    TERRENO 12X20m

    1 LIMPEZA DO TERRENO

    1.1-LIMPEZA (m) 240 m rea do terreno

    1.2-TAPUME DA OBRA

    TOTAL = 140,80m

    FOLHA DE COMPENSADO (1,10x2,20)

    64m lineares x 2,20 (altura)

    TOTAL = 140,80m de madeira

    QUANTIDADE (140,80 / 2,42 = 58,18 = 59 folhas

    1.3-PLACA DA OBRA (m) 2m

    1.4-BARRACO DA OBRA (m) = 3,63m

    1.5-LOCAO DA OBRA (m) 94,50m

    2. FUNDAO

    2.1 - ESCAVAO MANUAL (m)

    METROS LINERARES DAS PAREDES

    8,90X2

    8,45X2

    4,35X1

    3,50X1

    3,45X2

    1,85X1

    3,00X1

    TOTAL METROS LINEARES = 53,3m

    SAPATA CORRIDA = 0,60 x 0,35 x 53,3

    Volume= 11,19m

    SAPATA ISOLADA = 0,60 x 0,60 x 0,35

    Volume= 0,126m x 6 = 0,756m

    TOTAL VOLUME= 11,946 m

  • 7/23/2019 oramento civil

    3/6

    2.2- CONCRETO MAGRO (m)

    Sapata isolada= 0,4 x 0,4 x 0,05 = 0,008x6 = 0,048m

    Sapata corrida= 0,4 x 53,3 x 0,05 = 1,066 mTOTAL= 1,114m

    2.3- CONCRETO ARMADO (m)

    Sapata corrida= 0,09m x 53,3m = 4,797m

    Sapata isolada= (aplicar frmulas) = 0,0345m x 6 = 0,207m

    TOTAL = 5,004m

    2.4- ALVENARIA DE 1 VEZ (m)

    Altura = 0,30

    Comprimento= 53,30

    TOTAL= 15,99m

    2.5RADIER

    0,10 x 53,3 = 5,33m

    2.6ATERRO DO CAIXO

    8,45 x 8,90 x 0,40 = 30,08m

    2.7- REATERRO APLICADO

    Vreaterro = Vescavao

    Vconcretom

    Vconcretoa

    Vreaterro = 11,9461,1145,004

    Vreaterro = 5,828

    2.8REMOO DO MATERIAL

    VescavaoVreaterro = 11,9465,828

    TOTAL = 6,118 (25%) = 7,6475 m

  • 7/23/2019 oramento civil

    4/6

    3 ESTRUTURA

    Portas

    (1x) 0,90 x 2,10 = 1,89m(1x) 0,80 x 2,10 = 1,68m

    (1x) 0,70 x 2,10 = 1,47m

    (1x) 0,60 x 2,10 = 1,26m

    TOTAL = 6,20m

    Janelas

    (4x) 1,50 x 1,00 = 6,00m

    (1x) 1,35 x 0,50 = 0,675m

    (1x) 2,50 x 0,50 = 1,25m

    TOTAL= 7,925m

    TOTAL= 14,225m

    3.1 REA DE ALVENARIA

    53,3x 2,50 = 139,75m

    Tijolo da coberta

    4x (4,60 x 1/2)

    4 x 2,30 = 9,20 m

    3.2 VERGAS E CONTRAVERGAS

    3.2.1 VERGAS

    Portas

    0,90 + 0,20 = 1,10m

    0,80 + 0,20 = 1,00m

    0,70 + 0,20 = 0,90m

    0,60 + 0,20 = 0,80m

  • 7/23/2019 oramento civil

    5/6

    Janelas

    4 x (1,5+0,30) = 7,20m

    1,35 + 0,27 = 1,62m

    2,50 + 0,50 = 3,00m

    TOTAL = 15,62m

    3.2.2 CONTRAVERGA

    Janelas = Verga

    11,82m

    4 REVESTIMENTO

    4.1 CHAPISCO

    139,75 x 2 = 279,50m

    4.2 REBOCO

    COZINHA

    12,60 X 2,50 = 31,50m

    Porta = 1,47m

    Janela = 1,25m

    31,501,471,25 = 28,78m

    BWC

    10,30 x 2,50 = 25,75m

    Porta = 1,26m

    Janela = 0,675m

    25,751,260,675 = 23,81m

    TOTAL= 52,59m

    4.3 AZULEJO

    Azulejo = Reboco

    52,59m

  • 7/23/2019 oramento civil

    6/6

    4.4 MASSA NICA

    139,7531,5025,75 = 82,50

    139,75 + 82,50 = 222,25m

    4.5 CHAPISCO TETO8,45 x 9,20 = 77,74m

    4.6 FORRO DE GESSO

    77,74m