Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Page
P e 4 e a e Pe g a
P ea e ea a e e e e e ea e e
e e a e a e a a e e e e e a e e a a a g 2 e a e e
ee e a a e e g a a e ea e e a a e ea e e e
a e e e a e ea e a e e g
Pe g a a e e g e e e ee e g with sent posts eing g e P a e e e e g a e e e e g a
a e e e a e ge e a e a e e
a e a e e a e e e e g a for e a e a ea e e e ge e a e a g e a a e e e e e a e a e e e e g a a e e a e e e e e e
e e a e ee g e e ea a e e a e e e e a e a g e ee a e e a e e
a e e e a e a e a a a a e e e a e a e e a e e a e e a e
a e a a a e a e a e
Page 2
If ou plan to concrete the wood posts efore uilding the pergola this is er
important ecause ou will not e a le to mo e the posts after the concrete is set up.
If ou are planning on uilding the pergola efore pouring the concrete ou will need to
make sure that the post locations are close. ou will e a le to plum the posts once the
pergola is done efore pouring the concrete.
ou can add gra el or loose dirt to keep the posts plum as well ut will need to remo e it later.
1
Page
nce posts are mounted ou areread to install our 2 headers.
ee pencil mark on inside ofheader. ake sure the marks are on the outside of posts.
Page
Fasten 2 to post with .5”screws per side. omplete this step on oth ends of the beam.
Make sure the beams are aligned before tightening screws.
ou are now read to install our2 runners.
Page
Putting them in notches asshown measure each side until it is e enl spaced.
Fasten 2 runners to headers with 1 .5” screw at a 45
degree angle per header. omplete this step until all
runners in place, repeating on both directions as shown.
Page 6
11 Fasten top runners with 1 2.5”screw per pre-drilled holes.
marks on top of runners.10 Installing top runners – place at
Page
1 Install races 1 per post. Fastenrace to post with 2 5” head lock
screws. Fasten top of race with 2 2.5” screws on oth side of headers.
1 our pergola is now complete. If ou ha e completed the pergola and willnow e pouring the concrete ou need to make sure that posts are plum . Prop up with supports wood 2 etc. eep props in place until the concrete is set up.
e 3/2020
Ensure that the braces are the same distance from the header.