NATIONAL CLIMATE CHANGE RESPONSE DIALOGUE TECHNOLOGY CHOICES IN THE TRANSITION TO A LOW CARBON FUTURE Date: 12 November 2014 Presenter: Gina Downes

NATIONAL CLIMATE CHANGE RESPONSE DIALOGUE TECHNOLOGY ... · NATIONAL CLIMATE CHANGE RESPONSE DIALOGUE TECHNOLOGY CHOICES IN THE TRANSITION TO A LOW CARBON FUTURE Date: …

  • Upload
    vocong

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

NATIONAL CLIMATE CHANGE RESPONSE DIALOGUE

TECHNOLOGY CHOICES IN THE TRANSITION TO A LOW

CARBON FUTURE

Date: 12 November 2014

Presenter: Gina Downes

TECHNOLOGY CHOICES…

• Electrification, including offgrid

• Internal energy efficiency gains

• Demand side management initiatives, including:

• Efficient lighting initiatives

• Solar water heating

• Solar augmentation

• Sere

• Transmission planning for connections

• Smart grid strategy

• CSP – tower

• R,T&D, including:

• other renewables

• efficient components

• clean coal technologies2014/11/12 2

AN INCONVENIENT REALITY…

2014/11/12 3

GROUNDBREAKING INTEGRATED RESOURCE PLAN 2010

2014/11/12 4

WHICH IS BEING IMPLEMENTED….

2014/11/12 5

AND SUPPORTED BY ESKOM ….

2014/11/12 6

East LondonEast London

Port ElizabethPort Elizabeth

DurbanDurban

BloemfonteinBloemfontein

UpingtonUpington

JohannesburgJohannesburg

PretoriaPretoria

PolokwanePolokwane

Cape TownCape Town

System Demand Forecast

0

10

20

30

40

50

60

70

80

90

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

Years

GW

Eskom Position High conferdance of location Low conferdance of location

(a) Load Demand Forecast

40 GW

(b) Capacity Plan

RTS Coal PS etc.

40 GW

Capacity Project Funnel

Build1000

800

1775

165

Feasibility, Business

Case, Contract

Concluding

Pre-feasibility

ResearchOpportunity

Identification

PBMR

Echo 1128

Grootvlei

1520

Camden

300

Arnot P1&P2

November

600

Juliett

Oscar

6000

Mike

1000

Lima

1000

600

India

Romeo

1600

Sierra

1050

OCGT

1600

*Papa

1300

Kilo

Bravo

961

KomatiUCG

17375 MW 7800 MW 20850 MW

1050

Quebec

800

Tango90

112

4000Concentrating

Solar

100

Version CPF 1.3.14 Date: 10/05/2006

- Coal

W - Hydro

- Nuclear

- Gas

- Coal

- Coal

- Hydro

- Nuclear

- Gas

- Coal

Solar-

Transmission-

Whiskey

500

Songo ApolloHVDC Link Capacity Upgrade

* Possible 2400MW Mid Merit

Trans KalahariInterconnector

0

0

Discard Coal

0

New Coal Supply

0

90

9

90

1800

Uniform

1200

Victor

Rainbow Millenium

2000

X-ray

1775

3500

Zulu

* Brown outer circle indicates – out of Borders project

2100

Delta

Charlie872

2400

4200

500

Yankee

800

2100

Alpha

Hotel

1332

4200

Foxtrot4200

500

1800

Golf

(c) Capital project funnel>40 GW

Volume & type Spatial & transportation

2014/11/12 72014/11/12

FINAL SEA CORRIDORS FOR SIP 10 PROJECT

The “National” power corridors were then further refined and consolidated into five Major Transmission power Corridors.

These were then used as the basis for a national SEA study project by the DEA. This forms part of the SIP 10 project of the Govt. NDP.

The objective is to secure all the needed environmental approvals for Tx lines within the corridors which will be valid in perpetuity.

COSTS HAVE INCREASED…

2014/11/12 8

AND INTENSITY HAS DECREASED…

2014/11/12 9

DIFFERENT DEMAND FORECASTS…

2014/11/12 10

COSTS ARE AN ISSUE, AS IS AVAILABILITY

2014/11/12 11

Cloud impact on PV power generation

DIFFERENT EMISSIONS TRAJECTORIES…

2014/11/12 13

NEW COAL MINING INVESTMENTS ARE STILL REQUIRED

2014/11/12 14

graph removed possibly outdated

THANK YOU

Gina Downes

Corporate Consultant (Environmental Economics)Eskom Holdings LimitedTel +27-11-800-3099Fax +27-86-668-4767

Email [email protected]

Megawatt Park, Maxwell Drive, Sunninghill, SandtonP .O. Box 1091, Johannesburg, 2000 South Africa