1
EXISTING ADMINISTRATION EXISTING STAGE 1 BUILDING 0 5 10m peninsula hot springs Peninsula Hot Springs Baukosten _ $2.8mill. Leistungsphase 8 (Sept 2008 - März 2009) Position: Assistent des Projektleiters Verwaltung des Bauvertrages, Regelmäßige Baustellenmeetings- / Besichtigungen. Neubau einer Relaxation-Badeanstalt mit Umkleideräumen, Sanitären Anlagen und mehreren Pools in einem Gebiet mit heißen Quellen. work@gregory burgess architects PBW FOYER BALCONY R1.02 EVAPORATIVE AIR COOLER TB2 RS1 D0.08 D0.05 FEMALE CHANGE LOWER FOYER R0.01 R0.03 R1.01 UPPER FLOOR - FFL 17 300 LOWER FLOOR - FFL 14 000 MID LEVEL FOYER - FFL 15 650 CEILING 2700 D A401 E A401 RELAXATION SPACE LAKE EXIST G L 1650 1650 3300 6 5 4 3 600 RS1 J0.03 J0.04 J0.01 LIFT PIT ELECTRICAL SWITCHBOARD W1.02 W1.01 D1.02 W1.41 W1.40 W1.39 W1.38 J0.02 TB2 PBW TB2 W0.20 PBW EVAPORATIVE COOLER DUCTING & RISERS - REFER M.E.D. AGI DRAIN CHANGES REFER TO A707

Peninsula Hot Springs

Embed Size (px)

DESCRIPTION

Public bath house and relaxation place

Citation preview

Page 1: Peninsula Hot Springs

EXISTING ADMINISTRATION

FUTURE STAGE 3 BUILDING

EXISTING STAGE 1 BUILDING

0 5 10m

peni

nsul

a h

ot s

pri

ng

sPeninsula Hot Springs

Baukosten _ $2.8mill.

Leistungsphase 8 (Sept 2008 - März 2009)Position: Assistent des Projektleiters

Verwaltung des Bauvertrages, Regelmäßige Baustellenmeetings- /Besichtigungen.

Neubau einer Relaxation-Badeanstalt mit Umkleideräumen, Sanitären Anlagen und mehreren Pools in einem Gebiet mit heißen Quellen.

work@gregory burgess architects

BATH HOUSE SECTIONScale 1:100

G-GA201

BATH HOUSE SECTIONScale 1:100

I - IA201

Contractors must verify all dimensions on site before commencing any work or shop drawings.

This drawing must be read in conjunction with the other contract documents including the Project Specification and any Architects Instructions issued during the course of the contract.

DRAWING No.

SCALE: ISSUE DATE:

REVISION DATE BY

REVISION No.

10 York Street Richmond Vic 3121Ph +613 9411 0600 Fax +613 9411 0699

Email:gba@gregoryburgessarchitects.com.auwww.gregoryburgessarchitects.com.au

Gregory Burgess Pty Ltd Architects

DRAWING TITLE

DESIGN DEVELOPEMENT

TENDER ISSUE

CONTRACT ISSUE

194-CD_Bath House Print File.mcd

Tues

sday

, Aug

ust 5

, 200

8Pr

int D

ate:

PENINSULA HOT SPRINGSBATH HOUSE AND

1:100 @ A1 26 AUG 2008

SECTIONS F - I

A402

STAFF ROOM

A

BATH HOUSE

BATH HOUSE SECTION Scale 1:100

F-FA201

BATH HOUSE SECTIONScale 1:100

H-HA201

100 50mm

DRINKING FOUNTAIN

ABBREVIATIONS

FLOOR WASTE

URINALTACTILE INDICATORS

DOWN PIPE

RELATIVE LEVEL

FINISHED FLOOR LEVEL

CEILING HIEGHTCOLUMN - REFER S.E.D.

GROUND LINE

DF

FW

URTAC

DP

RL

FFL

CHCOL

GL

ELECTRICAL SWITCH BOARDESB

STRUCTURAL ENGINEERS DRAWINGSSED

LP BOLLARD LIGHT

MECHANICAL ENGINEERS DRAWINGSMED

ELECTRICAL ENGINEERS DRAWINGSEED

LFVENTILATION GRILLE - REFER M.E.D.GR

WALKWAY POSTWP1

HYDRAULIC ENGINEERS DRAWINGSHED

LIGHT FITTING. TYPE & POSITIONTBC BY ARCHITECT

HWU HOT WATER UNIT - REFER H.E.D.

HEATING PANELHPCONTROL JOINTCJ

NORTH ENTRY DECK

FOYER BALCONY

R0.01ROOM LEGEND

R0.02

R0.03

R0.04

R0.05

R0.06

R0.07

R0.08

R0.09

R0.10

R1.01

R1.02

R1.03

R1.04

R1.05

LOWER FOYER

MALE CHANGE

FEMALE CHANGE

FIRST AID

WCWC

FAMILY SHOWER

ACCESS SHOWER

ACCESS SHOWER

RETAIL

RECEPTION

ENTRY FOYER

RELAXATION SPACE

FAMILY CHANGE CORRIDOR

U0.01

U0.02

U0.03

V0.01

V0.02

V0.03

V1.01

CLEANER STORE

EVAPORATIVE COOLER

EXTERNAL PLANT

LOWER TERRACE

ZEN CHI VERANDAH

POOL VERANDAH

SOUTH ENTRY DECK

U0.04

U0.05

PLANT ROOM

V1.02

STAFF VERANDAHV2.01

STAFF BREEZEWAYV2.02

COVERED WALKWAYV2.03

SUB-FLOOR AREA

WC 2

R2.01

R2.02

R2.03

R2.04

R2.05

R2.06

R2.07

LUNCH ROOM

KIOSK KITCHEN

LOCKER ROOM

POWDER ROOM

SHOWER

WC 1

R2.08 KIOSK SERVERY

R0.11 UNISEX AIRLOCK

R2.09 AIRLOCK & WC'S

ENTRY WALKWAYV2.04KIOSK SEATINGV2.05POOL SERVERYV2.06

BINSV2.07

V1.03 UPPER TERRACE

CCS

TB1

TD

ANODIZED FINISH

BAGGED AND PAINTED MASONRYBLOCKWORK

CONCRETE

CONCRETE POLISHED

CEMENT SHEET

CEMENT SHEET COMPRESSEDFIXED GLAZING

FLYSCREEN

GLAZING

LAMINATE

LINOLEUM

MASONRY

FLOOR MAT

MEDIUM DENSITY FIBERBOARDNIL FINISH

PLASTERBOARDWATER RESISTANT PLASTERBOARDPLYWOOD

RESILIENT FLOORINGCUSTOM ORB ROOF SHEET

SKYLIGHT

SKIRTING TIMBER

TILES CERAMIC ANTISLIP FLOOR

EXTERNAL HORIZONTALTIMBER CLADDING

TIMBER DECKING

ANO

BPMBWCO

COPCS

FGFSGL

LALINM

MATMDFNILPB

PBWPLYRF

RS1

SLSK1

T1

TIMBER FLOORBOARDSTFB

FINISHES LEGEND

ROOF DECKRS2CLEAR CORRUGATED ROOF SHEETINGRS3

TB2 EXTERNAL VERTICAL TIMBER CLADDING

TB3 EXTERNAL ECOPLY TIMBER CLADDING

TILES CERAMIC ANTISLIP FLOORT2TILES CERAMIC WALLT10TILES CERAMIC WALLT11

T12TILES FEATUREWALLT20

T21T22T23

TILES CERAMIC WALL

TILES FEATUREWALLTILES FEATUREWALLTILES FEATUREWALL

STONE FLOORING(BY OWNER)ST2

STONE WALL FACING(BY OWNER)ST1

SKIRTING STONESK2SKIRTING TILE T10SK3SKIRTING TILE T4SK4SKIRTING COVED SSSK5

GRAVEL PATHWAYGP

TEA TREE SOFFITLINING (BY OWNER)TT

BAMBOOBB

GRANOLITHIC SCREEDGS

T24 BRASS STRIP

A Construction Issue 10.12.08

EXIST G L

2100

min

PLANT EXTERNALPLANT

U0.02 U0.03

LOWER FLOOR - FFL 14 000

UPPER FLOOR - FFL 17 300

3300

E

A4014

NORTH ENTRYDECKV1.02

PB TB3

RETAILR1.05TFB

W1.13

AGI DRAIN

R0.08MALE CHANGE DIS' BATHROOM

RECEPTION

EXIST G L

R0.02

R1.03

R0.03FEMALE CHANGE

FAMILYCHANGE

UPPER FLOOR - FFL 17 300

LOWER FLOOR - FFL 14 000

3300

C

A401

E

A401

D

A401

6543

RS2

07A503

J0.03J0.04

J1.11J1.03

W1.12 W1.11

ENTRY FOYERR1.04

J0.13J0.15

PBW PBW

PBW

PB

02A501

CEILING

2700

PBW

R0.10

D0.16

D1.04

DF

HWU - REFER H.E.D.

HWU FLUE - REFER H.E.D.

EXHAUST DUCTING& CEILING REGISTER - REFER M.E.D.

EVAP COOLER DUCTING - REF M.E.D.

AGI DRAIN

CONCRETE SLAB

PBW

FOYERBALCONY

R1.02

EVAPORATIVE AIR COOLER

TB2

RS1

D0.08 D0.05

FEMALE CHANGELOWER FOYER

R0.01R0.03

R1.01UPPER FLOOR - FFL 17 300

LOWER FLOOR - FFL 14 000

MID LEVEL FOYER - FFL 15 650

CEILING

2700

D

A401

E

A401

RELAXATION SPACE

LAKE

EXIST G L

1650

1650

3300

6543

600

RS1

J0.03J0.04

J0.01

LIFT PIT

ELECTRICAL SWITCHBOARD

W1.02W1.01

D1.02W1.41 W1.40 W1.39 W1.38

J0.02

TB2

PBWTB2

W0.20

PBW

EVAPORATIVE COOLER DUCTING

& RISERS- REFER M.E.D.

AGI DRAIN

S1.22

S1.22

EXIST G L

LAKE

LOWER FLOOR - FFL 14 000

FOYER SEATING - FFL 15 650

1650

E

A401D

A401

UPPER FLOOR - FFL 17 300

1650

120 x 45 PURLINS HYBEAMS RAFTERS(REFER TO S.E.D.)

PLY CEILING PANNELS(REFER TO CEILING PLAN)

CUSTOM ORBROOF SHEET

STONE PAVINGSTONE FACE(BY OWNER)

CONC. SLAB(REFER TO S.E.D.)

NEW GLLEVEL AT STAIRS FRONT

CONC. SLABTO A/C/UNIT

STONE FACED CONC. STAIRTREAD

TIMBER STAIRS

FOOTINGS(REFER TO

S.E.D.)

MIN 1 in 2BATTER

R0.01

EXISTING GL

RELAXATION SPACER1.01

LOWER FOYER

D0.01 D0.02

W1.56

W1.54 W1.53 W1.52 W1.51

W1.50 W1.49 W1.48 W1.47 W1.46 W1.45

W0.18W0.16W0.17

W1.55

G0.01

3300

D1.01

W1.57W1.58

W1.59

D0.03

PBW

PBW

EVAPORATIVECOOLERDUCTING& RISERS- REFER M.E.D.

PLY

ST1

AGI DRAIN

CHANGES REFER TO A707

B Changes in Sec.H-H Refer to A707

11.05.09

B