NEAREST MEETING NEAREST MEETING April 1-3, 2009, Brest, France. April 1-3, 2009, Brest, France. A. A. BIROUK, M. KASMI, BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH, A. IBENBRAHIM, A. EL MOURAOUAH, ING, CNRST, Morocco. ING, CNRST, Morocco. ي طن و ل هد ا ع م ل ا اء ي ز ي ف و ي جل لNATIONAL INSTITUTE OF GEOPHYSICS (ING) ROYAUME DU MAROC MOROCCO SEISMIC NETWORK MOROCCO SEISMIC NETWORK

NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

Embed Size (px)

Citation preview

Page 1: NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

NEAREST MEETINGNEAREST MEETINGApril 1-3, 2009, Brest, France.April 1-3, 2009, Brest, France.

A.A. BIROUK, M. KASMI,BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,A. IBENBRAHIM, A. EL MOURAOUAH, ING, CNRST, Morocco.ING, CNRST, Morocco.

الوطني المعهدللجيوفيزياء

NATIONAL  INSTITUTE OF GEOPHYSICS

(ING)

ROYAUME DU MAROC

MOROCCO SEISMIC NETWORKMOROCCO SEISMIC NETWORK

Page 2: NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

Moroccan Seismic Network UpgradeMoroccan Seismic Network Upgrade

• 1st phase In progress :- 20 BB stations;- 11 SP stations;- VSAT facilities using 2 satellites & dual hub (seismic monitoring availibility even in case of one

satellite faillure)- 6-8 stations linked simultaniuosely by VSAT & VPN for redundancy purpose- 8 stations equiped with STS-2 and Episensor- Data acquisition & processing system

(antelope)

• Second Phase:- 15 BB stations;- 10 SP stations;- 40 accelerographs;- 15 Portable digital seismographs

Page 3: NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

Station distribution of the new telemetred seismic network (1st phase)Station distribution of the new telemetred seismic network (1st phase)

Page 4: NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

Dual Modem

DUAL HUB

Data Acquisition & Processing System

Antelope

Page 5: NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

Moroccan Seismic Network Upgrade Moroccan Seismic Network Upgrade (Central recording System)(Central recording System)

-2 workstations Sun Ultra 45-1 Raid System;- Dual Hub- NMS server;- 2 LCD screen 52’’

Page 6: NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

New Station Installation

Page 7: NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

New Station Installation

Page 8: NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

Seismic data exchange

Last November, CNRST started the installation of new VSAT Seismic Network:

-The Central acquisition system using Antelope software and Dual Hub VSAT System was installed, ;

- 2 remote stations(1BB, 1SP) already installed and two other programmed for this month;

- 2 BB stations in the north of Morocoo can be integrated to Nearest Nodes.

Page 9: NEAREST MEETING April 1-3, 2009, Brest, France. A.BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, A.BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

Integration of tide gauge data :

- CNRST has ordered and bought several months ago (June 2007), a real time digital tide gauge;

- CNRST signed an agreement with Harbours management department (HMD) for the installation and operating of the tide gauge acquired by the CNRST and to upgrade of tide gauges owned by HMD for real time data communication;

- Casablanca Harbour was chosen to host the new tide gauge and the installation is scheduled in 3 to 5 weeks.

.