48
Optimized Chiller Water Plant for Chilled Beams System Execução Implementação Realização Micah Bowman Daikin Applied Americas Luciano de A Marcato Daikin Applied - Brasil 24/02/2016 - Rio de Janeiro

Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Embed Size (px)

Citation preview

Page 1: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Optimized Chiller Water Plant forChilled Beams System

Execução Implementação Realização

Micah Bowman Daikin Applied Americas

Luciano de A Marcato Daikin Applied - Brasil

24/02/2016 - Rio de Janeiro

Page 2: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

ContentsContents

• Chilled Beam– Application– Operation– Benefits– Design Considerations

• Water System Design

• Energy Comparisons / Simulations– Magnetic Bearing Centrifugal Chiller Plant– Premium Efficiency Air-Cooled Inverter Screw Chiller Plant

Page 3: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Beam ApplicationChilled Beam Application

• The chilled beam system promotes excellent thermal comfort, energyconservation, and efficient use of space due to the high heat capacityof water used as heat transfer medium.

Heat Removal Ratio

WatersideCooling

70%

AirsideCooling

30%

Page 4: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

All move the same amount of Energy

Annual Energy Usage

Pumps22%

Tower2%

Chiller33%Fans

43%

Water = Efficient TransportWater = Efficient Transport

1 Ton of Cooling

requires between 400and 550 CFM of air

or

4 GPM of water

42” Duct 5/8” Refrigerant Pipe2” Pipe

Page 5: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Fan Energy Use in BuildingsFan Energy Use in Buildings

“Energy Consumption Characteristics of Commercial Building HVACSystems” - publication prepared for U.S. Department of Energy

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Central VAV Central CAV Packaged CAV

Des

ign

Load

KW

/SF

Chiller/Compressor

Supply & Return Fans

Chilled Water Pump

Condenser Water Pump

Cooling Tower Fan

Condenser Fan

0

1

2

3

4

5

6

7

Central VAV Central CAV Packaged CAV

Ener

gy U

se K

Wh/

SF

Page 6: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Beam ApplicationChilled Beam Application

• The operation principle of the system is simple and trouble-free. Thehigh temperature cooling and low temperature heating maximize theopportunity for free cooling and heating.

• Typical applications are cellular and open plans offices, hotel rooms,hospital wards, retail shops, etc. Laboratory applications are alsogood with a few extra considerations (chemicals / gases).

Page 7: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Beam Operation PrincipleChilled Beam Operation Principle

Page 8: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Beam Operation PrincipleChilled Beam Operation Principle

1 – Dehumidified Primary Air

2 – Primary Air supply throughbeam nozzles

3 – Induced room air tocirculate by chilled beam heatexchanger by primary airsupply air pattern

4 – Mixed air between primaryand recirculate air

5 – Chilled Water connection

6 – Hot Water Connection

Page 9: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

System BenefitsSystem Benefits

•Chilled beams provides benefits in life cycle costs:– Low maintenance cost (no filters, moving parts, condensate pump)– Easy inspection and cleaning of coils and surfaces 4-5 years– Easy maintenance access– Good energy efficiency– Free cooling possible in cold and temperate climate

•Chilled beams operate with a dry cooling coil– No condensate collection system– Primary air should be dehumidified in the air handling unit and/or– Control of water temperatures is needed to avoid condensation

Page 10: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

ACTIVE CHILLED BEAM DESIGNCONSIDERATIONS

ACTIVE CHILLED BEAM DESIGNCONSIDERATIONS

Characteristics that favor Active Chilled Beams

• Zones with moderate-high sensible load densities– Where primary airflows would be significantly higher than needed

for ventilation• Buildings most affected by space constraints

– Hi – rises, existing buildings with induction systems• Zones where the acoustical environment is a key design

criteria• Laboratories where sensible loads are driving airflows as

opposed to air change rates• Buildings seeking LEED or Green Globes certification

Page 11: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

ACTIVE CHILLED BEAM DESIGNCONSIDERATIONS

ACTIVE CHILLED BEAM DESIGNCONSIDERATIONS

Characteristics that less favor Active Chilled Beams

• Buildings with operable windows or “leaky” construction– Beams with drain pans could be considered

• Zones with:– Relatively low sensible load densities– Relatively low sensible heat ratios and low ventilation air requirements– High filtration requirements for the re-circulated room air– High latent loads

Page 12: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Primary Air DesignPrimary Air Design

• Central AHU sized to handle:– sensible and latent cooling/heating of the ventilation air– portion of the sensible internal cooling/heating loads

AND– all of the internal and infiltration latent loads

• Primary air delivered continuously to the chilled beams– VAV primary air can be considered for the perimeter if the sensible

loads are high• Chilled beam water coils provide additional sensible

cooling/heating to control zones

Page 13: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Passive Chilled Beams - Exposed TypePassive Chilled Beams - Exposed Type

Photo Courtesy of

Page 14: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Active Chilled Beams Typical InstallActive Chilled Beams Typical Install

Photo Courtesy of

Page 15: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Photo Courtesy of

Active Chilled Beams Typical InstallActive Chilled Beams Typical Install

Page 16: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

THE LUXTON-REED CENTERTHE LUXTON-REED CENTER

Photo Courtesy of

Page 17: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

THE LUXTON-REED CENTERTHE LUXTON-REED CENTER

Photo Courtesy of

Page 18: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

WATER SYSTEM DESIGNWATER SYSTEM DESIGN

Page 19: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Dedicated ChillerDedicated Chiller

T

To chilled beam zones

Bypass Valve

Chilled waterpump

Dedicated chiller11+ COP

CoolingTower

Geothermal Loop

Geothermal HeatPump

64°F

58°F

Photo Courtesy of

Page 20: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Secondary LoopSecondary Loop

ST

Secondary chilled watersupply to beams

Secondary chilledwater return

Supply temperaturemonitor

Primary chilledwater supply

Primary chilledwater return

HeatExchanger

SCHWPump

54°F

45°F

58°F

64°F

T

Photo Courtesy of

Page 21: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

ENERGY COMPARISONENERGY COMPARISON

Page 22: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Energy Savings - Compared to VAVEnergy Savings - Compared to VAV

Source Technology Application % Saving*

US Dept. of Energy Report (4/2001) Beams/Radiant Ceilings General 25-30

ASHRAE 2010 Technology Awards Passive Chilled Beams Call Center 41

ACEE Emerging Technologies Report (2009) Active Chilled Beams General 20

ASHRAE Journal 2007 Active Chilled Beams Laboratory 57

SmithGroup Active Chilled Beams Offices 24

*Compared to VAV

“Energy Consumption Characteristics of Commercial Building HVACSystems” - publication prepared for U.S. Department of Energy

Page 23: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

FAN COILS VS PASSIVE CB’S VS ACB’SFAN COILS VS PASSIVE CB’S VS ACB’S

Page 24: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Beam System MaintenanceChilled Beam System Maintenance1 – Air Side Maintenance

Chilled Beams / Primary Air AHU / AHU or FCU ifapplied2 – Chiller Plant3 – Water Distribution System4 – Control System

Page 25: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Energy Analyzer 2 SimulationEnergy Analyzer 2 Simulation

Page 26: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Energy Analyzer 2 SimulationEnergy Analyzer 2 Simulation

910 TR system configured with N+1

Three levels of temperatures.

Low Temp 5°C DOAS ≈30% (280TR)Medium Temp 10°C AHUs ≈30% (280TR)High Temp 15°C Chilled Beams≈40% (350TR)

Page 27: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Qty 4 x 300T Premium Efficiency VFDAir-Cooled Screw Chillers

Page 28: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Qty 2 x 330T Premium EfficiencyAir-Cooled Screw Chillers

Qty 2 x 290T Premium EfficiencyAir-Cooled Screw Chillers

*one sized as the +1 “joker” chiller

Page 29: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Water Temp simulationChilled Water Temp simulation

Page 30: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Water Temp simulationChilled Water Temp simulation

Page 31: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Water Temp simulationChilled Water Temp simulation

Page 32: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Life Cycle AnalysisLife Cycle Analysis

Page 33: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Life Cycle AnalysisLife Cycle Analysis

Considered Chillers only

Page 34: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Life Cycle AnalysisLife Cycle Analysis

Chillers + Airside + WaterDistribution Systems

Page 35: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Energy Analyzer 2 SimulationEnergy Analyzer 2 Simulation

Page 36: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Energy Analyzer 2 SimulationEnergy Analyzer 2 Simulation

910 TR system configured with N+1

Three levels of temperatures.

Low Temp 5°C DOAS ≈30% (280TR)Medium Temp 10°C AHUs ≈30% (280TR)High Temp 15°C Chilled Beams≈40% (350TR)

Page 37: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Energy Analyzer 2 SimulationEnergy Analyzer 2 Simulation

Qty 4 x Identical MagneticBearing Chillers to handle alltemperature conditions.

Page 38: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Energy Analyzer 2 SimulationEnergy Analyzer 2 Simulation

Qty 2 x Magnetic BearingChillers for DOAS and AHUs

Qty 2 x Magnetic BearingChillers of smaller size forAHUs and Chilled Beams

*one sized as the +1 “joker”chiller

Page 39: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Water Temp simulationChilled Water Temp simulation

Page 40: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Water Temp simulationChilled Water Temp simulation

Page 41: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Chilled Water Temp simulationChilled Water Temp simulation

Page 42: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Life Cycle AnalysisLife Cycle Analysis

Page 43: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Life Cycle AnalysisLife Cycle Analysis

Considered Chillers only

Page 44: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Life Cycle AnalysisLife Cycle Analysis

Chillers + Air side + waterdistribution systems

Page 45: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Active Chilled Beams - First CostsActive Chilled Beams - First Costs

• Office Building, Palo Alto, CA

• 80,000 ft2

• Thermostat in each office for beam design

*HPAC Engineering Article “European Technology Taking Hold in the U.S.: Chilled Beams,Peter Rumsey, PE, CEM, FASHRAE, FRMI

“costs were in line with VAV”*

Page 46: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

• Office Building, Denver, CO

• 600,000 ft2 design/build renovation

• Elimination of two air handlers per floor due tobeams

*HPAC Engineering Article “European Technology Taking Hold in the U.S.: Chilled Beams,Peter Rumsey, PE, CEM, FASHRAE, FRMI, January 1st 2010

“the chilled-beam system was equal tothe VAV system”*

Active Chilled Beams - First CostsActive Chilled Beams - First Costs

Page 47: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

• Lower energy consumption and operating costs asprimary air flow is reduced (by 25-50%)

• Excellent thermal comfort and better IAQ(no dumping in cooling or stratification in heating mode)

• Very low noise levels with typical inlet static pressures of 0.2 in.w.c and there are no fans or motors located in/near theoccupied spaces

• Space savings in ceiling plenums and vertical shaftsdue to drastically reduced ductwork sizes

• Eliminate Fan Powered VAV (no power or maintenance)

• ALWAYS LOOK AS A SYSTEM !

• ALWAYS LOOK FOR LIFE CYCLE COST EVALUATION !

System Benefits

Page 48: Optimized Chiller Water Plant for Chilled Beams Systemprotocolodemontreal.org.br/eficiente/repositorio/Eventos/seminario... · Optimized Chiller Water Plant for Chilled Beams System

Execução Implementação Realização