3
Tekanan Tanah Aktif SF1 = 3 Menententukan Jarak (spasi)SF2 = 1.5 p = = 0 x 0,31) + (0,31 x 17 x = 6.2 h (meter) sv (meter) digunakan sv (meter) 1 0.988 0.6 2 0.677 0.6 3 0.515 0.4 4 0.415 0.4 5 0.348 0.3 6 0.300 0.3 Lapis No z(m) sv(m) 14 0.7 0.7 13 1.3 0.6 12 1.9 0.6 11 2.3 0.4 10 2.7 0.4 9 3.1 0.4 8 3.5 0.4 7 3.9 0.4 6 4.2 0.3 5 4.5 0.3 4 4.8 0.3 3 5.1 0.3 2 5.4 0.3 1 5.7 0.3 0 6 0.3 pq ka + ka ϒ z

perkuatan tanah

Embed Size (px)

DESCRIPTION

perkuatan tanah

Citation preview

Page 1: perkuatan tanah

Tekanan Tanah Aktif SF1 = 3Menententukan Jarak (spasi) SF2 = 1.5

p == (20 x 0,31) + (0,31 x 17 x z)= 6.2 + 5.27

h (meter) sv (meter) digunakan sv (meter)1 0.988 0.62 0.677 0.63 0.515 0.44 0.415 0.45 0.348 0.36 0.300 0.3

Lapis No z(m) sv(m) LR (m) LR min (m)14 0.7 0.7 2.94 113 1.3 0.6 2.61 112 1.9 0.6 2.27 111 2.3 0.4 2.05 110 2.7 0.4 1.83 1

9 3.1 0.4 1.61 18 3.5 0.4 1.39 17 3.9 0.4 1.16 16 4.2 0.3 1.00 15 4.5 0.3 0.83 14 4.8 0.3 0.67 13 5.1 0.3 0.50 12 5.4 0.3 0.33 11 5.7 0.3 0.17 10 6 0.3 0.00 1

pq ka + ka ϒ z

Page 2: perkuatan tanah

Ka = 0.31 φ1 = 32pq = 20 = 51ϒ = 17 c1 = 0Ta ijin = 17 B = 0.67

x z H = 6

Le (m) Ltotal(m) Dipakai L (m)1.04 3.98 40.63 3.24 40.54 2.81 40.34 2.39 2.50.32 2.15 2.50.31 1.91 2.50.30 1.68 2.50.29 1.45 2.50.21 1.21 1.50.21 1.04 1.50.21 1.21 1.50.21 1.21 1.50.20 1.20 1.50.20 1.20 1.50.20 1.20 1.5

σg ult