ORM Presentation - Final

Embed Size (px)

Citation preview

  • 7/31/2019 ORM Presentation - Final

    1/39

    Group 4B

    Bibek Samantaray (B10075)

    Parag Jain (B10094)

    Pinaki Majumdar (B10095)

    Smriti Mehrotra (B10111)V S Rama Krishna Chava (B10116)

    A STUDY OF OPERATIONSMANAGEMENT IN HOTEL JK

    RESIDENCY

  • 7/31/2019 ORM Presentation - Final

    2/39

    Hotel Industry in India Tremendous boom in recent years due to thriving

    economy and increased business opportunities

    Supply of 110000 rooms and shortage of 150000rooms currently

    Demand to exceed supply by 100% in next 2years

    Hotel rates in India to rise by 25%

    Occupancy of hotels to rise by 80% 60000 rooms in planning and development

    stages

    Huge growth expected in budget and mid-market

    hotel segment

  • 7/31/2019 ORM Presentation - Final

    3/39

    JK Residency Located in Sakchi, Jamshedpur

    Started around 5 months back

    37 elegantly furnished rooms

    Tariff range: Rs 2000 Rs 6000 Restaurant (Appetite) that can seat 120 people

    Conference Hall (Concurrence) 60 peoplecapacity

    Rooftop Banquet (Steelscapes) 200 peoplecapacity

  • 7/31/2019 ORM Presentation - Final

    4/39

    Service Process Matrix

    HOTELS

    The Service Process Matrix is a classification matrix ofservice industry firms based on the characteristics ofthe individual firm's service processes

  • 7/31/2019 ORM Presentation - Final

    5/39

    Managerial Challenges ServiceFactory

    Low labor intense firms Infrastructure choices are extremely important

    Inflexible capacity

    Scheduling service delivery is more important

    Low customer interaction firms Relatively more marketing challenges

    Attention to physical surroundings required to keeptrack of constantly evolving industry standards

    SOPs can be used Organizational structure with many layers and a

    rigid relationship between layers is appropriate

  • 7/31/2019 ORM Presentation - Final

    6/39

    Residency

  • 7/31/2019 ORM Presentation - Final

    7/39

    Organization Structure

    Total no. of employees : 120Total no. of Administrative staff : 25

    Heads:

    General Manager: Mr. Saikat Chatterjee

    Food & Beverage Production (Head): Mr. RanjitSharma

    Food & Beverage (Head): Mr. Hemant Gupta

    Room Division (Head): Mr. Saikat Chatterjee

    Housekeeping Department(Head): Mr. Paramjit Singh

    Finance & Accounts (Head): Mr. Barwa, Mr. Chinmaya Safety and Security (Head): Mr. Lakhanpal

    Front Office (Lead): Mr. Niranjan Baid

    Maintenance (Head): Mr Anurag Jain

  • 7/31/2019 ORM Presentation - Final

    8/39

    Core functioning departments (1/3)

    Food & Beverage Department Responsible for food and beverage services to the

    guests

    Second largest revenue generator for the hotel

    Separate sub-departments for restaurant, banquets,room service etc.

    Food & Beverage Production Department

    Responsible for preparation of food items.Dish Type Process Type

    Indian Dish Assemble to Order

    Chinese Dish Made to Order

    Continental Dish Made to Order

  • 7/31/2019 ORM Presentation - Final

    9/39

    Core functioning departments (2/3)

    Front office department Most important department of the hotel

    Largest revenue generator

    Responsible for processing guest reservations,

    registering incoming guests, settling guestaccounts, checking out guests etc.

    Housekeeping Department

    Responsible for cleanliness of guest rooms andpublic areas

    Employs maximum number of people

    Safety & Security Department

    Responsible for security of the Hotels guests and

    employees

  • 7/31/2019 ORM Presentation - Final

    10/39

    Core functioning departments (2/3)

    Finance & Accounting Department Responsible for accounting work

    Responsible for managing required finances for dayto day operations

    Cost control

    Maintenance Department

    Responsible for maintaining exterior and interiorfacilities of the hotel

  • 7/31/2019 ORM Presentation - Final

    11/39

    Forecasting Major business operations revolve around

    forecasting right amount of occupancy

    Manpower planning and food preparation in therestaurant is based on forecasts ofRoom/Restaurant/Conference Hall/Banquet Hall

    occupancy

    Demand Management

    JK Residency follows Active Demand Management

    Discounts to students (for e.g.: XLRI students)

    Organizing special functions on festival days

    Attractive discounts on bookings of conference hall/banquethall

    Maintaining a superior quality of service and food

  • 7/31/2019 ORM Presentation - Final

    12/39

    Basic components of forecasting -Hotel

    Raw material forecast for the kitchen Affected by

    Room occupancy

    Banquet Hall/Conference Hall bookings

    Restaurant traffic

    Linen forecast

    Affected by

    Number of rooms

    Room occupancy Laundry service quality

  • 7/31/2019 ORM Presentation - Final

    13/39

    Forecasting methodology at JKResidency

    Qualitative forecasting employed Historical Analogy

    Seasonality Factor Analysis Past 5 month data

    Month Actual Sales(Rs lakhs)

    Average Sales

    (Rs lakhs)Seasonality

    factorNovember 5 5.65 0.885December 5.4 5.65 0.956January 5.75 5.65 1.018February 6.2 5.65 1.097March(Projected

    )5.9* 5.65 1.044

    Total sales 28.25 28.25

  • 7/31/2019 ORM Presentation - Final

    14/39

    Seasonality Factor

    y = 0.046x + 0.8619

    R = 0.786

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    0 1 2 3 4 5 6

    SeasonalityFactor

    Months

    Seasonality factor

    Seasonality factor

    Linear (Seasonalityfactor)

  • 7/31/2019 ORM Presentation - Final

    15/39

    Inventory Control (1/2) Linen Inventory

    Bed sheets, blankets and drapes are unique toeach room

    Absolutely necessary to maintain a minimum

    inventory of these items Fixed Order Quantity model employed

    Grocery Inventory

    Agreement with private contractors

    Price of the items fixed Contract renewedannually

    Fixed Order Quantity model employed - order ismade when the grocery inventory reaches a

    minimum threshold

  • 7/31/2019 ORM Presentation - Final

    16/39

    Inventory Control (2/2) Beverage Inventory

    Procured through a local distributor

    Fixed Order Quantity model is employed

  • 7/31/2019 ORM Presentation - Final

    17/39

    Manpower Planning

    Months November December January February

    Days 25 27 26 24

    Full time employees 100 120 122 130

    Full time days 2500 3240 3172 3120

    Salary expense of full time workers 400000 480000 488000 520000

    Number of special occasions 5 9 10 12

    Expense on contract workers(per day) 250 250 250 250

    Contract Workers 35 63 70 84

    Salary expense of contract workers 8750 15750 17500 21000

    # Full time employee salary is Rs.4000 pm# No. of contract workers required per special occasion is

  • 7/31/2019 ORM Presentation - Final

    18/39

    Materials Requirement Planning (1/5)

    Final Output Food produced in the restaurantkitchen

    Rough estimate of daily requirement of raw materialsprovided below

  • 7/31/2019 ORM Presentation - Final

    19/39

    Materials Requirement Planning (2/5)

  • 7/31/2019 ORM Presentation - Final

    20/39

    Materials Requirement Planning (3/5)

    Based on raw material data, a sample materialrequirements planning schedule was created

    Non-Vegetarian

    ItemDaily Order

    Quantity*Special Order

    QuantityLead Time

    Chicken 4 kg 21 kg 1 dayMutton 2 kg 8 kg 1 daySea Food 1 kg 3 kg 2 days* Special Order Quantity refers to the occasions when both of theirBanquet halls are occupied (as seen earlier one has a capacity of200 people & another of 60 people)

  • 7/31/2019 ORM Presentation - Final

    21/39

    Day 1 Day 2 Day 3 Day 4 Day 5 Day 6Chicken Gross requirement 4 4 4 4 4 21LT = 1 day Scheduled receipts 4Order quantity = lot-for-lot Projected available balance

    Net requirements 0 4 4 4 4 21Planned order receipts 0 4 4 4 4 21Planned order releases 4 4 4 4 21 4

    Mutton Gross requirement 2 2 2 2 2 8LT = 1 day Scheduled receipts 2Order quantity = lot-for-lot Projected available balance

    Net requirements 0 2 2 2 2 8Planned order receipts 0 2 2 2 2 8Planned order releases 2 2 2 2 8 2

    Sea food Gross requirement 1 1 1 1 1 3LT = 2 days Scheduled receipts 1 1Order quantity = lot-for-lot Projected available balance

    Net requirements 0 0 1 1 1 3Planned order receipts 0 0 1 1 1 3Planned order releases 1 1 1 3 1 1

  • 7/31/2019 ORM Presentation - Final

    22/39

    Materials Requirement Planning (5/5)

    Industry Type Expected benefits

    Assemble to stock High

    Fabricate to stock Low

    Assemble to Order High

    Fabricate to Order LowManufacture to Order High

    Industry Applications & Expected Benefits

    The Restaurant business is basically Assemble toOrder in nature, hence the benefits from MRP ascan be seen from the following table are HIGH

  • 7/31/2019 ORM Presentation - Final

    23/39

    Raw Material Security (1/2) Most of the raw materials locally procured Sea food and Dry fruits procured from other cities

    through intermediaries

    Assured & continuous flow of raw material isrequired as inventory cannot be maintained dueto the perishable nature of raw materials

    Raw Material Procurement Method followed:

    Fixed Period Contracts Provides Raw material security

    Provides insulation from price changes over thetime period

  • 7/31/2019 ORM Presentation - Final

    24/39

    Raw Material Security (2/2)

    Raw Material Type Period of Contract Other Salientfeatures

    Contract

    selectionVegetables Monthly Price Fixed at the

    start of the monthLowest Bid

    selectedNon-Vegetarian

    itemsMonthly Price Fixed at the

    start of the monthLowest Bid

    selectedGrocery Yearly Price Fixed at start of

    the year, Mid-year

    price review also

    done

    Lowest Bid

    selected, also

    Parties allowing

    Mid-year price

    review given

    preferenceBeverages Yearly Price Fixed at start of

    the yearLowest Bid

    Selected

  • 7/31/2019 ORM Presentation - Final

    25/39

    Quality Management Customer satisfaction key priority Restaurant

    Inspection of raw materials for quality

    Quality ingredients used for preparing dishes

    Inspection of dishes before serving to customers Rooms

    Cleanliness of rooms ensured

    Clean linen used

    Perfect room service Overall hygiene is given very high importance

    Customer feedback on Quality solicited & utilized

  • 7/31/2019 ORM Presentation - Final

    26/39

    Suggestions :Standard processes formaintaining quality(1/2)

    ISO 22000 Standard on issues related to food safety It consists of:

    Interactive communication system management

    Pre-requisite programs HACCP

    Hazard Analysis Critical Control Point (HACCP) Systematic preventive approach to food &

    pharmaceutical safety Addresses physical and biological hazards by tackling

    them through prevention techniques rather thaninspection

    To reduce/eliminate the risk of hazards before they arerealized

    Used at all stages of food production and preparation

    processes including packaging & distribution

  • 7/31/2019 ORM Presentation - Final

    27/39

    Suggestions :Standard processes formaintaining quality(2/2)

    Seven Principles of HACCP Conduct a hazard analysis

    Identify critical control points

    Establish critical limits for each critical control point

    Establish critical control point monitoringrequirements

    Establish corrective actions

    Establish record keeping procedures

    Establish procedures for ensuring the HACCPsystem is working as intended

  • 7/31/2019 ORM Presentation - Final

    28/39

    A study on day to day operations

    Check-in and Check-out processCheck-in 5 10 15 20 25 60

    Personal Information & Security

    Deposit collection

    Luggage Check-in into the room

    Room service

    Check-out

    Resolving outstanding guest

    account balances.

    Updating room statusinformation.

    Creating guest history records.

    Feedback

    Housekeeping activities

  • 7/31/2019 ORM Presentation - Final

    29/39

    Day to day operations

    Housekeeping Responsibility of the housekeeping is to provide

    with clean rooms

    JK Residency runs a good practice of distributinga room cleanliness rating card

    Some issues noticed:

    In some rooms, glass windows at both wall sides

    where curtains cover over are not well dusted andcleaned

    Lack of proper inspection

  • 7/31/2019 ORM Presentation - Final

    30/39

    Day to day operations Outsourcing of laundry

    Advantages - Convenience and low cost

    Disadvantages Checking laundry quality is not possible

    Hotel staff cannot spend time in checking every item Random checks may not give a proper picture

    Defects occur during cleaning process or transportationwhich will not be under the control of hotel

    Damaged items cannot be fixed and are very costly to

    replace

    To avoid these issues, JK Residency adopted anin-house laundry system

  • 7/31/2019 ORM Presentation - Final

    31/39

    Day to day operations

    Laundry Inventory Controlling items such as bedspreads, curtains

    Inefficient supervision leads to extra costs

    Loss and damage to be recorded immediately

    Use, Balance and Supply levels form criticalcontrol information to ensure availability whenneeded

    JK Residency keeps 3 times the number actually

    required Set 1 - Used in the room

    Set 2 Laundry

    Set 3 - Spare

  • 7/31/2019 ORM Presentation - Final

    32/39

    Day to day operations - Maintenance

    Furniture care and maintenance: Interior furniture has a significant impact on the

    guests perceptions of the hotel

    Preventive maintenance is essential andinstructions on wooden items, glass ware should bestrictly practiced

    Laminated tops are an essential element of mostinstitutional furniture - spilled drinks and beveragerings would quickly mar the finish

    Furniture might get damaged while vacuuming thefloor

    Electrical Maintenance Regular check-ups of lighting and other electrical

    equipment in the guest rooms Plumbin Maintenance

    Fi i d fi

  • 7/31/2019 ORM Presentation - Final

    33/39

    Fire equipment and fire

    procedures

    Following equipment are installed Emergency lighting system

    Automatic fire alarm system,

    Complete automatic sprinklers

    Room smoke detector

    Exit signs and external escape stairs

    Access to fire equipment stations are kept clearand available at all times.

    Regular inspection of the equipment conducted toensure that all are in working condition

  • 7/31/2019 ORM Presentation - Final

    34/39

    Fire drills and procedures

    Fire safety information and emergencyinstructions, emergency contact numbers areprovided in guest rooms

    Floor diagram and assembly exits are clearly

    guided

    Fire drills for all staff are conducted in the hotelregularly

    Staff are given clear instructions aboutappropriate use of fire extinguishers to differenttypes of fire

    Issues noticed:

    Portable fire extinguishers in between guest rooms

  • 7/31/2019 ORM Presentation - Final

    35/39

    Security

    A separate security section Surveillance cameras, intercoms, public address

    system installed

    24x7 manned control room

    Regular training sessions conducted for securitypersonnel

  • 7/31/2019 ORM Presentation - Final

    36/39

    Suggestions(1/3)

    Performance Management System- BalanceScorecard

    Best way to improve service quality is to instituteperformance management systems

    Implementation of Balance Score Card strategicperformance management tool

    Helps to gauge the efficiency the hotel from both

    the owner's and manager's viewpoints Financial parameters

    Customer perspective related Measures

    Internal Business Process related Measures

    Learning and Growth related Measures

  • 7/31/2019 ORM Presentation - Final

    37/39

    Suggestions(2/3)

    Implementing Proper Yield ManagementSystems

    Yield management - Process of allocating theright type of capacity to right type of customer at

    the right price and time to maximize revenue oryield

    PRICEFIXED VARIABLE

    DURATION

    PREDICTABLE Quadrant 1:Movies,

    Stadium/Arenas,Convention

    Centres

    Quadrant 2:

    Hotels,

    Airlines,Rental cars,

    Cruise linesUNPREDICTABL

    EQuadrant 3:

    Restaurants, Golf

    courses

    Quadrant 4:

    Continuing

    carehospitals

  • 7/31/2019 ORM Presentation - Final

    38/39

    Suggestions(3/3)

    Implementing Proper Yield ManagementSystems

    Restaurant business falls in the 3rd quadrant

    Improvising the business by controlling durationof indeterminate time to determinate time.

    Example - Following a fix time reservationplanning - It will ensure that the reservations are

    not blocking our manpower & capacity beyond atime.

    Yield from such an investment in capacity will beenhanced

  • 7/31/2019 ORM Presentation - Final

    39/39

    THANK YOU