    horizontal directional drilling

    a specialist that successfully executes projects, no matter how complex

  • 7/31/2019 Nacap HDD Brochure Def

    2/8

    no matter how complexwe have the knowledge

    to handle your project

    2 wehavetheknowledgetohandleyourproject

  • 7/31/2019 Nacap HDD Brochure Def

    3/8

    Benefits of horizontal

    directional drilling

    We have established ourselves as the

    leader in HDD industry. HDD constitutes

    an important component o many pipe-

    line construction projects. For more than

    twenty years we have employed this

    drilling technique as an environmen-

    tally riendly, sae, realiable and efcient

    alternative to conventional construction

    methods. Horizontal directional drillingis more ecient, oten more economi-

    cal, aster and, above all, has much less

    impact on the environment. It is also

    widely used in the oil and gas, power

    and telecommunications industries or

    bringing pipelines and cables ashore or

    taking them oshore.

    The characteristics o HDD make it the

    best solution or many customer needs;

    in some cases it provides the only prac-

    tical solution. Nacap uses horizontal

    directional drilling or, among others:

    Wtrwy

    Nturrrv

    Mjrrdndtrfcjunctin

    Rilwy

    Indutrilit

    Dnlyppultdrin

    and urban areas

    Lndfllndutfll

    Fldplinndb

    Untblilcnditin

    Frttinblwcntmintdground.

    environmentally friendly

    with minimal disturBance

    The traditional method o constructing

    a pipeline, in which a trench is exca-

    vated, can lead to major obstructions

    and objections amongst various autho-

    rities and in dierent areas. Horizontal

    directional drilling avoids breaking open

    or causing damage to these areas and

    it minimises the impact to the surroun-

    dings o the works.

    ThaILaND

    sai noi-north/south

    Bangkok power plants

    gas pipeline project

    Installation o 44 crossings by HDD

    technology. Total length o 45,000 m

    (up to 2 km per crossing). This required

    the use o three rigs one o 180, 275

    nd300tnns.Mjrchllnsfth

    project were the heavy trac, dicultaccess and densely populated and

    congested areas.

    Nacap is an expert in the feld o horizontal directional drilling (HDD).

    We have used this specialist technique all over the world, solving the

    most difcult challenges. Because o our expertise we always fnd the

    most efcient and economical solution or every drilling problem.

    We have extensive knowledge o the industry and experience in the feld,

    to be able to guarantee proessionalism and high quality service. We use

    our own modern and well maintained equipment to handle your project.

  • 7/31/2019 Nacap HDD Brochure Def

    4/8

    our specialist equipment -

    standard and custom BuiltNacaps success is partly attributable

    to the in-house development and the

    use o specialist HDD equipment. Feed-

    back rom projects is integrated in the

    design and development o equipment

    on a continous basis.

    The resulting improvements in eci-

    ency and saety contribute to environ-

    mentally riendly and timely project

    completion, critical issues or Nacaps

    clients.

    The rigs used by Nacap are purpose-

    built or tropical and remote locationsand eature computer controlled drilling.

    With 9 drilling rigs worldwide, we are

    able to meet all o our customers'

    requirements. We have developed

    several drilling machines ourselves.

    These machines have a pulling capa-

    city o up to 400Te.

    To date we have completed more than

    700 HDD crossings around the world

    in all types o ground conditions or

    cables & pipes up to 1,200 mm (48) in

    diameter and over 2,000 m.

    no matter how complex

    we have the right tools for the job

    4 wehavetherighttoolsforthejob

  • 7/31/2019 Nacap HDD Brochure Def

    5/8

    hdd in steps

    apilthlisdrilldccrdintthpr-

    fle design. Directional control is achieved

    by using the survey steering tool system.The survey probe installed in the drilling

    assembly measures the survey data re-

    quired or steering the drilling tool along

    the design prole

    Thhlisthnnlrdndcnditind

    in stages using a sequence o reamers/

    fycutters/hole openers to the required

    diameter or receiving the product pipe

    Tprductpipitnpulldintthole by the rig

    UNITeDKINgDoM

    Barton stacey to

    lockerley pipeline project

    In this project an HDD o 1,125 meter had

    to be constructed under a sensitive

    location, the river Test. This river harbours

    the amous trout ishing industry and

    thereore any chance that drilling mud

    would escape into the water had to be

    avoided. Thanks to excellent team work,the HDD crossing was completed with

    minimal disturbance to the environment.

  • 7/31/2019 Nacap HDD Brochure Def

    6/8

    no matter how complex

    we have the experience

    6 wehavetheexperience

    our extensive track record

    We give the highest priority to workingsaely, transparently and with respect

    or our environment. We have a con-

    vincing track record o successully

    completed projects. These projects

    were executed with a level o quality

    and proessionalism that exceeded our

    clients expectations.

    Nacap always works with clients in

    order to devise the best solution. In

    2008, or instance, Nacap successully

    completed a horizontal directional dr il-

    linrpprcingrik,et

    Jv,Indni,prtfKdc

    ffrePCIrvicfrWtM-durndPlnld.ThDDpip

    string was a 2,000 m long DN400 (16)

    steel gas pipeline with 1 concrete

    coating or buoyancy purpose. This

    crossing was the longest shore ap-

    proach that Nacap has completed to

    date.

    Cmplxlistics,cmmunityissus,

    security concerns and strict environ-

    mental procedures were just some o

    the issues that conronted Nacap during

    tWtafricngPiplinprjct

    (WagP)ndthBPTnuhprjctin

    IrinJy.Prmfrt,mrlnd,rock, humidity, densely populated or

    remote areas are other conditions under

    which projects have been completed.

  • 7/31/2019 Nacap HDD Brochure Def

    7/8

    the landfall method

    (onrptin)

    apiltlwillbdrilldfrmnr

    entry point towards oshore exit pointalong a planned profle assisted by down-

    hole steering tool system

    Tdrilldlwillbnlrduin

    sequence o reamers/lycutters rom

    onshore towards oshore

    Prductpipstrinfbrictdnshrwill

    be pulled through the reamed hole rom

    onshore towards oshore by a HDD rig

    located onboard the drill barge

    INDoNesIa

    west madura and

    poleng field

    Installation o a shore approach o a 16

    submarine gas pipeline by horizontal

    directional drilling, measuring 2,000 m

    inlnth,sprtfthWstMdur

    ndPlnFildprjctinestJvfr

    il&sprtr,KdcenryCLtd.

  • 7/31/2019 Nacap HDD Brochure Def

    8/8

    v

    Nacap b.v.

    Machlaan 5

    9761 TK Eelde

    The Netherlands

    m

    Nacap b.v.

    P.O. Box 46

    9750 AA Haren

    The Netherlands

    T +31 (0)50 599 12 00

    F +31 (0)50 599 12 22

    E [email protected]

    W www.nacap.com

    www.nacap.com