGES

ESR 1ST STAGE

Page 90: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

90

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

..ECO-INNOVATION 2011. TWO STAGES

ESR 1ST STAGE

Page 91: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

91

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

..ECO-INNOVATION 2011. TWO STAGES

ESR 1ST STAGE

Page 92: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

92

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

..ECO-INNOVATION 2011. TWO STAGES

ESR 1ST STAGE

Page 93: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

93

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

AUMENTO DE FINANCIACIÓN EN VII PROGRAMA MARCO(financiación europea mayor que estatal)

ES NECESARIO AUMENTAR LA PARTICIPACIÓN ESPAÑOLA

VARIABILIDAD DE TOPICS(incremento de opciones y oportunidades en I+D)

CONCLUSIONES Y ACTUACIONES FUTURAS

Page 94: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

94

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

PT NACIONALES- PLANETA www.cdti.es- PTE AGUA Y RIEGO www.plataformaagua .org/- PTE QUÍMICA SOSTENIBLE www.pte-quimicasostenible .org/- PTE CONSTRUCCIÓN www.construccion 2030.org/- PTE FORESTAL www.plataformaforestal .org/- PTE BIOMASA www.bioplat.org/-PTE PESCA www.ptepa.org/-PROTECMA www.protecma.es-PTE PESCA www.ptepa.org/

PT EUROPEAS�Sustainable Chemistry - SusChem [email protected]�Water Supply and Sanitation Technology Platform - WSSTP [email protected]�Waterborne ETP - Waterborne [email protected]�Zero Emission Fossil Fuel Power Plants - ZEP [email protected]�European Biofuels Technology Platform - Biofuels [email protected]�European Construction Technology Platform - ECTP [email protected] (1) (2) �European Space Technology Platform - ESTP [email protected]�European Technology Platform on Sustainable Mineral Re sources - ETP SMR�Forest based sector Technology Platform - Forestry [email protected]

PLATAFORMAS TECNOLPLATAFORMAS TECNOLPLATAFORMAS TECNOLPLATAFORMAS TECNOLÓÓÓÓGICAS RELACIONADAS CON GICAS RELACIONADAS CON GICAS RELACIONADAS CON GICAS RELACIONADAS CON MEDIO AMBIENTE, MEDIO AMBIENTE, MEDIO AMBIENTE, MEDIO AMBIENTE, UIIsUIIsUIIsUIIs, , , , BTsBTsBTsBTs

Page 95: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

95

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

DEBATE

1. ¿Cuál es la experiencia en esta temática?2. ¿Retos?3. ¿Dificultades? ¿Resultados hasta el momento?

4. ¿Sinergias detectadas?5. ¿Propuestas de actuación?…

Page 96: Medio Ambiente (incluido Cambio Clim ático) · 2014. 7. 21. · eHealth eIdentity ICT for TT Energy efficiency Programmes Instruments New thematic initiatives ... PANORAMA ACTUAL

96

AlmerAlmer íía, 19 de mayo de 2011a, 19 de mayo de 2011

Carolina Rodríguez RodríguezRepresentante Nacional y PNCMedio Ambiente - VII PM

[email protected],4 – 28001 MadridTel. +34 91 581 55 00/55 62

Consultas generales I+D+i y el VII PM: www.cdti.es/pidi - Tel. 902 34 74 34

Gracias por su atenciGracias por su atencióónn