13
Mühendislik Ltd. Şti. Adres : NISH İstanbul Plaza, Çobançeşme Sanayi Cad. No:44 C -Blok Kat:3 Daire:40 34196 Yenibosna /İstanbul www.dualmuhendislik.com

Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

  • Upload
    lamcong

  • View
    226

  • Download
    4

Embed Size (px)

Citation preview

Page 1: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

Mühendislik  Ltd.  Şti.  

 Adres : NISH İstanbul Plaza, Çobançeşme Sanayi Cad. No:44

C -Blok Kat:3 Daire:40 34196 Yenibosna /İstanbul www.dualmuhendislik.com

 

Page 2: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

Endüstriyel İşlerde

 � Tehlikeli  Bölge  Sınıflandırması  � Katodik   Koruma   Hesapları   ve   dizaynı  (Tank,  Boru  hattı  ve  İskele  için)  

� Faraday   Kafesi   Yıldırımdan   Koruma  hesapları  ve  projelendirmesi  

� Topraklama   direnci   ölçüm   raporuna  uygun  IEC  normunda  hesap  ve  dizayn  

� Baca  Yıldırımdan  Koruma  ve  Uyarı-­‐İkaz  Aydınlatma  Projelendirmesi  

� Harmonik  hesaplamaları  � Termik  /Hidroelektrik/Rüzgar  Santrali  � Ex-­‐proof   saha   ekipman   seçimi   ve   proje  dizayn,  tipik  montaj  detayları  

� YG/OG/AG/Zayıf  Akım  Projeleri  � Saha  süpervizörlük  hizmetleri  � Metanatör  ve  Kerosen  Üniteleri  elektrik  proje  dizaynı  

� Elektr ik/Enstrüman/Otomasyon/HVAC/Mekanik/Borulama/Mimari  

Verilen Hizmetler

Metro İşlerinde

Diğer İşlerde

 � Yük  akım  etüdü  � Bitişikten  besleme  hesapları  � OG  Kabloları  Akım  azaltma  �   (redüksiyon)  faktörü  hesabı  � Kaçak   Akım   Korozyon   kontrolü   hesap  ve  projelendirilmesi  

� Acil  Açtırma  hesabı  � Topraklama   /   İletişim   Sistemleri   /  Scada   /YolcuAnons/CCTV/Yolcu  Bilgilendirme   /Saat/Otomatik   Ücret  Toplama/Telsiz   /  Hat  boyu  Zayıf  Akım/Tünel  sistemleri  /  Hat  boyu  Aydınlatma,  Kavram  Raporları   ve  Blok  Diyagramları,  Kolon  Şemaları  

� Tasarım  el  kitabının  oluşturulması  � Cer  sistemi  hesabı  � Kataner  tasarımı          � Hoparlör   adedi   ve   kamera   lens   seçimi  hesapları  

� Sinyalizasyon   sistemi   saha   dağıtımı,  hesaplandırması                                                                                            

� Teklif/Avan/Kesin/Uygulama  Proje  hizmetleri,  Birim  Fiyat  tariflerinin  hazırlanması,  Kesin  Kabül  hesaplandırması    

� Şartname  /  Bakım  Kılavuzu  /  Montaj  Talimatları/  Dizayn  Kriterleri  hazırlanması  

� Otoyol   kavşak   sinyalizasyon   sistemi  hesapları  ve  dizaynı  

� OG/AG/Kuvvet/Bina   Aydınlatma  hesapları    

� Bus-­‐Bar  Kablo  tava,  konduvi  planları  � Bina   aydınlatma,   priz,   kuvvet,  HVAC,   zayıf   akım   sistemleri   (Scada,  CCTV,   Telefon,   Data,   Telsiz,   PI,  Anons,   Saat,   bina   otomasyon)  tesisatı  projelendirmesi  

� Otoyol  ve  Tünel  sistemleri  projelendirmesi  

� Şehir  KabloTV  sistem  dizaynı  

Page 3: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

�  API 540-Electrical Installations in Petroleum Processing Plants �  API 505-Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classifies as

Class I, Zone 0, Zone 1 and Zone 2 �  API 1104-Welding of pipelines and related facilities �  ITU-T K.20-Resistibility of telecommunication switching equipment to overvoltage’s and overcurrents �  UFC-3-56-1-Stationary Battery Room Design �  IEEE-Std 1115-Sizing Nickel Cadmium Batteries for Stationary Applications �  BS 6651-Protection of structures against lightning �  IEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard �  IEC 60076-8-Power Transformers Application Guide �  IEC 60079-0-Electrical apparatus for explosive gas atmospheres-Part 0:General requirements �  IEC 60364-5-52-Electrical Installations of Buildings – Selection and erection of electrical equipment wiring systems �  IEC 61850-3-Communication network and systems in substations – Part 3: General requirements �  IEEE Std 1300-Guide for cable connections for gas-insulated substations �  IEEE Std 1100- IEEE Recommended Practice for Powering and Grounding Electronic Equipment �  IEEE Std 142- IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems �  NFPA-72-National Fire Alarm Code �  NFPA-850-Recommended Practice for Fire Protection �  BS 7361 - Part 1 Code of Practice for Cathodic Protection �  BS 5839 – Part 1 Code of Practice for system design, installation and servicing for Fire Detection for General Buildings �  BOTAS 4-NGTL 0-GN-E-002-8002 CP Design Calc. & Sizing - 8003 Spec for CP Installation �  Mechanical Engineer’s Reference Book – Edward H. Smith �  TCRP Report 57-Track Design Handbook for Light Rail Transit �  EN-50 122-2-Railway Applications-fixed installations-Part 2: Protective provisions against the effects of Stray Currents caused

by DC traction systems �  VDE 0150-Corrosion resulting from stray currents from DC installation �  TIA/EIA TSB-72-Centralized Optical Fiber Cabling Guidelines  

Kullanılan Uluslararası Standartlardan birkaçı

Page 4: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

Değerli Müşterilerim, Dostlarım, Çalışanlarım

2006 yılından beri sizlere Endüstriyel Elektrik Projelendirmesinde hizmet veren DUAL Mühendislik Ltd. Şti.ni 2011 Mayıs ayından itibaren 13,5 sene hizmet verdiğim Tekfen Mühendislik A.Ş. de son 5 senesinde bilfiil idame ettirdiğim Elektrik Proje Departman Müdürlüğünden ayrılarak devralmış bulunmaktayım. Şirketimiz Endüstriyel Elektrik Proje üretiminin yanısıra birlikte çalıştığımız şirketler vasıtasıyla Enstrümantasyon, Otomasyon, Mekanik, HVAC, Mimari projelendirmede de sizlere yardımcı olacaktır. Her şirketin kendi döngüsü içinde bir hizmet anlayışı vardır. Bizim şirketimizin amacı Endüstriyel işlerde (Yüksek Gerilim Tesisleri, Termik Santraller, Rüzgâr Santralleri ve Çiftlikleri, Kömür Santralleri, Fabrika, Boru Hattı, Rafineri, Pompa İstasyonu, Metro, Havaalanı Hangarı, Demiryolu ve Otoyol Tünelleri gibi) çalışarak siz müşterilerimize ve dostlarımıza uluslararası standartlarda proje üretebilmektir. Proje üretimin her aşamasında attığımız her adımı güncellenmiş standartlarla ispat etmek, hesaplamak, tipik montaj ve kurulum detay projelerimiz ile (Botaş, Tüpraş, Kvaerner John Brown standartlarında) hazırlamak, başlıca ilkemizdir. Her projelendirme uluslararası konjüktöre uygun olarak doküman numaralandırma prosedürü, şartnameleri, dizayn kriterleri, proje listesi, zaman çizelgesi, satınalma dökümanı, malzeme listesi, dizayna en uygun seçilmiş üretici firma bilgileri, üretici firma satınalım değerlendirme formları, fabrika teslim test föyleri ile birlikte yapılacaktır. Her projelendirme ilgili ülke standartlarını referans alacak ama bununla yetinmeyip şartnamede istenen tüm standartlara sahip olarak gerçeklenecektir. Web sayfamızın Kütüphanesinde “Yararlı bilgiler” başlığı altından da göreceğiniz gibi IEC, NFPA, IEEE, API, SNIP, DIN VDE, EN standartlarımızın tamamı projelendireceğimiz konularla ilgilidir. DUAL Mühendislik Ltd. Şti. olarak hedefimiz sektörümüzde lider olmaktan çok, dış pazarlara açılım yapan inşaat ve yatırım firmalarımıza en doğru ve en uygun endüstriyel elektrik ve diğer projelendirmelerde yardımcı olabilmek, sektörümüzün standartlarını yukarıya çekecek öncü bir şirket olarak anılabilmektir. Saygılarımla…

Mehmet ASSAN

Genel Müdürümüzün Mesajı ve CV’si

Page 5: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

PERSONAL Name : Mehmet Assan (0.533.459 65 89) Date of Birth : 4 May 1965 Nationality : Turkish Language : Turkish – Mother Tongue

English – Advanced KEY EXPERIENCE

�  Design coordination and management �  All of the electrical (High Voltage, Medium Voltage, Low Voltage, Low Current) Design of High Voltage

Facilites, Metanator and Kerosene Facilities, Fire Training Center, Highway-Passway, Light and Heavy Metro, Power Plant, Jetty, Enhancement of Crude Export Facilities, Crude Oil Pipeline, Water Transmission System, Formula-1 Runway, Complex and Special Buildings and Fabrics (Cotton Yarn, Pharmaceutical, Cement, Iron-Steel, Jail and etc.), Aircraft Hangar

�  Design of High Voltage/Medium Voltage/Low Voltage Electrical Single Line Diagram, Indoor and Outdoor Lighting, Grounding, Lightning Protection, Cathodic Protection, Hazardous Area Classification, Ex-proof Area, Electrical Load Scada, Cable Trench/Tray/Conduit Detail Layouts, Wiring and Installation Diagrams

�  Preparation of all electrical (High Voltage, Medium Voltage, Low Voltage, Low Current) technical specifications

�  Calculate of Lighting Intensity Level, Grounding, Lightning Protection, Lift Loads, Cable voltage drop and cross-section, Bus-bar loads, Transformator and/or Generator loading, Load Current Info and same as other electrical engineering analysis.

�  Design of Fire and Gas Detection, Telephone, Data, Passenger Information, PA/GA, Clock, Safety, CCTV, Radio Detail Layouts, Wiring and Installation Diagrams

�  Calculate of Camera Lens Degree, Loudspeaker Sound Level, Cable cross-section and same as other all Low Current system analysis

�  Design and Calculate of special systems; Helicopter Runway, Aircraft Shed, Airplane Runway, Pool, Metro Tunnel, Highway Tunnel, Traffic Signalization, Cable TV, Stray Current installations

�  Site supervision and project implementation, cost and quantity estimates, bid evaluations �  Use of British (BS), Russian (CNIP), International (IEEE, IEC, NFPA) and Turkish Standards

Page 6: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

EDUCATION Istanbul Technical University The Faculty of Electrical Engineering (Energy), BSc - 1989

PROFESSIONAL AFFILIATIONS

Member of Istanbul Electrical Engineering Association Member of Turkey Electrical Installation Engineers Society

EMPLOYMENT RECORD May, 2011-Present General Manager, DUAL Engineering, Turkey 2006-2011 Electrical Department Manager, Tekfen Engineering, Turkey 1997-2006 Lead Electrical Engineer, Tekfen Engineering, Turkey 1996-1997 (mid) Project Director, Berg-Westinghouse Electrical Devices Ltd., Turkey 1995-1996 Marketing Expert Engineer, Groupe Schneider Co. Inc., Turkey 1993-1995 South Cities Office Manager, CEDETAŞ Group, Turkey 1990-1993 PLC & AC, Drive Sales Engineer, ABC CEDETAŞ Automaiton & Control Co., Turkey 1989-1990 Process Engineer & Manufacturing Manager Assistant, MEKSAN Electronic Oil Pump Manufacturing Co. Inc.,

Turkey PROFESSIONAL EXPERIENCE 1997 – 2011 Tekfen Engineering – Istanbul, Turkey www.tekfenmuhendislik.com CEYDEM Fire Training Center / Ceyhan / British Petroleum

For Fire Training Center special buildings and training area; Power, Grounding, Fire Detection, Hazardous Area Classification, Lightning Protection, PA/GA, Cable tray Ex-Proof Layouts, calculations, preparation of technical specifications, load lists and bid evaluations.

Tüpraş A.Ş. Kerosene Unit / İzmir Aliağa Refinery / TÜPRAŞ A.Ş.

For Area and foundation, Grounding, Fire Detection, Hazardous Area Classification, PA/GA, Cable tray Ex-Proof Layouts, MCC loop and wiring diagrams, single line drawings, calculations, preparation of technical specifications load lists and bid evaluations.

Page 7: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

Tüpraş A.Ş. Kerosene Unit / İzmit Aliağa Refinery / TÜPRAŞ A.Ş. For Area and foundation, Grounding, Fire Detection, Hazardous Area Classification, PA/GA, Cable tray Ex-Proof Layouts, MCC loop and wiring diagrams, single line drawings, calculations, preparation of technical specifications load lists and bid evaluations.

İstanbul Bosphorus Passway / Sambo Engineering/ Korean.

For Bosphorus Passway; Road Lighting, Pump Rooms, traffic signalization, electric single line drawings, calculations, preparation of technical specifications load lists and bid evaluations.

Al Khalij Combined Cycle Power Plant / Bechtel – GAMA / Libya

For Final Site and Buildings Foundations Grounding, Final Site and Buildings’ Lightning Protection, Final Buildings’ PA/GA-Telephone-Data, Temporary and Final Outdoor Lighting Detail Layouts, Temporary Area MV/LV Distribution and Cable Trench Layouts, Grounding-Lightning Protection-Cable Cross section and Voltage Drop Calculations

Tüpraş A.Ş. Metanator Foundation / İzmir Aliağa Refinery / TÜPRAŞ A.Ş.

For Area and foundation Grounding, Fire Detection, Hazardous Area Classification, PA/GA, Cable tray Ex-Proof Detail Layouts, calculations, preparation of technical specifications and load lists.

Toros Agriculture Industry & Trading Co. Inc./ Samsun & Adana-Ceyhan Foundations / New Jetty Constructions

For all the Jetty constructions, Medium & Low Voltage Single Line Diagrams, Grounding, Outdoor Lighting, Ex-proof Fire Detection, Hazardous Area Classification, Cathodic Protection, Cable tray distribution Layouts, Cathodic Protection - Outdoor Lighting - Cable cross-section – Grounding - Transformator Load Calculations

Alstom Power Generation AG / Bulgaria-Maritza / East 1 Power Station

Fire Detection, HVAC Panel and cable tray distribution, Building grounding, cable trench plans, Stack Lightning Protection & aviation warning lighting design, HVAC cables voltage drop calculations, preparation of technical specifications and load lists.

İstanbul Metropolitan Municipality / İstanbul Metro–Kirazlı-Başak Konutları-4 Metro (8 Stations)

Power Distribution Layouts (Lighting - Socket outlet – Panels), Low Current Layouts ( Fire Alarm – Telephone - Data-Clock – CCTV - Passenger Information – Loudspeaker - Noise Microphone - Passenger Aid Telephone - Scada), Lighting Intensity calculations, camera lens calculations, loudspeaker noise calculations, voltage drop calculations, grounding calculations, Low current schematic Diagrams (Fire Alarm-Telephone-Clock-PI), preparation of Load Current Study & technical  specifications  

Page 8: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

Kuwait Oil Company-K.O.C / Enhancement of Crude Export Facilities (For 8-eight tanks, Gravity & Filling Manifold areas and special buildings) Power, indoor lighting, low current (Fire alarm & Telephone), instrument location, hazardous, socket outlet, grounding & faraday type lightning protection plans design, all of the electric (lighting, grounding, lightning protection, voltage drop) calculations, preparation of technical specifications.

Kazakhstan North Caspian Operating Company / Kashagan Main Construction Camp & Temporary Facilities Area for

6500 Men (Between the demountable containers and concrete special buildings) Power distribution, cable trench, Lightning Protection, Grounding, Outdoor Lighting projects design, trench section & details, fire alarm-telephone-cable TV-data systems schematic diagrams, all of the electric (lighting, cable cross section, voltage drop) calculations, preparation of technical specifications.

Kazakhstan North Caspian Operating Company / Kashagan Main Work Office Buildings

Power, indoor lighting, low current (Fire alarm & Telephone) plans design, all of the electric (lighting, cable cross section, ex.) calculations, preparation of technical specifications.

Bursa Metropolitan Municipality / BursaRay Light Rail Transit System

Station Power, Lighting, Grounding, Cable Tray plans design, Line ways Grounding Layouts design and material take-off. Stray current Protection Layouts design.

Azerbaijan International Operating Company BP Exploration (Shah Deniz) Ltd. / Baku-Tblisi-Ceyhan Crude Oil Pipeline Project – AIOC/Shahdeniz (Phase-1 Baku Side Special Buildings) (Phase-2 Baku Side Special Buildings)

Special Buildings power, indoor lighting, low current (Fire alarm & Telephone) plans design, all of the electric (lighting, cable cross section, voltage drop, heating ex.) calculations, preparation of data collection tool

İstanbul Metropolitan Municipality / Light Rail Transit System Line Pre-Final Design Works (Bakırköy-Beylikdüzü Line-18 Stations) (Bağcılar-İkitelli Line-20 Stations) (Levent-Bağcılar Line-15 Stations)

Power Distribution Layouts (Lighting- Socket outlet –Panels), Low Current Layouts ( Fire Alarm-Telephone-Data-Clock-CCTV- Passenger Information-Loudspeaker-Noise Microphone-Passenger Aid Telephone- Scada), Lighting Intensity calculations, camera lens calculations, loudspeaker noise calculations, voltage drop calculations, grounding calculations, Low current schematic Diagrams (Fire Alarm-Telephone-Clock-PI), preparation of technical specifications

Page 9: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

Formula-1 Area Electric & Electronic Project Design Works As-Built project works, Pre-Final Calculation works

Azerbaijan International Operating Company BP Exploration (Shah Deniz) Ltd. Central Azeri Complex Buildings

Special Buildings power, indoor lighting, low current (Fire alarm & Telephone) plans design, all of the electric (lighting, cable cross section, ex.) calculations, preparation of technical specifications

Novartis-Kurtköy Pharmaceutical Site Transfer Project/İstanbul

Electrical and low current design, calculations and preparation of technical specifications Azerbaijan International Operating Company BP Exploration (Shah Deniz) Ltd. Camp & Office Area

Area and buildings power, indoor and outdoor lighting, grounding, lightning protection, low current (Fire alarm & Telephone) plans design, all of the electric (lighting, cable cross section, ex.) calculations and preparation of technical specifications

Ankara Rail Transit System Stage 3 Works

Line ways and stations, buildings power, indoor and outdoor lighting, grounding, lightning protection, low current (CCTV, Fire alarm, Scada systems, master/slave clock, PA, Telephone, Data) plans design, all of the electric (lighting, cable cross section, ex.) and low current (PA, camera lens, Scada list of information) calculations, preparation of technical specifications

4x360MW Afşin-Elbistan B Thermal Power Plant

Bunker, Boiler and Coal Crusher Buildings with Stack Lightning Protection & aviation warning lighting, outside area lighting plans design, calculations, preparation of technical specifications GTT and Enka staff buildings electrical and low current installations design, calculations and preparation of technical specifications

Anatolian Health Village / Gebze

Energy transfer line, outside area lighting and low current installations design, calculations and preparation of technical specifications

Page 10: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

İstanbul Metro Yenikapı-Bağcılar Rail System The design of Metro electromechanical, electrification, telecommunication, signalisation and low current systems, integration to existing Phase 1 system.

TEKFEN Barbaros Residence / İstanbul

Electrical and low current installations design, calculations and preparation of technical specifications TEKFEN Taksim Residence / İstanbul

Electrical and low current installations design, calculations and preparation of technical specifications SPM Sanko Co., Inc. Jetty / Adana-Gölovası

Lighting, Grounding and Cable Tray installations design, calculations and preparation of technical specifications Aydın-Denizli Motorway Interchanges

Motorway interchange signalization system design, calculations and preparation of technical specifications TEKFEN Aircraft Hangar Project / İstanbul

Electrical and low current design, calculations and preparation of technical specifications BUSEB Free Zone Office Building / Bursa

Electrical and low current calculations and preparation of technical specifications Eastern Province of Water Transmission System (EPWTS) / Al-Khobar - Saudi Arabia

Electrical, low current and instrumentation system design, calculations and to evaluate the offers. Denizli Cable TV - Tekfen/Türk Telecom

The design of Cable TV satellite – headend –fibre - distribution system TEKFEN Uzbekhistan Papfen Cotton Yarn Fabric

The design of LV Panels and preparation of technical specifications

Page 11: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

1996-1997 BERG-Westinghouse Electrical Devices Ltd. – Istanbul, Turkey www.berg.com.tr Çimsa Cement Co. Inc., / Mersin

III. Cement Installation Line MV & LV system design, panels manufacturing and start-up of System and panels Denizli Cement Co. Inc., / Denizli

II. Cement Installation Line MV & LV system design, panels manufacturing and start-up of System and panels EREĞLİ Iron-Steel Factory / K.Ereğlisi

Start-up Basler Control Electric Devices Kayseri Textiles Co. Inc., / Kayseri

For Different textile fabrics, Power Factor Compansation panels designing, manufacturing and start-up U.S.A.İncirlik Air Force / Adana

No.2 Flight runway LV panels manufacturing, distribution system panels modification and start-up 1995-1996 SCHNEIDER Electric Co., Inc. – Istanbul, Turkey www.schneider-electric.com.tr

TSX 07 Micro Telemecanique PLC / TSX 37 Telemecanique PLC / Marketing Expert Engineer

İstanbul (Europe site), Bursa and Adana zone ASA Telemecanique PLC Expert Engineer For OEM, Marble Machine Automation program software design, TSX37 Micro PLC sales and start-up For OEM, PVC Window Machine Automation program software design, TSX37 Micro PLC sales and start-up

Page 12: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

1993-1995 CEDETAS Group. – Istanbul, Turkey www.cedetasas.com.tr İskenderun Steel-Iron Factory / İskenderun

Hitachi AC Drives sales and start-up (For ABC Cedetas Automation & Control Ltd.) Fire cable and protection system sales and start-up (For Enser Fire-CCTV Ltd.) Cedetas Proximity Sensors sales and start-up (For Cedetas Electromechanical Co., Inc.) CCTV system sales and start-up (For Enser Fire-CCTV Ltd.)

MERT Sugar Installation Factory / Gaziantep

The design and start-up of sugar installation line with Hitachi AC Drives and PLCs (For ABC Cedetas Automation & Control Ltd.)

MARSA Kraft Jacobs Factory Co., Inc. / Adana

The design and start-up of chocolate installation with Hitachi PLC (For ABC Cedetas Automation & Control Ltd.) EKİNCİLER Iron-Steel Co., Inc. / İskenderun

The design and start-up of II. Denim Line installation with Hitachi PLC (For ABC Cedetas Automation & Control Ltd.) The design and start-up Steel Shop Automation with Hitachi PLC (For ABC Cedetas Automation & Control Ltd.)

1990-1993 ABC CEDETAS AUTOMATION & CONTROL CO. – Istanbul, Turkey www.abcenser.com.tr Hitachi PLC & AC Drives / Allen-Bradley PLC & AC Drives / Wonderware Scada SUNTASAN Timber Factory / Eskişehir

Sales of all factory’s automation, PLC, AC Drive and Scada

Page 13: Mühendislik Ltd.+Şti. · PDF fileIEC 62305-3-Protection against lightning / Part-3: Physical damage to structures and life hazard! IEC 60076-8-Power Transformers Application Guide!

SASA  Co.,  Inc.  /  Adana    Sales  of  installation  line  automation  with  Allen-­‐Bradley  PLC  &  AC  Drives  

   EKİNCİLER  Iron-­‐Steel  Co.,  Inc.  /  İskenderun  

 Sales  of  installation  line  automation  with  Hitachi  PLC  &  AC  Drives      VİTRA  Co.,  Inc.  /  İstanbul  

 For  new  Klozet  manufacturing  line  automation  Sales  of  PLC,  AC  Drive  and  LV  Panels    1989-1990 MEKSAN Electronic Oil Pump Manufacturing Co., Inc.. – Istanbul, Turkey      

 Wayne-­‐Dressler  Oil  Pumps  /  Meksan  Electronic  Oil  Pumps  /  Meksan  Electronic  Talking  Oil  Pumps      

 For  Shell,  BP,  Petrolofisi  etc.  firms  Electronic  Oil  Pump  CPU,  I/O  and  Display  electronic  cards  first  design,  manufacturing,  service,  test  and  start-­‐up  works  on  Turkey.