26
1 Sewer inspection chambers

PE sewer inspection chambers (EN)

Embed Size (px)

Citation preview

Page 1: PE sewer inspection chambers (EN)

1

Sewer inspection chambers

Page 2: PE sewer inspection chambers (EN)
Page 3: PE sewer inspection chambers (EN)

4

Page 4: PE sewer inspection chambers (EN)

-

-

Page 5: PE sewer inspection chambers (EN)

6

DN 625 DN 800 DN 1000Inlet

Outlet 160 200 250 160 200 250 315 160 200 250 315 400

160 •200 • • • •250 • • • • • • • • •315 • • • • • • • •400 • • • • •

DN 625 DN 800 DN 1000Inlet

Outlet 160 200 250 315 160 200 250 315 400 160 200 250 315 400

200 • •250 • • • • • • • • •315 • • • • • • • • • • • •400 • • • • • • • • • •

DN 800 DN 1000Inlet

Outlet 200 250 315 400 200 250 315 400

200 • •250 • • • •315 • • • • • •400 • • • • • • • •

Page 6: PE sewer inspection chambers (EN)

DN 625 inspection chamber

Technical informationMaterial: polyethylene or polypropylene.Chamber inner diameter: 625 mm.Examples of sewage pipe connections:> 1/1 chamber • Standard outlet connections: PVC ɸ200, ɸ250 in ɸ315. • Standard inlet connections: ɸ160, ɸ200, ɸ250 and ɸ315 or blank connection for the 1/1 chamber.> 3/1 chamber • Standard outlet connections: PVC ɸ160, ɸ200 and ɸ250. • Standard inlet connections: ɸ160, ɸ200 and ɸ250 or blank connection for chamber.

Other connections also available upon request.

Option of additional connections on the body of the chamber: • ɸ63 to ɸ200 with inlet gasket, larger diameters are welded.

Minimum height: 0.5 m.Maximum height: 4.0 m or as requested.Simple height adjustment.Guaranteed watertight joints of chamber elements.Connecting pipes: • PVC smooth and corrugated pipes, • PE smooth and corrugated pipes, • PP smooth and corrugated pipes, • All other sewage pipes (ductile, polyester, AC and AB pipes, etc.).

Page 7: PE sewer inspection chambers (EN)

8

Page 8: PE sewer inspection chambers (EN)

Technical informationMaterial: polyethylene or polypropylene.Chamber inner diameter: 1000 mm.Examples of sewage pipe connections:> 1/1 chamber • Standard outlet connections: PVC: ɸ250, ɸ315 and ɸ400 for chamber. • Standard inlet connections: ɸ160, ɸ200, ɸ250 and ɸ315 and ɸ400 or blank connection.> 3/1 chamber • Standard outlet connections: PVC: ɸ250, ɸ315 and ɸ400 for chamber. • Standard inlet connections: ɸ160, ɸ200, ɸ250, ɸ315 and ɸ400 or blank connection.> 4G chamber (1/1 in 1/1 45°) • Standard outlet and inlet connections for corrugated pipe PVC: ɸ200, ɸ250, ɸ315 and ɸ400, PE: ɸ200, ɸ250, ɸ315 and ɸ400, PP: ɸ200, ɸ250 and ɸ315,Other connections also available upon request.

Option of additional connections on the body of the chamber: • ɸ63 to ɸ200 with inlet gasket, larger diameters are welded.

Minimum height: 0.5 m.Maximum height: 4.0 m or as requested.Simple height adjustment.Guaranteed watertight joints of chamber elements.Connecting pipes: • PVC smooth and corrugated pipes, • PE smooth and corrugated pipes, • PP smooth and corrugated pipes, • All other sewage pipes (ductile, polyester, AC and AB pipes, etc.).

DN 1000 inspection chamber

Page 9: PE sewer inspection chambers (EN)

10

Page 10: PE sewer inspection chambers (EN)

Technical informationMaterial: polyethylene or polypropylene.Chamber inner diameter: 800 mm.Examples of sewage pipe connections: • Standard outlet connections: PVC: ɸ500 and ɸ600, PE: ɸ500 and ɸ600, PP: ɸ500 and ɸ600. • Standard inlet connections: PVC: ɸ500 and ɸ600 or blank connection, PE: ɸ500 and ɸ600 or blank connection, PP: ɸ500 and ɸ600 or blank connection.Other connections also available upon request.Option of pipe connections at an angle.

Option of additional connections on the body of the chamber: • ɸ63 to ɸ200 with inlet gasket, larger diameters are welded.

Chamber flow baseMinimum height: 0,75 m.Maximum height: 4,0 m or as requested.Simple height adjustment.Guaranteed watertight joints of chamber elements.Connecting pipes: • PVC smooth and corrugated pipes, • PE smooth and corrugated pipes, • PP smooth and corrugated pipes, • All other sewage pipes (ductile, polyester, AC and AB pipes, etc.).

L DN 800 inspection chamber

Page 11: PE sewer inspection chambers (EN)

12

DN 800 DN 1000Inlet

Outlet 160 200 250 200 250 315

160 •200 • • •250 • • • • •315 • • •

Page 12: PE sewer inspection chambers (EN)

DN Height (mm) Outlet (DN)

400 1000 160400 1500 200500 1000 160500 1500 160500 1000 200500 1500 200

DN Height (mm)

400 1000400 1500400 1750500 1000500 1500500 1750625 500625 1000625 1500800 7501000 10001600 1500

We manufacture various connecting pipes with an inlet gasket or a welded connection for all types of sewage pipes.

Page 13: PE sewer inspection chambers (EN)

14

Base (DN) Height (mm)625 1000800 500800 17501000 5001000 750

Riser (DN) Height (mm)625 250625 500800 500800 7501000 5001000 1000

Cone (DN) Height (mm)800 500800 7501000 7501000 1000

DN 625 DN 800DN 1000

Base (DN) Height (mm)625 1000800 500800 17501000 5001000 1500

Cover gasket

DN 400 DN 500

Page 14: PE sewer inspection chambers (EN)

DN 400 DN 500DN 625

DN 800 DN 1000

PE cupola

Material: polyethylene or polypropylene.

PE cover

Material: polyethylene or polypropylene.

Page 15: PE sewer inspection chambers (EN)

16

With the PE modular elements and suitable gaskets assembly on site is simple and easy. The chamber height is easily adjusted to the actual requirements. To assemble the chamber you also need a hand held scroll jigsaw, suitable lubricant and a tool for pressing the ele-ments together. In the field you can use a smaller excavator to press the elements together. Before applying the pressure insert a wooden plate to equally distribute the pressure along the chamber riser rim.

Page 16: PE sewer inspection chambers (EN)
Page 17: PE sewer inspection chambers (EN)

18

IZSTOP VSTOP

Page 18: PE sewer inspection chambers (EN)
Page 19: PE sewer inspection chambers (EN)

20

Height adjustment

The height of the chamber is adjusted to the terrain with -

gs on the cone provide for level cut.

The chamber can be extended. The rim of the cone is cut

of max. height of 250 mm is installed. Another method is to remove the cone from the body, which can then be extended with a suitable riser. The DN 800 h=750 and DN 1000 h=1000 cones, which are already extended, should not be extended any further.

Installation of PE or cast iron cover

The chamber can be covered with covers for direct installation:• PE cover

• Cast iron cover of the B 125 type, no additional AB ring required.

Page 20: PE sewer inspection chambers (EN)

625 800 1000

diameter (mm)*1025 1200 1400

RC plate

RC ring

Before installing of the chamber in a heavy traffic area it must be taken into account that the RC ring and the plate they do not rest on top of the chamber. The distance be-tween the top of the chamber and finished RC ring or the lower rim of the cast iron cover has to be min. 50 mm. Thus the static and dynamic loads do not transfer directly to the body of the chamber, but rather on the backfilling material around the chamber.

Minimum recommended dimensions of the RC ring and installation

Chamber diameter DN 625 800 1000

RC ring diameter (mm)*

1025 1200 1400

*The correct dimensions of the RC ring and RC plate are specified by the project manager with respect to the load bearing capacity of the cast iron cover and the surface loads!!!

Page 21: PE sewer inspection chambers (EN)

22

Examples of inspection chamber and sand separator installation

Page 22: PE sewer inspection chambers (EN)

Inlet

Chamber ring

min. 500 mm

20 mm

min

. 50

mm

150

- 200

H c

ham

ber

H

Chamber cone

Standard chamber baseOutlet

RC ringRC plate

Page 23: PE sewer inspection chambers (EN)

24

Page 24: PE sewer inspection chambers (EN)

No.

N

ame

of

the

cham

ber

DN

of t

he

chm

ber

Hei

ght

Inle

ts

Out

let

No.

of

psc

D

eclin

e* (%)

H (m

) of

unde

rgro

ud

wat

er

DN

(mm

) H

(mm

) D

1 (m

m)

D2

(mm

) D

3 (m

m)

D4

(mm

)

inle

t ou

tlet

1

2

3

4

5

6

7

Lege

nd:

GA

– P

VC A

lveh

ol

PG –

PE

smoo

th p

ipe

G –

PVC

sm

ooth

pip

e PR

– P

E co

rrug

ated

pip

e R

– PV

C co

rrug

ated

pip

e PP

– P

P co

rrug

ated

pip

e D

ate:

____

____

____

___

Cus

tom

er: _

____

____

____

____

____

____

____

Sig

natu

re:

Obr

. 72/

12

No.

N

OTE

:

1

2

3

4

5

6

7

for i

nlet

s an

d ou

tles

is O

BLIG

ATO

RY to

mar

k fo

r whi

ch ty

pe o

f the

pip

e is

nee

ded

- fro

m th

e le

gend

p

ipes

whi

ch a

re c

onne

cted

to th

e ch

ambe

r can

be

adju

sted

for ±

50

Not

e:

* B

otto

m o

f cha

mne

r has

a d

eclin

e of

1,5

%!

- ot

her d

eclin

es a

cha

rged

ext

ra!

H-height of hb

botto

m

botto

m 1

/ 1

CHAM

BER

ORD

ER F

ORM

Proj

ect:_

____

____

____

____

____

____

____

____

__D

ate

of d

eliv

ery:

____

____

____

___

ND

N__

____

____

__

Page 25: PE sewer inspection chambers (EN)

26

Order form for sand separators

Obr. 72/10

SAND SEPARATOR ORDER FORM

a) REGULAR b) ODOURLESS

Sand separator no.:

Diameter of sand separator D: (mm)

Height of sand separator H: (mm)

Diameter of outlet D1: (mm)

Height of outlet H1: (mm)

Additional outlets: Outlet

Diameter (mm) Height (mm) Angle 0

D2 H2= 2 = 0

D3 H3= 3 = 0

D4 H4= 4 = 0

NUMBER OF THE SAME SAND SEPARATORS: _____pcs Date: Customer: Signature:

NOTE: Angle of additional outlet is measured from D1 in clockwise.

Page 26: PE sewer inspection chambers (EN)

YOUR RETAILER: