23
Confidential & Proprietary Confidential & Proprietary 益美科技 益美科技 EPS Group, Inc. EPS Group, Inc. 1 Optimization Strategy in Optimization Strategy in Energy Saving of Energy Saving of Chiller Plant Systems Chiller Plant Systems

Optimization Strategy in Energy Saving of Chiller Plant … · benefit through chiller plant energy saving, while – Meet all demands at all times – Preserve system-wide safety

  • Upload
    doannhu

  • View
    223

  • Download
    2

Embed Size (px)

Citation preview

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.1

    Optimization Strategy in Optimization Strategy in Energy Saving of Energy Saving of

    Chiller Plant SystemsChiller Plant Systems

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.2

    Objectives Objectives EPSS Energy OptimizerEPSS Energy Optimizer Deliver attractive, on-going economical

    benefit through chiller plant energy saving, while Meet all demands at all times Preserve system-wide safety and integrity Improve day-to-day operation efficiency Impose no impact to install & maintain

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.3

    What is EPSSWhat is EPSS EPSS is a patented and proven energy

    saving solution for industrial and commercial chiller plant cooling applications

    Product highlights Patented optimization strategy Unique system-based approach Proven track record of significant economical benefits Modular system design & layout Safe & easy to install & maintain Flexible to deploy & operate Eco-friendly

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.4

    Chiller Plant OverviewChiller Plant Overview

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.5

    Chiller Plant CyclesChiller Plant Cycles

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.6

    Traditional Chiller PlantTraditional Chiller Plant

    Subsystems Control Energy SavingCooling Tower Cooling Tower SubsystemSubsystem

    Constant-speedcooling tower fans

    Cooling Water Cooling Water SubsystemSubsystem

    Constant-speed cooling water pumps

    Chiller SubsystemChiller Subsystem Inlet guide vane load control

    Primary Chilled Primary Chilled Water SubsystemWater Subsystem

    Constant-speed chilled water pumps

    Secondary Chilled Secondary Chilled Water SubsystemWater Subsystem

    Variable-speed differential pressure control

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.7

    Energy Saving in Pumps/FansEnergy Saving in Pumps/Fans Pump/Fan Characteristics

    FlowRatioFlowRatio 1.0 0.9 0.8 0.7 0.6 0.5

    PowerRatioPowerRatio 1.000 0.729 0.512 0.343 0.216 0.125

    PowerSaving% 0.0% 27.1% 48.8% 65.7% 78.4% 87.5%

    where KWi : Kilo Watts; and Qi : Flow

    Energy saving Golden Opportunity via VFD C/T fans, CW pumps, CH pumps Now, the million dollar question: How exactly?

    KW2KW1

    =Q2Q1

    3

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.8

    EPSS EPSS Optimized Chiller PlantOptimized Chiller PlantSubsystemsSubsystems EPSS ModuleEPSS Module EPSS OptimizationEPSS Optimization

    Cooling Tower Cooling Tower SubsystemSubsystem

    Wet bulb temperature sensor VFD for cooling tower fans

    VariableVariable--speed speed according to according to OA Enthalpy and optimization OA Enthalpy and optimization strategystrategy

    Cooling Water Cooling Water SubsystemSubsystem

    Condenser water temperature sensors

    VFD for condenser water pumps CWP

    VariableVariable--speedspeed according to according to load and optimization load and optimization strategystrategy

    Chiller SubsystemChiller Subsystem No modification required other than proper chiller operating condition

    As isNo change in chiller control & operating procedure

    Primary Chilled Primary Chilled Water SubsystemWater Subsystem

    Chilled water decouple line flow meter

    VFD for chilled water pumps CHP

    VariableVariable--speedspeed according to according to load and optimization load and optimization strategystrategy

    Secondary Chilled Secondary Chilled Water SubsystemWater Subsystem

    No modification required As isNo change in SCHP control

    Monitoring & Monitoring & Control SubsystemControl Subsystem

    EPSS Control & Optimization System (ECOP)

    Control platform & optimization strategy

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.9

    99

    EPSS EPSS Chiller Plant Chiller Plant ptimizationptimization

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.10

    EPSSEPSS CWP OptimizationCWP OptimizationFixed ECWT & Fixed % Load

    Total KW = Chiller KW + CWP KW

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.11

    CWP OptimizationCWP OptimizationFixed ECWT & Varying % Load

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.12

    Optimization Cost FunctionsOptimization Cost Functions

    ECWT1 ECWT2 ECWT3

    ECWT6ECWT5ECWT4

    Varying ECWT & Varying % Load

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.13

    Optimization StrategyOptimization Strategy Unique System Approach Total Cost Function

    ( )

    ( ) ( ) ( ) ( )tKWtKWtKWtKW

    LoadWBTtKWKW

    ChillerCHPCWPTCt

    tTotal

    +++=

    =

    /

    %,,

    System-Based Constrained Optimization

    LoadandWBTgivenatTandTforvalueslowandhighoptimaltheareTandTwhere

    TTTTTT

    KW

    LL

    LL

    HILLL

    LLLOLTotal

    MMMMMMMMM

    HICHPCHPLOCHPHIGGLOGHILLLOL

    %:

    21

    *2

    *1

    22*2

    *111min

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.14

    US Patent No.: 6446448US Patent No.: 6446448

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.15

    System Architecture System Architecture -- EPSSEPSS

    DecoupleLine

    Flow Sensors

    CondenserWater

    TemperatureSensors

    System Panel

    VFDPanels

    Ethernet

    ChilledWater

    TemperatureSensors

    WBT Sensor

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.16

    LLXXXX EPSSEPSS InstallationInstallation

    System panelSystem panel VFD panels for CHPVFD panels for CHP

    VFD panels for CWPVFD panels for CWP

    VFD panels for CTFVFD panels for CTF

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.17

    LLXXXX M&V SummaryM&V Summary Verification: Validate real-time long-term performance

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.18

    DDXXXX Chiller PlantChiller Plant

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.19

    DDXXXX System LayoutSystem Layout

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.20

    DDXXXX EPSS EPSS InstallationInstallation

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.21

    DDXXXX M&V SummaryM&V Summary

    1002 Total KW = 1920

    1002

    1003 Total KW = 2209

    1003

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.22

    Product HighlightsProduct Highlights Patented optimization strategy Unique system-based approach Proven track record of significant economical

    benefits Modular system design & layout Safe & easy to install & maintain Flexible to deploy & operate Eco-friendly

  • Confidential&ProprietaryConfidential&Proprietary EPSGroup,Inc.EPSGroup,Inc.23

    SummarySummary We are your best partner to work with you on

    chiller plant energy saving and provide you with an optimum solution that Best match your application; Meet your goals on energy saving policy; Minimize energy consumption; Realize on-going economical benefit; and Reduce environment impact.

    Objectives EPSS Energy OptimizerWhat is EPSSChiller Plant OverviewChiller Plant CyclesTraditional Chiller PlantEnergy Saving in Pumps/FansEPSS Optimized Chiller PlantEPSS Chiller Plant ptimizationEPSS CWP OptimizationCWP OptimizationOptimization Cost FunctionsOptimization StrategyUS Patent No.: 6446448System Architecture - EPSSLXX EPSS InstallationLXX M&V SummaryDXX Chiller PlantDXX System LayoutDXX EPSS InstallationDXX M&V SummaryProduct HighlightsSummary