20
México Oro-Plata– Mayo 2011 Brent McFarlane, VP Operaciones Salvador Aguayo, Gerente, México TSX-V: SVL Proyecto Mina Santa Elena

México Oro-Plata– Mayo 2011 - Portal de Noticias · México Oro-Plata– Mayo 2011 Brent McFarlane, VP Operaciones Salvador Aguayo, Gerente, México ... Evaluación y Manejo de

  • Upload
    vanhanh

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

México Oro-Plata– Mayo 2011Brent McFarlane, VP Operaciones

Salvador Aguayo, Gerente, MéxicoTSX-V: SVL

ProyectoMina Santa Elena

TSX-V: SVL2

DisclaimerThe information provided in this presentation is not intended to be a comprehensive review of all matters and developmentsconcerning the Company. It should be read in conjunction with all other disclosure documents of the Company. The informationcontained herein is not a substitute for detailed investigation or analysis. No securities commission or regulatory authority hasreviewed the accuracy or adequacy of the information presented.

This presentation contains forward-looking statements which address future events and conditions which are subject to variousrisks and uncertainties. The Company’s actual results, programs and financial position could differ materially from thoseanticipated in such forward-looking statements as a result of numerous factors, some of which may be beyond the Company’scontrol. These factors include: the availability of funds; the timing and content of work programs; results of exploration activitiesand development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties ofresource and reserve estimations, receipt and security of mineral property titles; project cost overruns or unanticipated costs andexpenses, fluctuations in metal prices; currency fluctuations; and general market and industry conditions.

Forward-looking statements are based on the expectations and opinions of the Company’s management on the date thestatements are made. The assumptions used in the preparation of such statements, although considered reasonable at the timeof preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

TSX-V: SVL

ExperienciaGerencia con experiencia

Enfocada a México y con un proyecto integral de expansión y crecimiento

Mina Santa Elena: lixiviación en patios de minerales de Au-Ag, 30k oz Au/año & 800k oz Ag/año

Cruz de Mayo: 15 millones+ onzas de plata y cercano a Santa ElenaLa Joya: proyecto de exploración de un mineral polimetálico Ag-Cu-Au

SilverCrest Mines Inc.

3

TSX-V: SVL 4

Equipo de Gerencia ExperimentadoJ. Scott Drever, President (45 años de experiencia) Planeación Estratégica, Adquicisiones y Asociaciones. Anteriormente con Placer Dome, Blackdome Mines, Pan Ocean Oil

Barney Magnusson, CFO (30 años de experiencia) Financiamiento en minería. Anteriormente con High River Gold Mines, Dayton Resources, Brohm Resources

N. Eric Fier, COO (25 años de experiencia) Operaciones, Evaluación y Manejo de Proyectos. Anteriormente con Newmont Mining, Eldorado Gold, Pegasus Gold Corp.

Brent McFarlane, VP Operaciones (25 años de experiencia)Operaciones, Manejo de Proyectos, y Construccion. Anteriormente con Minera San Xavier, Minefinders, TVI Pacific, Pegasus Gold Corp.

TSX-V: SVL5

Localización

La Joya

TSX-V: SVL

Antecedentes

6

■ Descubierta en tiempos de la dominación española■ Abandonada hasta 1856■ Vendida en 1889 por Gral. Ignacio Pesqueira■ 1899 propiedad de The Consolidated Gold Fields of México

■ Tungsteno de Baviácora último propietario

TSX-V: SVL7

+ 1M Au EQ Onzas y AumentandoSANTA ELENA & CRUZ DE MAYO GOLD AND SILVER RESOURCES AND RESERVES (JANUARY 2011)

Santa Elena Open Pit Contained ContainedReserves Tonnes Au gpt Ag gpt Gold (tr.oz.) Silver (tr.oz.)

Probable* 4,794,790 1.81 75.9 278,560 11,711,000Santa Elena Underground

Resources**Indicated 991,100 1.83 109.1 58,330 3,476,960Inferred 1,879,000 1.53 86.9 92,470 5,250,190

Cruz De MayoResources***

Indicated 1,141,000 0.06 64.2 2,300 2,353,400Inferred 6,065,000 0.07 66.5 13,300 12,967,100Totals

Total Probable 4,794,790 1.81 75.9 278,560 11,711,000Total Indicated 2,132,100 0.88 85.0 60,630 5,830,360Total Inferred 7,944,000 0.41 71.3 105,770 18,217,290

TOTAL 444,960 35,758,650* based on US$1,000/oz of gold and US$18/oz of silver, cut-off grade of 0.38 g/t gold equivalent with

applied metallurgical recoveries. Excludes 2010 production.

** based on US$1,000/oz of gold and US$18/oz of silver, cut-off grade is 1.77 g/t gold equivalent with

applied metallurgical recoveries.

*** based on a silver cut-off grade of 30 g/t. This is presented in the 2007 Fier and Wallis Technical Report.

TSX-V: SVL

Mina de Tajo Abierto – Alta Ley1.81 g/t Au y 75.9 g/t AgDepósito Epitermal de Au y Ag

Reservas (NI43-101)Reservas Probables278,560 oz Au y 11,711,000 oz Ag

ProducciónTajo Abierto, Lix. En Patios 2,500 ton. Por diaProd. Anual Promedio 30,000 oz Au, 800,000 oz AgCosto Promedio US $8/oz Ag EqVida de la Mina 7 años

8

Santa Elena: Generalidades

Patio de Lixiviación-SE

Mina Santa Elena

TSX-V: SVL

100% propietario, no regalías

150 km noreste de Hermosillo sobre caminopavimentado, muy buen acceso e infraestructura

Muy buen potencial para expandir las Reservas, Desarrollo de Mina Subterránea

Contrato con Bienes Comunales por renta de superficiepor 20 años

Minado por contrato

Primera Barra de Doré Septiembre 9, 2010

Producción Comercial mediados de 2011

Recursos para 2011 $15M operación + $5M expansión

9

Santa Elena Cont.

Primera Tronada en Santa Elena

Circuito de Trituración

TSX-V: SVL 10

Mina Santa Elena: Desarrollo del Tajo

Mina Santa Elena: Modelo de Bloques

11

TSX-V: SVL 12

Mina Santa Elena: MinadoProduccion diaria de 20,000 a 25,000toneladas (tepetate y mineral con proporción de estéril a mineral entre 4:1y 5:1 en los primeros fases.

Minado muy selectivo, maximizando larecuperación de mineral y minimizandodilución.

El minado selectivo requiere alto nivel de planificación de mina y controlGeológico.

La clave de la selectividad en el minado es “La Gallina”.

TSX-V: SVL

Mina Santa Elena: Trituración

Trituradora Primaria de QuijadaCedarapids 30541372 mm x 762 mm

■ 2,500 tpd■ Tres Etapas de Trituración■ Dos Magnetos■ Detector de Metales

Trituradora Secundaria de ConoCedarapids MVP 380

Trituradora Terciaria de Cono CortoCedarapids MVP 380

13

TSX-V: SVL 14

Mina Santa Elena: Patios de LixiviaciónArcilla 300 mmGeomembrana LLDPE 60milSistema de Detección de FugasDos Fases:

Fase I: 7 levantes de 6 mFase II: 6 levantes

Pileta de Solución RicaPileta de Soluciones Pobre e IntermediaPileta de Emergencia

12 l/h-m2

Ciclo de Lixiviación: 60 días

TSX-V: SVL 15

Mina Santa Elena: Planta Merrill-Crowe

160 m3/h3 Clarificadores de Hoja, VerticalesTorre de Vacío (Crowe) Empacada4 Filtros de Placas

TSX-V: SVL 16

Planta Merrill-Crowe/Refinería■ Horno de gas

60 kg de doré/día■ Secador eléctrico con Casa de Sacos

TSX-V: SVL 17

Transporte de Dore

TSX-V: SVL 18

Responsabilidad Social SilverCrest está comprometida

con la Comunidad,

Y con la Seguridad: Cerca de 500,000 horas-hombre sin accidentes de trabajo,

De la fuerza laboral de Santa Elena, casi 70% pertenece a la Comunidad de Banámichi o pueblos cercanos,

Compromiso de apoyar con Servicios de Salud en la Comunidad

El 18 de mayo de 2010, SilverCrest donó una ambulancia totalmente

equipada al municipio de Banamichi, Sonora, México.

TSX-V: SVL 19

Planes de Crecimiento para Santa Elena Fase I: Minado Tajo Abierto-Lixiviación en Pilas

Producción Comercial 2011Flujo de capital positivo 2011

Fase II: Re-tratamiento de Pilas de LixiviaciónConstrucción de molino convencional de 2500 - 3500 tpd 2012-2014Reprocesamiento de mineral 2014

Fase III: Desarrollo de Mina Cruz de MayoMina de Tajo Abierto de Ag disponible para alimentarse al molino de Santa Elena 2014

Fase IV: Desarrollo del Minado Subterráneo en Santa Elena Desarrollo de rampa & Minado Subterráneo 2011-2014Inicio de Explotación y Procesamiento de Mina Subterránea 2014

TSX-V: SVL 20

Gracias!