RUJ.
KELULUSAN
RUJUKAN
OSCPTJ TAJUK KERJA SEKSYEN STATUS
TINDAKAN
(PPPA/PTJ)JURUTERA JURUTEKNIK
TARIKH
KEPUTUSAN
TARIKH
TAMAT
TEMPOH
SAH
KELULUSAN
CATATAN BIL. MINIT
473 28732
TAMAN
PERTANIAN
UNIVERSITI (TPU)
MOHON PEMBAIKAN JANAKUASA
LADANG PUCHONG
DISEGERAKAN, MUSIM HUJAN DAN
PETIIR DIKHUATIRI BEKALAN
ELEKTRIK TERGANGGU. TPU
TELAH MEMBUAT PERMERIKSAAN
PADA 18/4/2014 JUMAAT DIDAPATI
JANAKUASA PINCANG TUGAS,
PINTU GENSET BERKUNCI
MEKANIKAL LULUS PPPA EN. REDUAN EN. ZULPAKAR 8/5/2014 TELAH AMBIL TINDAKAN UNTUK PEMBAIKAN 12/2014
474 28734 PPPA
1) PENGHAWA DINGIN
CENTRALIZED DI TINGKAT BAWAH
PPPA TIDAK SEJUK 2) PENGHAWA
DINGIN DI RUANGAN MAKAN BILIK
MESYUARAT UTAMA TIDAK SEJUK
MEKANIKAL LULUS PPPA EN. REDUANEN.
MUHAMMAD8/5/2014 12/2014
475 28736
PEJ. PENDAFTAR
(KUARTERS
PEGAWAI)
CURRENT SHOOT ON ROOF
BEKALAN ELEKTRIK TERPUTUS
SEJAK MALAM TADI WAYAR
TEGANG DAN KALI KEDUA ADUAN.
MINTA TEBANG POKOK
BELIMBING DEPAN RUMAH
ELEKTRIK BATAL PTJ EN. FUADEN. FARIZ
AZRAQ8/5/2014
SIASATAN TIDAK DAPAT DIBUAT, TIADA
KERJASAMA DARI TUAN RUMAH KERANA
TIADA DIRUMAH DAN TIDAK DAPAT
DIHUBUNGI
12/2014
476 28740PEJABAT NAIB
CANSELOR
ALAT PEMADAM API DI PEJABAT
NAIB CANSELOR (DI BAWAH
KELOLAAN PEJABAT
PEMBANGUNAN) TELAH TAMAT
TEMPOH PADA 22 APRIL 2014
MEKANIKAL LULUS PPPA EN. REDUANEN.
MUHAMMAD8/5/2014 12/2014
477 2014/380FAKULTI
KEJURUTERAAN
KERJA MEMBAIKPULIH SISTEM
PAIP DITANGKI AIR DAN PAIP
PECAH DIMAKMAL BLOK I FASA 1
MEKANIKALLULUS
BERSYARATPTJ EN. REDUAN EN. ZULPAKAR 8/5/2014 12/2014
478 2014/438INSTITUT
BIOSAINS (IBS)
CADANGAN MEMBINA DAN
MENGUBAHSUAI RUANG
TAMBAHAN DI COMET, IBS
BAHAGIAN
PROJEKLULUS PTJ
EN. AMIRZAKI
CHE HASSAIMPN. MUSHIRAH 8/5/2014
PASTIKAN PENUTUP LONGKANG SEMUA BILIK
BOLEH DIBUKA UNTUK TUGAS-TUGAS
MEINTENANCE, DAPATKAN KELULUSAN
JURUTERA UNTUK CANTUMAN ANTARA
DINDING LAMA DAN DINDING BATU BATA
YANG BARU UNTUK MENGELAK SEBARANG
RETAKAN SERTA KELULUSAN JURUTERA
UNTUK SEBARANG PENGALIHAN
COMPRESSOR AIRCOND.
12/2014
MINIT JAWATAN KUASA KELULUSAN KERJA BULAN MEI 2014
479 2014/442
FAKULTI
PERUBATAN
VETERINAR
KERJA-KERJA MENYELESAIKAN
MASALAH BUMBUNG BOCORAWAM LULUS PTJ
PN. NOR
HAFIZAHEN. HANAFI 8/5/2014 HARGA TIDAK MELEBIHI RM 1,270.00 12/2014
480 2014/444 PPPA
CADANGAN MENUKAR PINTU
BARU ATAU MENGECAT SEMULA
(SAMA WARNA DENGAN DINDING)
PINTU STOR ALAT DB, BELAKANG
BANGUNAN PPPA
AWAM LULUS PPPA EN. SHAHRIL EN. MUKMIN 8/5/2014TINDAKAN OLEH EN. MUKMIN. LAKSANA
KERJA SECARA PUSINGAN12/2014
481 2014/447
PUSAT
PEMBANGUNAN
KEUSAHAWAAN
DAN
KEBOLEHPASARA
N GRADUAN
(CEM)
MEMBAIKI PENGHAWA DINGIN DI
BILIK PENGARAH CEM DAN BILIK
KETUA SEKSYEN PENTADBIRAN
DAN KEWANGAN, PUSAT
PEMBANGUNAN KEUSAHAWAAN
DAN KEBOLEHPASARAN
GRADUAN (CEM) UPM
MEKANIKALLULUS
BERSYARATPTJ EN. REDUAN EN. ZULPAKAR 8/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
12/2014
482 2014/448
PEJ. PENDAFTAR
(KUARTERS
PEGAWAI)
MEMBAIKPULIH KESELURUHAN
RUMAH H7/1 SETELAH PENGHUNI
LAMA KELUAR
AWAM LULUS PPPA EN. SHAHRIL EN. MUKMIN 8/5/2014 TINDAKAN OLEH EN. MUKMIN. 12/2014
483 2014/450KOLEJ PENDETA
ZA'ABA (KPZ)BAIK PULIH BUMBUNG BOCOR AWAM LULUS PTJ EN. SHAHRIL EN. SHAHRIL J 8/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
12/2014
484 2014/451
FAKULTI
BIOTEKNOLOGI
DAN SAINS
BIOMOLEKUL
PERMOHONAN PEMASANGAN
SINKI TERMASUK KERJA
PERPAIPAN AIR MASUK SERTA
KELUAR BAGI KETUA JARINGAN
INDUSTRI
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAH
EN.
SAHARUDIN
NAIM
8/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
12/2014
485 2014/453 PPPA
PAIP UTAMA BOCOR DI SEBELAH
BLOK KALVI DAN JALAN RUMAH
FELO, K.5, UPM
AWAM LULUS PPPA EN. SHAHRIL EN. SHAHRIL J 8/5/2014TINDAKAN OLEH EN. MOHD SHAHRIL
JAMALUDIN. KERJA KERJA DARURAT12/2014
486 2014/455
INSTITUT
PENYELIDIKAN
PRODUK HALAL
(IPPH)
MEMBUAT PENDAWAIAN DAN
PEMASANGAN KIPAS EKZOS DI
BILIK PENGEKSTRAKAN SAMPLE
DAN MAKMAL PCR DI LABORATORI
PERKHIDMATAN HALAL
MEKANIKAL LULUS PTJ EN. REDUAN EN. ZULPAKAR 8/5/2014 HARGA TIDAK MELEBIHI RM 1, 090.00 12/2014
487 2014/456
FAKULTI
PERUBATAN DAN
SAINS KESIHATAN
MEMBUAT TANGGA BATU TEMPAT
BERKUMPUL KAWASAN PADANG
FPSK
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
8/5/2014
SILA KEMUKAKAN PELAN BAGI UKURAN
PANJANG DAN LEBAR (HARGA SEMAKAN
PPPA ADALAH RM 6,200.00)
12/2014
488 2014/457 PPPA
KERJA-KERJA PEMBAIKAN DAN
NAIKTARAF SISTEM PAIP KOLAM
RENANG, PUSAT SUKAN UPM
MEKANIKAL LULUS PPPA EN. REDUAN EN. FARIQ 8/5/2014 12/2014
489 2014/458 PPPAPAIP BOCOR DALAM TANAH DI
JALAN MASUK LADANG 5 (MSN)AWAM LULUS PPPA EN. SHAHRIL EN. SHAHRIL J 8/5/2014
TINDAKAN OLEH EN. MOHD SHAHRIL
JAMALUDIN. KERJA KERJA DARURAT12/2014
490 2014/460
FAKULTI
BIOTEKNOLOGI
DAN SAINS
BIOMOLEKUL
PERMOHONAN KERJA
PENDAWAIAN SEMULA LAMPU
SERTA DB DI BANGUNAN MTDC
(MAKMAL BIOMASS)
ELEKTRIK LULUS PTJ EN. FUADEN.
AMIRUDDIN8/5/2014 HARGA TIDAK MELEBIHI RM 8,470.00 12/2014
491 2014/461
FAKULTI
BIOTEKNOLOGI
DAN SAINS
BIOMOLEKUL
KERJA BAIKPULIH AWAM BAGI
MAKMAL BIOMASS N1 UNTUK
PENYERAHAN KEMBALI MAKMAL
N1 KE PENGURUSAN MTDC
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
8/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
12/2014
492 2014/462
FAKULTI
BIOTEKNOLOGI
DAN SAINS
BIOMOLEKUL
PERMOHONAN MENAIKTARAF
MAKMAL BIOTEKNOLOGI INDUSTRI
DI BANGUNAN BIOTECH 5
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
8/5/2014
SILA KEMUKAKAN SEBUTHARGA YANG
TERPERINCI UNTUK SEMAKAN SPESIFIKASI
DAN HARGA UNTUK KERJA AWAM DAN
ELEKTRIK
12/2014
493 2014/463
INSTITUT
PENYELIDIKAN
MATEMATIK
(INSPEM)
MEMERIKSA KEROSAKAN
BUMBUNG DI BANGUNAN INSPEM AWAM LULUS PPPA
PN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
8/5/2014 12/2014
494 2014/464PUSAT SAINS
MARIN
KERJA-KERJA MENGGANTI DAN
MEMASANG SEMUA ALAT
PENDINGIN UDARA YANG ROSAK
MEKANIKAL LULUS PTJ EN. REDUANEN.
MUHAMMAD8/5/2014 HARGA TIDAK MELEBIHI RM 2,185.00 12/2014
495 2014/465 KOLEJ 11
KERJA-KERJA MENAIKTARAF
TANGKI AIR BOCOR DAN LAIN-LAIN
KEROSAKAN DI RUMAH PAM DI
KOLEJ 11
MEKANIKAL LULUS PTJ EN. REDUAN EN. FARIQ 8/5/2014LAKSANA KERJA SECARA SEBUTHARGA
UNIVERSITI / KERJA UNDI12/2014
496 2014/466 KOLEJ 11
MENAIKTARAF DAN MEMBAIKI
KEROSAKAN DI GELANGGANG
PERMAINAN BOLA TAMPAR DAN
GELANGGANG FUTSAL DI KOLEJ
11
AWAMLULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 8/5/2014
WAKIL PTJ (PEMOHON) TIDAK DAPAT
MENERANGKAN JUSTIFIKASI KERJA YANG
DIMOHON. MOHON PIHAK KOLEJ 11
BERBINCANG DENGAN KETUA BAHAGIAN
PENGURUSAN FASILITI (KBPF) KERANA PIHAK
KOLEJ 11 INGIN MEMOHON PERUNTUKAN
13036
12/2014
497 2014/467
PEJ. PENDAFTAR
(KUARTERS
PEGAWAI)
BUMBUNG RUMAH BOCOR
WALAUPUN TELAH DIBAIKI OLEH
PPPA ( L4-04)
AWAM LULUS PPPA EN. SHAHRIL EN. MUKMIN 8/5/2014TINDAKAN EN. MUKMIN. KERJA-KERJA
DARURAT12/2014
498 2014/468 KOSASS TANGKI SEPTIK (STP) PENUH MEKANIKAL LULUS PPPA EN. REDUAN EN. FAZRUL 8/5/2014 12/2014
499 2014/469
FAKULTI
PERUBATAN
VETERINAR
KERJA-KERJA DARURAT
MENYELESAIKAN MASALAH PAIP
FLUSH TANDAS PATAH/BOCOR
AWAM LULUS PTJPN. NOR
HAFIZAHEN. HANAFI 8/5/2014 HARGA TIDAK MELEBIHI RM 450.00 12/2014
500 2014/471
BAHAGIAN HAL
EHWAL PELAJAR
(BHEP)
1. SELENGGARA DAN
PENDAWAIAN SEMULA MATA
LAMPU DI BILIK AIR PEJABAT
BAHAGIAN HAL EHWAL PELAJAR 2.
SELENGGARA DAN PENDAWAIAN
SEMULA MATA LAMPU DAN SOKET
DI ASTAKA SENI
ELEKTRIK LULUS PTJ EN. FUAD EN. MOKHTAR 8/5/2014 HARGA TIDAK MELEBIHI RM 950.00 12/2014
501 2014/473FAKULTI
KEJURUTERAAN
KERJA DARURAT MEMBAIKI PAIP
PECAH DAN SAMBUNGAN KE
MESIN DI MAKMAL KESIHATAN
AWAM JABATAN
MEKANIKALLULUS
BERSYARATPTJ EN. REDUAN EN. ZULPAKAR 8/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
12/2014
502 2014/476
PEJ. PENDAFTAR
(KUARTERS
PEGAWAI)
ATAP BOCOR DAN PAIP BOCOR
(KUARTERS UL 574/2)AWAM LULUS PPPA EN. SHAHRIL EN. MUKMIN 8/5/2014
TINDAKAN EN. MUKMIN. KERJA-KERJA
DARURAT12/2014
503 2014/478 PPPA
MEMBAIKPULIH LAMPU
SPOTLIGHT DI PADANG KOLEJ
SERUMPUN
ELEKTRIK LULUS PPPA EN. FUAD EN. MOKHTAR 8/5/2014 12/2014
504 2014/483 KOLEJ 10
KERJA-KERJA MEMASANG SILING,
SUIS PENGHAWA DINGIN DAN
LAMPU SERTA MENGGANTIKAN
ZINK YANG ROSAK PADA SETOR
KOLEJ SEPULUH
AWAMLULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 8/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
DAN PTJ PERLU MENGGUNAKAN LAMPU
YANG SESUAI DENGAN STOR
12/2014
505 2014/484 KOLEJ 10
NAIKTARAF KAKI LIMA BANGUNAN
KOLEJ 10 KEPADA RUANG SUDUT
PERBINCANGAN PELAJAR,
BAIKPULIH DAN NAIKTARAF
GELANGGANG BOLA TAMPAR DAN
TAKRAW
AWAMLULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 8/5/2014
PTJ PERLU MENGADAKAN MESYUARAT
KOORDINASI BERSAMA PPPA. SILA JEMPUT :
(A) MOHAMMAD SHAHRIL SALLEH (B) EN.
MUHAMMAD HAFIZ BAKAR © EN. MOHD FUAD
MAHMOOD (D) EN. MOHD SHAHRIL
JAMALUDIN (E) PN. SUZIANA SIDIK
12/2014
506 2014/485
FAKULTI
EKONOMI DAN
PENGURUSAN
MEMBUAT WATERPROOFING DI
BLOK E DAN AAWAM
LULUS
BERSYARATPTJ
PN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
8/5/2014
SILA KEMUKAKAN SEBUTHARGA KEPADA
PPPA DENGAN MELANTIK KONTRAKTOR
PAKAR
12/2014
507 2014/486
FAKULTI
EKONOMI DAN
PENGURUSAN
MENURAP SEMULA JALAN DI
FAKULTI EKONOMIAWAM LULUS PPPA
PN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
8/5/2014 12/2014
508 2014/487
FAKULTI
EKONOMI DAN
PENGURUSAN
MEMERIKSA SISTEM BEKALAN AIR
BERSIH DI BLOK A, FAKULTI
EKONOMI
MEKANIKALLULUS
BERSYARATPTJ EN. REDUAN EN. FAZRUL 8/5/2014
SILA KEMUKAKAN SEBUTHARGA DAN KOS
UNTUK SEMAKAN PPPA12/2014
509 2014/488
FAKULTI
EKONOMI DAN
PENGURUSAN
MENGGANTIKAN AIRCOND BARU
DI BILIK A103 (1.5HP X 1 UNIT),
D104 (1.5HP X 1 UNIT) DAN BILIK
SERVER A 123 (2HP X 2 UNIT)
MEKANIKAL LULUS PTJ EN. REDUAN EN. FAZRUL 8/5/2014 HARGA TIDAK MELEBIHI RM 9,700.00 12/2014
510 2014/498INSTITUT
BIOSAINS (IBS)
MEMBEKAL DAN MEMASANG
AIRCOND TERMASUK
PENDAWAIAN
MEKANIKALLULUS
BERSYARATPTJ EN. REDUAN EN. FAZRUL 8/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
12/2014
511 2014/500KOLEJ TUN DR.
ISMAIL (KTDI)PAIP GATE VALVE 1 1/2 ROSAK MEKANIKAL LULUS PTJ EN. REDUAN
EN.
MUHAMMAD8/5/2014 12/2014
512 2014/502FAKULTI
PERTANIAN
KERJA PENDAWAIAN TAMBAHAN
SOKET ALIR KELUAR UNTUK
MAKMAL
ELEKTRIK LULUS PTJ EN. FUAD EN. MOKHTAR 8/5/2014 HARGA TIDAK MELEBIHI RM 2,120.00 12/2014
513 2014/503FAKULTI
PERTANIAN KERJA PENDAWAIAN STOR ELEKTRIK LULUS PTJ EN. FUAD EN. MOKHTAR 8/5/2014 HARGA TIDAK MELEBIHI RM 1,480.00 12/2014
514 28742 KOLEJ 14
KEROSAKAN JALAN BERLUBANG
DI HADAPAN BLOK L2 (KOLEJ 14)
DAN JUGA KAWASAN PARKIR
(ANTARA BLOK L6 DAN L5)
AWAM BATAL PN. FIZAH 16/5/2014KERJA-KERJA INI BUKAN DIBAWAH
TANGGUNGJAWAB PPPA13/2014
515 28746 KOPERASI UPMAIR PERLAHAN DIPERCAYAI PAIP
METER TERSUMBAT AWAM BATAL PN. FIZAH 16/5/2014 KERJA TELAH SELESAI 13/2014
516 28747
FAKULTI
PERUBATAN DAN
SAINS KESIHATAN
TERDAPAT KEBOCORAN TANGKI
AIR DAN TELAH MENGALIR DI
BUMBUNG PUSAT SUMBER DAN
PENDIDIKAN KANSER
MEKANIKAL LULUS PTJ EN. REDUAN EN. FAZRUL 16/5/2014 13/2014
517 2014/404 PPPA
KERJA-KERJA MEMBAIKPULIH
PENUTUP LONGKANG SEDIA ADA ,
PEMBERSIHAN LONGKANG UTAMA
SERTA MENGOREK DAN
MENDALAMKAN KOLAM TADAHAN
DI KOMPLEKS MAHASISWA,
UNIVERSITI PUTRA MALAYSIA
BAHAGIAN
PROJEKLULUS PPPA
EN. MOHD
ZAMANU AL-
MOHTADI
EKHWAN
EN. IZZATI 16/5/2014 13/2014
518 2014/405 PPPA
CADANGAN MEMBINA LALUAN
PEJALAN KAKI YANG
MENGHUBUNGKAN KOLEJ 17 KE
FAKULTI PERUBATAN VETERINAR
BAHAGIAN
PROJEKLULUS PPPA
EN. MOHD
ZAMANU AL-
MOHTADI
EKHWAN
EN. IZZATI 16/5/2014LAKSANA KERJA SECARA SEBUTHARGA
UNIVERSITI13/2014
519 2014/449
PEJ. TNC
(PENYELIDIKAN
DAN INOVASI)
NAIKTARAF TANDAS WANITA DI
PEJABAT TNCPIAWAM LULUS PTJ EN. SHAHRIL EN. MUKMIN 16/5/2014 HARGA TIDAK MELEBIHI RM 18,800.00 13/2014
520 2014/470KOLEJ TUN DR.
ISMAIL (KTDI)
PENGUBAHSUAIAN DEWAN MAKAN
KE DEWAN SERBAGUNAAWAM
LULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014
PTJ DIMINTA MENGADAKAN MESYUARAT
KOORDINASI BERSAMA PPPA13/2014
521 2014/472FAKULTI
KEJURUTERAAN
TO SUPPLY AND LAY CONCRETE
SLAB (L) 18' X (H)34" X (D) 29'
COMPLETE WITH INSTALLATION
OF TILES, INSTALLATION OF
CHEMICAL RESISTANT SINK
COMPLETE TAP AND PIPING (2ND),
INSTALLATION OF ALUMINIUM
SLIDING DOOR OF THE BOTTOM
OF CONCRETE SLAB
AWAMLULUS
BERSYARAT PTJ
PN. NOR
HAFIZAHPN. ROHAIZI 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
522 2014/474FAKULTI
KEJURUTERAAN
PEMASANGAN BUMPER TAR SIZE
9 X 2 FEET DAN LINE ROAD SILION
DIOXIDE OR SIO2
AWAMLULUS
BERSYARAT PTJ
PN. NOR
HAFIZAHPN. ROHAIZI 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
523 2014/475FAKULTI
KEJURUTERAAN
KERJA MEMBAIKI SALURAN
GUTTER DI ATAS PEJABAT TDB
DAN PENOLONG PENDAFTAR
ARAS 7 BLOK PENTADBIRAN
FAKULTI
AWAMLULUS
BERSYARAT PTJ
PN. NOR
HAFIZAHPN. ROHAIZI 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
524 2014/477 KOLEJ 6 MEMBAIKI RUMAH PAM MEKANIKALLULUS
BERSYARAT PTJ EN. REDUAN EN. FARIQ 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
525 2014/479
FAKULTI
PERUBATAN
VETERINAR
KERJA-KERJA DARURAT
MEMBAIKI PAIP FLUSH TANDAS
PATAH DAN BOCOR
AWAM LULUS PTJPN. NOR
HAFIZAHEN. HANAFI 16/5/2014 HARGA TIDAK MELEBIHI RM 750.00 13/2014
526 2014/480
FAKULTI
PERUBATAN
VETERINAR
MEMBEKAL DAN MEMASANG PAIP
DAN SINKI UNTUK MESIN BASUHAWAM PTJ LULUS
PN. NOR
HAFIZAHEN. HANAFI 16/5/2014 HARGA TIDAK MELEBIHI RM 3,455.00
527 2014/482BAHAGIAN
ANTARABANGSA
KEROSAKAN SUIS UTAMA
PEJABAT YANG TERLALU KERAP
'TRIP' SEPANJANG HARI
ELEKTRIKLULUS
BERSYARAT PTJ EN. FUAD
EN.
AMIRUDDIN16/5/2014
SYOR TUKAR DB - 1 LOT DB 63 ATPN 63
ARCCB 300MA (BRAND ABB ATAU SETARAF) ,
24 WAYS ( 12 WAY 32A SPN, 12 WAY 20A SPN).
SILA KEMUKAKAN SEBUTHARGA UNTUK
SEMAKAN PPPA
13/2014
528 2014/489FAKULTI
KEJURUTERAAN
MEMOHON KELULUSAN MEMBINA
BANGUNAN TAMBAHAN DI
BAHAGIAN TEPI MAKMAL VOLTAN
TINGGI KEE
BAHAGIAN
PROJEKLULUS PTJ
PN.
NORAZLINDA
NOR
AKAHBAR
PN. MUSHIRAH 6/5/2014 HARGA TIDAK MELEBIHI RM 19,995.00 13/2014
529 2014/490FAKULTI
KEJURUTERAAN
MENGECAT DINDING DAN SILING
DI CELPAWAM
LULUS
BERSYARAT PTJ
PN. NOR
HAFIZAHPN. ROHAIZI 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
530 2014/491FAKULTI
KEJURUTERAAN
KERJA MEMBAIKI PAIP PECAH DAN
KEBUK LONGKANG DI MAKMAL
H2.2 FASA 2A
AWAMLULUS
BERSYARAT PTJ
PN. NOR
HAFIZAHPN. ROHAIZI 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
531 2014/492FAKULTI
KEJURUTERAAN
MEMBEKAL, MENGHANTAR DAN
MEMASANG PINTU GRILL SLIDING
DAN SWING DI MAKMAL-MAKMAL
KAA
AWAM LULUS PTJPN. NOR
HAFIZAHPN. ROHAIZI 16/5/2014 HARGA TIDAK MELEBIHI RM 8,150.00 13/2014
532 2014/493FAKULTI
KEJURUTERAAN
MEMBAIKI KEBOCORAN DAN AIR
BERTAKUNG PADA LANTAI
BUMBUNG DAN MEMASANG
WATERPROOFING PADA LANTAI
BANGUNAN CELP
AWAMLULUS
BERSYARAT PTJ
PN. NOR
HAFIZAHPN. ROHAIZI 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
533 2014/494FAKULTI
KEJURUTERAAN
KERJA MENAIKTARAF DI
BAHAGIAN AKADEMIK, HAL EHWAL
PELAJAR , ALUMNI DAN JARINGAN
INDUSTRI
AWAM LULUS PTJPN. NOR
HAFIZAHPN. ROHAIZI 16/5/2014
KELULUSAN HANYA UNTUK KERJA-KERJA
BAGI ITEM BIL NO. 1 DAN BIL. 5, HARGA TIDAK
MELEBIHI RM 1,200.00 SAHAJA. UNTUK
PEROLEHAN SECARA BEKALAN TIDAK PERLU
KELULUSAN PPPA (JKKK) IAITU UNTUK ITEM
BIL NO. 2 HINGGA BIL NO. 4
13/2014
534 2014/497
FAKULTI
BIOTEKNOLOGI
DAN SAINS
BIOMOLEKUL
PERMOHONAN PEMASANGAN
JERIJI KESELAMATAN DI
BANGUNAN MAKMAL TISU KULTUR
HAIWAN (BIOTECH 3)
AWAM LULUS PTJPN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
16/5/2014 HARGA TIDAK MELEBIHI RM 3,330.00 13/2014
535 2014/501 KOLEJ 13
MEMBUAT SALUR SINKI BARU
SERTA MEMBAIKI BUMBUNG
BOCOR DAN MEMASANG 1 UNIT
PAIP DALAM BILIK TANDAS
AWAMLULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
536 2014/504FAKULTI
PERTANIAN
KERJA MEMBUAT KIOSK
PERCETAKAN PELAJAR FAKULTIAWAM LULUS PTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014 HARGA TIDAK MELEBIHI RM 3, 150.00 13/2014
537 2014/506FAKULTI
PERTANIAN
MENUKAR GANTI PINTU SWING
YANG ROSAKAWAM LULUS PTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014 HARGA TIDAK MELEBIHI RM 2,250.00 13/2014
538 2014/508FAKULTI
PERTANIAN
BAIKPULIH PAIP BOCOR DI DALAM
TANAHAWAM LULUS PTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014 HARGA TIDAK MELEBIHI RM 1,750.00 13/2014
539 2014/510FAKULTI
PERTANIAN
PERMOHONAN LANJUT TEMPOH
KELULUSAN JKKK MENGGANTI
BUMBUNG LUTSINAR
AWAM LULUS PTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014 13/2014
540 2014/513 KOLEJ 15
MEMBAIKPULIH KEROSAKAN
RUMAH PENGETUA KOLEJ LIMA
BELAS
AWAMLULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
541 2014/515 KOLEJ 13
MEMASANG JUBIN LANTAI DI BILIK
DOBI KOLEJ TIGA BELAS (2 UNIT -
BLOK C DAN G)
AWAMLULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
542 2014/534 KOLEJ 6PAIP BAWAH TANAH BOCOR
(BERDEKATAN SURAU KOLEJ 6)AWAM
LULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
(HARGA SEMAKAN KESELURUHAN PPPA
UNTUK GABUNGAN PERMOHONAN KERJA
OSC : 2014/534 DAN OSC 2014/536)
13/2014
543 2014/536 KOLEJ 6 SALUR HUJAN SETIAP BLOK AWAMLULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
(HARGA SEMAKAN KESELURUHAN PPPA
UNTUK GABUNGAN PERMOHONAN KERJA
OSC : 2014/534 DAN OSC 2014/536)
13/2014
544 2014/538
INSTITUT
PERHUTANAN
TROPIKA DAN
PRODUK HUTAN
(INTROP)
KEBOCORAN TANGKI AIR DI
BANGUNAN INTROP MEKANIKAL LULUS PTJ EN. REDUAN EN. FAZRUL 16/5/2014 13/2014
545 2014/541KOLEJ TUN
DR.ISMAIL (KTDI)
MEMBEKAL DAN MEMASANG
LALUAN BERBUMBUNGAWAM
LULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 16/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
13/2014
546 2014/545 PPPA
MENAIKTARAF DAN
MENGGANTIKAN PAIP AIR UTAMA
DAN PAIP AIR AGIHAN SEDIADA
DARI JENIS ASBESTOS KEPADA
JENIS 'MILD STEEL CEMENT LINER
MSCL' DI K2, JALAN PENGGAWA
DAN DEWAN BESAR
AWAM LULUS PPPA EN. SHAHRIL EN. SHAHRIL J 16/5/2014 13/2014
547 2014/546 PPPA
PAIP BOCOR DI PASP DALAM
LONGKANG (BELAKANG
BANGUNAN) DAN DALAM TANAH
(DEPAN BANGUNAN)
AWAM LULUS PPPA EN. SHAHRIL EN. SHAHRIL J 16/5/2014 KERJA-KERJA DARURAT 13/2014
548 28749
TAMAN
PERTANIAN
UNIVERSITI (TPU)
PEMEGANG KABEL PUTUS
(OVERHEAD) 2 TIANG KE PEJABAT
TEPI KOLAM 2. PUNCA AKIBAT
ANGIN KENCANG DAN KABEL
JATUH ATAS TANAH
ELEKTRIK LULUS PPPA EN. FUADEN. FARIZ
AZRAQ22/5/2014
TERMASUK DIDALAM KONTRAK LAMPU
JALAN. KERJA-KERJA DARURAT14/2014
549 2014/495FAKULTI
KEJURUTERAAN
MEMBEKAL. MEMASANG DAN
MENUKARGANTI UNIT HAWA
DINGIN YANG LAMA KEPADA YANG
BARU 1.5HP SEBANYAK 8 UNIT
MEKANIKALLULUS
BERSYARATPTJ EN. REDUAN EN. ZULPAKAR 22/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
14/2014
550 2014/496FAKULTI
KEJURUTERAAN
KERJA-KERJA MEMBUKA DAN
MEMASANG MCCB PENGHAWA
DINGIN YANG ROSAK
ELEKTRIKLULUS
BERSYARATPTJ EN. FUAD
EN, FARID CHI
NONG22/5/2014
MOHON PTJ BERI JUSTIFIKASI BAGI KERJA-
KERJA ITEM NO. 1, 2 DAN 3 DENGAN LEBIH
TERPERINCI UNTUK SEMAKAN PPPA
14/2014
551 2014/507FAKLTI
PERTANIAN
KEBOCORAN TANGKI DAN PAIP
LANDSKAP BOCORMEKANIKAL LULUS PTJ EN. REDUAN EN. FARIIQ 22/5/2014 HARGA TIDAK MELEBIHI RM 1,100.00 14/2014
552 2014/514
FAKULTI
PERUBATAN DAN
SAINS KESIHATAN
KERJA-KERJA BAIK PULIH PAM
PANCUR BASAHMEKANIKAL
LULUS
BERSYARATPTJ EN. REDUAN EN. FAZRUL 22/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
14/2014
553 2014/517
FAKULTI
PERUBATAN
VETERINAR
KERJA DARURAT MENYELESAIKAN
MASALAH STOP COCK ROSAK
DAN PAIP BOCOR
MEKANIKAL LULUS PTJ EN. REDUANEN.
MUHAMMAD22/5/2014 14/2014
554 2014/518 KOLEJ 13PAIP RUMAH PAM DEWAN PUTRA
BOCORMEKANIKAL LULUS PTJ EN. REDUAN EN. FARIQ 22/5/2014 HARGA TIDAK MELEBIHI RM 880.00 14/2014
555 2014/519FAKULTI
KEJURUTERAAN
CADANGAN KERJA MEMBINA
GARAJ MOTOSIKAL UNTUK
KEGUNAAN STAFF DI FAKULTI
KEJURUTERAAN
AWAM TIDAK LULUSPN. NOR
HAFIZAHPN. ROHAIZI 22/5/2014
PARKING BERBUMBUNG TIDAK DIBENARKAN
DI UPM14/2014
556 2014/520FAKULTI
KEJURUTERAAN
CADANGAN MENAIKTARAF CAFÉ
PELAJAR DI FAKULTI
KEJURUTERAAN UPM
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAHPN. ROHAIZI 22/5/2014
PTJ PERLU MENGADAKAN MESYUARAT
KOORDINASI BERSAMA PPPA14/2014
557 2014/521FAKULTI
KEJURUTERAAN
CADANGAN KERJA-KERJA
MEMBINA TAPAK LETAK KERETA
UNTUK PELAJAR DAN PELAWAT DI
FAKULTI KEJURUTERAAN
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAHPN. ROHAIZI 22/5/2014
PTJ PERLU MENGADAKAN MESYUARAT
KOORDINASI BERSAMA PPPA14/2014
558 2014/523
PUSAT
KOKURIKULUM
DAN
PEMBANGUNAN
PELAJAR
SISTEM PENDAWAIAN ELEKTRIK
DIKHUATIRI BERLAKU "LITAR
PINTAS"- BAHAGIAN PANEL
ELEKTRIK (PARTITION)
ELEKTRIK MAKLUMAN EN. FUAD EN. MOKHTAR 22/5/2014 14/2014
559 2014/524
PEJ. PENDAFTAR
(KUARTERS
PEGAWAI)
LAMPU DI RUANG TAMU, BILIK
TIDUR DAN LUAR RUMAH TIDAK
MENYALA (H28)
ELEKTRIK LULUS PPPA EN. FUADEN. FARIZ
AZRAQ22/5/2014
PEMOHON PERLU HUBUNGI PPPA UNTUK
TINDAKAN LANJUT. KERJA-KERJA DARURAT14/2014
560 2014/527
FAKULTI
PERUBATAN
VETERINAR
KERJA-KERJA MENYELESAIKAN
MASALAH KEBOCORAN BUMBUNG
DAN PLASTER SILING DAN KERJA-
KERJA BERKAITAN
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAHPN. ROHAIZI 22/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
14/2014
561 2014/528
BAHAGIAN HAL
EHWAL PELAJAR
(BHEP)
UBAHSUAI SISTEM PENDAWAIAN
SUIS 2 HALA KEPADA SUIS 1 HALA
UNTUK LAMPU BILIK (PEJABAT
UPMISA)
ELEKTRIK LULUS PTJ EN. FUAD EN. MOKHTAR 22/5/2014MOHON PTJ RUJUK HARGA KERJA JKR
UNTUK PANDUAN14/2014
562 2014/529
PUSAT
KESIHATAN
UNIVERSITI (PKU)
PENGHAWA DINGIN DI BILIK
RAWATAN PERGIGIAN NO. 52
ROSAK DAN TELAH LAMA
MEKANIKAL LULUS PTJ EN. REDUANEN.
MUHAMMAD22/5/2014 HARGA TIDAK MELEBIHI RM 1, 940.00 14/2014
563 2014/530
PUSAT
PEMBANGUNAN
MAKLUMAT DAN
KOMUNIKASI
(IDEC)
MEMASANG TILES BILIK UKICT AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAH PN. ROHAIZI 22/5/2014
SILA GABUNGKAN PERMOHONAN KERJA OSC
: 2014/530 DAN OSC 2014/532 SERTA PERLU
KEMUKAKAN SEBUTHARGATERPERINCI
UNTUK SEMAKAN PPPA. SEKIRANYA
MELEBIHI RM 20,000.00 PEROLEHAN SECARA
UNDIAN
14/2014
564 2014/531
PUSAT
PEMBANGUNAN
MAKLUMAT DAN
KOMUNIKASI
(IDEC)
PEMASANGAN BUMBUNG UNTUK
RUANG LEGARAWAM
LULUS
BERSYARATPTJ
PN. NOR
HAFIZAHPN. ROHAIZI 22/5/2014
LAKSANA KERJA MENGIKUT PROSEDUR
KERJA UNDI14/2014
565 2014/532
PUSAT
PEMBANGUNAN
MAKLUMAT DAN
KOMUNIKASI
(IDEC)
MEMASANG TILES (IDEC ALPHA) AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAHPN. ROHAIZI 22/5/2014
SILA GABUNGKAN PERMOHONAN KERJA OSC
: 2014/530 DAN OSC 2014/532 SERTA PERLU
KEMUKAKAN SEBUTHARGATERPERINCI
UNTUK SEMAKAN PPPA. SEKIRANYA
MELEBIHI RM 20,000.00 PEROLEHAN SECARA
UNDIAN. PERLU LAKSANA KOORDINASI
DENGAN PPPA
14/2014
566 2014/533 KOLEJ 6 LAMPU SPOT LIGHT ELEKTRIKLULUS
BERSYARATPTJ EN. FUAD EN. REZUIAN 22/5/2014
SILA KEMUKAKAN SEBUTHARGA DAN KOS
UNTUK SEMAKAN PPPA14/2014
567 2014/535 KOLEJ 6PAIP AIR KE TANGKI SIMPANAN
AIRMEKANIKAL
LULUS
BERSYARATPTJ EN. REDUAN EN. FARIQ 22/5/2014
SILA KEMUKAKAN SEBUTHARGA DAN KOS
UNTUK SEMAKAN PPPA14/2014
568 2014/539
FAKULTI SAINS
KOMPUTER DAN
TEKNOLOGI
MAKLUMAT
(FSKTM)
MEMBEKAL DAN MEMASANG ALAT
HAWA DINGIN JENIS WALL
MOUNTED SPLIT UNIT 2.0HP DAN
2.5HP DI FAKULTI SAINS
KOMPUTER DAN TEKNOLOGI
MAKLUMAT, UPM
MEKANIKAL LULUS PTJ EN. FAZRUL EN. REDUAN 22/5/2014 HARGA TIDAK MELEBIHI RM 14,950.00 14/2014
569 2014/540
FAKULTI BAHASA
MODEN DAN
KOMUNIKASI
MENAIKTARAF MAKMAL
FOTOGRAFI, JABATAN
KOMUNIKASI, FBMK
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAHPN. ROHAIZI 22/5/2014
SILA KEMKUKAKAN SEBUTHARGA BARU
YANG LEBIH TERPERINCI YANG MELIBATKAN
ELEKTRIKAL DAN MEKANIKAL. SEKIRANYA
MELEBIHI RM 20,000.00, PEROLEHAN SECARA
UNDIAN PERLU DILAKSANAKAN
14/2014
570 2014/542
FAKULTI
PERUBATAN
VETERINAR
KERJA-KERJA MENYELESAIKAN
MASALAH BUMBUNG /ATAP
BOCOR
AWAM LULUS PTJPN. NOR
HAFIZAHEN. HANAFI 22/5/2014 HARGA TIDAK MELEBIHI RM 4, 098.00 14/2014
571 28756
TAMAN
PERTANIAN
UNIVERSITI (TPU)
PEMEGANG KABEL JATUH 2
TIANG, LAMPU JALAN ROSAK 1,
SPOT LIGHT 400 WATT, LALUAN
MASUK KE BUKIT EKSPO (RUMAH
MUTIARA) KEROSAKAN AKIBAT
DAHAN POKOK PATAH , RIBUT/
HUJAN
ELEKTRIK LULUS PPPA EN. FUADEN. FARIZ
AZRAQ30/5/2014 15/2014
572 2014/505FAKULTI
PERTANIANMEMBUAT STOR TAMBAHAN
BAHAGIAN
PROJEKLULUS PTJ
EN. ZAMANU
AL-MOHTADI
EKHWAN
PN. MUSHIRAH 30/5/2014 HARGA TIDAK MELEBIHI RM 9, 225.00 15/2014
573 2014/509FAKULTI
PERTANIAN
KERJA MEMBINA TAMBAHAN
LOADING BAY
BAHAGIAN
PROJEKLULUS PTJ
EN. ZAMANU
AL-MOHTADI
EKHWAN
PN. MUSHIRAH 30/5/2014
SILA KEMUKAKAN SPESIFIKASI DAN LUKISAN
DENGAN LEBIH TERPERINCI UNTUK
SEMAKAN PPPA
15/2014
574 2014/525
PEJ. PENDAFTAR
(KUARTERS
PEGAWAI)
MEMOHON MENUKAR TANDAS
CANGKUNG KEPADA TANDAS
DUDUK (H28)
AWAM LULUS PPPAPN. NOR
HAFIZAHEN. MUKMIN 30/5/2014
SILA GABUNGKAN PERMOHONAN KERJA OSC
: 2014/525 DAN OSC 2014/526 DAN LAKSANA
KERJA SECARA UNDIAN ATAU PUSINIGAN
(EN. MUKMIN). PERUNTUKAN PTJ (PEJ.
PENDAFTAR)
15/2014
575 2014/526
PEJ. PENDAFTAR
(KUARTERS
PEGAWAI)
TUIL TARIK TANGKI SIMBAH
PATAH (H28)AWAM LULUS PPPA
PN. NOR
HAFIZAHEN. MUKMIN 30/5/2014
SILA GABUNGKAN PERMOHONAN KERJA OSC
: 2014/526 DAN OSC 2014/525 DAN LAKSANA
KERJA SECARA UNDIAN ATAU PUSINIGAN
(EN. MUKMIN). PERUNTUKAN PTJ (PEJ.
PENDAFTAR)
15/2014
576 2014/537 KOLEJ 6 SISTEM P.A DAN WIRING ELEKTRIK LULUS PTJ EN. FUAD EN. REZUIAN 30/5/2014 15/2014
577 2014/543
FAKULTI
PERUBATAN
VETERINAR
KERJA-KERJA MENYELESAIKAN
MASALAH PAIP AIR BOCOR DAN
SALURAN TERSUMBAT
MEKANIKALLULUS
BERSYARATPTJ` EN. REDUAN EN. FARIQ 30/5/2014
HARGA SEMAKAN PPPA AKAN DINYATAKAN
DIDALAM SURAT MAKLUMAN. SILA GUNAKAN
HARGA SEMAKAN INI BAGI TUJUAN URUSAN
TAWARAN KERJA KEPADA KONTRAKTOR
15/2014
578 2014/547 PPPA
KERJA-KERJA MEMBAIKI
LONGKANG YANG ROSAK DAN
MEMBERSIHKAN KESELURUHAN
LONGKANG DI SEKITAR RUMAH
PENGETUA DI JALAN PENGAWA
AWAM LULUS PPPA EN. SHAHRIL EN. MUKMIN 30/5/2014 KERJA-KERJA DARURAT 15/2014
579 2014/549 FAKULTI SAINS
KERJA-KERJA MEMBEKAL DAN
MEMASANG JUBIN LANTAI DI
PEJABAT AM DEKAN
AWAM LULUS PTJ EN. SHAHRIL EN. SHAHRIL J 30/5/2014 HARGA TIDAK MELEBIHI RM 8, 550.00 15/2014
580 2014/550 FAKULTI SAINS
KERJA-KERJA MEMBAIKI
KEROSAKAN PAPAN LANTAI DI
BILIK MESYUARAT 102, PEJ.
DEKAN
AWAMLULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 30/5/2014
SILA KEMUKAKAN SEBUTHARGA BAHARU
UNTUK SEMAKAN PPPA SERTA
PENGGANTIAN BAHARU SEPERTI SEDIADA
15/2014
581 2014/551 FAKULTI SAINS
PENGGANTIAN 1 UNIT AIRCOND
3HP DI BAHAGIAN AKADEMIK
PEJABAT DEKAN
MEKANIKAL LULUS PTJ EN. REDUANEN.
MUHAMMAD30/5/2014 HARGA TIDAK MELEBIHI RM 4,320.00 15/2014
582 2014/552
PEJ. PENDAFTAR
(KUARTERS
PEGAWAI)
WAYAR NEUTRAL KIPAS PUTUS DI
RUANG TAMU (G15, LORONG
KEKABU 3)
ELEKTRIK LULUS PPPA EN. FUADEN. FARIZ
AZRAQ30/5/2014
DISYORKAN KELULUSAN KERANA
PENDAWAIAN KESELURUHAN DAIF DAN LAMA15/2014
583 2014/554 PPPA
KERJA MEMBAIKI KEROSAKAN
LAMPU LIMPAH DI BANGUNAN
PENTADBIRAN
ELEKTRIK LULUS PPPA EN. FUADEN. FARIZ
AZRAQ30/5/2014 KERJA-KERJA DARURAT 15/2014
584 2014/555 PPPA
KERJA-KERJA PENDAWAIAN
ELEKTRIK DI PONDOK PENGAWAL
KESELAMATAN
ELEKTRIK LULUS PPPA EN. FUAD EN. ISHAK 30/5/2014 15/2014
585 2014/561FAKULTI
PERHUTANAN
BUMBUNG BOCOR DI BILIK TUTOR
(AIR MASUK BILIK AKIBATKAN
BANJIR)
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
30/5/2014
SILA GABUNGKAN PERMOHONAN KERJA OSC
: 2014/561, 2014/562 DAN 2014/563 SERTA
KEMUKAKAN SEBUTHARGA DAN KOS UNTUK
SEMAKAN PPPA
15/2014
586 2014/562FAKULTI
PERHUTANAN
DINDING BILIK KETUA JABATAN
BERKULAT AKIBAT KEADAAN
LEMBAB DISEBABKAN
KEBOCORAN (DARURAT)
AWAMLULUS
BERSYARATPTJ
PN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
30/5/2014
SILA GABUNGKAN PERMOHONAN KERJA OSC
: 2014/561, 2014/562 DAN 2014/563 SERTA
KEMUKAKAN SEBUTHARGA DAN KOS UNTUK
SEMAKAN PPPA
15/2014
587 2014/563FAKULTI
PERHUTANAN
DINDING PAPAN COVER BEAM
BESI RUNTUH (DARURAT)AWAM
LULUS
BERSYARATPTJ
PN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
30/5/2014
SILA GABUNGKAN PERMOHONAN KERJA OSC
: 2014/561, 2014/562 DAN 2014/563 SERTA
KEMUKAKAN SEBUTHARGA DAN KOS UNTUK
SEMAKAN PPPA
15/2014
588 2014/564 KOLEJ 10`
WATER PROOFING PADA SETIAP
TANDAS KOLEJ BOCOR DAN
MENYEBABKAN SIMEN GUGUR KE
LANTAI HAMPIR MENGHEMPAP
PELAJAR
AWAMLULUS
BERSYARATPTJ EN. SHAHRIL EN. SHAHRIL J 30/5/2014
SILA KEMUKAKAN SEBUTHARGA DAN KOS
UNTUK SEMAKAN PPPA DAN LANTIK
KONTRAKTOR PAKAR
15/2014
589 2014/575FAKULTI
PERHUTANAN
KERJA-KERJA MENAIKTARAF
RUANG MASAK (DAPUR) DI TAPAK
PERKHEMAHAN SISFEC
AWAM LULUS PTJPN. NOR
HAFIZAH
HJ.
SAHARUDIN
NAIM
30/5/2014 HARGA TIDAK MELEBIHI RM 18, 010.00 15/2014