México Oro-Plata– Mayo 2011Brent McFarlane, VP Operaciones
Salvador Aguayo, Gerente, MéxicoTSX-V: SVL
ProyectoMina Santa Elena
TSX-V: SVL2
DisclaimerThe information provided in this presentation is not intended to be a comprehensive review of all matters and developmentsconcerning the Company. It should be read in conjunction with all other disclosure documents of the Company. The informationcontained herein is not a substitute for detailed investigation or analysis. No securities commission or regulatory authority hasreviewed the accuracy or adequacy of the information presented.
This presentation contains forward-looking statements which address future events and conditions which are subject to variousrisks and uncertainties. The Company’s actual results, programs and financial position could differ materially from thoseanticipated in such forward-looking statements as a result of numerous factors, some of which may be beyond the Company’scontrol. These factors include: the availability of funds; the timing and content of work programs; results of exploration activitiesand development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties ofresource and reserve estimations, receipt and security of mineral property titles; project cost overruns or unanticipated costs andexpenses, fluctuations in metal prices; currency fluctuations; and general market and industry conditions.
Forward-looking statements are based on the expectations and opinions of the Company’s management on the date thestatements are made. The assumptions used in the preparation of such statements, although considered reasonable at the timeof preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.
TSX-V: SVL
ExperienciaGerencia con experiencia
Enfocada a México y con un proyecto integral de expansión y crecimiento
Mina Santa Elena: lixiviación en patios de minerales de Au-Ag, 30k oz Au/año & 800k oz Ag/año
Cruz de Mayo: 15 millones+ onzas de plata y cercano a Santa ElenaLa Joya: proyecto de exploración de un mineral polimetálico Ag-Cu-Au
SilverCrest Mines Inc.
3
TSX-V: SVL 4
Equipo de Gerencia ExperimentadoJ. Scott Drever, President (45 años de experiencia) Planeación Estratégica, Adquicisiones y Asociaciones. Anteriormente con Placer Dome, Blackdome Mines, Pan Ocean Oil
Barney Magnusson, CFO (30 años de experiencia) Financiamiento en minería. Anteriormente con High River Gold Mines, Dayton Resources, Brohm Resources
N. Eric Fier, COO (25 años de experiencia) Operaciones, Evaluación y Manejo de Proyectos. Anteriormente con Newmont Mining, Eldorado Gold, Pegasus Gold Corp.
Brent McFarlane, VP Operaciones (25 años de experiencia)Operaciones, Manejo de Proyectos, y Construccion. Anteriormente con Minera San Xavier, Minefinders, TVI Pacific, Pegasus Gold Corp.
TSX-V: SVL
Antecedentes
6
■ Descubierta en tiempos de la dominación española■ Abandonada hasta 1856■ Vendida en 1889 por Gral. Ignacio Pesqueira■ 1899 propiedad de The Consolidated Gold Fields of México
■ Tungsteno de Baviácora último propietario
TSX-V: SVL7
+ 1M Au EQ Onzas y AumentandoSANTA ELENA & CRUZ DE MAYO GOLD AND SILVER RESOURCES AND RESERVES (JANUARY 2011)
Santa Elena Open Pit Contained ContainedReserves Tonnes Au gpt Ag gpt Gold (tr.oz.) Silver (tr.oz.)
Probable* 4,794,790 1.81 75.9 278,560 11,711,000Santa Elena Underground
Resources**Indicated 991,100 1.83 109.1 58,330 3,476,960Inferred 1,879,000 1.53 86.9 92,470 5,250,190
Cruz De MayoResources***
Indicated 1,141,000 0.06 64.2 2,300 2,353,400Inferred 6,065,000 0.07 66.5 13,300 12,967,100Totals
Total Probable 4,794,790 1.81 75.9 278,560 11,711,000Total Indicated 2,132,100 0.88 85.0 60,630 5,830,360Total Inferred 7,944,000 0.41 71.3 105,770 18,217,290
TOTAL 444,960 35,758,650* based on US$1,000/oz of gold and US$18/oz of silver, cut-off grade of 0.38 g/t gold equivalent with
applied metallurgical recoveries. Excludes 2010 production.
** based on US$1,000/oz of gold and US$18/oz of silver, cut-off grade is 1.77 g/t gold equivalent with
applied metallurgical recoveries.
*** based on a silver cut-off grade of 30 g/t. This is presented in the 2007 Fier and Wallis Technical Report.
TSX-V: SVL
Mina de Tajo Abierto – Alta Ley1.81 g/t Au y 75.9 g/t AgDepósito Epitermal de Au y Ag
Reservas (NI43-101)Reservas Probables278,560 oz Au y 11,711,000 oz Ag
ProducciónTajo Abierto, Lix. En Patios 2,500 ton. Por diaProd. Anual Promedio 30,000 oz Au, 800,000 oz AgCosto Promedio US $8/oz Ag EqVida de la Mina 7 años
8
Santa Elena: Generalidades
Patio de Lixiviación-SE
Mina Santa Elena
TSX-V: SVL
100% propietario, no regalías
150 km noreste de Hermosillo sobre caminopavimentado, muy buen acceso e infraestructura
Muy buen potencial para expandir las Reservas, Desarrollo de Mina Subterránea
Contrato con Bienes Comunales por renta de superficiepor 20 años
Minado por contrato
Primera Barra de Doré Septiembre 9, 2010
Producción Comercial mediados de 2011
Recursos para 2011 $15M operación + $5M expansión
9
Santa Elena Cont.
Primera Tronada en Santa Elena
Circuito de Trituración
TSX-V: SVL 12
Mina Santa Elena: MinadoProduccion diaria de 20,000 a 25,000toneladas (tepetate y mineral con proporción de estéril a mineral entre 4:1y 5:1 en los primeros fases.
Minado muy selectivo, maximizando larecuperación de mineral y minimizandodilución.
El minado selectivo requiere alto nivel de planificación de mina y controlGeológico.
La clave de la selectividad en el minado es “La Gallina”.
TSX-V: SVL
Mina Santa Elena: Trituración
Trituradora Primaria de QuijadaCedarapids 30541372 mm x 762 mm
■ 2,500 tpd■ Tres Etapas de Trituración■ Dos Magnetos■ Detector de Metales
Trituradora Secundaria de ConoCedarapids MVP 380
Trituradora Terciaria de Cono CortoCedarapids MVP 380
13
TSX-V: SVL 14
Mina Santa Elena: Patios de LixiviaciónArcilla 300 mmGeomembrana LLDPE 60milSistema de Detección de FugasDos Fases:
Fase I: 7 levantes de 6 mFase II: 6 levantes
Pileta de Solución RicaPileta de Soluciones Pobre e IntermediaPileta de Emergencia
12 l/h-m2
Ciclo de Lixiviación: 60 días
TSX-V: SVL 15
Mina Santa Elena: Planta Merrill-Crowe
160 m3/h3 Clarificadores de Hoja, VerticalesTorre de Vacío (Crowe) Empacada4 Filtros de Placas
TSX-V: SVL 16
Planta Merrill-Crowe/Refinería■ Horno de gas
60 kg de doré/día■ Secador eléctrico con Casa de Sacos
TSX-V: SVL 18
Responsabilidad Social SilverCrest está comprometida
con la Comunidad,
Y con la Seguridad: Cerca de 500,000 horas-hombre sin accidentes de trabajo,
De la fuerza laboral de Santa Elena, casi 70% pertenece a la Comunidad de Banámichi o pueblos cercanos,
Compromiso de apoyar con Servicios de Salud en la Comunidad
El 18 de mayo de 2010, SilverCrest donó una ambulancia totalmente
equipada al municipio de Banamichi, Sonora, México.
TSX-V: SVL 19
Planes de Crecimiento para Santa Elena Fase I: Minado Tajo Abierto-Lixiviación en Pilas
Producción Comercial 2011Flujo de capital positivo 2011
Fase II: Re-tratamiento de Pilas de LixiviaciónConstrucción de molino convencional de 2500 - 3500 tpd 2012-2014Reprocesamiento de mineral 2014
Fase III: Desarrollo de Mina Cruz de MayoMina de Tajo Abierto de Ag disponible para alimentarse al molino de Santa Elena 2014
Fase IV: Desarrollo del Minado Subterráneo en Santa Elena Desarrollo de rampa & Minado Subterráneo 2011-2014Inicio de Explotación y Procesamiento de Mina Subterránea 2014