14
1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工 1 1 Experience In the use of rectangular pipe jacking machine in P R China (中国 中国 中国 中国 矩形顶管机及 矩形顶管机及 矩形顶管机及 矩形顶管机及其顶管施工 顶管施工 顶管施工 顶管施工) YU Bin Quan ,Senior Engineer [email protected] , David Cheng [email protected] ,Technical Advisor Yangzhou Guangxin Heavy Machinery , www.gxtunnel.com, Index ndex ndex ndex ref ref ref ref Topic Topic Topic Topic pg pg pg pg 1 Introduction Introduction Introduction Introduction 2 2 Table Table Table Table -China China China China - box jacking box jacking box jacking box jacking –using using using using shield machines shield machines shield machines shield machines 4 3 Examples of box jacking in China Examples of box jacking in China Examples of box jacking in China Examples of box jacking in China 7 4 Some pictures Some pictures Some pictures Some pictures 11

P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

Embed Size (px)

DESCRIPTION

Box culvert (rectangular) jacking - experience on large jacking suing shield machine , by cheng , yu , [email protected]

Citation preview

Page 1: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

1

1

Experience In the use of rectangular pipe jacking machine in P R China

((((中国中国中国中国 矩形顶管机及矩形顶管机及矩形顶管机及矩形顶管机及其其其其顶管施工顶管施工顶管施工顶管施工)

YU Bin Quan ,Senior Engineer [email protected] ,

David Cheng [email protected] ,Technical Advisor

Yangzhou Guangxin Heavy Machinery , www.gxtunnel.com,

IIIIndex ndex ndex ndex

refrefrefref Topic Topic Topic Topic pgpgpgpg

1111 Introduction Introduction Introduction Introduction 2222

2222 Table Table Table Table ----China China China China ---- box jacking box jacking box jacking box jacking ––––using using using using

shield machines shield machines shield machines shield machines

4444

3333 Examples of box jacking in China Examples of box jacking in China Examples of box jacking in China Examples of box jacking in China 7777

4444 Some picturesSome picturesSome picturesSome pictures 11111111

Page 2: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

2

2

1. Introduction

Presently, the common way of construction of large rectangular pipeline

generally involve the following options:

1.1.1.1. Open cut excavation and construction

2.2.2.2. construction using box culvert jacking method –manual

3.3.3.3. construction using box culvert machine jacking method- using

rectangular shield machine

4.4.4.4. Pipe roof construction and pipe jacking construction.

Of these four methods, options 1 (open cut excavation) and 3 (using

rectangular shield shield machines) can be used to construct longer

distances. The former ,option 1 requires situation where interruption of traffic

and services are allowed and are generally only suitable

for construction in the outskirts of cities and not under railway lines etc.;

Option 2 ( Manual box jacking) has been widely used especially in India

and in SE Asia for constructing underpass across railways lines and

roads .Even in USA ( Boston) large boxes have been successfully jacked in

that manner , where soil and other conditions make it suitable due to ability

and acceptance of reasonable controllable l settlement .

option 3 (rectangular shield machine ) enabler construction of large boxes

safer and economical .The machines have been evolved through

various applications and China’s Yangzhou Guangxin (GX Tunnel) ihave

developed machines that are huge success in a number of prestigious

projects .

Option 4 (Pipe roof construction ) generally are suitable for length up to

Page 3: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

3

3

150 m due to its limitation of jacking a series of steel pipe of small

diameter( 700 -800 mm OD in common) forming a roof , and excavate the

soil bounded by the pipe roof and build the final structure of

underpass or subway using steel portal frames and concreting the sections

thus supported .

Compared with pipe roof method, the time taken for constructing similar

large boxed are much shorter if box culvert jacking machine is used and

the saving in cost due to less temporary material( steel pipes used, as

the culvert cast are jacked directly , section by section in the option 3. and pipe

jacking construction for not more than 150m a shorter

distance, rectangular pipeline construction

Page 4: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

4

4

2. China China China China ---- box jacking box jacking box jacking box jacking ––––using using using using shield machinesshield machinesshield machinesshield machines

In China, research and application of the rectangular box jacking have gained

grounds since the early 1990s.

The first major rectangular pipe jacking construction was done in April 1999.

When The Shanghai Institute of tunnel construction technology developed a

3.8 m × 3.8 m rectangular box jacking machine for box construction.

The Construction of Shanghai Metro Line 2 Lujiazui Station on the 5th

entrance used earth pressure balance pipe jacking machine, and completed in

two months the two tunnels. These works were achieved with good quality,

and safety, with the normal use and road traffic during the construction of

underground pipelines.

Other examples will be illustrated and the following table indicate the

rectangular pipe jacking machine engineering performance in China :

Page 5: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

5

5

Table-showing recent rectangular box jacking projects using shield machines

Sno Project name Length, m Period

1 Kaiming Street, Ningbo City, ~ medicine Street

Underground Access

2 X 50 M Jun 2006 Sept 2006

( 4 months )

2 Shanghai, Longyang Road Station on the 4th

entrance of the Shanghai rail line , 6th

1x 40.5 m Nov 2006- Dec 2006

( 1 Mth)

3 Shanghai ,rail delivery line Qibao Station 5,6

entrance 1064 2007.1 ~ 2007.3

2 nos (56

m, 54 m)

Jan 2007- Mar 2007

( 3 mth)

4 Shanghais - Spring Road Station Exit 4

Shanghai rail delivery on the 9th line

1 x 44.8 m Apr 2007- May 2007

( 2 mth)

5 Shanghai , rail cross Road Station on the 1st

entrance a length of 60.5 m 600 2008.5 ~

2008.7

1 x 60.5 May 2008- Jul 2008

( 3 mth)

6 Shanghai , rail delivery on the 7th line ,

South Chen Road Station on the 2nd entrance a

1 x 37.3 m Aug 2008- oct 2008

( 3 mth)

7 Pujang - bus supporting projects in Pujiang

Town (2, Exit 3)

1 x 44 m Jul 2008 Oct 2008

( 3 mth)

8 Shanghai --- Rail delivery on the 10th line of the

new Bay Exit 5, 7, 8

2 x( 56.5 ,

43.5 m)

Aug 2008- Dec 2008

( 5 mth)

9 Shanghai , rail cross the line on the 10th Yin

High Road Station on the 3rd entrance

1 x 48 ,m Sept 2008-Nov 2008

( 3 mth)

10 Nanjing West ancestral hall Lane Rectangular

Pipe Jacking

1 x 42.2 m Nov 2008-Jan 2009

( 3 mth)

11 Nanjing Military General Hospital Rectangular

Pipe Jacking

1 x 44 m Jan 2009- Mar 2009

(3 mth)

Page 6: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

6

6

Sno

Project name Length, m Period

12 Nanjing , Hongwu Road Guojietongdao

Rectangular Pipe Jacking

1x 43.3 m Nov 2009- Dec 2009

( 2 mth)

13 Nanjing Water Simon Street Memorial of

underground Guojietongdao Rectangular Pipe

Jacking

1 x 60 m Dec 2009- Jan 2010

( 2 mth)

Page 7: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

7

7

3-Box jacking in China- some examples

Shanghai Metro Line 6 Pudian entrance rectangular channel construShanghai Metro Line 6 Pudian entrance rectangular channel construShanghai Metro Line 6 Pudian entrance rectangular channel construShanghai Metro Line 6 Pudian entrance rectangular channel constructionctionctionction is

then ( April 2006) the largest cross-section rectangular pipe jacking machine,

pipe jacking machine measuring internal dimension of 4.360 m × 6.240m, a

length of 52m.

In April 7, 2009, another record was broken with the largest domestic

section of the rectangular top tube tunnel extended Jinke Road Station in Jinke Road Station in Jinke Road Station in Jinke Road Station in

Shanghai Rail Transit Line 2 EastShanghai Rail Transit Line 2 EastShanghai Rail Transit Line 2 EastShanghai Rail Transit Line 2 East, a4.2m × 6.9m multi-cutter earth pressure

balanced rectangular pipe jacking machine (with Yangzhou wide the Xin

rectangular pipe jacking machine) Tunneling. Through Jinke Road Zu Chong

Zhi Road intersection project located in the Pudong New Area, for a total

length of 49.1m, the overburden depth of 5.1 ~ 4.6m.The jacking slope

+0.7%

The Road and along the tunnel during construction through the Zu including

two 220KV power cable, Φ1000mm rainwater pipes, Φ500mm other series of

important pipelines, and the engineering challenge for this project was

tremendous . For this a special Rectangular pipe jacking project

department was established to develop a detailed construction program,

and to ensure the adoption of many detail and contingency plans to handle

project risks .The top command are specialist leading senior engineers in the

Page 8: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

8

8

field and with meticulous contract and technical management, the

rectangular tunnel was successfully completed by run through May 1,2009 ,

in less than 1 month since starting .

In September 29, 2010 after just 24 days of work MCC Heavenly Shanghai MCC Heavenly Shanghai MCC Heavenly Shanghai MCC Heavenly Shanghai

thirteen Metallurgical Construction Co., Ltd. at the Shanghai Zhongshanthirteen Metallurgical Construction Co., Ltd. at the Shanghai Zhongshanthirteen Metallurgical Construction Co., Ltd. at the Shanghai Zhongshanthirteen Metallurgical Construction Co., Ltd. at the Shanghai Zhongshan

Hospital, the rectangular shield machine made by Yangzhou GuangXin

smoothly executed the 78.8 m long, 3.3 m high x 5.0 m wide box through the

connecting hospital (Shanghai Zhongshan Hospital, Fudan) .The completion of

the underground passage further improve the process of hospital care in the

future.

The First rectangular pipe jacking in Guangzhou was done in 2012 The First rectangular pipe jacking in Guangzhou was done in 2012 The First rectangular pipe jacking in Guangzhou was done in 2012 The First rectangular pipe jacking in Guangzhou was done in 2012

GuangzhouGuangzhouGuangzhouGuangzhou’’’’s Metros Metros Metros Metro----using GX Tunnelusing GX Tunnelusing GX Tunnelusing GX Tunnel’’’’s s s s rectangular shieldrectangular shieldrectangular shieldrectangular shield .The cheaper

"open-top excavation method for this project ,near the Pearl River was

considered too risky due the heavy trafficked road and the nature of the

sandy layers. This Subway , measuring 64.5 m long, on the 6th line East Lake

Station on the 2nd entrance involve the investment of over 1000 million

RMB( USD 170 Million) – a total of 4 rows of 6.4 x 4 m , separated by 1 m in

betwwen. The cover is only 4 m maximum

The project team reported not encountering much difficulties in the

project execution, and with most of the problems similar to other

Page 9: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

9

9

circular shield machine- the control of the front of the cutter rotating and

the sped of soil excavation .

In In In In Guangzhou, Guangzhou, Guangzhou, Guangzhou, Foshan Foshan Foshan Foshan GuichengGuichengGuichengGuicheng underground commercial street rectangle underground commercial street rectangle underground commercial street rectangle underground commercial street rectangle

pipe jackingpipe jackingpipe jackingpipe jacking

The Guicheng Underground Commercial Street located in Nanhai Avenue

South, with the complexity of the location (at the lower part of the planned

subway lines and close proximity of the upper large drainage boxes,

cross-section 4.2m x 2.5m.) with the conditions imposed by the municipality

that the traffic cannot be interrupted, the proposed pipe jacking construction

was done using rectangular shield from GX Tunnel.

The jacking strata are mainly sandy, any manual or open excavation will cause

gushing sand, resulting in excessive deformation .The cover is only 5.5 m, with

the electrical crossings at the depth of 2.2 to 3.1 m, and only 6.5m adjacent to

an existing tunnel With the various boundary underground conditions, busy

street the proposed construction of the pipe jacking method using the parallel

arrangement of the four sections. The details are summarized below:

i. . depth or cover 5.5m,

ii. Cross section of box : 6.9m × 4.9m rectangular, wall thickness of 0.45m,

iii. Each box section length 2m, with tongue and groove joints.

Page 10: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

10

10

iv. Between sections –spacing of 0.5m.a domestic 1st

v. Each of the top section with prestressing strand segment bolted together

to enhance the overall stiffness.

vi. The shield machine is made into 2 halves- the top and down .The

two halves were assembled and the box sections jacked one row

after another .

Page 11: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

11

11

4) Some pictures 4) Some pictures 4) Some pictures 4) Some pictures

The following are some photos of the construction site.

Rectangular Shield machine -顶管机

Page 12: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

12

12

Rectangular shield machine assembly) - 顶管机井下拼装(扬州广鑫矩形顶管

机)

Main jacking frame at the jacking pit 工作坑内的主顶装置

View of Jacking pit corner 顶进中的工作坑一角

Page 13: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

13

13

Inside the jacked section 顶进中的管道内

Lowering the next box section -下管节

Page 14: P02-Yu ,Cheng 02-Box Culvert Jacking (Eng ) w Records 1205.Pd

1204- Yu 02-Box jacking (Eng n Mandarin) 矩形顶管施工

14

14

Rectangular shield Machine at the exit -顶管机进洞

Box jacking completed -已顶到

i www.gxtunnel.com ,[email protected]