NOTE de CALCUL Entretoise Verinage

Embed Size (px)

Citation preview

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    1/18

    NOTE DE CALCUL

    Projet:

    Etude dentretoise dabout

    phase VERINAGE

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    2/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    2

    1 Niveau :

    Nom : Niveau standard

    Cote de niveau : 1.50 (m)

    Tenue au feu : 0 h Fissuration : trs prjudiciable

    Milieu : trs agressif

    2 Poutre : Poutre1 Nombre : 5

    2.1 Caractristiques des matriaux :

    Bton : fc28 = 25.00 (MPa) Densit = 2501.36 (kG/m3)

    Aciers longitudinaux : type HA 400 fe = 400.00 (MPa)

    Aciers transversaux : type RL 235 fe = 235.00 (MPa)

    2.2 Gomtrie :

    2.2.1 Dsignation Position APG L APD(m) (m) (m)

    P1 Console G ---- 0.44 0.40

    Section de 0.00 0.44 (m)40.0 x 50.0 (cm)Pas de plancher gauchePas de plancher droit

    2.2.2 Dsignation Position APG L APD(m) (m) (m)

    P2 Trave 0.40 0.44 0.40

    Section de 0.00 0.44 (m)40.0 x 50.0 (cm)Pas de plancher gauchePas de plancher droit

    2.2.3 Dsignation Position APG L APD(m) (m) (m)

    P3 Trave 0.40 0.88 0.40

    Section de 0.00 0.88 (m)40.0 x 50.0 (cm)Pas de plancher gauchePas de plancher droit

    2.2.4 Dsignation Position APG L APD(m) (m) (m)

    P4 Trave 0.40 0.88 0.40

    Section de 0.00 0.88 (m)40.0 x 50.0 (cm)Pas de plancher gauche

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    3/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    3

    Pas de plancher droit

    2.2.5 Dsignation Position APG L APD(m) (m) (m)

    P5 Trave 0.40 0.88 0.40

    Section de 0.00 0.88 (m)40.0 x 50.0 (cm)Pas de plancher gauchePas de plancher droit

    2.2.6 Dsignation Position APG L APD(m) (m) (m)

    P6 Trave 0.40 0.44 0.40

    Section de 0.00 0.44 (m)40.0 x 50.0 (cm)Pas de plancher gauche

    Pas de plancher droit

    2.2.7 Dsignation Position APG L APD(m) (m) (m)

    P7 Console D 0.40 0.44 ----

    Section de 0.00 0.44 (m)40.0 x 50.0 (cm)Pas de plancher gauchePas de plancher droit

    2.3 Hypothses de calcul :

    Rglement de la combinaison : CM66 Avril 2000

    Calculs suivant : BAEL 91 mod. 99

    Dispositions sismiques : non

    Poutres prfabriques : non

    Enrobage : Aciers infrieurs c = 5.0 (cm): latral c1 = 5.0 (cm): suprieur c2 = 5.0 (cm)

    Tenue au feu : forfaitaire

    Coefficient de redistribution des moments sur appui : 0.80

    Ancrage du ferraillage infrieur :

    appuis de rive (gauche) : Auto

    appuis de rive (droite) : Auto

    appuis intermdiaires (gauche) : Auto

    appuis intermdiaires (droite) : Auto

    2.4 Chargements :

    2.4.1 Rpartis :

    Type Nature Pos. Dsignation f X0 Pz0 X1 Pz1 X2 Pz2 X3(m) (kN/m) (m) (kN/m) (m) (kN/m) (m)

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    4/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    4

    poids propre permanente - 6;5;4;3;2 1.35 - - - - - - -uniforme permanente en haut 2-6 1.35 - 0.00 - - - - -

    2.4.2 Concentrs :

    Type Nature Pos. Dsignation f X1 Fz Fx My n X2(m) (kN) (kN) (kN*m) (m)force concentre permanente en haut 1 1.35 0.00 74.64 - - 1 0.00force concentre permanente en haut 2 1.35 0.22 74.64 - - 1 0.00force concentre permanente en haut 3 1.35 0.44 74.64 - - 1 0.00force concentre permanente en haut 4 1.35 0.44 74.64 - - 1 0.00force concentre permanente en haut 5 1.35 0.44 74.64 - - 1 0.00force concentre permanente en haut 7 1.35 0.44 74.64 - - 1 0.00force concentre permanente en haut 6 1.35 0.22 74.64 - - 1 0.00

    2.5 Rsultats thoriques :

    2.5.1 Ractions

    Appui V1Cas Fx Fz Mx My(kN) (kN) (kN*m) (kN*m)

    G1 - 3.95 - -0.00G2 - 162.94 - -0.00G3 - 32.20 - 0.00G4 - -14.99 - -0.00G5 - 4.00 - -0.00G6 - -1.00 - 0.00G7 - -0.33 - -0.00G8 - 0.12 - 0.00Pondration max : - 252.30 - -0.00Pondration min : - 186.89 - -0.00

    Appui V2Cas Fx Fz Mx My

    (kN) (kN) (kN*m) (kN*m)G1 - 2.31 - -0.00G2 - -96.97 - 0.00G3 - 45.69 - 0.00G4 - 54.31 - 0.00G5 - -12.00 - -0.00G6 - 3.00 - 0.00G7 - 1.00 - 0.00G8 - -0.37 - 0.00Pondration max : - -3.02 - 0.00Pondration min : - -4.08 - 0.00

    Appui V3Cas Fx Fz Mx My

    (kN) (kN) (kN*m) (kN*m)G1 - 4.53 - 0.00

    G2 - 11.00 - 0.00G3 - -4.12 - 0.00G4 - 42.32 - -0.00G5 - 45.32 - -0.00G6 - -9.00 - -0.00G7 - -3.00 - 0.00G8 - 1.12 - 0.00Pondration max : - 119.02 - -0.00Pondration min : - 88.17 - -0.00

    Appui V4Cas Fx Fz Mx My

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    5/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    5

    (kN) (kN) (kN*m) (kN*m)G1 - 4.53 - 0.00G2 - -3.00 - -0.00G3 - 1.12 - -0.00G4 - -9.00 - 0.00G5 - 45.32 - -0.00

    G6 - 42.32 - 0.00G7 - 11.00 - 0.00G8 - -4.12 - -0.00Pondration max : - 119.02 - 0.00Pondration min : - 88.17 - 0.00

    Appui V5Cas Fx Fz Mx My

    (kN) (kN) (kN*m) (kN*m)G1 - 2.31 - -0.00G2 - 1.00 - -0.00G3 - -0.37 - 0.00G4 - 3.00 - 0.00G5 - -12.00 - 0.00G6 - 54.31 - -0.00G7 - -96.97 - -0.00

    G8 - 45.69 - 0.00Pondration max : - -3.02 - -0.00Pondration min : - -4.08 - -0.00

    Appui V6Cas Fx Fz Mx My

    (kN) (kN) (kN*m) (kN*m)G1 - 3.95 - 0.00G2 - -0.33 - 0.00G3 - 0.12 - -0.00G4 - -1.00 - -0.00G5 - 4.00 - -0.00G6 - -14.99 - 0.00G7 - 162.94 - -0.00G8 - 32.20 - 0.00Pondration max : - 252.30 - -0.00

    Pondration min : - 186.89 - -0.00

    2.5.2 Sollicitations ELU

    Dsignation Mtmax. Mtmin. Mg Md Vg Vd(kN*m) (kN*m) (kN*m) (kN*m) (kN) (kN)

    P1 0.00 -44.98 -0.00 -44.98 -100.76 -103.68P2 0.00 -44.98 -44.98 -38.99 148.62 44.94P3 16.52 -10.67 14.89 14.09 40.86 -65.73P4 12.14 -10.67 -10.67 -10.67 53.30 -53.30P5 16.52 -10.67 14.09 14.89 65.73 -40.86P6 0.00 -44.98 -38.99 -44.98 -44.94 -148.62P7 0.00 -44.98 -44.98 -0.00 103.68 100.76

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    6/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    6

    0 1 2 3 4 5 620

    10

    0

    -10

    -20

    -30

    -40

    -50

    [kN*m]

    Moment flchissant ELU: Mu

    0 1 2 3 4 5 6-150

    -100

    -50

    0

    50

    100

    150

    [kN]

    Effort transversal ELU: Vu

    0 1 2 3 4 5 63

    2

    1

    0

    1

    2

    3

    45

    6

    7

    8

    [cm2]

    Section d'acier en flexion: Abt Abr Abmin

    0 1 2 3 4 5 610

    8

    6

    4

    2

    0

    2

    4

    6

    8

    10

    [cm2/m]

    Section d'acier en cisaillement: Ast Ast_strut Asr

    0 1 2 3 4 5 60.2

    0.15

    0.1

    0.05

    0

    -0.05

    -0.1

    -0.15

    -0.2

    [cm]

    Flches: Fgi Fgv Fpi F Fadm

    0 1 2 3 4 5 6-150

    -100

    -50

    0

    50

    100

    150

    [kN]

    Force: V

    0 1 2 3 4 5 620

    10

    0

    -10

    -20

    -30

    -40

    -50

    [kN*m]

    : M

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    7/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    7

    2.5.3 Sollicitations ELS

    Dsignation Mtmax. Mtmin. Mg Md Vg Vd(kN*m) (kN*m) (kN*m) (kN*m) (kN) (kN)

    P1 0.00 -23.22 -0.00 -33.32 -74.64 -76.80P2 0.00 -18.72 -33.32 -1.42 110.09 33.29P3 12.24 0.00 -1.42 -7.90 30.27 -48.69P4 8.99 0.00 -7.90 -7.90 39.48 -39.48P5 12.24 0.00 -7.90 -1.42 48.69 -30.27P6 0.00 -18.72 -1.42 -33.32 -33.29 -110.09P7 0.00 -23.22 -33.32 -0.00 76.80 74.64

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    8/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    8

    0 1 2 3 4 5 620

    10

    0

    -10

    -20

    -30

    -40

    -50

    [m]

    [kN*m]

    Moment flchissant ELS: Ms Mrs Mts Mcs

    0 1 2 3 4 5 6-150

    -100

    -50

    0

    50

    100

    150

    [m]

    [kN]

    Effort transversa l ELS: Vs Vrs

    0 1 2 3 4 5 6-0.15

    -0.1

    -0.05

    0

    0.05

    0.1

    0.15

    [m]

    [0.1%]

    Dformations: Ats Acs Bs

    0 1 2 3 4 5 6-20

    -15

    -10

    -5

    0

    5

    10

    15

    20

    25

    [m]

    [MPa]

    Contraintes: Atss Acss Bss

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    9/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    9

    2.5.4 Sollicitations ELU - combinaison rare

    Dsignation Mtmax. Mtmin. Mg Md Vg Vd(kN*m) (kN*m) (kN*m) (kN*m) (kN) (kN)

    P1 0.00 0.00 0.00 0.00 0.00 0.00P2 0.00 0.00 0.00 0.00 0.00 0.00P3 0.00 0.00 0.00 0.00 0.00 0.00P4 0.00 0.00 0.00 0.00 0.00 0.00P5 0.00 0.00 0.00 0.00 0.00 0.00P6 0.00 0.00 0.00 0.00 0.00 0.00P7 0.00 0.00 0.00 0.00 0.00 0.00

    2.5.5 Sections Thoriques d'Acier

    Dsignation Trave (cm2) Appui gauche (cm2) Appui droit (cm2)inf. sup. inf. sup. inf. sup.

    P1 0.00 0.00 0.00 0.00 0.00 4.70

    P2 0.00 0.00 0.00 5.26 0.00 2.66

    P3 1.87 0.00 0.98 0.20 0.95 1.19

    P4 1.36 0.00 0.68 1.19 0.68 1.19

    P5 1.87 0.00 0.95 1.19 0.98 0.20

    P6 0.00 0.00 0.00 2.66 0.00 5.26

    P7 0.00 0.00 0.00 4.70 0.00 0.00

    0 1 2 3 4 5 63

    2

    1

    0

    1

    23

    4

    5

    6

    7

    8

    [m

    [cm2]

    Section d'acier en flexion: Abt Abr Abmin

    0 1 2 3 4 5 610

    8

    6

    4

    2

    0

    2

    4

    6

    8

    10

    [m

    [cm2/m]

    Section d'acier en cisaillement: Ast Ast_strut Asr AsHang

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    10/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    10

    2.5.6 Flches

    Fgi - flche due aux charges permanentes totalesFgv - flche de longue dure due aux charges permanentesFji - flche due aux charges permanentes la pose des cloisonsFpi - flche due aux charges permanentes et d'exploitation

    Ft - part de la flche totale comparable la flche admissibleFadm - flche admissible

    Trave Fgi Fgv Fji Fpi Ft Fadm(cm) (cm) (cm) (cm) (cm) (cm)

    P1 0.0 0.0 0.0 0.0 0.0 0.2P2 -0.0 -0.0 -0.0 -0.0 -0.0 -0.1P3 0.0 0.0 0.0 0.0 0.0 0.2P4 0.0 0.0 0.0 0.0 0.0 0.2P5 0.0 0.0 0.0 0.0 0.0 0.2P6 -0.0 -0.0 -0.0 -0.0 -0.0 -0.1P7 0.0 0.0 0.0 0.0 0.0 0.2

    0 1 2 3 4 5 60.2

    0.15

    0.1

    0.05

    0

    -0.05

    -0.1

    -0.15

    -0.2

    [m]

    [cm]

    Flches: Fgi Fgv Fji Fpi F Fadm

    2.5.7 Contrainte dans la bielle comprime

    Valeur admissible : 13.33 (MPa)

    a/add

    bc A Atheor Ar(m) (MPa) (cm2) (cm2)

    Trave P1 Appui droitVu = 103.68(kN)Bielle infrieure 0.36 1.44 0.00 2.26

    Trave P2 Appui gaucheVu = 148.62(kN)Bielle infrieure 0.36 2.06 1.66 2.26

    Trave P2 Appui droitVu = 0.00(kN)Bielle infrieure 0.36 0.00 0.00 2.26

    Trave P3 Appui gaucheVu = 40.86(kN)Bielle infrieure 0.36 0.57 1.70 2.26

    Trave P3 Appui droitVu = 65.73(kN)

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    11/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    11

    Bielle infrieure 0.36 0.91 1.55 2.26

    Trave P4 Appui gaucheVu = 53.30(kN)Bielle infrieure 0.36 0.74 0.95 2.26

    Trave P4 Appui droitVu = 53.30(kN)Bielle infrieure 0.36 0.74 0.95 2.26

    Trave P5 Appui gaucheVu = 65.73(kN)Bielle infrieure 0.36 0.91 1.55 2.26

    Trave P5 Appui droitVu = 40.86(kN)Bielle infrieure 0.36 0.57 1.70 2.26

    Trave P6 Appui gaucheVu = 0.00(kN)Bielle infrieure 0.36 0.00 0.00 2.26

    Trave P6 Appui droitVu = 148.62(kN)Bielle infrieure 0.36 2.06 1.66 2.26

    Trave P7 Appui gaucheVu = 103.68(kN)Bielle infrieure 0.36 1.44 0.00 2.26

    2.6 Rsultats thoriques - dtaills :

    2.6.1 P1 : Console G de 0.00 0.44 (m)ELU ELS ELU - comb. acc.

    Abscisse M max. M min. M max. M min. M max. M min. A chapeau A trave A compr.(m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (cm2) (cm2) (cm2)0.00 0.00 -0.00 0.00 -0.00 0.00 0.00 0.00 0.00 0.000.04 0.00 -44.98 0.00 -3.29 0.00 0.00 4.70 0.00 0.000.09 0.00 -44.98 0.00 -6.59 0.00 0.00 4.70 0.00 0.000.13 0.00 -44.98 0.00 -9.90 0.00 0.00 4.70 0.00 0.000.18 0.00 -44.98 0.00 -13.21 0.00 0.00 4.70 0.00 0.000.22 0.00 -44.98 0.00 -16.54 0.00 0.00 4.70 0.00 0.000.26 0.00 -44.98 0.00 -19.88 0.00 0.00 4.70 0.00 0.00

    0.31 0.00 -44.98 0.00 -23.22 0.00 0.00 4.70 0.00 0.000.35 0.00 -44.98 0.00 -26.58 0.00 0.00 4.70 0.00 0.000.40 0.00 -44.98 0.00 -29.94 0.00 0.00 4.70 0.00 0.000.44 0.00 -44.98 0.00 -33.32 0.00 0.00 4.70 0.00 0.00

    ELU ELS ELU - comb. acc.Abscisse V max. V red. V max. V red. V max. V red.(m) (kN) (kN) (kN) (kN) (kN) (kN)0.00 -100.76 -59.11 -74.64 -74.64 0.00 0.000.04 -101.06 -59.11 -74.86 -74.86 0.00 0.000.09 -101.35 -59.11 -75.07 -75.07 0.00 0.000.13 -101.64 -59.11 -75.29 -75.29 0.00 0.00

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    12/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    12

    0.18 -101.93 -59.11 -75.50 -75.50 0.00 0.000.22 -102.22 -59.11 -75.72 -75.72 0.00 0.000.26 -102.51 -59.11 -75.94 -75.94 0.00 0.000.31 -102.80 -59.11 -76.15 -76.15 0.00 0.000.35 -103.10 -59.11 -76.37 -76.37 0.00 0.000.40 -103.39 -59.11 -76.58 -76.58 0.00 0.00

    0.44 -103.68 -59.11 -76.80 -76.80 0.00 0.00

    Abscisse *(m) (MPa) (MPa) (MPa)0.00 0.00 0.00 -0.00 0.00 0.00 -0.000.04 0.00 0.00 -0.01 0.00 0.00 -0.200.09 0.02 0.00 -0.03 4.11 0.00 -0.370.13 0.03 0.00 -0.04 6.10 0.00 -0.530.18 0.04 0.00 -0.05 8.14 0.00 -0.710.22 0.05 0.00 -0.07 10.19 0.00 -0.890.26 0.06 0.00 -0.08 12.25 0.00 -1.070.31 0.07 0.00 -0.09 14.31 0.00 -1.250.35 0.08 0.00 -0.11 16.38 0.00 -1.430.40 0.09 0.00 -0.12 18.45 0.00 -1.610.44 0.10 0.00 -0.13 20.53 0.00 -1.79

    2.6.2 P2 : Trave de 0.84 1.28 (m)ELU ELS ELU - comb. acc.

    Abscisse M max. M min. M max. M min. M max. M min. A chapeau A trave A compr.(m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (cm2) (cm2) (cm2)0.84 0.00 -44.98 0.00 -33.32 0.00 0.00 5.26 0.00 0.000.88 0.00 -44.98 0.00 -28.44 0.00 0.00 4.46 0.00 0.000.93 0.00 -44.98 0.00 -23.58 0.00 0.00 3.67 0.00 0.000.97 0.00 -44.98 0.00 -18.72 0.00 0.00 3.07 0.00 0.001.02 0.00 -44.98 0.00 -13.88 0.00 0.00 3.07 0.00 0.001.06 0.00 -44.98 0.00 -9.04 0.00 0.00 3.07 0.00 0.001.10 0.00 -44.98 0.00 -7.50 0.00 0.00 3.07 0.00 0.001.15 0.00 -44.98 0.00 -5.96 0.00 0.00 3.07 0.00 0.001.19 0.00 -44.98 0.00 -4.44 0.00 0.00 3.07 0.00 0.001.24 0.00 -44.98 0.00 -2.92 0.00 0.00 3.07 0.00 0.001.28 0.00 -38.99 0.00 -1.42 0.00 0.00 2.66 0.00 0.00

    ELU ELS ELU - comb. acc.Abscisse V max. V red. V max. V red. V max. V red.(m) (kN) (kN) (kN) (kN) (kN) (kN)0.84 148.62 61.26 110.09 110.89 0.00 0.000.88 148.33 61.26 109.87 110.68 0.00 0.000.93 148.03 61.26 109.66 110.46 0.00 0.000.97 147.74 61.26 109.44 110.25 0.00 0.001.02 147.45 61.26 109.22 110.03 0.00 0.001.06 147.16 61.26 109.01 109.81 0.00 0.001.10 46.10 61.26 34.15 34.96 0.00 0.001.15 45.81 61.26 33.94 34.74 0.00 0.001.19 45.52 61.26 33.72 34.53 0.00 0.001.24 45.23 61.26 33.50 34.31 0.00 0.001.28 44.94 61.26 33.29 34.09 0.00 0.00

    Abscisse *

    (m) (MPa) (MPa) (MPa)0.84 0.10 0.00 -0.13 20.47 0.00 -1.770.88 0.09 0.00 -0.11 17.49 0.00 -1.510.93 0.07 0.00 -0.09 14.47 0.00 -1.250.97 0.06 0.00 -0.07 11.50 0.00 -0.991.02 0.04 0.00 -0.06 8.52 0.00 -0.731.06 0.03 0.00 -0.04 5.55 0.00 -0.481.10 0.02 0.00 -0.03 4.61 0.00 -0.401.15 0.02 0.00 -0.02 3.67 0.00 -0.321.19 0.01 0.00 -0.02 2.74 0.00 -0.241.24 0.01 0.00 -0.01 1.81 0.00 -0.161.28 0.00 0.00 -0.01 0.88 0.00 -0.08

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    13/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    13

    2.6.3 P3 : Trave de 1.68 2.56 (m)ELU ELS ELU - comb. acc.

    Abscisse M max. M min. M max. M min. M max. M min. A chapeau A trave A compr.(m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (cm2) (cm2) (cm2)1.68 14.89 -1.92 0.00 -1.42 0.00 0.00 0.20 0.98 0.001.77 16.52 -1.92 1.39 0.00 0.00 0.00 0.13 1.10 0.001.86 16.52 -1.92 4.16 0.00 0.00 0.00 0.13 1.10 0.001.94 16.52 -1.92 6.89 0.00 0.00 0.00 0.13 1.10 0.002.03 16.52 -2.80 9.58 0.00 0.00 0.00 0.19 1.45 0.002.12 16.52 -8.15 12.24 0.00 0.00 0.00 0.55 1.87 0.002.21 16.52 -10.67 8.28 0.00 0.00 0.00 0.72 1.25 0.002.30 16.52 -10.67 4.29 0.00 0.00 0.00 0.67 1.04 0.002.38 16.52 -10.67 0.27 0.00 0.00 0.00 0.67 1.04 0.002.47 16.52 -10.67 0.00 -3.80 0.00 0.00 0.67 1.04 0.002.56 14.09 -10.67 0.00 -7.90 0.00 0.00 1.19 0.95 0.00

    ELU ELS ELU - comb. acc.Abscisse V max. V red. V max. V red. V max. V red.(m) (kN) (kN) (kN) (kN) (kN) (kN)1.68 40.86 22.54 30.27 32.11 0.00 0.001.77 40.28 22.54 29.84 31.68 0.00 0.00

    1.86 39.70 22.54 29.41 31.25 0.00 0.001.94 39.12 22.54 28.97 30.82 0.00 0.002.03 38.53 22.54 28.54 30.38 0.00 0.002.12 37.95 22.54 28.11 29.95 0.00 0.002.21 -63.40 -36.57 -46.96 -45.12 0.00 0.002.30 -63.98 -36.57 -47.39 -45.55 0.00 0.002.38 -64.56 -36.57 -47.82 -45.98 0.00 0.002.47 -65.15 -36.57 -48.26 -46.41 0.00 0.002.56 -65.73 -36.57 -48.69 -46.85 0.00 0.00

    Abscisse *(m) (MPa) (MPa) (MPa)1.68 0.00 0.00 -0.01 0.88 0.00 -0.081.77 0.00 0.00 -0.01 0.86 0.00 -0.081.86 0.01 0.00 -0.02 2.59 0.00 -0.231.94 0.02 0.00 -0.03 4.31 0.00 -0.39

    2.03 0.03 0.00 -0.04 5.97 0.00 -0.542.12 0.04 0.00 -0.05 7.63 0.00 -0.692.21 0.03 0.00 -0.03 5.16 0.00 -0.472.30 0.01 0.00 -0.02 2.68 0.00 -0.242.38 0.00 0.00 -0.00 0.17 0.00 -0.022.47 0.01 0.00 -0.02 2.37 0.00 -0.222.56 0.02 0.00 -0.03 4.94 0.00 -0.45

    2.6.4 P4 : Trave de 2.96 3.84 (m)ELU ELS ELU - comb. acc.

    Abscisse M max. M min. M max. M min. M max. M min. A chapeau A trave A compr.(m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (cm2) (cm2) (cm2)2.96 10.11 -10.67 0.00 -7.90 0.00 0.00 1.19 0.68 0.003.05 12.14 -10.67 0.00 -4.45 0.00 0.00 0.66 0.75 0.003.14 12.14 -10.67 0.00 -1.03 0.00 0.00 0.65 0.74 0.003.22 12.14 -10.67 2.35 0.00 0.00 0.00 0.65 0.74 0.00

    3.31 12.14 -10.67 5.69 0.00 0.00 0.00 0.71 0.85 0.003.40 12.14 -8.55 8.99 0.00 0.00 0.00 0.57 1.36 0.003.49 12.14 -10.67 5.69 0.00 0.00 0.00 0.71 0.85 0.003.58 12.14 -10.67 2.35 0.00 0.00 0.00 0.65 0.74 0.003.66 12.14 -10.67 0.00 -1.03 0.00 0.00 0.65 0.74 0.003.75 12.14 -10.67 0.00 -4.45 0.00 0.00 0.66 0.75 0.003.84 10.11 -10.67 0.00 -7.90 0.00 0.00 1.19 0.68 0.00

    ELU ELS ELU - comb. acc.Abscisse V max. V red. V max. V red. V max. V red.(m) (kN) (kN) (kN) (kN) (kN) (kN)2.96 53.30 29.56 39.48 39.48 0.00 0.00

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    14/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    14

    3.05 52.71 29.56 39.05 39.05 0.00 0.003.14 52.13 29.56 38.62 38.62 0.00 0.003.22 51.55 29.56 38.18 38.18 0.00 0.003.31 50.96 29.56 37.75 37.75 0.00 0.003.40 -50.38 -29.56 -37.32 -37.32 0.00 0.003.49 -50.96 -29.56 -37.75 -37.75 0.00 0.00

    3.58 -51.55 -29.56 -38.18 -38.18 0.00 0.003.66 -52.13 -29.56 -38.62 -38.62 0.00 0.003.75 -52.71 -29.56 -39.05 -39.05 0.00 0.003.84 -53.30 -29.56 -39.48 -39.48 0.00 0.00

    Abscisse *(m) (MPa) (MPa) (MPa)2.96 0.02 0.00 -0.03 4.94 0.00 -0.453.05 0.01 0.00 -0.02 2.78 0.00 -0.253.14 0.00 0.00 -0.00 0.64 0.00 -0.063.22 0.01 0.00 -0.01 1.47 0.00 -0.133.31 0.02 0.00 -0.02 3.55 0.00 -0.323.40 0.03 0.00 -0.04 5.61 0.00 -0.513.49 0.02 0.00 -0.02 3.55 0.00 -0.323.58 0.01 0.00 -0.01 1.47 0.00 -0.133.66 0.00 0.00 -0.00 0.64 0.00 -0.06

    3.75 0.01 0.00 -0.02 2.78 0.00 -0.253.84 0.02 0.00 -0.03 4.94 0.00 -0.45

    2.6.5 P5 : Trave de 4.24 5.12 (m)ELU ELS ELU - comb. acc.

    Abscisse M max. M min. M max. M min. M max. M min. A chapeau A trave A compr.(m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (cm2) (cm2) (cm2)4.24 14.09 -10.67 0.00 -7.90 0.00 0.00 1.19 0.95 0.004.33 16.52 -10.67 0.00 -3.80 0.00 0.00 0.67 1.04 0.004.42 16.52 -10.67 0.27 0.00 0.00 0.00 0.67 1.04 0.004.50 16.52 -10.67 4.29 0.00 0.00 0.00 0.67 1.04 0.004.59 16.52 -10.67 8.28 0.00 0.00 0.00 0.72 1.25 0.004.68 16.52 -8.15 12.24 0.00 0.00 0.00 0.55 1.87 0.004.77 16.52 -2.80 9.58 0.00 0.00 0.00 0.19 1.45 0.004.86 16.52 -1.92 6.89 0.00 0.00 0.00 0.13 1.10 0.004.94 16.52 -1.92 4.16 0.00 0.00 0.00 0.13 1.10 0.00

    5.03 16.52 -1.92 1.39 0.00 0.00 0.00 0.13 1.10 0.005.12 14.89 -1.92 0.00 -1.42 0.00 0.00 0.20 0.98 0.00

    ELU ELS ELU - comb. acc.Abscisse V max. V red. V max. V red. V max. V red.(m) (kN) (kN) (kN) (kN) (kN) (kN)4.24 65.73 36.57 48.69 46.85 0.00 0.004.33 65.15 36.57 48.26 46.41 0.00 0.004.42 64.56 36.57 47.82 45.98 0.00 0.004.50 63.98 36.57 47.39 45.55 0.00 0.004.59 63.40 36.57 46.96 45.12 0.00 0.004.68 -37.95 -22.54 -28.11 -29.95 0.00 0.004.77 -38.53 -22.54 -28.54 -30.38 0.00 0.004.86 -39.12 -22.54 -28.97 -30.82 0.00 0.004.94 -39.70 -22.54 -29.41 -31.25 0.00 0.005.03 -40.28 -22.54 -29.84 -31.68 0.00 0.005.12 -40.86 -22.54 -30.27 -32.11 0.00 0.00

    Abscisse *(m) (MPa) (MPa) (MPa)4.24 0.02 0.00 -0.03 4.94 0.00 -0.454.33 0.01 0.00 -0.02 2.37 0.00 -0.224.42 0.00 0.00 -0.00 0.17 0.00 -0.024.50 0.01 0.00 -0.02 2.68 0.00 -0.244.59 0.03 0.00 -0.03 5.16 0.00 -0.474.68 0.04 0.00 -0.05 7.63 0.00 -0.694.77 0.03 0.00 -0.04 5.97 0.00 -0.544.86 0.02 0.00 -0.03 4.31 0.00 -0.39

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    15/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    15

    4.94 0.01 0.00 -0.02 2.59 0.00 -0.235.03 0.00 0.00 -0.01 0.86 0.00 -0.085.12 0.00 0.00 -0.01 0.88 0.00 -0.08

    2.6.6 P6 : Trave de 5.52 5.96 (m)ELU ELS ELU - comb. acc.

    Abscisse M max. M min. M max. M min. M max. M min. A chapeau A trave A compr.(m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (cm2) (cm2) (cm2)5.52 0.00 -38.99 0.00 -1.42 0.00 0.00 2.66 0.00 0.005.56 0.00 -44.98 0.00 -2.92 0.00 0.00 3.07 0.00 0.005.61 0.00 -44.98 0.00 -4.44 0.00 0.00 3.07 0.00 0.005.65 0.00 -44.98 0.00 -5.96 0.00 0.00 3.07 0.00 0.005.70 0.00 -44.98 0.00 -7.50 0.00 0.00 3.07 0.00 0.005.74 0.00 -44.98 0.00 -9.04 0.00 0.00 3.07 0.00 0.005.78 0.00 -44.98 0.00 -13.88 0.00 0.00 3.07 0.00 0.005.83 0.00 -44.98 0.00 -18.72 0.00 0.00 3.07 0.00 0.005.87 0.00 -44.98 0.00 -23.58 0.00 0.00 3.67 0.00 0.005.92 0.00 -44.98 0.00 -28.44 0.00 0.00 4.46 0.00 0.005.96 0.00 -44.98 0.00 -33.32 0.00 0.00 5.26 0.00 0.00

    ELU ELS ELU - comb. acc.Abscisse V max. V red. V max. V red. V max. V red.

    (m) (kN) (kN) (kN) (kN) (kN) (kN)5.52 -44.94 -61.26 -33.29 -34.09 0.00 0.005.56 -45.23 -61.26 -33.50 -34.31 0.00 0.005.61 -45.52 -61.26 -33.72 -34.53 0.00 0.005.65 -45.81 -61.26 -33.94 -34.74 0.00 0.005.70 -46.10 -61.26 -34.15 -34.96 0.00 0.005.74 -147.16 -61.26 -109.01 -109.81 0.00 0.005.78 -147.45 -61.26 -109.22 -110.03 0.00 0.005.83 -147.74 -61.26 -109.44 -110.25 0.00 0.005.87 -148.03 -61.26 -109.66 -110.46 0.00 0.005.92 -148.33 -61.26 -109.87 -110.68 0.00 0.005.96 -148.62 -61.26 -110.09 -110.89 0.00 0.00

    Abscisse *(m) (MPa) (MPa) (MPa)5.52 0.00 0.00 -0.01 0.88 0.00 -0.08

    5.56 0.01 0.00 -0.01 1.81 0.00 -0.165.61 0.01 0.00 -0.02 2.74 0.00 -0.245.65 0.02 0.00 -0.02 3.67 0.00 -0.325.70 0.02 0.00 -0.03 4.61 0.00 -0.405.74 0.03 0.00 -0.04 5.55 0.00 -0.485.78 0.04 0.00 -0.06 8.52 0.00 -0.735.83 0.06 0.00 -0.07 11.50 0.00 -0.995.87 0.07 0.00 -0.09 14.47 0.00 -1.255.92 0.09 0.00 -0.11 17.49 0.00 -1.515.96 0.10 0.00 -0.13 20.47 0.00 -1.77

    2.6.7 P7 : Console D de 6.36 6.80 (m)ELU ELS ELU - comb. acc.

    Abscisse M max. M min. M max. M min. M max. M min. A chapeau A trave A compr.(m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (kN*m) (cm2) (cm2) (cm2)6.36 0.00 -44.98 0.00 -33.32 0.00 0.00 4.70 0.00 0.00

    6.40 0.00 -44.98 0.00 -29.94 0.00 0.00 4.70 0.00 0.006.45 0.00 -44.98 0.00 -26.58 0.00 0.00 4.70 0.00 0.006.49 0.00 -44.98 0.00 -23.22 0.00 0.00 4.70 0.00 0.006.54 0.00 -44.98 0.00 -19.88 0.00 0.00 4.70 0.00 0.006.58 0.00 -44.98 0.00 -16.54 0.00 0.00 4.70 0.00 0.006.62 0.00 -44.98 0.00 -13.21 0.00 0.00 4.70 0.00 0.006.67 0.00 -44.98 0.00 -9.90 0.00 0.00 4.70 0.00 0.006.71 0.00 -44.98 0.00 -6.59 0.00 0.00 4.70 0.00 0.006.76 0.00 -44.98 0.00 -3.29 0.00 0.00 4.70 0.00 0.006.80 0.00 -0.00 0.00 -0.00 0.00 0.00 0.00 0.00 0.00

    ELU ELS ELU - comb. acc.

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    16/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    16

    Abscisse V max. V red. V max. V red. V max. V red.(m) (kN) (kN) (kN) (kN) (kN) (kN)6.36 103.68 59.11 76.80 76.80 0.00 0.006.40 103.39 59.11 76.58 76.58 0.00 0.006.45 103.10 59.11 76.37 76.37 0.00 0.006.49 102.80 59.11 76.15 76.15 0.00 0.00

    6.54 102.51 59.11 75.94 75.94 0.00 0.006.58 102.22 59.11 75.72 75.72 0.00 0.006.62 101.93 59.11 75.50 75.50 0.00 0.006.67 101.64 59.11 75.29 75.29 0.00 0.006.71 101.35 59.11 75.07 75.07 0.00 0.006.76 101.06 59.11 74.86 74.86 0.00 0.006.80 100.76 59.11 74.64 74.64 0.00 0.00

    Abscisse *(m) (MPa) (MPa) (MPa)6.36 0.10 0.00 -0.13 20.53 0.00 -1.796.40 0.09 0.00 -0.12 18.45 0.00 -1.616.45 0.08 0.00 -0.11 16.38 0.00 -1.436.49 0.07 0.00 -0.09 14.31 0.00 -1.256.54 0.06 0.00 -0.08 12.25 0.00 -1.076.58 0.05 0.00 -0.07 10.19 0.00 -0.89

    6.62 0.04 0.00 -0.05 8.14 0.00 -0.716.67 0.03 0.00 -0.04 6.10 0.00 -0.536.71 0.02 0.00 -0.03 4.11 0.00 -0.376.76 0.00 0.00 -0.01 0.00 0.00 -0.206.80 0.00 0.00 -0.00 0.00 0.00 -0.00

    *- contraintes dans ELS, dformations en ELS

    2.7 Ferraillage :

    2.7.1 P1 : Console G de 0.00 0.44 (m)Ferraillage longitudinal : Aciers infrieurs

    2 HA 400 12 l = 1.00 de 0.05 0.86

    Ferraillage transversal :4 Cad RL 235 8 l = 1.55e = 1*0.03 + 3*0.13 (m)

    2.7.2 P2 : Trave de 0.84 1.28 (m)Ferraillage longitudinal : Aciers infrieurs

    2 HA 400 12 l = 1.29 de 0.42 1.70

    Aciers de montage (haut)2 HA 400 8 l = 0.74 de 0.69 1.43

    Chapeaux2 HA 400 14 l = 1.54 de 0.05 1.342 HA 400 14 l = 1.47 de 0.10 1.332 HA 400 12 l = 1.37 de 0.68 2.05

    Ferraillage transversal :

    4 Cad RL 235 8 l = 1.56e = 1*0.06 + 3*0.11 (m)

    2.7.3 P3 : Trave de 1.68 2.56 (m)Ferraillage longitudinal : Aciers infrieurs

    2 HA 400 12 l = 1.73 de 1.26 2.98

    Aciers de montage (haut)2 HA 400 8 l = 1.18 de 1.53 2.71

    Chapeaux2 HA 400 12 l = 1.62 de 0.78 2.40

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    17/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    17

    2 HA 400 12 l = 1.84 de 1.84 3.68

    Ferraillage transversal :7 Cad RL 235 8 l = 1.56e = 1*0.05 + 6*0.13 (m)

    2.7.4 P4 : Trave de 2.96 3.84 (m)Ferraillage longitudinal : Aciers infrieurs

    2 HA 400 12 l = 1.73 de 2.54 4.26

    Aciers de montage (haut)2 HA 400 8 l = 1.18 de 2.81 3.99

    Chapeaux2 HA 400 12 l = 1.84 de 3.12 4.96

    Ferraillage transversal :7 Cad RL 235 8 l = 1.56e = 1*0.05 + 6*0.13 (m)

    2.7.5 P5 : Trave de 4.24 5.12 (m)Ferraillage longitudinal : Aciers infrieurs

    2 HA 400 12 l = 1.73 de 3.82 5.54

    Aciers de montage (haut)2 HA 400 8 l = 1.18 de 4.09 5.27

    Chapeaux2 HA 400 12 l = 1.62 de 4.40 6.02

    Ferraillage transversal :7 Cad RL 235 8 l = 1.56e = 1*0.05 + 6*0.13 (m)

    2.7.6 P6 : Trave de 5.52 5.96 (m)Ferraillage longitudinal : Aciers infrieurs

    2 HA 400 12 l = 1.29 de 5.10 6.38

    Aciers de montage (haut)

    2 HA 400 8 l = 0.74 de 5.37 6.11 Chapeaux

    2 HA 400 12 l = 1.37 de 4.75 6.122 HA 400 14 l = 1.54 de 5.46 6.752 HA 400 14 l = 1.47 de 5.47 6.70

    Ferraillage transversal :4 Cad RL 235 8 l = 1.56e = 1*0.06 + 3*0.11 (m)

    2.7.7 P7 : Console D de 6.36 6.80 (m)Ferraillage longitudinal : Aciers infrieurs

    2 HA 400 12 l = 1.00 de 5.94 6.75

    Ferraillage transversal :4 Cad RL 235 8 l = 1.55

    e = 1*0.03 + 3*0.13 (m)

    3 Quantitatif : Volume de Bton = 6.80 (m3)

    Surface de Coffrage = 44.80 (m2)

    Acier HA 400

    Poids total = 265.16 (kG)

  • 7/25/2019 NOTE de CALCUL Entretoise Verinage

    18/18

    Autodesk Robot Structural Analysis Professional2010Auteur : BEZI TASNIM Fichier : entretoise VERINAGE.rtd

    Projet: Port CHEBA

    18

    Densit = 38.99 (kG/m3)

    Diamtre moyen = 11.7 (mm)

    Liste par diamtres :

    Diamtre Longueur Nombre :(m)

    8 0.74 208 1.18 3012 1.00 2012 1.29 2012 1.37 2012 1.62 2012 1.73 3012 1.84 2014 1.47 2014 1.54 20

    Acier RL 235 Poids total = 113.43 (kG)

    Densit = 16.68 (kG/m3)

    Diamtre moyen = 8.0 (mm)

    Liste par diamtres :

    Diamtre Longueur Nombre :(m)

    8 1.55 185