90
HOJA DE METRADOS ESTRUCTURAS - RESUMEN 6/15/2022 OBRA PROPIETARIO :MUNICIPALIDAD DISTRITAL DE ACOS VINCHOS PROVINCIA FORMULA : ESTRUCTURAS DEPARTAMENTO. ITEM PARTIDA DESCRIPCIÓN UND 01 ESTRUCTURAS MODULO I (NIVEL SEC. Y USO COMUN) 01.01 OBRAS PROVISIONALES 01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60X2.40 m und 01.01.02 CAMPAMENTO PROVISIONAL DE OBRA m2 01.01.03 FLETE GENERAL MODULO I GLB 01.02 TRABAJOS PRELIMINARES 01.02.01 LIMPIEZA DE TERRENO MANUAL m2 01.02.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 01.02.03 CERCO PROVISIONAL m 01.03 MOVIMIENTO DE TIERRAS 01.03.01 EXCAVACION DE PLATAFORMA EN TIERRA EN FORMA MANUAL m3 01.03.02 EXCAVACION DE ZANJAS P/CIMIENTOS HASTA 1.70 M. TERRENO NORMAL m3 01.03.03 Err:509 m3 01.03.04 RELLENO Y COMPACTADO C/EQUIPO LIVIANO (CON MATERIAL PROPIO) m3 01.03.05 ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANO m3 01.03.06 AFIRMADO DE 4" PARA FALSO PISO m2 01.03.07 AFIRMADO DE 4" PARA VEREDAS m2 01.04 OBRAS DE CONCRETO SIMPLE 01.04.01 SOLADO E= 4" m2 01.04.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G. m3 01.04.03 CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO:HORMIGON 25% P.M. m3 01.04.04 ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTO H=0.40 M. m2 01.04.05 CONCRETO EN FALSO PISO DE 4" DE 1:8 CEMENTO:HORMIGON PARA PISO PULIDO m2 01.04.06 ENCOFRADO Y NDESENCOFRADO EN FALSO PISO DE 4" DE VEREDAS m3 01.04.07 CONCRETO EN COLUMNETAS F'C=175 KGC/M2 EN BAJADA DE TUB. PLUVIAL m3 01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 01.05 OBRAS DE CONCRETO ARMADO 01.05.01 ZAPATAS 01.05.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 m3 01.05.01.02 ACERO PARA ZAPATAS FY=4200 KG/CM2 - GRADO 60 kg 01.05.02 SOBRECIMIENTO ARMADO 01.05.02.01 CONCRETO EN SOBRECIMIENTO ARMADO F'C= 175 KG/CM2 m3 01.05.02.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO ARMADO m2 01.05.02.03 ACERO EN VIGA DE CIMENTACION FY=4200 KG/CM2 GRADO 60 kg 01.05.03 COLUMNAS 01.05.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 01.05.03.03 ACERO FY=4200 KG/CM2 GRADO 60 EN COLUMNAS kg 01.05.04 VIGAS 01.05.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 01.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 01.05.04.03 ACERO FY=4200 KG/CM2 GRADO 60 EN VIGAS kg 01.05.05 LOSA ALIGERADA H=0.20 M. 01.05.05.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 01.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 01.05.05.03 ACERO GRADO 60 EN LOSAS ALIGERADAS kg 01.05.05.04 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO und 01.06 ESTRUCTURAS DE COBERTURA 01.01.01 COBERTURAS 01.06.01.01 COBERTURA CON TEJA ANDINA m2 01.06.01.02 CUMBRERA CON TEJA ANDINA m 01.07 MUROS Y TABIQUES DE ALBAÑILERIA 01.07.01 MURO DE CABEZA LADRILLO K.K 9X13X23 m2 01.07.02 MURO DE SOGA LADRILLO DE ARCILLA KK. 9X12X23 m2 : “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PRIMER NIVEL DE ATENCIÓN EN LOS EE.SS. DE HUAY MICRORED QUINUA-RED DE SALUD HUAMANGA-DIRESA AYACUCHO, DISTRITO DE ACOS VINCHOS-HUAMAN

Planilla de Metrdos Urpay Final

Embed Size (px)

DESCRIPTION

metrados

Citation preview

resumen

HOJA DE METRADOS ESTRUCTURAS - RESUMEN7/8/15OBRA: MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PRIMER NIVEL DE ATENCIN EN LOS EE.SS. DE HUAYCHAO Y URPAY DE LA MICRORED QUINUA-RED DE SALUD HUAMANGA-DIRESA AYACUCHO, DISTRITO DE ACOS VINCHOS-HUAMANGA-AYACUCHOPROPIETARIO:MUNICIPALIDAD DISTRITAL DE ACOS VINCHOSPROVINCIA HUAMANGAFORMULA: ESTRUCTURASDEPARTAMENTO.AYACUCHOITEMPARTIDA DESCRIPCINMEDIDASUNDCANT

01ESTRUCTURAS MODULO I (NIVEL SEC. Y USO COMUN)01.01OBRAS PROVISIONALES01.01.01CARTEL DE IDENTIFICACION DE OBRA DE 3.60X2.40 mundERROR:#REF!1.0001.01.02CAMPAMENTO PROVISIONAL DE OBRAm2ERROR:#REF!96.0001.01.03FLETE GENERAL MODULO IGLBERROR:#REF!1.0001.02TRABAJOS PRELIMINARES01.02.01LIMPIEZA DE TERRENO MANUALm2354.55218.0301.02.02TRAZO NIVELES Y REPLANTEO PRELIMINARm2354.55218.0301.02.03CERCO PROVISIONALmERROR:#REF!70.0001.03MOVIMIENTO DE TIERRAS01.03.01EXCAVACION DE PLATAFORMA EN TIERRA EN FORMA MANUALm3205.62109.2501.03.02EXCAVACION DE ZANJAS P/CIMIENTOS HASTA 1.70 M. TERRENO NORMALm351.0022.3701.03.03ERROR:#REF!m3ERROR:#REF!65.2101.03.04RELLENO Y COMPACTADO C/EQUIPO LIVIANO (CON MATERIAL PROPIO)m370.8719.8101.03.05ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm3341.45212.4501.03.06AFIRMADO DE 4" PARA FALSO PISOm2235.72137.0501.03.07AFIRMADO DE 4" PARA VEREDASm282.3063.7501.04OBRAS DE CONCRETO SIMPLE01.04.01SOLADO E= 4"m265.0436.2401.04.02CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m361.2919.2901.04.03CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO:HORMIGON 25% P.M.m38.071.7401.04.04ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTO H=0.40 M.m279.3223.6101.04.05CONCRETO EN FALSO PISO DE 4" DE 1:8 CEMENTO:HORMIGON PARA PISO PULIDOm2235.72137.0501.04.06ENCOFRADO Y NDESENCOFRADO EN FALSO PISO DE 4" DE VEREDASm3ERROR:#REF!01.04.07CONCRETO EN COLUMNETAS F'C=175 KGC/M2 EN BAJADA DE TUB. PLUVIALm3ERROR:#REF!2.1301.04.08ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2ERROR:#REF!21.3101.05OBRAS DE CONCRETO ARMADO01.05.01ZAPATAS01.05.01.01CONCRETO EN ZAPATAS F'C=210 KG/CM2m339.0218.1201.05.01.02ACERO PARA ZAPATAS FY=4200 KG/CM2 - GRADO 60kg978.49431.0001.05.02SOBRECIMIENTO ARMADO01.05.02.01CONCRETO EN SOBRECIMIENTO ARMADO F'C= 175 KG/CM2m35.234.0101.05.02.02ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO ARMADOm20.0043.7701.05.02.03ACERO EN VIGA DE CIMENTACION FY=4200 KG/CM2 GRADO 60kg0.00735.9601.05.03COLUMNAS01.05.03.01CONCRETO EN COLUMNAS F'C=210 KG/CM2m316.8816.4301.05.03.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2ERROR:#REF!232.2601.05.03.03ACERO FY=4200 KG/CM2 GRADO 60 EN COLUMNASkg0.003,417.6101.05.04VIGAS01.05.04.01CONCRETO EN VIGAS F'C=210 KG/CM2m332.1611.8301.05.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm2172.91190.0001.05.04.03ACERO FY=4200 KG/CM2 GRADO 60 EN VIGASkg3,469.632,195.2001.05.05LOSA ALIGERADA H=0.20 M.01.05.05.01CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2m338.8514.3301.05.05.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASm2364.50169.1301.05.05.03ACERO GRADO 60 EN LOSAS ALIGERADASkg2,515.241,126.0601.05.05.04LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADOund3,036.291,409.0001.06ESTRUCTURAS DE COBERTURA01.01.01COBERTURAS01.06.01.01COBERTURA CON TEJA ANDINAm2355.26264.6601.06.01.02CUMBRERA CON TEJA ANDINAm29.6323.8001.07MUROS Y TABIQUES DE ALBAILERIA01.07.01MURO DE CABEZA LADRILLO K.K 9X13X23m2216.9476.4201.07.02MURO DE SOGA LADRILLO DE ARCILLA KK. 9X12X23m2186.81100.0202ESTRUCTURAS MODULO II (LABORATORIO-ADM-SALA DE COMPUTO/SS-HH)2.01TRABAJOS PRELIMINARES02.01.01LIMPIEZA DE TERRENO MANUALm2ERROR:#REF!218.0302.01.02TRAZO NIVELES Y REPLANTEO PRELIMINARm2ERROR:#REF!218.0302.01.03CERCO PROVISIONALGLBERROR:#REF!70.002.02MOVIMIENTO DE TIERRAS02.02.01EXCAVACION DE PLATAFORMA EN TIERRA EN FORMA MANUALm3ERROR:#REF!109.2502.02.02EXCAVACION DE ZANJAS P/CIMIENTOS HASTA 1.70 M. TERRENO NORMALm3ERROR:#REF!22.3702.02.03EXCAVACION PARA ZAPATAS DE 1.80M. DE PROFUNDIDADm3ERROR:#REF!65.2302.02.04RELLENO Y COMPACTADO C/EQUIPO LIVIANO (CON MATERIAL PROPIO)m3ERROR:#REF!19.8102.02.05ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm3ERROR:#REF!212.4502.02.06AFIRMADO DE 4" PARA FALSO PISOm2ERROR:#REF!137.0502.02.07AFIRMADO DE 4" PARA VEREDASm2ERROR:#REF!63.752.03OBRAS DE CONCRETO SIMPLE02.03.01SOLADO E= 4"m2ERROR:#REF!36.2402.03.02CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3ERROR:#REF!19.2902.03.03CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO:HORMIGON 25% P.M.m3ERROR:#REF!1.7402.03.04ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTO H=0.40 M.m2ERROR:#REF!23.6102.03.05CONCRETO EN FALSO PISO DE 4" DE 1:8 CEMENTO:HORMIGON PARA PISO PULIDOm2ERROR:#REF!137.0502.03.06CONCRETO EN COLUMNETAS F'C=175 KGC/M2m3ERROR:#REF!2.1302.03.07ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETASm2ERROR:#REF!21.312.04OBRAS DE CONCRETO ARMADO02.04.01ZAPATAS02.04.02CONCRETO EN ZAPATAS F'C=210 KG/CM2m3ERROR:#REF!18.1202.04.03ACERO PARA ZAPATAS FY=4200 KG/CM2 - GRADO 60kgERROR:#REF!431.0002.04.04SOBRECIMIENTO ARMADO02.04.05CONCRETO EN SOBRECIMIENTO ARMADO F'C= 175 KG/CM2m3ERROR:#REF!4.0102.04.06ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO ARMADOm2ERROR:#REF!43.7702.04.07ACERO EN SOBRECIMIENTO ARMADO FY=4200 KG/CM2 GRADO 60kgERROR:#REF!735.9602.05.03COLUMNAS02.05.03.01CONCRETO EN COLUMNAS F'C=210 KG/CM2m3ERROR:#REF!16.4302.05.03.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2ERROR:#REF!232.2602.05.03.03ACERO FY=4200 KG/CM2 GRADO 60 EN COLUMNASkgERROR:#REF!3,417.6102.05.04VIGAS02.05.04.01CONCRETO EN VIGAS F'C=210 KG/CM2m3ERROR:#REF!11.8302.05.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm2ERROR:#REF!190.0002.05.04.03ACERO FY=4200 KG/CM2 GRADO 60 EN VIGASkgERROR:#REF!2,195.0002.05.05LOSA ALIGERADA H=0.20 M. (PRIMER PISO)02.05.05.01CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2m3ERROR:#REF!14.3302.05.05.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASm2ERROR:#REF!169.1302.05.05.03ACERO GRADO 60 EN LOSAS ALIGERADASkgERROR:#REF!1,126.0602.05.05.04LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADOundERROR:#REF!1,409.0002.05.06LOSA ALIGERADA H=0.17 M.(SEGUNDO PISO)02.05.06.01CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2m3ERROR:#REF!02.05.06.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASm2ERROR:#REF!02.05.06.03ACERO GRADO 60 EN LOSAS ALIGERADASkgERROR:#REF!02.05.06.04LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADOundERROR:#REF!02.05.06GARGOLAS02.05.06.01CONCRETO EN GARGOLA F'C=175 KG/CM2m3ERROR:#REF!0.0302.05.06.02ENCOFRADO Y DESENCOFRADO NORMAL EN GARGOLAm2ERROR:#REF!0.8402.05.06.03ACERO FY=4200 KG/CM2 GRADO 60kgERROR:#REF!6.8502.05.07MESA DE TRABAJO DE LABORATORIO02.05.07.01CONCRETO EN LOSA F'C=210 KG/CM2 EN MESA DE LABORATORIO N01 Y 02m3ERROR:#REF!0.2102.05.07.02ENCOFRADO Y DESENCOFRADO EN LOSAS PARA MESA DE LABORATORIOm2ERROR:#REF!3.2002.05.07.03ACERO FY=4200 KG/CM2 GRADO 60 EN LOSAS DE DE MESA DE LABORATORIOkgERROR:#REF!10.1902.06ESTRUCTURAS DE COBERTURA02.06.01COBERTURAS02.06.01.01COBERTURA CON TEJA ANDINAm2ERROR:#REF!264.6602.06.01.02CUMBRERA CON TEJA ANDINAmERROR:#REF!23.8002.07MUROS Y TABIQUES DE ALBAILERIA02.07.01MUROS DE LADRILLO KK DE ARCILLA DE CABEZA DE 9X13X24cm (Artesanal).m2ERROR:#REF!73.8202.07.02MUROS DE LADRILLO KK DE ARCILLA DE SOGA DE 9X13X24cm (Artesanal).m2ERROR:#REF!5.8002.07.03MURO PREFABRICADO CON MULTIPLACA DE 6MM Y ESTRUCT. DE MADERAm2ERROR:#REF!4ESTRUCTURAS DE CERCO PERIMETRICO4.01CONSTRUCCION DE CERCO PERIMETRICO E INGRESO04.01.01TRABAJOS PRELIMINARES04.01.01.01LIMPIEZA DE TERRENO MANUALm2ERROR:#REF!480.0004.01.01.02TRAZO NIVELES Y REPLANTEO PRELIMINARm2ERROR:#REF!480.0004.01.02MOVIMIENTO DE TIERRAS04.01.02.01EXCAVACION DE ZANJAS P/CIMIENTOS TERRENO NORMALm3ERROR:#REF!115.2004.01.02.02EXCAVACION DE ZANJAS P/ZAPATAS TERRENO NORMALm4ERROR:#REF!04.01.02.03RELLENO Y COMPACTADO C/EQUIPO LIVIANO EN ZANJAS (CON MATERIAL PROPIO)m3ERROR:#REF!24.0004.01.02.04RELLENO Y COMPACTADO C/EQUIPO LIVIANO EN ZAPATAS (CON MATERIAL PROPIO)m3ERROR:#REF!04.01.02.05ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm3ERROR:#REF!123.6004.01.02.06NIVELACION Y PERFILADO CIMIENTOS EN GENERALm2ERROR:#REF!192.0004.01.03OBRAS DE CONCRETO SIMPLE04.01.03.01SOLADO PARA ZAPATAS Fc = 100Kg/cm2, e =10cmERROR:#REF!04.01.03.02CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3ERROR:#REF!115.0904.01.03.03ENCOFRADO Y DESENCOFRADO CARAVISTA DE SOBRECIMIENTOm2ERROR:#REF!383.6504.01.03.04CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO:HORMIGON 25% P.M.m3ERROR:#REF!28.7704.01.04OBRAS DE CONCRETO ARMADO04.01.04.01COLUMNAS04.01.04.01.01ACERO DE REFUERZO FY=4200 KG/CM2.kgERROR:#REF!2,542.8504.01.04.01.02ENCOFRADO Y DESENCOFRADO CARAVISTA DE COLUMNASm2ERROR:#REF!331.1004.01.04.01.03CONCRETO EN COLUMNAS F'C=210 KG/CM2m3ERROR:#REF!29.5604.01.04.02VIGAS04.01.04.02.01ACERO FY=4200 KG/CM2 GRADO 60 EN VIGASkgERROR:#REF!1,721.1404.01.04.02.02ENCOFRADO Y DESENCOFRADO CARAVISTA DE VIGASm2ERROR:#REF!143.8704.01.04.02.03CONCRETO EN VIGAS F'C=210 KG/CM2m3ERROR:#REF!10.7904.01.03ZAPATAS04.01.03.01ACERO FY=4200 KG/CM2 GRADO 60 EN ZAPATASKGkgERROR:#REF!04.01.03.02CONCRETO EN ZAPATAS F'C=210 KG/CM2m3ERROR:#REF!04.01.04MUROS DE CONTENSION04.01.04.01ACERO FY=4200 KG/CM2 GRADO 60 EN ZAPATASKgERROR:#REF!04.01.04.02ENCOFRADO Y DESENCOFRADO CARAVISTA DE VIGASm2ERROR:#REF!04.01.04.03CONCRETO EN ZAPATAS F'C=210 KG/CM2m3ERROR:#REF!04.01.05MUROS Y TABIQUES DE ALBAILERIA04.01.05.01MURO DE SOGA LADRILLO KK ARCILLA M:1:5 E=1.5 CMm2ERROR:#REF!863.894.02PORTADA DE INGRESO04.02.01MOVIMIENTO DE TIERRAS04.02.01.01EXCAVACION PARA ZAPATAS DE 1.40M. A 2.15M. DE PROFUNDIDADm3ERROR:#REF!5.0704.02.01.02EXCAVACION DE ZANJAS P/CIMIENTOS HASTA 1.70 M. TERRENO NORMALm3ERROR:#REF!3.9004.02.01.03RELLENO Y COMPACTADO C/EQUIPO LIVIANO (CON MATERIAL PROPIO)m3ERROR:#REF!1.9204.02.01.04ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm3ERROR:#REF!8.1104.02.01.05NIVELACION Y PERFILADO DE CIMIENTO MANUALm2ERROR:#REF!8.4804.02.02OBRAS DE CONCRETO SIMPLE04.02.02.01SOLADO E= 4"m2ERROR:#REF!3.9004.02.03OBRAS DE CONCRETO ARMADO04.02.03.01ZAPATAS04.02.03.01.01ACERO PARA ZAPATAS FY=4200 KG/CM2 - GRADO 60kgERROR:#REF!30.8604.02.03.01.02CONCRETO EN ZAPATAS F'C=210 KG/CM2m3ERROR:#REF!1.6404.02.03.02VIGA DE CIMENTACION04.02.03.02.01ACERO DE REFUERZO FY=4200 KG/CM2.kgERROR:#REF!57.3304.02.03.02.02ENCOFRADO Y DESENCOFRADO VIGA DE CONFINAMIENTOm2ERROR:#REF!3.8004.02.03.02.03CONCRETO EN VIGAS DE CONFINAMIENTO F'C= 175 KG/CM2m3ERROR:#REF!0.5704.02.03.03COLUMNAS04.02.03.03.01ACERO FY=4200 KG/CM2 GRADO 60 EN COLUMNASkgERROR:#REF!337.7604.02.03.03.02ENCOFRADO Y DESENCOFRADO CARAVISTA DE COLUMNASm2ERROR:#REF!13.5604.02.03.03.03CONCRETO EN COLUMNAS F'C=210 KG/CM2m3ERROR:#REF!1.2504.02.03.04VIGAS04.02.03.04.01ACERO FY=4200 KG/CM2 GRADO 60 EN VIGASkgERROR:#REF!42.5904.02.03.04.02ENCOFRADO Y DESENCOFRADO CARAVISTA DE VIGASm2ERROR:#REF!5.2504.02.03.04.03CONCRETO EN VIGAS F'C=210 KG/CM2m3ERROR:#REF!0.5304.02.03.05PARAPETO EN UMBRAL04.02.03.05.01ACERO DE REFUERZO FY=4200 KG/CM2kgERROR:#REF!13.2304.02.03.05.02ENCOFRADO Y DESENCOFRADO CARAVISTA EN UMBRALm2ERROR:#REF!1.4004.02.03.05.03CONCRETO EN UMBRAL F'C=210 KG/CM2m3ERROR:#REF!0.355ESTRUCTURAS LOSA DEPORTIVA (01 UND)5.01LOSA DEPORTIVA (01 UND)05.01.01TRABAJOS PRELIMINARES05.01.01.01LIMPIEZA DE TERRENO MANUALm2ERROR:#REF!1,451.5205.01.01.02TRAZO NIVELES Y REPLANTEO PRELIMINARm2ERROR:#REF!33.0405.01.02MOVIMIENTO DE TIERRAS05.01.02.01EXCAVACION DE PLATAFORMA EN TIERRA EN FORMA MANUALm3ERROR:#REF!290.3005.01.02.02EXCAVACION PARA UASm3ERROR:#REF!14.6405.01.02.03REFINE Y NIVELACION DE PLATAFORMAm2ERROR:#REF!1,451.5205.01.02.04AFIRMADO DE 4" PARA FALSO PISOm2ERROR:#REF!1,451.5205.01.02.05ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm3ERROR:#REF!290.3005.01.03CONCRETO SIMPLE05.01.03.01ENCOFRADO Y DESENCOFRADO DE LOSAm2ERROR:#REF!140.7705.01.03.02CONCRETO F'C=140 KG/CM2, E=5" + FROTACHADOm3ERROR:#REF!199.4305.01.03.03JUNTAS ASFALTICASmERROR:#REF!428.805.02GRADERIA05.02.01TRABAJOS PRELIMINARES05.02.01.01LIMPIEZA DE TERRENO MANUALm2ERROR:#REF!54.0005.02.01.02TRAZO NIVELES Y REPLANTEO PRELIMINARm2ERROR:#REF!54.0005.02.02MOVIMIENTO DE TIERRAS05.02.02.01REFINE Y NIVELACION DE PLATAFORMAm2ERROR:#REF!54.0005.02.02.02EXCAVACION DE ZANJAS P/CIMIENTOS HASTA 0.80M. TERRENO NORMALm3ERROR:#REF!11.8405.02.02.03ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm3ERROR:#REF!45.9705.02.02.04AFIRMADO CON MATERIAL DE PRESTAMO E=0.10 AL NIVEL RASANTEm2ERROR:#REF!38.6405.02.03OBRAS DE CONCRETO SIMPLE05.02.03.01CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3ERROR:#REF!13.2605.02.03.02CONCRETO F'C=140 KG/CM2 EN TRIBUNASm3ERROR:#REF!19.6105.02.04ENCOFRADO Y DESENCOFRADO05.02.04.01ENCOFRADO Y DESENCOFRADOm2ERROR:#REF!214.905.03FLETE TERRESTRE05.03.01FLETE GENERAL GLBERROR:#REF!6TANQUE SEPTICO Y POZO PERCOLADOR (01 UND)6.01TANQUE SEPTICO (01 UND)06.01.01TRABAJOS PRELIMINARES06.01.01.01LIMPIEZA DE TERRENO MANUALm2ERROR:#REF!118.1306.01.01.02TRAZO NIVELES Y REPLANTEO PRELIMINARm2ERROR:#REF!39.3806.01.02MOVIMIENTO DE TIERRAS06.01.02.01EXCAVACIONES06.01.02.01.01EXCAVACION MANUAL DE HOYOSm3ERROR:#REF!99.5906.01.02.02RELLENOS06.01.02.02.01RELLENO MANUAL CON MATERIAL PROPIOm3ERROR:#REF!66.1706.01.02.03ELIMINACION DE MATERIAL EXCEDENTE06.01.02.03.001ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.m3ERROR:#REF!40.1006.01.02.03.002ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm3ERROR:#REF!40.1006.01.03OBRAS DE CONCRETO SIMPLE06.01.03.01SOLADOS06.01.03.01.001SOLADO E= 4"m2ERROR:#REF!22.9506.01.04OBRAS DE CONCRETO ARMADO06.01.04.01CONCRETO F'C=210 KG/CM2m3ERROR:#REF!18.8506.01.04.02ENCOFRADO Y DESENCOFRADO NORMALm2ERROR:#REF!108.7506.01.04.03ACERO FY=4200 KG/CM2 GRADO 60kgERROR:#REF!699.646.02POZO PERCOLADOR (06 UND)06.02.01TRABAJOS PRELIMINARES06.02.01.01LIMPIEZA DE TERRENO MANUALm2ERROR:#REF!37.5006.02.01.02TRAZO NIVELES Y REPLANTEO PRELIMINARm2ERROR:#REF!37.5006.02.02MOVIMIENTO DE TIERRAS06.02.02.01EXCAVACIONES06.02.02.01.001EXCAVACION MANUAL DE HOYOSm3ERROR:#REF!116.2506.02.02.02RELLENOS06.02.02.02.001RELLENO MANUAL CON MATERIAL PROPIOm3ERROR:#REF!26.9006.02.02.03ELIMINACION DE MATERIAL EXCEDENTE06.02.02.03.001ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.m3ERROR:#REF!107.2206.02.02.03.002ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm3ERROR:#REF!107.2206.02.03OBRAS DE CONCRETO SIMPLE06.02.03.01SOLADOS06.02.03.01.001SOLADO E= 4"m2ERROR:#REF!39.3806.02.03.02CIMIENTOS CORRIDOS06.02.03.02.001CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.m3ERROR:#REF!9.8406.02.04OBRAS DE CONCRETO ARMADO06.02.04.01ENCOFRADO Y DESENCOFRADO NORMALm2ERROR:#REF!9.6806.02.04.02CONCRETO F'C=210 KG/CM2m3ERROR:#REF!64.5106.02.04.03ACERO FY=4200 KG/CM2 GRADO 60kgERROR:#REF!41.6606.02.05MUROS Y TABIQUES DE ALBAILERIA06.02.05.01MUROS DE LADRILLO CORRIENTE DE ARCILLA06.02.05.01.001MURO DE CABEZA LADRILLO CORRIENTE 9x12x22 cmm2ERROR:#REF!4.1006.02.05.01.002MURO DE SOGA LADRILLO KK DE ARCILLA DE 9X12X22 cm (MESA DE LABORATORIO)m2ERROR:#REF!81.9006.02.06MEDIO FILTRANTE06.02.06.01FILTRO DE GRAVAm3ERROR:#REF!4.486.03FLETE TERRESTRE06.03.01FLETE GENERALGLBERROR:#REF!1.007ESTRUCTURAS VEREDAS DE CIRCULACION EXTERIOR7.01LIMPIEZA DE TERRENO MANUALm2ERROR:#REF!299.107.02TRAZO NIVELES Y REPLANTEO PRELIMINARm2ERROR:#REF!299.107.03EXCAVACION DE PLATAFORMA EN TIERRA EN FORMA MANUALm3ERROR:#REF!109.577.04AFIRMADO DE 4" PARA VEREDASm2ERROR:#REF!299.107.05VEREDA DE CONCRETO DE 4"m2ERROR:#REF!299.107.06CONCRETO EN UAS F'C=175 KGC/M2 EN VEREDASm3ERROR:#REF!10.697.07ENCOFRADO Y DESENCOFRADO DE VEREDASm2ERROR:#REF!95.647.08ACERO FY=4200 Kg/cm2 EN BANCAS 02 UNIDKGERROR:#REF!8CANALETA DE DRENAJE PLUVIAL 8.01TRABAJOS PRELIMINARES08.01.01LIMPIEZA DE TERRENO MANUALm2ERROR:#REF!08.01.02TRAZO NIVELES Y REPLANTEO PRELIMINARm2ERROR:#REF!8.02MOVIMIENTO DE TIERRAS08.02.01EXCAVACIONm3ERROR:#REF!08.02.02REFINE Y NIVELACIONm2ERROR:#REF!08.02.03ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm3ERROR:#REF!8.03CONCRETO SIMPLE08.03.01CONCRETO F'C=140 KG/CM2, E=5" + FROTACHADOm3ERROR:#REF!08.03.02ENCOFRADO Y DESENCOFRADOm2ERROR:#REF!08.03.03JUNTAS ASFALTICASmlERROR:#REF!9INFRAESTRUCTURA DE TANQUE ELEVADO09.01.00CISTERNA 09.01.01OBRAS PRELIMINARES09.01.01.01LIMPIEZA DE TERRENO MANUALM2ERROR:#REF!09.01.01.02TRAZO Y TREPLANTEOM2ERROR:#REF!09.01.01.03NIVELACION Y APISONADO MANUALM2ERROR:#REF!09.01.02MOVIMIENTO DE TIERRAS09.01.02.01EXCAVACION MANUALM3ERROR:#REF!09.01.02.02ELIMINACION DE MATERIAL EXCEDENTE D=25 MT.M3ERROR:#REF!09.01.03CONCRETO SIMPLE09.01.03.01SOLADO E = 3"M2ERROR:#REF!09.01.04CONCRETO ARMADO09.01.04.01CONCRETO F'C=210 KG/CM2 EN CISTERNAM3ERROR:#REF!09.01.04.02ACERO Fy = 4200 KG/CM2KGERROR:#REF!09.01.04.03ENCOFRADO Y DESENCOFRADO DE MUROS (02 CARAS)M2ERROR:#REF!09.01.05REVOQUES Y ENLUCIDOS09.01.05.01TARRAJEO CON IMPERMEABILIZANTE, MEZCLA 1:1 E=1.5 CM.M2ERROR:#REF!09.01.06ACCESORIOS CISTERNA09.01.06.01TUBERIAS PVC SAP (ELECRTICAS) D=1"MLERROR:#REF!09.01.06.02CABLE ELECTRICO NYY 2x4.0 MM2MLERROR:#REF!09.01.06.03ELECTROBOMBAS (INC. LLAVE TERMOMAGNETICA)UNDERROR:#REF!09.01.06.04TUBERIA PVC SAP CALSE 10 P/AGUA FRIA 3/4"MLERROR:#REF!09.01.06.05TUBERIAS DE PVC 4"MLERROR:#REF!09.01.06.06VALVULA SHECK DE BRONCE DE 3/4"PZAERROR:#REF!09.01.06.07VALVULA DE COMPUERTA DE BRONCE DE 3/4"PZAERROR:#REF!09.01.06.08TUBERIA DE VENTILACION DE 2"UNDERROR:#REF!09.02.00TANQUE DE AGUA09.02.01OBRAS PRELIMINARES09.02.01.01LIMPIEZA DE TERRENO MANUALM2ERROR:#REF!09.02.01.02TRAZO Y TREPLANTEOM2ERROR:#REF!09.02.02MOVIMIENTO DE TIERRAS09.02.02.01EXCAVACION MANUALM3ERROR:#REF!09.02.02.02ACARREO DE MATERIAL EXCEDENTE HASTA D PROM=30MT.M3ERROR:#REF!09.02.03 OBRAS DE CONCRETO SIMPLE09.02.03.01CONCRETO EN CIMIENTO CORRIDO C:H 1:10 + 30% PGM3ERROR:#REF!09.02.03.02CONCRETO EN SOBRECIMIENTO C:H 1:8+25% PMM3ERROR:#REF!09.02.03.03ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOERROR:#REF!09.02.03.04SOLADO EN ZAPATASM2ERROR:#REF!09.02.04 OBRAS DE CONCRETO ARMADO09.02.04.01 ZAPATA09.02.04.01.01CONCRETO F'C=210 KG/CM2 EN ZAPATASM3ERROR:#REF!09.02.04.01.02ACERO Fy = 4200 KG/CM2KGERROR:#REF!09.02.04.02 COLUMNAS Y VIGAS09.02.04.02.01CONCRETO F'C=210 KG/CM2 EN COLUMNAS Y VIGASM3ERROR:#REF!09.02.04.02.02ACERO Fy = 4200 KG/CM2KGERROR:#REF!09.02.04.02.03ENCOFRADO Y DESENCOFRADO DE COLUMNAS Y VIGASERROR:#REF!09.02.04.03 LOSA MACIZA 09.02.04.03.01CONCRETO F'C=210 KG/CM2 EN LOSA MACIZAM3ERROR:#REF!09.02.04.03.02ACERO Fy = 4200 KG/CM2KGERROR:#REF!09.02.04.03.03ENCOFRADO Y DESENCOFRADO DE LOSA MACIZAERROR:#REF!09.02.04.04MUROS Y TABIQUES DE ALBAILERIA09.02.04.04.01MURO DE LADRILLO TIPO IV 18 HUECOS DE SOGA C:A 1:4 X 1.5 CMM2ERROR:#REF!09.02.04.05REVOQUES ENLUCIDOS Y MOLDURAS09.02.04.05.01TARRAJEO DE COLUMNAS, VIGAS Y LOSASM2ERROR:#REF!09.02.04.05.02TARRAJEO DE MUROS DE SOGAM2ERROR:#REF!09.02.04.06PINTURA09.02.04.06.01PINTURA DE COLUMNAS, VIGAS Y LOSAM2ERROR:#REF!09.02.04.06.02PINTURA LATEX EN MUROSM2ERROR:#REF!09.02.04.07ACCESORIOS TANQUE ELEVADO09.02.04.07.01TANQUE ELEVADO DE 2.00 M3 DE PLASTICO|||UNDERROR:#REF!09.02.04.07.02TUBERIA PVC CLASE 10 P/AGUA FRIA 3/4"MLERROR:#REF!09.02.04.07.03VALVULA COMPUERTA DE BRONCE DE 3/4"UNDERROR:#REF!09.02.04.07.04VALVULA SHECK DE BRONCE DE 3/4"UNDERROR:#REF!09.02.04.07.05PUERTA CONTRAPLACADA PARA INTERIORESM2ERROR:#REF!09.02.04.07.06ESCALERA DE GATOMLERROR:#REF!

PLANT GENRALHOJA DE METRADO DE PLANTEAMIENTO GENERALOBRA: MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PRIMER NIVEL DE ATENCIN EN LOS EE.SS. DE HUAYCHAO Y URPAY DE LA MICRORED QUINUA-RED DE SALUD HUAMANGA-DIRESA AYACUCHO, DISTRITO DE ACOS VINCHOS-HUAMANGA-AYACUCHO

Departamento: AyacuchoProvincia: HuamangaDistrito: Acos vinchosFecha 7/8/15 OBRAS PRELIMINARES Y PLANTEAMIENTO GENERALITEMDESCRIPCIONUNIDN VECLARGOANCHOALTOPARCIALTOTAL02.00INFRAESTRUCTURA EE.SS. URPAY02.01TRABAJOS PRELIMINARES02.01.01 OBRAS PRELIMINARES02.01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40Mund1.001.001.0002.01.01.02 ALQUILER DE LOCAL PARA ALMACENmes6.006.006.0002.01.01.03 CERCO PROVISIONALm1.00183.55183.55183.5502.01.01.04 DEPOSITO PARA AGUA (2X3X1m)GLB1.001.001.0002.01.01.05 FLETE AYACUCHO A URPAYkg1.00301,895.38301,895.38301,895.3802.02PLANTEAMIENTO GENERAL02.02.01 PATIOS02.02.01.01TRABAJOS PRELIMINARES02.02.01.01.01 LIMPIEZA DE TERRENO MANUALm241.76Ingreso Peatonal 1.00Area Cad =6.206.20Ingreso Vehicular1.00Area Cad =35.5635.56

02.02.01.01.02TRAZO Y REPLANTEO DURANTE EL PROCESOm241.76Ingreso Peatonal 1.00Area Cad =6.206.20Ingreso Vehicular1.00Area Cad =35.5635.56

02.02.01.02MOVIMIENTO DE TIERRAS02.02.01.02.01CORTE DE TERRENO EN FORMA MANUALm36.26Ingreso Peatonal 1.00Area Cad =6.200.150.93Ingreso Vehicular1.00Area Cad =35.560.155.33

02.02.01.02.02ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm37.83eliminacion1.006.261.257.83

02.02.01.02.03 AFIRMADO DE 4" PARA VEREDAS EXTERIORESm241.76Ingreso Peatonal 1.00Area Cad =6.206.20Ingreso Vehicular1.00Area Cad =35.5635.56

02.02.01.03CONCRETO SIMPLE02.02.01.03.01 VEREDA DE CONCRETO DE 4"m241.76Ingreso Peatonal 1.00Area Cad =6.206.20Ingreso Vehicular1.00Area Cad =35.5635.56

02.02.01.03.02 VEREDAS ENCOFRADO Y DEDESENCOFRADOm25.63vereda 110.160.151.52Vereda 227.400.154.11

02.02.01.03.03SARDINEL CONCRETO FC=175KG/CM2m31.41sardinel en laterales de vereda de ingreso 12.380.150.300.11sardinel en laterales de vereda de ingreso 11.950.150.300.09sardinel en laterales de vereda de ingres vehicularo 23.150.150.300.14sardinel en laterales de vereda de ingreso vehicuar 23.340.150.300.156.320.150.300.285.250.150.300.249.020.150.300.41

02.02.01.03.04SARDINEL ENCOFRADO Y DEDESENCOFRADOm29.42sardinel en laterales de vereda de ingreso 12.380.300.72sardinel en laterales de vereda de ingreso 11.950.300.59sardinel en laterales de vereda de ingres vehicularo 23.150.300.95sardinel en laterales de vereda de ingreso vehicuar 23.340.301.006.320.301.905.250.301.589.020.302.71

02.02.01.03.05 JUNTAS ASFALTICASm35.00Juntas asfalticas 1.0035.0035.00

02.02.02CANALETA DE DRENAJE PLUVIAL02.02.02.01 MOVIMIENTO DE TIERRAS02.02.02.01.01EXCAVACION DE ZANJASm318.78canal del fondo67.810.400.359.49canal en el centro8.440.400.351.18canal del lateral posterior57.920.400.358.11

02.02.02.01.02ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOm323.4818.781.2523.48

02.02.02.01.03 REFINE Y NIVELACIONm253.64canal del fondo67.810.4027.09canal en el centro8.440.403.38canal del lateral posterior57.920.4023.1702.02.02.02CONCRETO SIMPLE02.02.02.02.01CANALETA ENCOFRADO Y DEDESENCOFRADOm2147.59canal del fondo2.0067.810.3547.472.0067.810.2027.12

canal en el centro2.008.440.355.912.008.440.203.38

canal del lateral posterior2.0057.920.3540.542.0057.920.2023.17

02.02.02.02.02CONCRETO F'C=140 KG/CM2 P/CANALETA DE DRENAJE PLUVIALm313.42canal del fondo67.81area Cad=0.106.78canal en el centro8.44area Cad=0.100.84canal del lateral posterior57.92area Cad=0.105.79

02.02.02.02.03JUNTAS ASFALTICASm35.78canal del fondo22.600.8018.08canal en el centro2.810.802.25canal del lateral posterior19.310.8015.45

02.02.02.02.04 REJILLA METALICA DE ANGULO Y PLATINA (0.20 DE ANCHO )m18.951.0018.9518.95

02.02.03SISTEMA DE ALCANTARILLADO SANITARIO02.02.03.01 TRABAJOS PRELIMINARES02.02.03.01.01TRAZO Y REPLANTEO PRELIMINARm217.90Linea de red emisor1.0044.760.4017.9002.02.03.02MOVIMIENTO DE TIERRAS02.02.03.02.01EXCAVACION MANUAL, PARA REDES H=0.80 Mm44.76Linea de red emisor1.0044.7644.7602.02.03.02.02RELLENO Y COMPACT.,PARA REDES H=0.80 M.m44.76Linea de red emisor1.0044.7644.76

02.02.03.03TENDIDO DE TUBERIAS 02.02.03.03.01TUBERIA PVC SAL 4"m44.76Linea de red emisor1.0044.7644.7602.02.03.04CAJA DE REGISTRO02.02.03.04.01 ACERO DE REFUERZO Fy= 4200 Kg/cm2kgUNIDAD5.00factor8.33acero en tapa 4.600.660.250.767.600.330.250.63manija de acero de 3/8"2.000.250.560.28

02.02.03.04.02ENCOFRADO Y DESENCOFRADOm2perim11.71parte exterior1.001.900.761.44parte interior1.001.800.500.90

02.02.03.04.03CONCRETO EN CAJA DE REGISTRO F'C=140 KG/CM2m30.59caja de registro0.76area cad=0.100.082.000.350.080.500.03en tapa1.000.660.360.060.0102.02.04 LINEA DE ALIMENTACION DE AGUA POTABLE02.02.04.01TRABAJOS PRELIMINARES02.02.04.01.01TRAZO Y REPLANTEO PRELIMINARm221.35RED Principal del ingreso de Agua1.0021.3521.35

02.02.04.02MOVIMIENTO DE TIERRAS02.02.04.02.01EXCAVACION MANUAL, PARA REDES m21.00RED Principal del ingreso de Agua1.0021.0021.0002.02.04.02.02REFINE Y NIVELACION EN FONDOS DE ZANJAm28.54RED Principal del ingreso de Agua1.0021.360.408.54

02.02.04.02.03CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO, E=10CM.m28.54RED Principal del ingreso de Agua1.0021.360.408.54

02.02.04.02.04RELLENO Y APISONADO DE ZANJA C/ MATERIAL PROPIO m28.54RED Principal del ingreso de Agua1.0021.360.408.54

02.02.04.03TENDIDO DE TUBERIAS 02.02.04.03.01TUBERIA PVC SAP 3/4" /LINEA ALIMENTACIONm8.54RED Principal del ingreso de Agua1.0021.360.408.5402.02.04.04LLAVE DE PASO02.02.04.04.01CAJAS DE PASO 25 CM x 30CM. MORTERO 1:4und2.002.002.0002.02.04.04.02LLAVE DE PASO DE 3/4"und2.002.002.0002.02.05 INSTALACIONES ELECTRICAS02.02.05.01TABLERO DE MEDIDOR Y/O MEDIDOR02.02.05.01.01TABLERO ELECTRICO CON INTERRUPTOR GENERAL und1.001.001.0002.02.05.01.02 CONDUCTOR CABLE ELECTRICO THWm76.63del medidor al TG-011.008.438.43del TG-01 AL TD-031.0015.0715.07del TG-01 AL TD-042.0026.5753.1302.02.05.01.03TABLERO DE DISTRIBUCION TD-4 (TERMOMAG. MONOF. + CAJA) EN TANQ ELEV.und1.001.001.0002.02.05.02MOVIMIENTO DE TIERRAS02.02.05.02.01EXCAVACION MANUAL, PARA REDESm50.06del medidor al TG-011.008.438.43del TG-01 AL TD-031.0015.0715.07del TG-01 AL TD-041.0026.5726.5702.02.05.02.02REFINE Y NIVELACION EN FONDOS DE ZANJAm220.03del medidor al TG-011.008.430.403.37del TG-02 AL TD-031.0015.070.406.03del TG-02 AL TD-041.0026.570.4010.6302.02.05.02.03 CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO, E=10CM.m222.66del medidor al TG-011.008.430.406.00del TG-01 AL TD-031.0015.070.406.03del TG-01 AL TD-041.0026.570.4010.63

02.02.05.02.04 RELLENO Y APISONADO DE ZANJA C/ MATERIAL PROPIOm225.03del medidor al TG-011.008.430.504.22del TG-01 AL TD-031.0015.070.507.53del TG-01 AL TD-041.0026.570.5013.2802.02.05.03TENDIDO DE TUBERIAS 02.02.05.03.01TUBERIA PVC 25MM. m76.63del medidor al TG-011.008.438.43del TG-02 AL TD-031.0015.0715.07del TG-01 AL TD-042.0026.5753.1302.02.05.04POZO PUESTA A TIERRA02.02.05.04.01 POZO PUESTA A TIERRAund1.001.001.0002.02.05.04.02PARARRAYOS CON DOSPOSITIVO CEBADO C/. POZO A TIERRAund1.001.001.0002.02.05.05PLACA RECORDATORIA02.02.05.05.01PLACA RECORDATORIAund1.001.001.0002.02.05.06CASETA DE AMBULANCIA02.02.05.06.01 CUBERTURA DE CASETA DE AMBULANCIAund1.001.0002.02.05.07 PRUEBAS DE LABORATORIO02.02.05.07.01PRUEBA DE LABORATORIOund1.001.00

MODU I SERV BAS.

HOJA DE METRADOS MODULO I (SERVICIOS BASICOS)OBRA : MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PRIMER NIVEL DE ATENCIN EN LOS EE.SS. DE HUAYCHAO Y URPAY DE LA MICRORED QUINUA-RED DE SALUD HUAMANGA-DIRESA AYACUCHO, DISTRITO DE ACOS VINCHOS-HUAMANGA-AYACUCHOPROPIETARIO:MUNICIPALIDAD DISTRITAL DE ACOS VINCHOSFECHA42193.0

METRADO DE MODULO I - URPAYITEMDESCRIPCION PARTIDAUNDCANT.N VEC.MEDIDASPARCIALTOTALLARGOANCHOALTO02.03MODULO I - INFRAESTRUCTURA BASICA02.03.01TRABAJOS PRELIMINARES02.03.01.01LIMPIEZA DE TERRENO MANUALM2130.3011.50354.55354.5502.03.01.02TRAZO Y REPLANTEO PRELIMINARM2130.8311.00354.55354.55

02.03.02MOVIMIENTO DE TIERRAS02.03.02.01CORTE DE PLATAFORMA EN FORMA MANUALM3113.30AREA BCAD= 15.46205.62205.6202.03.02.02EXCAVACION DE ZAPATA S H= 1.80 M. M3105.13EJE 1 - 1 Z - 01 (1A)11.601.601.363.48EJE 1 - 1 Z - 02 (1B)11.801.801.364.41EJE 1 - 1 Entre D-D, EJE 2-2 Entre D-D (Z-03)21.001.001.362.72

EJE 2 - 2 Entre A-A, C-C (Z-01)21.601.601.567.99EJE 2 - 2 Entre B-B (Z-02)11.801.801.565.05

EJE 3 - 3 Entre A-A, C-C (Z-01)21.601.601.598.14EJE 3 - 3 Entre B-B (Z-02)11.801.801.595.15

EJE 4 - 4 Entre A-A, C-C (Z-01)21.601.601.708.70EJE 4 - 4 Entre B-B (Z-02)11.801.801.705.51

EJE 5 - 5 Entre A-A, C-C (Z-01)21.601.601.708.70EJE 5 - 5 Entre B-B (Z-02)11.801.801.705.51

EJE 6 - 6 Entre A-A, C-C (Z-01)21.601.601.708.70EJE 6 - 6 Entre B-B (Z-02)11.801.801.705.51

EJE 7 - 7 Entre A-A, C-C (Z-01)21.601.601.708.70EJE 7 - 7 Entre B-B (Z-02)11.801.801.705.51

EJE 8 - 8 Entre C-C (Z-01)11.601.601.694.33EJE 8 - 8 Entre B-B (Z-02)11.801.801.695.48

EJE E - E Entre 5-6 (Z-04)20.800.801.201.54

02.03.02.03EXCAVACION DE ZANJAS DE CIMENTACION HASTA 1.70 MM351.00EJE A-A y B-B Entre 1-2 122.320.51.002.32EJE A-A y C-C Entre 2-3122.650.51.002.65EJE A-A y C-C Entre 3 -4122.350.51.002.35EJE A-A y C-C Entre 4 -5121.650.51.001.65EJE A-A y C-C Entre 5 -6122.950.51.002.95EJE A-A y C-C Entre 6 -7122.650.51.002.65EJE B-B y C-C Entre 7 -8123.50.51.003.50EJE B - B Entre 2 - 3112.450.50.800.98EJE B-B Entre 3 - 4111.430.50.800.57EJE B-B Entre 4 - 5111.450.50.800.58EJE D-D Entre 1 - 2113.150.51.001.58EJE 1-1 , Entre A-B Y B-D113.050.51.001.53EJE 2-2 , Entre B-C112.550.51.001.28EJE 7-7 , Entre A-B112.40.51.001.20EJE 8-8 , Entre B-C1140.51.002.00EJE 2-2, 4-4, 5-5, Entre A-B132.50.50.803.00EJE 2-2, 3-3, Entre A-B123.950.50.803.16EJE 1-1, Entre B-D111..350.50.800.40EJE D-D, Entre 2-31120.970.50.808.39En los ambientes de ss.hh y farmacia, 111.850.50.800.74pediatria , caja, almacen111.40.50.800.56111.10.50.800.44111.100.50.800.44111.100.50.800.44112.280.50.800.91112.680.50.801.07111.100.50.800.44113.550.50.801.42114.540.50.801.82

02.03.02.04RELLENO CON MATERIAL PROPIOM370.87EN ZANJAEJE A-A y B-B Entre 1-2 122.320.250.300.35EJE A-A y C-C Entre 2-3122.650.250.300.40EJE A-A y C-C Entre 3 -4122.350.250.300.35EJE A-A y C-C Entre 4 -5121.650.250.300.25EJE A-A y C-C Entre 5 -6122.950.250.300.44EJE A-A y C-C Entre 6 -7122.650.250.300.40EJE C-C Entre 7 -8113.50.250.300.26EJE D-D Entre 1 - 2113.150.250.300.24EJE 1-1 , Entre A-B Y B-D113.050.250.300.23EJE 2-2 , Entre B-C112.550.250.300.19EJE 7-7 , Entre A-B112.40.250.300.18EJE 8-8 , Entre B-C1140.250.300.30

EN ZAPATAEJE 1 - 1 Z - 01 (1A)1AREA =2.371.303.08EJE 1 - 1 Z - 02 (1B)1AREA =3.051.303.97EJE 1 - 1 Entre D-D, EJE 2-2 Entre D-D (Z-03)2AREA =0.941.102.06

EJE 2 - 2 Entre A-A, C-C (Z-01)2AREA =2.441.306.33EJE 2 - 2 Entre B-B (Z-02)1AREA =3.111.304.04

EJE 3 - 3 Entre A-A, C-C (Z-01)2AREA =2.311.004.62EJE 3 - 3 Entre B-B (Z-02)1AREA =2.991.002.99

EJE 4 - 4 Entre A-A, C-C (Z-01)2AREA =2.311.004.62EJE 4 - 4 Entre B-B (Z-02)1AREA =2.991.002.99

EJE 5 - 5 Entre A-A, C-C (Z-01)2AREA =2.441.004.87EJE 5 - 5 Entre B-B (Z-02)1AREA =3.111.003.11

EJE 6 - 6 Entre A-A, C-C (Z-01)2AREA =2.441.155.60EJE 6 - 6 Entre B-B (Z-02)1AREA =3.111.153.58

EJE 7 - 7 Entre A-A, C-C (Z-01)2AREA =2.441.155.60EJE 7 - 7 Entre B-B (Z-02)1AREA =3.111.153.58

EJE 8 - 8 Entre C-C (Z-01)1AREA =2.371.002.37EJE 8 - 8 Entre B-B (Z-02)1AREA =3.051.003.05

EJE E - E Entre 5-6 (Z-04)2AREA =0.590.700.83

02.03.02.05ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO A MANOM3341.45EXCAVACION1361.75RELLENO170.87ELIMINACION341.45

02.03.02.06NIVELACION INTERIOR Y APISONADO PARA F. PISO,m2235.72ambiente Gineco _obstetrico1area =26.9326.93ambiente Consult. General1area =13.3113.31ambiente Tpico1area =25.1425.14ambiente Sala de espera1area =38.0538.05ambiente circulacion - pasadizo1area =40.9940.99ambiente Almacen1area =19.0219.02ambiente archivos- historias1area =14.8414.84ambiente caja1area =5.705.70ambiente Farmacia1area =11.0011.00ambiente nios 1area =14.1914.19ambiente cadena de frio 1area =3.623.62ambiente SS.HH de publico1area =8.168.16ambiente SS.HH de personales1area =8.168.16ambiente de radio1area =2.202.20ambiente de cto de limpieza1area =2.582.58ambiente de cto de muestra de TBC1area =1.831.83

02.03.02.07 AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORESM2235.72ambiente Gineco _obstetrico1area =26.9326.93ambiente Consult. General1area =13.3113.31ambiente Tpico1area =25.1425.14ambiente Sala de espera1area =38.0538.05ambiente circulacion - pasadizo1area =40.9940.99ambiente Almacen1area =19.0219.02ambiente archivos- historias1area =14.8414.84ambiente caja1area =5.705.70ambiente Farmacia1area =11.0011.00ambiente nios 1area =14.1914.19ambiente cadena de frio 1area =3.623.62ambiente SS.HH de publico1area =8.168.16ambiente SS.HH de personales1area =8.168.16ambiente de radio1area =2.202.20ambiente de cto de limpieza1area =2.582.58ambiente de cto de muestra de TBC1area =1.831.83

02.03.02.08AFIRMADO DE 4" PARA VEREDASM282.30EJE A-A1170.8013.60EJE A-A18.41.2010.08EJE B-B16.451.207.74EJE 1-117.330.805.86EJE 7-7 14.451.205.34EJE 8-816.051.207.26EJE C-C ENTRE 1-8128.850.8023.08EJE D-D ENTRE 1-214.050.803.24EJE 2-2 ENTRE D-C13.211.906.10

02.03.03CONCRETO SIMPLE02.03.03.01 SOLADO02.03.03.01.01SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGONM265.04EN ZAPATASEJE 1 - 1 Z - 01 (1A)11.601.602.56EJE 1 - 1 Z - 02 (1B)11.801.803.24EJE 1 - 1 Entre D-D, EJE 2-2 Entre D-D (Z-03)21.001.002.00

EJE 2 - 2 Entre A-A, C-C (Z-01)21.601.605.12EJE 2 - 2 Entre B-B (Z-02)11.801.803.24

EJE 3 - 3 Entre A-A, C-C (Z-01)21.601.605.12EJE 3 - 3 Entre B-B (Z-02)11.801.803.24

EJE 4 - 4 Entre A-A, C-C (Z-01)21.601.605.12EJE 4 - 4 Entre B-B (Z-02)11.801.803.24

EJE 5 - 5 Entre A-A, C-C (Z-01)21.601.605.12EJE 5 - 5 Entre B-B (Z-02)11.801.803.24

EJE 6 - 6 Entre A-A, C-C (Z-01)21.601.605.12EJE 6 - 6 Entre B-B (Z-02)11.801.803.24

EJE 7 - 7 Entre A-A, C-C (Z-01)21.601.605.12EJE 7 - 7 Entre B-B (Z-02)11.801.803.24

EJE 8 - 8 Entre C-C (Z-01)11.601.602.56EJE 8 - 8 Entre B-B (Z-02)11.801.803.24

EJE E - E Entre 5-6 (Z-04)20.800.801.2802.03.03.02 CIMIENTO CORRIDO02.03.03.02.01CIMIENTOS CORRIDOS MEZCLA 1:10 +30% PG CEMENTO-HORMIGONM361.29EJE A-A y B-B Entre 1-2 123.550.50.702.49EJE A-A y C-C Entre 2-3123.750.50.702.63EJE A-A y C-C Entre 3 -4123.20.50.702.24EJE A-A y C-C Entre 4 -5122.750.50.701.92EJE A-A y C-C Entre 5 -6122.950.50.702.07EJE A-A y C-C Entre 6 -7123.750.50.702.63EJE B-B y C-C Entre 7 -8124.750.50.703.32EJE B - B Entre 2 - 3113.750.50.701.31EJE B-B Entre 3 - 4113.20.50.701.12EJE B-B Entre 4 - 5112.750.50.700.96EJE D-D Entre 1 - 2113.80.50.701.33EJE 1-1 , Entre A-B Y B-D113.70.50.701.30EJE 2-2 , Entre B-C113.450.50.701.21EJE 7-7 , Entre A-B113.70.50.701.30EJE 8-8 , Entre B-C115.050.50.701.77EJE 2-2, 5-5, Entre A-B123.70.50.802.96EJE 2-4 Entre A-B134.20.50.805.04EJE 1-1, Entre B-D121.70.50.801.36EJE D-D, Entre 2-4119.050.50.803.62EJE D-D, Entre 4-71112.520.50.805.01En los ambientes de ss.hh y farmacia, 112.150.50.800.86pediatria , caja, almacen112.20.50.800.88123.20.50.802.56112.520.50.801.01113.200.50.801.28111.650.50.800.66110.950.50.800.38134.050.50.804.86113.550.50.801.42114.540.50.801.8202.03.03.03 SOBRECIMIENTOS02.03.03.03.01 SOBRECIMIENTO CONCRETO 1:8 + 25% PMM38.07EJE A-A Entre 1-2 113.550.250.300.27EJE B-B Entre 1-2111.10.250.300.08EJE A-A y C-C Entre 2-3123.750.250.300.561820580.611542864.92EJE A-A y C-C Entre 3 -4123.20.250.300.48EJE A-A y C-C Entre 4 -5122.750.250.300.41EJE A-A y C-C Entre 5 -6122.950.250.300.44EJE A-A y C-C Entre 6 -7123.750.250.300.56EJE C-C Entre 7 -8114.750.250.300.36EJE B-B Entre 7 -8113.750.250.300.28EJE B - B Entre 2 - 3111.250.250.300.09EJE B-B Entre 3 - 4111.750.250.300.13EJE B-B Entre 4 - 5111.550.250.300.122,148,285.12EJE D-D Entre 1 - 21130.150.300.13107,414.26EJE 1-1 , Entre A-B Y B-D115.30.150.300.24TOTAL2,255,699.38EJE 2-2 , Entre B-C112.650.250.300.20EJE 7-7 , Entre A-B113.70.250.300.28EJE 8-8 , Entre B-C115.050.250.300.38EJE 2-2 y 4-4 Entre A-B122.20.150.300.20EJE 2-5 Entre A-B134.20.150.300.57EJE 1-1, Entre B-D111.850.150.300.08en SS.HHs,TBC, LIMPIEZA, Nios, farmacia, cja, alm.EJE D-D, Entre 2-3 (Radio)112.20.150.300.10EJE D-D, Entre 2-4 (Radio, SS.HH)114.20.250.300.32112.20.150.300.10112.20.150.300.10111.050.150.300.05111.350.150.300.06111.050.150.300.05111.750.150.300.08113.70.150.300.17110.950.150.300.04111.650.150.300.07113.20.150.300.14112.60.150.300.12114.050.150.300.18113.550.150.300.16112.90.150.300.13114.550.250.300.34

02.03.03.03.02 ENCOFRADO Y DEDESENCOFRADO M279.32EJE A-A Entre 1-2 213.550.302.13EJE B-B Entre 1-2211.10.300.6630,271.02EJE A-A y C-C Entre 2-3223.750.304.50EJE A-A y C-C Entre 3 -4223.20.303.84EJE A-A y C-C Entre 4 -5222.750.303.30EJE A-A y C-C Entre 5 -6222.950.303.54EJE A-A y C-C Entre 6 -7223.750.304.50EJE C-C Entre 7 -8214.750.302.85EJE B-B Entre 7 -8213.750.302.25EJE B - B Entre 2 - 3211.250.300.75EJE B-B Entre 3 - 4211.750.301.05EJE B-B Entre 4 - 5211.550.300.93EJE D-D Entre 1 - 22130.301.80EJE 1-1 , Entre A-B Y B-D215.30.303.18EJE 2-2 , Entre B-C212.650.301.59EJE 7-7 , Entre A-B213.70.302.22EJE 8-8 , Entre B-C215.050.303.03EJE 2-2 y 4-4 Entre A-B222.20.302.64EJE 2-5 Entre A-B234.20.307.56EJE 1-1, Entre B-D211.850.301.11en SS.HHs,TBC, LIMPIEZA, Nios, farmacia, cja, alm.EJE D-D, Entre 2-3 (Radio)212.20.301.32EJE D-D, Entre 2-4 (Radio, SS.HH)214.20.302.52212.20.301.32212.20.301.32211.050.300.63211.350.300.81211.050.300.63211.750.301.05213.70.302.22210.950.300.57211.650.300.99213.20.301.92212.60.301.56214.050.302.43213.550.302.13212.90.301.74214.550.302.7302.03.03.04 FALSO PISOS Y OTROS02.03.03.04.01FALSO PISO DE 4" DE CONCRETO 1:10M2235.7291,029.0377,143.25AMBIENTES DE SALUDambiente Gineco _obstetrico1area =26.9326.9316,385.23ambiente Consult. General1area =13.3113.31ambiente Tpico1area =25.1425.14ambiente Sala de espera1area =38.0538.05ambiente circulacion - pasadizo1area =40.9940.99ambiente Almacen1area =19.0219.02ambiente archivos- historias1area =14.8414.84ambiente caja1area =5.705.70ambiente Farmacia1area =11.0011.00ambiente nios 1area =14.1914.19ambiente cadena de frio 1area =3.623.62ambiente SS.HH de publico1area =8.168.16ambiente SS.HH de personales1area =8.168.16ambiente de radio1area =2.202.20ambiente de cto de limpieza1area =2.582.58ambiente de cto de muestra de TBC1area =1.831.83

02.03.04OBRAS DE CONCRETO ARMADO ESTRUCTURAL02.03.04.01ZAPATA02.03.04.01.01CONCRETO EN LOSA F'C=210 KG/CM2 M339.02EJE 1 - 1 Z - 01 (1A)11.601.600.601.54EJE 1 - 1 Z - 02 (1B)11.801.800.601.94EJE 1 - 1 Entre D-D, EJE 2-2 Entre D-D (Z-03)21.001.000.601.20

EJE 2 - 2 Entre A-A, C-C (Z-01)21.601.600.603.07EJE 2 - 2 Entre B-B (Z-02)11.801.800.601.94

EJE 3 - 3 Entre A-A, C-C (Z-01)21.601.600.603.07EJE 3 - 3 Entre B-B (Z-02)11.801.800.601.94

EJE 4 - 4 Entre A-A, C-C (Z-01)21.601.600.603.07EJE 4 - 4 Entre B-B (Z-02)11.801.800.601.94

EJE 5 - 5 Entre A-A, C-C (Z-01)21.601.600.603.07EJE 5 - 5 Entre B-B (Z-02)11.801.800.601.94

EJE 6 - 6 Entre A-A, C-C (Z-01)21.601.600.603.07EJE 6 - 6 Entre B-B (Z-02)11.801.800.601.94

EJE 7 - 7 Entre A-A, C-C (Z-01)21.601.600.603.07EJE 7 - 7 Entre B-B (Z-02)11.801.800.601.94

EJE 8 - 8 Entre C-C (Z-01)11.601.600.601.54EJE 8 - 8 Entre B-B (Z-02)11.801.800.601.94

EJE E - E Entre 5-6 (Z-04)20.800.800.600.77

02.03.04.01.02 ACERO FY=4200KG/CM2 KGCANTN VECLong. TotalFactor978.49Z-01 (1.6X1.6)Refuerzo Longitudinal 1/2" 13141.501.01275.73Refuerzo Transversal 1/2" 13141.501.01275.73

Z-02 (1.8X1.8)Refuerzo Longitudinal 1/2" 1481.701.01192.30Refuerzo Transversal 1/2" 1481.701.01192.30

Z-03 (1.0X1.0)Refuerzo Longitudinal 1/2" 720.901.0112.73Refuerzo Transversal 1/2" 720.901.0112.73

Z-04 (0.8X0.80)Refuerzo Longitudinal 1/2" 620.701.018.48Refuerzo Transversal 1/2" 620.701.018.48

02.03.04.02VIGA DE CIMENTACION02.03.04.02.01 VIGA DE CIMENTACION CONCRETO 210 KG/CM2M35.23EJE A-A y B-B Entre 1-2 123.550.250.300.53EJE A-A y C-C Entre 2-3123.750.250.300.56EJE A-A y C-C Entre 3-4123.20.250.300.48EJE A-A y C-C Entre 4-5122.750.250.300.41EJE A-A y C-C Entre 5-6124.30.250.300.64EJE A-A y C-C Entre 6-7123.750.250.300.56EJE B-B y C-C Entre 7-8124.750.250.300.71EJE 1-1 y 7-7 Entre B-C123.70.250.300.56EJE 2-2 y 8-8 Entre B - C125.10.250.300.76

02.03.04.02.02VIGA DE CIMENTACION ENCF.Y DESENCOFRADOM241.82EJE A-A y B-B Entre 1-2 223.550.304.26EJE A-A y C-C Entre 2-3223.750.304.50EJE A-A y C-C Entre 3-4223.20.303.84EJE A-A y C-C Entre 4-5222.750.303.30EJE A-A y C-C Entre 5-6224.30.305.16EJE A-A y C-C Entre 6-7223.750.304.50EJE B-B y C-C Entre 7-8224.750.305.70EJE 1-1 y 7-7 Entre B-C223.70.304.44EJE 2-2 y 8-8 Entre B - C225.10.306.12

02.03.04.02.03VIGA DE CIMENTACION ACERO Fy=4200 KGCANTN VECLong. TotalFactor919.00VC-01 (.25X.30)EJE A-A Entre 1-7 Refuerzo Longitudinal 1/2" 8124.851.01200.79Refuerzo Transversal (ESTRIBOS) 3/8" 18611.140.56118.74EJE 1-1 , 7-7 Entre A-BRefuerzo Longitudinal 1/2" 825.001.0180.80Refuerzo Transversal (ESTRIBOS) 3/8" 2821.140.5635.75EJE 2-2 y 8-8 Entre B-CRefuerzo Longitudinal 1/2" 826.351.01102.62Refuerzo Transversal (ESTRIBOS) 3/8" 4021.140.5651.07EJE C-C Entre 2-8Refuerzo Longitudinal 1/2" 8126.051.01210.48Refuerzo Transversal (ESTRIBOS) 3/8" 18611.140.56118.74

02.03.04.03COLUMNAS02.03.04.03.01COLUMNAS CONCRETO 210 KG/CM2 M316.88SEGUNDA PLANTACOLUMNA C-1 (L)EJE 1-1, ENTRE A-A 10.500.253.420.4310.250.253.420.21

EJE 1-1, ENTRE B-B 10.500.255.500.6910.250.255.500.34

EJE 2-2, ENTRE C-C 10.500.253.420.4310.250.253.420.21

EJE 7-7, ENTRE A-A Y EJE 8-8, ENTRE C-C 20.500.253.420.8620.250.253.420.43

EJE 8-8, ENTRE B-B 10.500.255.500.6910.250.255.500.34

COLUMNA C-2 (T)EJE 3-3 ENTRE A-A C-C Y EJE 4-4 ENTRE A-A C-C 40.750.253.422.5740.250.253.420.86

EJE 3-3 ENTRE B-B Y EJE 4-4 ENTRE B-B20.750.255.502.0620.250.255.500.69

COLUMNA C-3 EJE 2-2 ENTRE A-A 10.500.253.420.43EJE 2-2 ENTRE B-B 10.500.255.500.69EJE 5-5 ENTRE A-A , C-C, EJE 6-6 ENTRE A-A,C-C Y EJE 7-7 ENTRE C-C 50.500.253.422.14EJE 5-5 ENTRE B-B , EJE 6-6 ENTRE B-B Y EJE 7-7 ENTRE B-B 30.500.255.502.06COLUMNA C-4 EJE 1-1 ENTRE D-D Y EJE 2-2 ENTRE D-D 20.250.253.500.44

COLUMNA C-5 EJE E-E ENTRE 5-62AREA CAD=0.053.310.33

02.03.04.03.02COLUMNAS ENCOFRADO Y DESENCFRADOM2144.97COLUMNA C-1 (L)EJE 1-1, ENTRE A-A 120.503.423.42120.253.421.71

EJE 1-1, ENTRE B-B 120.505.505.50120.255.502.75

EJE 2-2, ENTRE C-C 120.503.423.42120.253.421.71

EJE 7-7, ENTRE A-A Y EJE 8-8, ENTRE C-C 220.503.426.84220.253.423.42

EJE 8-8, ENTRE B-B 120.505.505.50120.255.502.75

COLUMNA C-2 (T)EJE 3-3 ENTRE A-A C-C Y EJE 4-4 ENTRE A-A C-C 410.753.4210.26450.253.4217.10

EJE 3-3 ENTRE B-B Y EJE 4-4 ENTRE B-B210.755.508.25250.255.5013.75

COLUMNA C-3 EJE 2-2 ENTRE A-A 140.253.423.42EJE 2-2 ENTRE B-B 140.255.505.50EJE 5-5 ENTRE A-A , C-C, EJE 6-6 ENTRE A-A,C-C Y EJE 7-7 ENTRE C-C 540.253.4217.10EJE 5-5 ENTRE B-B , EJE 6-6 ENTRE B-B Y EJE 7-7 ENTRE B-B 320.505.5016.50310.255.504.13COLUMNA C-4 EJE 1-1 ENTRE D-D Y EJE 2-2 ENTRE D-D 230.253.505.25220.103.501.40

COLUMNA C-5 EJE E-E ENTRE 5-621.00L circunf. CAD=0.803.315.30

02.03.04.03.03 COLUMNAS ACERO Fy=4200 KG/CM2 KGCANTN VECLong. TotalFactor2,527.78COLUMNA C-1 (L)EJE 1-1, ENTRE A-A Refuerzo vertical 1/2" 415.081.0120.52Refuerzo vertical 5/8" 615.081.6048.77Refuerzo Transversal (ESTRIBOS) 3/8" 2511.410.5619.74Refuerzo Transversal (ESTRIBOS) 3/8" 2511.410.5619.74

EJE 1-1, ENTRE B-B Refuerzo vertical 1/2" 417.331.0129.61Refuerzo vertical 5/8" 617.331.6070.37Refuerzo Transversal (ESTRIBOS) 3/8" 3611.410.5628.43Refuerzo Transversal (ESTRIBOS) 3/8" 3611.410.5628.43

EJE 2-2, ENTRE C-C Refuerzo vertical 1/2" 415.081.0120.52Refuerzo vertical 5/8" 615.081.6048.77Refuerzo Transversal (ESTRIBOS) 3/8" 2511.410.5619.74Refuerzo Transversal (ESTRIBOS) 3/8" 2511.410.5619.74

EJE 7-7, ENTRE A-A Y EJE 8-8, ENTRE C-C Refuerzo vertical 1/2" 425.081.0141.05Refuerzo vertical 5/8" 625.081.6097.54Refuerzo Transversal (ESTRIBOS) 3/8" 2521.410.5639.48Refuerzo Transversal (ESTRIBOS) 3/8" 2521.410.5639.48

EJE 8-8, ENTRE B-B Refuerzo vertical 1/2" 417.331.0129.61Refuerzo vertical 5/8" 617.331.6070.37Refuerzo Transversal (ESTRIBOS) 3/8" 3611.410.5628.43Refuerzo Transversal (ESTRIBOS) 3/8" 3611.410.5628.43

COLUMNA C-2 (T)EJE 3-3 ENTRE A-A C-C Y EJE 4-4 ENTRE A-A C-C Refuerzo vertical 1/2" 645.081.01123.14Refuerzo vertical 5/8" 445.081.60130.05Refuerzo Transversal (ESTRIBOS) 3/8" 2541.910.56106.96Refuerzo Transversal (ESTRIBOS) 3/8" 2541.410.5678.96

EJE 3-3 ENTRE B-B Y EJE 4-4 ENTRE B-B (C-2")Refuerzo vertical 1/2" 227.331.0129.61Refuerzo vertical 5/8" 1027.331.60234.56Refuerzo Transversal (ESTRIBOS) 3/8" 3621.910.5677.01Refuerzo Transversal (ESTRIBOS) 3/8" 3621.410.5656.85

COLUMNA C-3 EJE 2-2 ENTRE A-A Refuerzo vertical 1/2" 815.081.0141.05Refuerzo Transversal (ESTRIBOS) 3/8" 2511.410.5619.74

EJE 2-2 ENTRE B-B(C-2") Refuerzo vertical 5/8" 817.331.6093.82Refuerzo Transversal (ESTRIBOS) 3/8" 3611.410.5628.43

EJE 5-5 ENTRE A-A , C-C, EJE 6-6 ENTRE A-A,C-C Y EJE 7-7 ENTRE C-C Refuerzo vertical 1/2" 855.081.01205.23Refuerzo Transversal (ESTRIBOS) 3/8" 2551.410.5698.70

EJE 5-5 ENTRE B-B , EJE 6-6 ENTRE B-B Y EJE 7-7 ENTRE B-B (C-2") Refuerzo vertical 5/8" 837.331.60281.47Refuerzo Transversal (ESTRIBOS) 3/8" 3631.410.5685.28

COLUMNA C-4 EJE 1-1 ENTRE D-D Y EJE 2-2 ENTRE D-D Refuerzo vertical 1/2" 424.731.0138.22Refuerzo Transversal (ESTRIBOS) 1/4" 2620.910.2511.83

COLUMNA C-5 EJE E-E ENTRE 5-6Refuerzo vertical 1/2" 423.311.0126.74Refuerzo Transversal (ESTRIBOS) 1/4" 2520.910.2511.38

02.03.04.04VIGAS02.03.04.04.01VIGAS CONCRETO F'C= 210KG/CM2 M332.16VIGA 0.25 X 0.50 EJE 1-1 ENTRE A-B114.500.250.500.561AREA =0.200.250.05

VIGA 0.25 X 0.50 EJE 2-2,3-3, 4-4, 5-5, 6-6, 7-7 ENTRE A-B615.960.250.504.47

VIGA 0.25 X 0.50 EJE 2-2,3-3, 4-4, 5-5, 6-6, 7-7 ENTRE B-C715.960.250.505.227AREA =0.250.250.44

VIGA 0.25 X VAR. EJE A-A y C-C ENTRE 1-72124.55AREA0.136.52

VIGA 0.25 X .50EJE B-B ENTRE 1-81120.500.250.502.56EJE B-B ENTRE 1-81125.750.061.60

VIGA 0.25 X .20EJE D-D ENTRE 1-2114.500.250.200.23

EJE 1-1 y 2-2 ENTRE B-D212.150.250.200.22

EJE A-A, B-B y C-C 610.550.250.200.17

VIGUETA EN EL CANAL DE DRENAJE PLUVIALEJE A-A ENTRE 1-71124.55AREA=0.194.59EJE C-C ENTRE 2-81125.75AREA=0.194.82

VIGA 0.25 X .20 (INGRESO PRINCIPAL)EJE E-E ENTRE 5-6 (LATERALES)212.45AREA=0.070.36

EJE E-E ENTRE 5-6 (INCLINADA)211.800.250.200.18EN CANALETA DE DRENAJE212.45AREA0.040.20

02.03.04.04.02 VIGAS, ENCOFRADO Y DESENCOFRADOM2172.91SEGUNDA PLANTA VIGA 0.25 X 0.50 EJE 1-1 ENTRE A-B124.000.302.40114.000.251.002AREA =0.200.4010.800.250.2011.000.250..200.25VIGA 0.25 X 0.50 EJE 2-2,3-3, 4-4, 5-5, 6-6, 7-7 ENTRE A-B624.000.3014.40614.000.256.00VIGA 0.25 X 0.50 EJE 2-2,3-3, 4-4, 5-5, 6-6, 7-7 y 8-8 ENTRE B-C725.660.3023.77715.660.259.9172AREA =0.253.50710.810.251.42VIGA 0.25 X VAR. EJE A-A y C-C ENTRE 1-72122.500.104.502122.500.2511.25

VIGA 0.25 X .50EJE B-B ENTRE 1-81121.300.306.39EJE B-B ENTRE 1-81121.300.102.131121.300.255.33114.500.251.13VIGA 0.25 X .20EJE D-D ENTRE 1-2212.150.251.08

EJE 1-1 y 2-2 ENTRE B-D610.550.250.83

VIGUETA EN EL CANAL DE DRENAJE PLUVIALEJE A-A ENTRE 1-71125.650.7519.241125.650.102.571225.650.2512.83

EJE C-C ENTRE 2-81126.850.7520.141126.850.102.691226.850.2513.43

VIGA 0.25 X .20 (INGRESO PRINCIPAL)EJE E-E ENTRE 5-6212.450.251.23

EJE E-E ENTRE 5-6222.150.252.15CANALETA DE DRENAJE212.450.321.57212.450.251.23

02.03.04.04.03VIGAS ACERO FY=4200KG/CM2KGCANTN VECLong. TotalFactor3,469.63SEGUNDA PLANTA VIGA 0.25 X 0.50 EJE 1-1 ENTRE A-BRefuerzo Horizontal 5/8" 216.061.6019.39Refuerzo Horizontal 5/8" 216.351.6020.32Refuerzo Horizontal 5/8" 211.841.605.89Refuerzo Horizontal 3/4" 212.472.2611.16Refuerzo Horizontal 5/8" 212.051.606.56Refuerzo Transversal (ESTRIBOS) 3/8" 2811.410.5622.11VIGA 0.25 X 0.50 EJE 2-2,3-3, 4-4, 5-5, 6-6, 7-7 ENTRE A-BRefuerzo Horizontal 5/8" 266.061.60116.35Refuerzo Horizontal 5/8" 266.351.60121.92Refuerzo Horizontal 5/8" 261.841.6035.33Refuerzo Horizontal 3/4" 262.472.2666.99Refuerzo Horizontal 5/8" 262.051.6039.36Refuerzo Transversal (ESTRIBOS) 3/8" 2861.410.56132.65

VIGA 0.25 X 0.50 EJE 2-2,3-3, 4-4, 5-5, 6-6, 7-7 Y 8-8 ENTRE B-CRefuerzo Horizontal 5/8" 277.931.60177.63Refuerzo Horizontal 5/8" 277.101.60159.04Refuerzo Horizontal 3/4" 272.782.2687.96Refuerzo Horizontal 3/4" 272.852.2690.17Refuerzo Horizontal 5/8" 272.321.6051.97Refuerzo Transversal (ESTRIBOS) 3/8" 3671.410.56198.98

VIGA 0.25 X VAR. EJE A-A y C-C ENTRE 1-7Refuerzo Horizontal 1/2" 6226.851.01325.42Refuerzo Transversal (ESTRIBOS) 3/8" 15421.320.56227.67

VIGA 0.25 X .50EJE B-B ENTRE 1-8Refuerzo Horizontal 1/2" 6230.451.01369.05Refuerzo Transversal (ESTRIBOS) 3/8" 18721.320.56276.46

EJE B-B ENTRE 1-8Refuerzo Horizontal 1/2" 6226.851.01325.42Refuerzo Transversal (ESTRIBOS) 3/8" 16221.150.56208.66

VIGA 0.25 X .20EJE D-D ENTRE 1-2Refuerzo Horizontal 1/2" 414.641.0118.75Refuerzo Transversal (ESTRIBOS) 3/8" 3010.830.5613.94

EJE 1-1 y 2-2 ENTRE B-DRefuerzo Horizontal 1/2" 422.321.0118.75Refuerzo Transversal (ESTRIBOS) 3/8" 1820.830.5616.73VIGUETA EN EL CANAL DE DRENAJE PLUVIALEJE A-A ENTRE 1-7Refuerzo Horizontal 3/8" 3125.650.5643.09Refuerzo Transversal (ESTRIBOS) 3/8" 10310.830.5647.69EJE C-C ENTRE 2-8Refuerzo Horizontal 3/8" 3126.850.5645.11Refuerzo Transversal (ESTRIBOS) 3/8" 10710.830.5649.92

VIGA 0.25 X .20 (INGRESO PRINCIPAL)EJE E-E ENTRE 5-6Refuerzo Horizontal 1/2" 422.891.0123.35Refuerzo Transversal (ESTRIBOS) 3/8" 1821.030.5620.76

EJE E-E ENTRE 5-6 (INCLINADAS)Refuerzo Horizontal 1/2" 422.421.0119.55Refuerzo Transversal (ESTRIBOS) 3/8" 1321.030.5615.00

EJE CUMBRERARefuerzo Horizontal 1/2" 514.531.0122.88Refuerzo Transversal (ESTRIBOS) 3/8" 3011.050.5617.64

02.03.04.05LOSA ALIGERADA H=0.20 M.02.03.04.05.01LOSAS ALIGERADAS, CONCRETO F'C=210 KG/CM2M338.85(TECHO INCLINADO)LADO 1-7 ENTRE A-B 125.655.580.2028.63LADO 2-8 ENTRE B-C 126.857.300.2039.20LADO 1-2 ENTRE B-D 14.302.150.201.85Menos los ladrillos-2,901.980.300.300.15-39.18En puerta de ingreso21.742.408.35

02.03.04.05.02LOSAS ALIGERADAS, ENCOFRADO Y DESENCOFRADO NORMALM2|364.50 (TECHO INCLINADO)LADO 1-7 ENTRE A-B 125.655.58143.13LADO 2-8 ENTRE B-C 126.857.30196.01LADO 1-2 ENTRE B-D 14.302.159.25En puerta de ingreso22.902.7816.1202.03.04.05.03 LOSAS ALIGERADAS, ACERO GRADO 60 KGCANTN VECLong. TotalFactor2,515.24SEGUNDA PLANTA (TECHO INCLINADO)EN VIGUETASEJE 1-7 ENTRE A-BAcero de refuerzo Positivo 1/2" 13125.651.01336.78Acero de refuerzo del Superior 1/2" 13125.651.01336.78Acero de refuerzo del superior = 3/8 1353.500.56127.40estribamiento con acero de 1/4" EN Vigueta lateral41.560.690.257.17aceros de temperatura = 1/4 1045.070.25131.31

EJE 2-8 ENTRE B-CAcero de refuerzo Positivo 1/2" 1926.851.01515.25Acero de refuerzo del Superior 1/2" 1926.851.01515.25Acero de refuerzo del superior = 3/8 1953.500.56186.20estribamiento con acero de 1/4"58.40.690.2510.07aceros de temperatura = 1/4 1087.300.25197.83

EJE 1-2 ENTRE B-D Acero de refuerzo Positivo 3/8" 122.150.5614.45Acero de refuerzo del Superior 1/2" 122.151.0126.06

aceros de temperatura = 1/4 104.300.2510.32

EJE A-E ENTRE 5-6 EN PUERTA DE INGRESO)Acero de refuerzo Positivo 3/8" 8.1323.150.5628.67Acero de refuerzo del Superior 1/2" 8.1323.191.0152.31

aceros de temperatura = 1/4 1422.850.2519.38

02.03.04.05.04LOSAS ALIGERADAS, LADRILLO HUECO DE ARCILLA 15X30X30 CMUND3,036.29SEGUNDA PLANTA (TECHO INCLINADO)8.33A1143.131,192.258.33A2196.011,632.728.33A39.2577.018.33A4 (puerta de Ingreso)16.12134.31

02.03.04.06COLUMNETAS Y VIGUETAS DE CONFINAMIENTO02.03.04.06.01COLUMNETAS Y VIGUETAS, CONCRETO F'C= 210KG/CM2M33.89COLUMNETAS 0.25 X 0.15 (EJE A-A) 100.250.150.900.34COLUMNETAS 0.25 X 0.15 (EJE A-A) puerta de ingreso princip 20.250.152.400.18COLUMNETAS 0.25 X 0.15 (EJE B-B) 90.250.152.400.81COLUMNETAS 0.25 X 0.15 (EJE D-D) 120.250.152.401.08COLUMNETAS 0.25 X 0.15 (EJE C-C) 70.250.150.900.2450.250.151.800.34VIGUETAS 025X0.15 EJE A-A12.000.250.150.0812.900.250.150.1110.500.250.150.0211.650.250.150.0613.100.250.150.12VIGUETAS 025X0.15 EJE C-C13.500.250.150.1311.200.250.150.0510.750.250.150.032.600.250.150.1032.000.250.150.22

02.03.04.06.02COLUMNETAS Y VIGUETAS, ENCOFRADO Y DESENCOFRADO NORMALM242.39COLUMNETAS 0.25 X 0.15 (EJE A-A) 1020.150.902.70COLUMNETAS 0.25 X 0.15 (EJE A-A) puerta de ingreso princip 20.252.401.20220.152.401.44COLUMNETAS 0.25 X 0.15 (EJE B-B) 920.252.4010.80COLUMNETAS 0.25 X 0.15 (EJE D-D) 1220.252.4014.40COLUMNETAS 0.25 X 0.15 (EJE C-C) 720.150.901.89520.151.802.70

VIGUETAS 025X0.15 EJE A-A122.000.150.60122.900.150.87120.500.150.15121.650.150.49123.100.150.93VIGUETAS 025X0.15 EJE C-C123.500.151.05121.200.150.36120.750.150.2222.600.150.78322.000.151.80

02.03.04.06.03COLUMNETAS Y VIGUETAS, ACERO FY=4200KG/CM2KG320.90COLUMNETAS 0.25 X 0.15 (EJE A-A) FactorRefuerzo vertical 3/8" 1041.420.5631.81Refuerzo Transversal (ESTRIBOS) 1/4" 1050.720.259.00

COLUMNETAS 0.25 X 0.15 (EJE A-A) puerta de ingreso princip Refuerzo vertical 3/8" 242.650.5611.87Refuerzo Transversal (ESTRIBOS) 1/4" 2100.720.253.60

COLUMNETAS 0.25 X 0.15 (EJE B-B) Refuerzo vertical 3/8" 942.650.5653.42Refuerzo Transversal (ESTRIBOS) 1/4" 9100.720.2516.20

COLUMNETAS 0.25 X 0.15 (EJE D-D) Refuerzo vertical 3/8" 1242.650.5671.23Refuerzo Transversal (ESTRIBOS) 1/4" 12100.720.2521.60

COLUMNETAS 0.25 X 0.15 (EJE C-C) Refuerzo vertical 3/8" 741.420.5622.27Refuerzo Transversal (ESTRIBOS) 1/4" 750.720.256.30COLUMNETAS 0.25 X 0.15 (EJE C-C) Refuerzo vertical 3/8" 542.100.5623.52Refuerzo Transversal (ESTRIBOS) 1/4" 580.720.257.20VIGUETASVIGUETAS 025X0.15 EJE A-A entre 1-2Refuerzo vertical 3/8" 212.220.562.49Refuerzo Transversal (ESTRIBOS) 1/4" 1100.450.251.12VIGUETAS 025X0.15 EJE A-A entre 2-3Refuerzo vertical 3/8" 212.980.563.34Refuerzo Transversal (ESTRIBOS) 1/4" 1150.450.251.68

VIGUETAS 025X0.15 EJE A-A entre 3-4Refuerzo vertical 3/8" 210.680.560.76Refuerzo Transversal (ESTRIBOS) 1/4" 130.450.250.34

VIGUETAS 025X0.15 EJE A-A entre 4-5Refuerzo vertical 3/8" 211.840.562.06Refuerzo Transversal (ESTRIBOS) 1/4" 180.450.250.90

VIGUETAS 025X0.15 EJE A-A entre 6-7Refuerzo vertical 3/8" 213.280.563.67Refuerzo Transversal (ESTRIBOS) 1/4" 1150.450.251.68

VIGUETAS 025X0.15 EJE C-C entre 2-3Refuerzo vertical 3/8" 211.380.561.55Refuerzo Transversal (ESTRIBOS) 1/4" 160.450.250.67

VIGUETAS 025X0.15 EJE C-C entre 3-4Refuerzo vertical 3/8" 213.880.564.35Refuerzo Transversal (ESTRIBOS) 1/4" 1160.450.251.79

VIGUETAS 025X0.15 EJE C-C entre 4-5Refuerzo vertical 3/8" 213.880.564.35Refuerzo Transversal (ESTRIBOS) 1/4" 1160.450.251.79

VIGUETAS 025X0.15 EJE C-C entre 5-6,6-7 y 7-83Refuerzo vertical 3/8" 212.180.567.32Refuerzo Transversal (ESTRIBOS) 1/4" 190.450.253.03

02.03.05ESTRUCTURAS DE COBERTURA02.03.05.01COBERTURA CON TEJA ARTESANALM2355.26LADO 1-7 ENTRE A-B 125.655.58143.13LADO 2-8 ENTRE B-C 126.857.30196.01En EL ingreso22.782.9016.12

02.03.05.02CUMBRERA CON TEJA ARTESANALM29.63LADO 2-8 ENTRE B-C 126.8526.85En EL ingreso12.782.78

02.03.06MUROS Y TABIQUES DE ALBAILERIA02.03.06.01MURO DE CABEZA LADRILLO K.K 9X13X23M2216.94EJE A-A ENTRE 1-213.552.408.52Menos ventana1-2.001.40-2.80

EJE A-A ENTRE 2-313.752.409.00Menos ventana1-2.001.40-2.801-0.601.40-0.84

EJE A-A ENTRE 3 - 413.202.407.68Menos ventana1-0.601.40-0.840.00EJE A-A ENTRE 4 - 512.752.406.60Menos ventana1-2.001.40-2.80

EJE A-A ENTRE 5 - 614.302.4010.32Puerta 1-1.804.40-7.92

EJE A-A ENTRE 6 - 714.002.409.60Menos ventana1-3.101.40-4.34

EJE B-B ENTRE 1-213.554.0514.38Menos puerta1-1.002.40-2.401-1.502.40-3.60

EJE B-B ENTRE 2-313.754.0515.19Menos puerta1-1.502.40-3.601-1.002.40-2.40

EJE B-B ENTRE 3 - 413.204.0512.96Menos puerta1-1.502.40-3.60

EJE B-B ENTRE 4 - 512.754.0511.14Menos puerta1-1.202.40-2.88

EJE B-B ENTRE 7 - 814.754.0519.24Menos puerta1-1.002.40-2.40Menos ventana1-3.101.40-4.34

EJE D-D ENTRE 2-3(Pasadizos)/ ss.hh12.854.0511.54Menos puerta1-0.802.40-1.92menos ventana1-0.901.40-1.26EJE D-D ENTRE 4-5En consult. De nios12.904.0511.75

EJE D-D ENTRE 6 - 7 / Farmacia -caja - archiv.14.501.205.4014.154.0516.81

EJE C-C ENTRE 2-313.502.408.40Menos ventana (Muestra TBC / SS.HH)1-0.600.50-0.301-2.150.50-1.08

EJE C-C ENTRE 3-413.202.407.68Menos ventana (SS.HH)1-1.200.50-0.60

EJE C-C ENTRE 4-512.752.406.60Menos ventana (Nios)1-2.001.80-3.60

EJE C-C ENTRE 5 -614.302.4010.32Menos ventana ( Farmacia)1-2.001.80-3.60

EJE C-C ENTRE 6 - 7 14.002.409.60Menos ventana ( Archiv)1-2.001.80-3.60

EJE C-C ENTRE 7 - 8 14.752.4011.40Menos ventana ( Almacen)1-2.001.80-3.60

EJE 1-1 y 7-7 ENTRE A - B 12AREA=12.3024.60Menos ventana (Sala de espera)1-3.101.80-5.58

EJE 2-2 ENTRE D - C 11AREA=13.3013.30Menos ventana (Sala de espera)1-3.101.80-5.58

EJE 7'-7' ENTRE D - C (archivos - pasadizos) 11AREA=17.3017.30puerta (Archivos - pasadizos)1-1.002.40-2.40

EJE 8-8 ENTRE B - C 11AREA=18.3018.30

02.03.06.02MURO DE SOGA LADRILLO DE ARCILLA KK. 9X12X23M2186.81EJE 1-1 ENTRE B - C 121.604.0512.96Menos Ventana (ss.hh)1-0.900.50-0.45

EJE 2-5 ENTRE A - B 15Area=12.9464.70Menos puerta (obstetrico)1-1.502.40-3.60Menos puerta (topico)1-1.502.40-3.60

EJE 2-3 ENTRE B - C122.404.2020.16Menos puerta Radio)1-0.802.40-1.92

EJE 2-4 ENTRE D - C13area_ 11.0933.27radio111.004.054.05Menos puerta Radio)1-0.802.40-1.92

EJE 4 - 7 ENTRE D - C14area_ 13.0952.36Menos puerta Nios1-1.502.40-3.60Menos puerta Caja1-0.902.40-2.16

En SS.HH - H=2.40 M.11.052.402.5211.352.403.2410.552.401.3211.352.403.2410.302.400.7211.352.403.2410.952.402.2802.03.07CIELORRASOS02.03.07.01ESTRUCTURAS DE SOPORTE METALICO DE TEE DE 1" X 1/8"M137.59Ambiente de Farmacia, caja, nios 153.8057.00Ambiente de topico/Consultorio General/Gineco - Obst.19.194.2080.59

02.03.07.02ESTRUCTURAS DE SOPORTE METALICO DE ANGULO DE 1"X 1" X 1/8"M115.20Ambiente de Farmacia182.4043.20Ambiente de topico/Consultorio General/Gineco - Obst.302.4072.00

02.03.07.03CIELORRASO CON MULTIPLACA 1.22X2.44 m e=6mmM112.05Ambiente de Farmacia12.523.8047.58Ambiente de topico/Consultorio General/Gineco - Obst.15.354.2064.47

02.03.08REVOQUES ENLUCIDOS Y MOLDURAS02.03.08.01TARRAJEO CIELORASOS C:A 1:5 E=1.5cmm2318.03LADO 1-7 ENTRE A-B 123.553.9993.96EN BOLADIZOS 24.530.554.98EN BOLADO DEL CANALETA125.650.8020.52

LADO 2-8 ENTRE B-C 125.005.68142.00EN BOLADIZOS 26.690.557.36EN BOLADO DEL CANALETA126.850.8021.48

LADO 1-2 ENTRE B-D 14.302.159.25En puerta de ingreso22.983.1018.48

02.03.08.02TARRAJEO EN MURO EXTERIOR C:A 1:5 E=1.5cmm2192.00 13.552.408.52Menos ventana1-2.001.80-3.60

EJE A-A ENTRE 2-313.752.409.00Menos ventana1-2.001.80-3.601-0.601.80-1.08

EJE A-A ENTRE 3 - 413.202.407.68Menos ventana1-0.601.80-1.080.00EJE A-A ENTRE 4 - 512.752.406.60Menos ventana1-2.001.80-3.60

EJE A-A ENTRE 5 - 614.302.4010.32Puerta 1-1.804.40-7.92

EJE A-A ENTRE 6 - 714.002.409.60Menos ventana1-3.101.80-5.58

EJE B-B ENTRE 1-213.554.0514.38Menos puerta1-1.002.40-2.401-1.502.40-3.60

EJE B-B ENTRE 2-313.754.0515.19Menos puerta1-1.502.40-3.601-1.002.40-2.40

EJE B-B ENTRE 3 - 413.204.0512.96Menos puerta1-1.502.40-3.60

EJE B-B ENTRE 4 - 512.754.0511.14Menos puerta1-1.202.40-2.88

EJE B-B ENTRE 7 - 814.754.0519.24Menos puerta1-1.002.40-2.40Menos ventana1-3.101.80-5.58

EJE D-D ENTRE 2-3(Pasadizos)/ ss.hh12.854.0511.54Menos puerta1-0.802.40-1.92

EJE D-D ENTRE 4-5En consult. De nios12.904.0511.75

EJE B-B ENTRE 6 - 7 / Farmacia -caja - archiv.14.501.205.4011.504.056.07

EJE C-C ENTRE 2-313.502.408.40Menos ventana (Muestra TBC / SS.HH)1-0.600.50-0.301-2.150.50-1.08

EJE C-C ENTRE 3-413.202.407.68Menos ventana (SS.HH)1-1.200.50-0.60

EJE C-C ENTRE 4-512.752.406.60Menos ventana (Nios)1-2.001.80-3.60

EJE C-C ENTRE 5 -614.302.4010.32Menos ventana ( Farmacia)1-2.001.80-3.60

EJE C-C ENTRE 6 - 7 14.002.409.60Menos ventana ( Archiv)1-2.001.80-3.60

EJE C-C ENTRE 7 - 8 14.752.4011.40Menos ventana ( Almacen)1-2.001.80-3.60

EJE 1-1 y 7-7 ENTRE A - B 12AREA=12.3024.60Menos ventana (Sala de espera)1-3.101.80-5.58

EJE 8-8 ENTRE B - C 11AREA=18.3018.30

EJE 1-1 ENTRE B - C 121.604.0512.96Menos Ventana (ss.hh)1-0.900.50-0.45

02.03.08.03TARRAJEO EN MURO INTERIOR C:A 1:5 E=1.5 cm m2545.92EJE A-A ENTRE 1-213.552.408.52Menos ventana1-2.001.80-3.60

EJE A-A ENTRE 2-313.752.409.00Menos ventana1-2.001.80-3.601-0.601.80-1.08

EJE A-A ENTRE 3 - 413.202.407.68Menos ventana1-0.601.80-1.080.00EJE A-A ENTRE 4 - 512.752.406.60Menos ventana1-2.001.80-3.60

EJE A-A ENTRE 5 - 614.302.4010.32Puerta 1-1.804.40-7.92

EJE A-A ENTRE 6 - 714.002.409.60Menos ventana1-3.101.80-5.58

EJE B-B ENTRE 1-213.554.0514.38Menos puerta1-1.002.40-2.401-1.502.40-3.60

EJE B-B ENTRE 2-313.754.0515.19Menos puerta1-1.502.40-3.601-1.002.40-2.40

EJE B-B ENTRE 3 - 413.204.0512.96Menos puerta1-1.502.40-3.60

EJE B-B ENTRE 4 - 512.754.0511.14Menos puerta1-1.202.40-2.88

EJE B-B ENTRE 7 - 814.754.0519.24Menos puerta1-1.002.40-2.40Menos ventana1-3.101.80-5.58

EJE D-D ENTRE 2-3(Pasadizos)/ ss.hh12.854.0511.54Menos puerta1-0.802.40-1.92

EJE D-D ENTRE 4-5En consult. De nios12.904.0511.75

EJE B-B ENTRE 6 - 7 / Farmacia -caja - archiv.14.501.205.4011.504.056.07

EJE C-C ENTRE 2-313.502.408.40Menos ventana (Muestra TBC / SS.HH)1-0.600.50-0.301-2.150.50-1.08

EJE C-C ENTRE 3-413.202.407.68Menos ventana (SS.HH)1-1.200.50-0.60

EJE C-C ENTRE 4-512.752.406.60Menos ventana (Nios)1-2.001.80-3.60

EJE C-C ENTRE 5 -614.302.4010.32Menos ventana ( Farmacia)1-2.001.80-3.60

EJE C-C ENTRE 6 - 7 14.002.409.60Menos ventana ( Archiv)1-2.001.80-3.60

EJE C-C ENTRE 7 - 8 14.752.4011.40Menos ventana ( Almacen)1-2.001.80-3.60

EJE 1-1 y 7-7 ENTRE A - B 12AREA=12.3024.60Menos ventana (Sala de espera)1-3.101.80-5.58

EJE 2-2 ENTRE D - C 12AREA=13.3026.60Menos ventana (Sala de espera)1-3.101.80-5.58

EJE 7'-7' ENTRE D - C (archivos - pasadizos) 12AREA=17.3034.60puerta (Archivos - pasadizos)1-1.002.40-2.40

EJE 8-8 ENTRE B - C 11AREA=18.3018.30

EJE 1-1 ENTRE B - C 121.604.0512.96Menos Ventana (ss.hh)1-0.900.50-0.45

EJE 2-5 ENTRE A - B 15Area=12.9464.70Menos puerta (obstetrico)1-1.502.40-3.60Menos puerta (topico)1-1.502.40-3.60

EJE 2-3 ENTRE B - C222.404.2040.32Menos puerta Radio)1-0.802.40-1.92

EJE 2-4 ENTRE D - C23area_ 11.0966.54radio211.004.058.10Menos puerta Radio)1-0.802.40-1.92

EJE 4 - 7 ENTRE D - C24area_ 13.09104.72Menos puerta Nios1-1.502.40-3.60Menos puerta Caja1-0.902.40-2.16

En SS.HH - H=2.40 M.121.052.405.04121.352.406.48120.552.402.64121.352.406.48120.302.401.44121.352.406.48120.952.404.56

02.03.08.04TARRAJEO DE COLUMNAS C:A 1:5 E=1.5CM INC. ARISTASm2128.05SEGUNDA PLANTACOLUMNA C-1 (L)EJE 1-1, ENTRE A-A 120.502.602.60120.252.601.30

EJE 1-1, ENTRE B-B 120.504.054.05120.254.052.03

EJE 2-2, ENTRE C-C 120.502.602.60120.252.601.30

EJE 7-7, ENTRE A-A Y EJE 8-8, ENTRE C-C 220.503.807.60220.253.803.80

EJE 8-8, ENTRE B-B 120.506.056.05120.256.053.03

COLUMNA C-2 (T)EJE 3-3 ENTRE A-A C-C Y EJE 4-4 ENTRE A-A C-C 410.752.607.80450.252.6013.00

EJE 3-3 ENTRE B-B Y EJE 4-4 ENTRE B-B210.754.056.07250.254.0510.13

COLUMNA C-3 EJE 2-2 ENTRE A-A 140.252.602.60EJE 2-2 ENTRE B-B 140.254.054.05EJE 5-5 ENTRE A-A , C-C, EJE 6-6 ENTRE A-A,C-C Y EJE 7-7 ENTRE C-C 540.253.8019.00EJE 5-5 ENTRE B-B , EJE 6-6 ENTRE B-B Y EJE 7-7 ENTRE B-B 320.505.4016.20310.256.404.80COLUMNA C-4 EJE 1-1 ENTRE D-D Y EJE 2-2 ENTRE D-D 230.252.503.75220.102.501.00

COLUMNA C-5 EJE E-E ENTRE 5-621.00L circunf. CAD=0.803.315.30

02.03.08.05TARRAJEO DE VIGAS INC. ARISTAS C:A 1:5 E=1.5CMm2209.66SEGUNDA PLANTA VIGA 0.25 X 0.50 EJE 1-1 ENTRE A-B124.000.302.40114.000.251.002AREA =0.200.4010.800.250.2011.000.250..200.25VIGA 0.25 X 0.50 EJE 2-2,3-3, 4-4, 5-5, 6-6, 7-7 ENTRE A-B624.000.3014.40614.000.256.00VIGA 0.25 X 0.50 EJE 2-2,3-3, 4-4, 5-5, 6-6, 7-7 ENTRE B-C725.660.3023.77715.660.259.9172AREA =0.253.50710.810.251.42VIGA 0.25 X VAR. EJE A-A y C-C ENTRE 1-72122.500.104.502122.500.2511.25

VIGA 0.25 X .50EJE B-B ENTRE 1-81121.300.306.39EJE B-B ENTRE 1-81121.300.102.131121.300.255.33114.500.251.13VIGA 0.25 X .20EJE D-D ENTRE 1-2212.150.251.08

EJE 1-1 y 2-2 ENTRE B-D610.550.250.83

VIGUETA EN EL CANAL DE DRENAJE PLUVIALEJE A-A ENTRE 1-71122.500.7516.881122.500.102.251222.500.2511.25

EJE C-C ENTRE 1-71122.500.7516.881122.500.102.251222.500.2511.25

VIGA 0.25 X .20 (INGRESO PRINCIPAL)EJE E-E ENTRE 5-6212.450.251.23

EJE E-E ENTRE 5-6222.150.252.15

02.03.08.06DERRAME DE VANOS m253.60VANOS y PUERTAS DE 0.25 cm Eje A-A entre eje 1 - 5 (VENTANA DE 2X1.80)3PERIME =7.6022.80 Eje A-A entre eje 1 - 5 (VENTANA DE 0.5X1.80)2PERIME =4.609.20 Eje A-A entre eje 1 - 5 (VENTANA DE 3.2X1.80)1PERIME =10.0010.00 Eje A-A entre eje 1 - 5 (Puerta de 1.8X2.40)1PERIME =6..61.00 Eje B-B entre eje 1 - 8 (Puerta de 1x2.40)3PERIME =5.8017.40 Eje B-B entre eje 1 - 8 (Puerta de 1.50x2.40)3PERIME =6.3018.90 Eje B-B entre eje 1 - 8 (Puerta de 1.20x2.40)1PERIME =6.006.00 Eje B-B entre eje 1 - 8 (Ventana de 3.20x1.8)1PERIME =10.0010.00 Eje C-C entre eje 2-8 (Ventana de 0.6x0.50)1PERIME =2.202.20 Eje C-C entre eje 2-8 (Ventana de 1.2x0.50)4PERIME =3.4013.60 Eje C-C entre eje 2-8 (Ventana de 0.30x0.50)1PERIME =1.601.60 Eje C-C entre eje 2-8 (Ventana de 0.70x0.50)1PERIME =2.302.30 Eje C-C entre eje 2-8 (Ventana de 0.65x0.50)1PERIME =2.402.40 Eje C-C entre eje 2-8 (Ventana de 2x1.80)4PERIME =7.6030.40 Entre Ejes B y C y entre eje 2-8 (Puerta de 0.80x2.40)1PERIME =5.605.60 Entre Ejes B y C y entre eje 2-8 (Puerta de 1.20x2.40)1PERIME =6.006.00 Entre Ejes B y C y entre eje 2-8 (Puerta de 1.00x2.40)3PERIME =5.8017.40 Eje 2-2 entre eje A-C (Puerta de 1.50x2.40) 1PERIME =6.306.30 Eje 2-2 entre eje A-C (Ventana de 0.25x2.50) 1PERIME =5.505.50 Eje 2-2 entre eje A-C (Ventana de 0.90x0.50) 1PERIME =2.802.80 Eje 2-2 entre eje A-C (Puerta de 0.80x2.40) 1PERIME =5.605.60 Eje 7-7 entre eje A-B (Ventana de 3.20x1.80) 1PERIME =10.0010.00VANOS y PUERTAS DE 0.15 cm Eje 1-1 entre eje A-C (Ventana de 0.90x0.50) 1PERIME =2.802.80 Eje 2-2 entre eje A-C (Puerta de 1.50x2.40) 1PERIME =6.306.30 Entre Eje 2 y 3 , eje B-C (Puerta de 0.80x2.10) SS.HH PERSONAL DAMAS Y CABALLEROS CABALLEROS Y SALA DE RADIO4PERIME =4.2016.80 Entre Eje 3 y 4 , eje A-B (Puerta de 1.50X2.40) Topico1PERIME =6.306.30 Entre Eje 3 y 4 , eje B-C (Puerta de 0.90X2.10) SS.HH PUBLICO DAMAS Y CABALLEROS 2PERIME =4.208.40 Entre Eje 4 y 5 , eje B-C (Puerta de 1.20X2.40) CAMARA DE FRIO (VACUNAS) Y NIOS 1PERIME =6.006.00

02.03.08.07BRUAS m317.38BRUADO EN MURO EXTERIOR EJE A-A DE EJES 1-1 y 7-7 ( BRUADO EXTERIOR MUROS)123.0023.00 EJE B-B DE EJES 1-1 y 2-2 ( BRUADO EXTERIOR MUROS)13.153.15 EJE B-B DE EJES 7-7 y 8-8 ( BRUADO EXTERIOR MUROS)14.374.37 EJE C-C DE EJES2-2 y 8-8 ( BRUADO EXTERIOR MUROS)125.7525.75 EJE 1-1 DE EJES A-B ( BRUADO EXTERIOR MUROS)16.656.65 EJE 7-7 DE EJES A-B ( BRUADO EXTERIOR MUROS)14.304.30 EJE2-2 DE EJES B-C ( BRUADO EXTERIOR MUROS)13.963.96 EJE 8-8 DE EJES B-C ( BRUADO EXTERIOR MUROS)16.206.20BRUADO EN MURO INTERIOR EJE A-A DE EJES 1-1 y 7-7 ( BRUADO INTERIOR MUROS)122.4622.46 EJE B-B DE EJES 1-1 y 8-8 ( BRUADO INTERIOR MUROS)19.719.71 EJE B-B DE EJES 1-1 y 8-8 ( BRUADO INTERIOR MUROS)114.0914.09 PASADIZO ENTRE EJE B-C DE EJES 1-1 y 8-8 ( BRUADO INTERIOR MUROS)121.4021.40 PASADIZO ENTRE EJE B-C DE EJES 2-2 y 8-8 ( BRUADO INTERIOR MUROS)116.0116.01 PARED ENTRE EJE B-C DE EJES 2-2 y 5-5 ( BRUADO INTERIOR MUROS)111.9111.91 EJE C-C DE EJES 2-2 y 8-8 ( BRUADO INTERIOR MUROS)125.3325.33 EJE 1-1 DE EJES A-C ( BRUADO INTERIOR MUROS)15.805.80 EJE 2-2 DE EJES A-C ( BRUADO INTERIOR MUROS)19.179.17 EJE 2-2 AL EJE 7-7 ENTRE EJES A-B ( SALA DE CAMA Y TOPICO)135.1735.17 PARED ENTRE EJE B-C ENTRE EJES 1-2 (GINECO OBSTETRICO)13.653.65 EJE 2-2 AL EJE 8-8 ENTRE EJES B-C ( PAREDES INTERIORES)165.3065.30

02.03.09PISOS Y PAVIMENTOS02.03.09.01VEREDA DE CONTORNO DE CONCRETO 140 KG/CM2 E=4"m253.05Veredas exteriores114.941.217.9316.201.27.44118.150.610.8913.001.23.6014.781.25.7416.211.27.4502.03.09.02ENCOFRADO Y DESENCOFRADO EN VEREDAS M27.99114.940.152.2416.200.150.93118.150.152.7213.000.150.4514.780.150.7216.210.150.93

02.03.09.03PISO PORCELANATO DE 60X60 CM.m294.19ambiente Gineco _obstetrico1area =26.9326.93ambiente Consult. General1area =13.3113.31ambiente Tpico1area =25.1425.14ambiente Farmacia1area =11.0011.00ambiente nios 1area =14.1914.19ambiente cadena de frio 1area =3.623.62

02.03.09.04PISO LOSETA CERAMICA DE 30X30 CM.m2187.25ambiente Sala de espera1area =38.0538.05ambiente circulacion - pasadizo1area =40.9940.99ambiente Almacen1area =19.0219.02ambiente archivos- historias1area =14.8414.84ambiente caja1area =5.75.70ambiente SS.HH de publico1area =8.168.16ambiente SS.HH de personales1area =8.168.16ambiente de radio1area =2.22.20ambiente de cto de limpieza1area =2.582.58ambiente de cto de muestra de TBC1area =1.831.83

En SS.HH - H=2.40 M.121.052.405.04121.352.406.48120.552.402.64121.352.406.48120.302.401.44121.352.406.48120.952.404.56115.252.4012.60

02.03.09.05PISO DE CEMENTO PULIDO Y BRUADO S/COLOREARm237.24En ingreso principal 1area=5.265.262area=15.9931.98

02.03.09.06JUNTAS ASFALTICASm23.40EJE A-A ENTRE 1-6 ( JUNTA ASFALTICA EN VEREDAS )511.206.00EJE A-A ENTRE7-8 ( JUNTA ASFALTICA EN VEREDAS)211.202.40EJE C-C ENTRE 1-8 ( JUNTA ASFALTICA EN VEREDAS)910.605.40EJE 7-8 ENTRE A-C ( JJUNTA ASFALTICA EN VEREDAS)811.209.60

02.03.09.07JUNTAS SISMICASm8.90EJE A-A ENTRE 1-7 ( JUNTA SISMICA)410.252.502.50EJE B-B ENTRE 1-8 ( JUNTA SISMICA)310.252.702.03EJE C-C ENTRE 1-8 ( JUNTA SISMICA)710.252.504.38

02.03.10CONTRAZOCALOS Y ZOCALOS02.03.10.01CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM 1:5 e=1.5cmm56.15EJE A-A ENTRE 1-71124.5524.55EJE C-C ENTRE 5-8119.059.05EJE 7-7 ENTRE A-B114.644.64EJE 8-8 ENTRE B-C114.254.25EJE B-B ENTRE 7-8116.216.21EJE D-D ENTRE 1-2113.253.25EJE 1-1 ENTRE B-C114.204.20

02.03.10.02CONTRAZOCALO DE LOSETA CERAMICO DE 10 CM, C.A 1:5m125.83EJE D-D ENTRE 2-7111.351.350.850.851.501.502.652.652.902.906.306.30EJE B-B ENTRE 1-71.801.801.501.501.701.701.251.251.851.85EJE A-A ENTRE 1-213.553.55EJE A-A ENTRE 2-313.753.75EJE A-A ENTRE 3 - 413.203.20EJE A-A ENTRE 4 - 512.752.75EJE A-A ENTRE 5 - 614.304.30EJE A-A ENTRE 6 - 714.004.00EJE C-C ENTRE 3-413.203.20EJE C-C ENTRE 4-512.752.75EJE C-C ENTRE 5 -614.304.30EJE C-C ENTRE 6 - 7 14.004.00EJE C-C ENTRE 7 - 8 14.754.75EJE 1-1 y 7-7 ENTRE A - B 124.208.40EJE 2-2 ENTRE D - C 13.303.30EJE 7'-7' ENTRE D - C (archivos - pasadizos) 14.554.55EJE 8-8 ENTRE B - C 14.554.55EJE 2-5 ENTRE A - B 144.2016.80EJE 2-3 ENTRE B - C112.152.15EJE 4 - 7 ENTRE D - C144.0216.08EJE 4 - 7 ENTRE D - C122.905.80

02.03.10.03 ZOCALO DE MAYOLICA BLANCA DE 20 X 20m261.97En SS.HH - H=1.80 M.121.051.803.78121.351.804.86120.551.801.98121.351.804.86120.301.801.08121.351.804.86120.951.803.42115.251.809.45Ambiente de Tpico H= 1.80 M.114.181.807.52111.551.802.79111.351.802.43114.201.807.56114.101.807.3802.03.11 CARPINTERIA DE MADERA02.03.11.01 PUERTA DE MADERA APANELADA .und53.52EJE B-B ENTRE 1-7Puerta 1.50 m3.001.502.4010.80Puerta 1.20 m1.001.202.402.88Puerta 1.00 m3.001.002.407.20EJE D-D ENTRE 2-80.00Puerta 0.80 m6.000.802.4011.52Puerta 1.00 m4.001.002.409.60Puerta 0.90 m3.001.002.407.20Puerta en ingreso principl1.001.802.404.3221.00

02.03.12CARPINTERIA METALICA02.03.12.01 MAMPARA CON PUERTA BATIENTE C/ VIDRIO 6 MM.4.324.324.32

02.03.13 CERRAJERIA02.03.13.01 BISAGRA CAPUCHINA DE 4" X 4"pza104.00104.00104.0002.03.13.02 CERRADURA DE 3 GOLPES PARA PUERTApza21.0021.0021.0002.03.13.03 MANIJA DE 4" PARA PUERTASund21.0021.0021.0002.03.14VIDRIOS, CRISTALES Y SIMILARES02.03.14.01 VENTANAS CON MARC DE ALUM C/. VIDRIO TEMPLADO e= 6mm.m249.03ventana de h=1.426.051.436.47ventana de h=0.54.380.52.19Ventana de atencion con taquilla(caja,Farmacia, Admision)4.51.25.40EJE B-B CUMBRERA DE VENTIL. (h= 0.3)1140.31.2013.70.31.112.90.30.872.750.30.833.20.30.96

02.03.15 PINTURA02.03.15.01 PINTURA EN CIELO RASOS Y VIGAS AL LATEXm2527.68527.6802.03.15.02 PINTURA EN MUROS INTERIORES AL LATEXm2545.92545.9202.03.15.03 PINTURA EN MUROS EXTERIORES AL LATEXm2192192.0002.03.15.04 PINTURA EN SUPERF. DE COLUMNAS AL LATEXm2128.05128.0502.03.15.05 PINTURAEN DERRAMES AL LATEXm253.6253.6002.03.15.06 PINTURA ESMALTE SINTETICO 2 MANOS EN ZCALO Y CONTRAZOCALOSm181.98181.9802.03.15.07 ACABADO EN CARPINTERIA DE MADERAm252.252.20

02.03.16INSTALACIONES ELECTRICAS02.03.16.01 SALIDA DE CENTRO DE LUZ02.03.16.01.01 SALIDA DE TECHO (CENTRO DE LUZ)pto33.00ALMACEN GENERAL22.00ARCHIVOS, HISTORIAS, ADMISION22.00CAJA11.00FARMACIA22.00NIOS22.00CADERA DE VACUNAS11.00BAOS, CUARTO DE LIMPIZA, RADIO Y MUESTRA TBC55.00GINECO OBSTETRICO+BAO+HAB.JUNTA44.00CONSULTORIO GENERAL22.00TOPICO+HAB.JUNTA33.00SALA DE ESPERA + PASADIZO99.0002.03.16.01.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLEpto17.00ALMACEN GENERAL11.00ARCHIVOS, HISTORIAS, ADMISION11.00CAJA11.00FARMACIA11.00NIOS11.00CADERA DE VACUNAS22.00 RADIO 11.00GINECO OBSTETRICO+BAO+HAB.JUNTA22.00CONSULTORIO GENERAL11.00TOPICO+HAB.JUNTA44.00SALA DE ESPERA + PASADIZO22.0002.03.16.01.03 SALIDA DE PARED P/INTERRUPTOR SIMPLEpto16.00ALMACEN GENERAL11.00ARCHIVOS, HISTORIAS, ADMISION11.00CAJA11.00FARMACIA11.00NIOS11.00CADERA DE VACUNAS11.00BAOS, CUARTO DE LIMPIZA, RADIO Y MUESTRA TBC55.00GINECO OBSTETRICO BAO+HAB.JUNTA22.00TOPICO HAB.JUNTA11.00SALA DE ESPERA + PASADIZO22.0002.03.16.01.04 SALIDA DE PARED P/INTERRUPTOR DOBLEpto5.00GINECO OBSTETRICO 11.00CONSULTORIO GENERAL11.00TOPICO11.00SALA DE ESPERA + PASADIZO22.0002.03.16.01.05SALIDA PARA INTERNET CON PVC1.00ALMACEN GENERALARCHIVOS, HISTORIAS, ADMISIONCAJAFARMACIANIOSCADERA DE VACUNASBAOS, CUARTO DE LIMPIZA, RADIO Y MUESTRA TBCGINECO OBSTETRICO+BAO+HAB.JUNTACONSULTORIO GENERALTOPICO+HAB.JUNTASALA DE ESPERA + PASADIZO

02.03.16.02ALIMETADORES Y CABLES02.03.16.02.01CONDUCTOR DE 2 X 2.5MM2 -THW - 20MMPVC-Pm127.89ALMACEN GENERAL112.1812.18ARCHIVOS, HISTORIAS, ADMISION16.766.76CAJA13.883.88FARMACIA15.185.18NIOS16.206.20CADERA DE VACUNAS13.723.72BAOS, CUARTO DE LIMPIZA, RADIO Y MUESTRA TBC115.5215.52GINECO OBSTETRICO+BAO+HAB.JUNTA114.3514.35CONSULTORIO GENERAL15.925.92TOPICO+HAB.JUNTA113.2213.22SALA DE ESPERA + PASADIZO140.9640.9602.03.16.02.02CONDUCTOR DE 2 X 4.00 MM2 -THW - 25MM PVC -Pm63.71C-4121.7921.79C-7113.1013.10C-5128.8128.81

02.03.16.03TABLEROS Y/O CUCHILLAS02.03.16.03.01TABLERO DE DISTRIBUCION TD01, TD3 (TERMOMAG. MONOF. + CAJA)und22.002.0002.03.16.03.02TABLERO GENERAL TG01 (TERMOMAG. MONOF. + CAJA)und11.001.00

02.03.16.04ARTEFACTOS0.002.03.16.04.01 FLUORESCENTE 44 W C/ PANTALLund27.00ALMACEN GENERAL22.00ARCHIVOS, HISTORIAS, ADMISION22.00CAJA11.00FARMACIA22.00NIOS22.00CADERA DE VACUNAS11.00SS.HH.22.00GINECO OBSTETRICO+HAB.JUNTA33.00CONSULTORIO GENERAL22.00TOPICO+HAB.JUNTA33.00SALA DE ESPERA + PASADIZO77.0002.03.16.04.02 LUMINARIAS DE 32 W C/ PANTALLund6.00 CUARTO DE LIMPIZA, RADIO Y MUESTRA TBC33.00GINECO OBSTETRICO SS.HH.11.00 PASADIZO22.0002.03.16.05POZO PUESTA A TIERRA02.03.16.05.01 POZO PUESTA A TIERRAund11.001.00

02.03.17INSTALACIONES SANITARIAS02.03.17.01SISTEMA DE AGUA FRIA02.03.17.01.01SALIDA DE AGUA FRIA 02.03.17.01.01.01 SALIDA DE AGUA FRIA 1/2"pto55.005.0002.03.17.01.01.02 SALIDA DE AGUA FRIA PARA INODORO PVC DE 1/2"pto77.007.0002.03.17.01.01.03 SALIDA DE AGUA FRIA PARA LAVATORIO PVC DE 1/2"pto88.008.00

02.03.17.01.02RED DE DISTRIBUCION02.03.17.01.02.01 TRAZO Y REPLANTEOm33.1433.1433.1402.03.17.01.02.02 EXCAVACION DE ZANJA,PARA REDES DE AGUA H=0.80 M.m33.0033.0033.0002.03.17.01.02.03 RELLENO Y COMPACT.,PARA REDESm33.0033.0033.0002.03.17.01.02.04 SUMINISTRO E INST. DE TUBERIA PVC C-10 DE 3/4" - AGUA FRIAm27.4227.4227.4202.03.17.01.02.05 SUMINISTRO E INSTAL. TUBERIA PVC C-10 DE 1/2" AGUA FRIAm51.3951.3951.39

02.03.17.01.03ACCESORIOS DE REDES02.03.17.01.03.01 SUMINISTRO DE REDUCCIONES PVC-SAP 3/4" - 1/2"und55.005.0002.03.17.01.03.02 SUMINISTRO DE CODO PVC SAP AGUA 3/4"und11.001.0002.03.17.01.03.03 SUMINISTRO DE CODO PVC SAP AGUA 1/2"und2424.0024.0002.03.17.01.03.04 SUMINISTRO DE TEE PVC-SAP 3/4"und44.004.0002.03.17.01.03.05 SUMINISTRO DE TEE PVC-SAP 1/2"und1313.0013.0002.03.17.01.03.06 SUMINISTRO E INST. DE CAJA DE VALVULAS DE 10" X 20" TAPA FF.und11.001.00

02.03.17.01.04 LLAVES Y VALVULAS02.03.17.01.04.01 VALVULA DE COMPUERTA DE BRONCE DE 3/4"und11.001.0002.03.17.01.04.02 VALVULA DE COMPUERTA DE BRONCE DE 1/2"und66.006.0002.03.17.01.04.03 SUMINISTRO E INST. DE CAJA DE VAL. DE 8" X 8" EN PARED /MARCO Y TAPA DE FG.und66.006.00

02.03.17.01.05PRUEBAS HIDRAULICA Y DEINFECCION DE EDES DE AGUA02.03.17.01.05.01 PRUEBA HIDRAULICA+DESINFECCION EN REDES DE AGUA m78.8178.8178.81

02.03.17.02SISTEMA DE DESAGUE02.03.17.02.01SALIDA DE DESAGUE02.03.17.02.01.01 SALIDA DE DESAGUE EN PVC 4" PARA INODOROpto55.005.0002.03.17.02.01.02 SALIDA DE DESAGUE EN PVC 2" PARA LAVATORIOpto88.008.0002.03.17.02.01.03 SALIDA DE DESAGUE EN PVC 2" PARA URINARIOpto22.002.0002.03.17.02.01.04 SALIDA DE DESAGUE EN PVC 2" PARA LAVADEROpto22.002.0002.03.17.02.01.05 SALIDA DE DESAGUE EN PVC 2" PARA SUMIDEROpto55.005.0002.03.17.02.01.06 SALIDA DE DESAGUE EN PVC 2" PARA DUCHApto22.002.0002.03.17.02.01.07 SALIDA DE VENTILACION PVC 2" CON REJILLApto33.003.00

02.03.17.02.02 REDES DE DERIVACION02.03.17.02.02.01 TRAZO Y REPLANTEOm5454.0054.0002.03.17.02.02.02 EXCAVACION DE ZANJA,PARA REDES DE DESAGUE H=0.80 M. / EXT.m53.4853.4853.4802.03.17.02.02.03 RELLENO Y COMPACT.,PARA REDES DE DESGUE H=0.80 M./ EXT.m53.4853.4853.4802.03.17.02.02.04 TUBERIA PVC SAL 2"m19.6719.6719.6702.03.17.02.02.05 TUBERIA PVC SAL 4"m56.4556.4556.45

02.03.17.02.03 ACCESORIOS DE REDES02.03.17.02.03.01 SUMINISTRO DE YEE DE PVC DE 4" X 4"pza22.002.0002.03.17.02.03.02 SUMINISTRO DE CODO DE PVC DE 4" X 45pza99.009.0002.03.17.02.03.03 SUMINISTRO DE CODO DE PVC DE 2" X 90pza33.003.0002.03.17.02.03.04 SUMINISTRO DE CODO DE PVC DE 2" X 45pza33.003.0002.03.17.02.03.05 SUMINISTRO DE YEE DE PVC DE 4" X 2"pza1414.0014.0002.03.17.02.03.06 SUMINISTRO DE YEE DE PVC DE 2" X 2"pza66.006.0002.03.17.02.03.07 REGISTROS DE BRONCE 4"pza33.003.0002.03.17.02.03.08 REGISTRO DE BRONCE 2" EN PISOund33.003.0002.03.17.02.03.09 SUMIDERO CROMADO 2", P/ PISOund55.005.0002.03.17.02.03.10 SUMIDERO CROMADO 2", P/ DUCHAund22.002.0002.03.17.02.03.11 CAJA DE REGISTRO DE 12" X 24" TAPA FFund66.006.00

02.03.17.02.04PRUEBAS HIDRAULICAS EN REDES DE DESAGUE02.03.17.02.04.01 PRUEBA HIDRAULICA EN RED DE DESAGUEm76.1276.1276.12

02.03.17.02.05APARATOS Y ACCESORIOS SANITARIOS02.03.17.02.05.01 INODORO TANQUE BAJO BLANCOpza55.005.0002.03.17.02.05.02 URINARIOS DE LOZA O BLANCOpza22.002.0002.03.17.02.05.03 LAVATORIO DE PARED BLANCO 1 LLAVEpza88.008.0002.03.17.02.05.04 LAVADERO DE ACERO INOXIDABLE S/ESCURRIDERApza22.002.0002.03.17.02.05.05 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOSund22.002.0002.03.17.02.05.06 JABONERA DE LOSA COLOR BLANCOund22.002.0002.03.17.02.05.07 PAPELERA DE LOZA BLANCA DE 13 X 15pza55.005.0002.03.17.02.05.08 INSTALACION DE APARATOS SANITARIOSund1717.0017.0002.03.17.02.05.09 INSTALACION DE ACCESORIOS SANITARIOS COMPLEMENTARIOSund4040.0040.00

02.03.17.03 SISTEMA DE AGUA DE LLUVIA02.03.17.03.01 TUBERIA DE PVC SAL 4" P/LLUVIASm12.8112.8112.8102.03.17.03.02 ACCES. EN TUB. BAJADA DE EVAC. PLUVIAL pto44.004.0002.03.17.03.03 COLUMNETA PARA EVACUACION PLUVIALund44.004.00

MOD II. RES PERHOJA DE METRADOS DE MODULO II (RESIDENCIA PERSONAL) / URPAYOBRA : MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PRIMER NIVEL DE ATENCIN EN LOS EE.SS. DE HUAYCHAO Y URPAY DE LA MICRORED QUINUA-RED DE SALUD HUAMANGA-DIRESA AYACUCHO, DISTRITO DE ACOS VINCHOS-HUAMANGA-AYACUCHOPROPIETARIO:MUNICIPALIDAD DISTRITAL DE ACOS VINCHOSFECHA41740.0

METRADO MODULO II (RESIDENCIA PERSONAL) - URPAYITEMDESCRIPCION PARTIDAUNDN DE VECESCANT.MEDIDASPARCIALTOTALLARGOANCHOALTO02.04 MODULO II RESIDENCIA PERSONAL02.04.01TRABAJOS PRELIMINARES02.04.01.01LIMPIEZA DE TERRENO MANUALM2112.8011.60148.48148.4802.04.01.02TRAZO Y REPLANTEO PRELIMINARM2112.8011.60148.48148.48

02.04.02MOVIMIENTO DE TIERRAS02.04.02.01CORTE DE TERRENO EN FORMA MANUALM211.73AREA CAD=4.6053.9646.5846.57Menos el area libre-2.862.58-7.3802.04.02.02EXCAVACION DE ZAPATA H=1.30 M.M3131.001.001.2015.6015.607.3902.04.02.03EXCAVACION DE ZANJAS DE CIMENTACION HASTA 0.80 M M310.52EJE A-A,C-C Entre 2-3 20.450.500.600.27EJE A-A,B-B,C-C Entre 3-432.650.500.602.39EJE A-A Entre 1-213.500.500.601.05EJE A-A,B-B Entre 2-320.950.500.600.57 EJE D-D Entre 1-213.050.500.600.91EJE 1-1,2-2 Entre D-C21.580.500.600.95EJE 1-1,2-2,3-3,4-4 Entre C-B42.820.500.603.38EJE 1-1 Entre B-A10.700.500.600.21EJE ,2-2,3-3,4-4 Entre B-A12.630.500.600.79

02.04.02.04RELLENO CON MATERIAL PROPIOM33.57EJE A-A Entre 1-41AREA CAD1.390.600.84EJE B-B Entre 1-41AREA CAD1.850.601.11EJE C-C Entre 1-41AREA CAD1.720.601.03EJE D-D Entre 1-41AREA CAD0.980.600.59

02.04.02.05ELIMINACION DE EXCESO DE CORTE CON VOLQUETE CARGUO A MANOM385.30VOLUMEN EXCAVADO =72.70VOLUMEN RELLENADO =3.57VOLUMEN A ELIMINAR =85.3002.04.02.06NIVELACION INTERIOR Y APISONADO PARA F. PISOM260.12DORMITORIOS 2AREA CAD=11.9823.97SS.HH PASADIZO CENTRAL 1AREA CAD=9.179.17COSINA1AREA CAD=26.9926.99

02.04.02.07AFIRMADO, DE 4" PARA PISOS INTERIORES Y EXTERIORESM260.12DORMITORIOS 2AREA CAD=11.9823.97SS.HH PASADIZO CENTRAL 1AREA CAD=9.179.17COSINA1AREA CAD=26.9926.99

02.04.02.08AFIRMADO DE 4" PARA VEREDASM239.71CONTORNO MODULOII1AREA CAD=39.7139.71

02.04.03CONCRETO SIMPLE02.04.03.01SOLADO02.04.03.01.01 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGONM213.00ZAPATA Z - 01131.001.0013.00

02.04.03.02CIMIENTO CORRIDO02.04.03.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 +30% PG CEMENTO-HORMIGONM316.16EJE A-A,C-C Entre 2-4 25.650.500.603.39EJE A'-A';D-D Entre1-223.500.500.602.10EJE A-A,B-B Entre 2-220.950.500.600.57EJE B-B Entre 3-413.200.500.600.96 EJE 1-1 Entre D-A17.670.500.602.30EJE 2-2 Entre D-C12.570.500.600.77EJE ,2-2,3-3,4-4 Entre C-B36.750.500.606.08

02.04.03.03SOBRECIMIENTO02.04.03.03.01SOBRECIMIENTO CONCRETO 1:8 + 25% PMM3 4.63EJE A-A,C-C Entre 2-4 25.350.230.400.98EJE A'-A' Entre 1-212.810.230.400.26EJE D-D Entre 1-313.900.230.400.36EJE A-A,B-B Entre 2-220.500.230.400.09EJE B-B Entre 3-413.400.230.400.31 EJE 1-1 Entre D-A17.400.230.400.68EJE 2-2 Entre D-A18.180.230.400.75EJE 3-3 Entre C-A15.150.230.400.47EJE 4-4 Entre C-A17.750.230.400.71

02.04.03.03.02ENCOFRADO Y DEDESENCOFRADOM220.11EJE A-A,C-C Entre 2-4 25.350.404.28EJE A'-A' Entre 1-212.810.401.12EJE D-D Entre 1-313.900.401.56EJE A-A,B-B Entre 2-220.500.400.40EJE B-B Entre 3-413.400.401.36 EJE 1-1 Entre D-A17.400.402.96EJE 2-2 Entre D-A18.180.403.27EJE 3-3 Entre C-A15.150.402.06EJE 4-4 Entre C-A17.750.403.10

02.04.03.04FALSO PISOS Y OTROS02.04.03.04.01 FALSO PISO DE 4" DE CONCRETO 1:10M288.91DORMITORIOS2AREA CAD=12.1024.21BANOS Y PASADIZO1AREA CAD=8.948.94PATIO ADELANTE Y ATRAS1AREA CAD=17.9617.96VEREDAS CONTORNO1AREA CAD=10.9410.94COSINA1AREA CAD=26.8526.8502.04.04OBRAS DE CONCRETO ARMADO ESTRUCTURAL02.04.04.01ZAPATAS02.04.04.01.01CONCRETO EN LOSA F'C=210 KG/CM2 M37.80ZAPATA Z - 01131.001.000.607.80

02.04.04.01.02ACERO FY=4200KG/CM2 KGLONGITUDFACTOR141.8013120.901.01141.8002.04.04.02SOBRECIMIENTO ARMADO02.04.04.02.01SOBRECIMIENTO ARMADO CONCRETO 210 KG/CM2M34.78EJE 1-1 Entre A"-C114.450.252.502.78EJE A"-A" Entre 1- 2113.80.252.101.99A @ 0.20ERROR:#REF!0.20dif=ERROR:#REF!02.04.04.02.02SOBRECIMIENTO ARMADO ENCF.Y DESENCOFRADOM276.42TOTAL DE ESTRIBERROR:#REF!ERROR:#REF!EJE 1-1 Entre A"-C224.452.5044.50EJE A"-A" Entre 1- 2223.82.1031.92

02.04.04.02.03SOBRECIMIENTO ARMADO ACERO Fy=4200 KGCANTN VECLong. TotalFactor161.91SA(.25X.VAR)EJE 1-1 Entre A"-CRefuerzo Vertical 1/2" 2112.751.0158.33Refuerzo Transversal 3/8" 1314.570.5633.27EJE A"-A" Entre 1- 2Refuerzo Longitudinal 1/2" 1912.381.0145.67Refuerzo Transversal (ESTRIBOS) 3/8" 1114.000.5624.64

02.04.04.03COLUMNAS02.04.04.03.01COLUMNAS CONCRETO 210 KG/CM2 M33.94

COLUMNA C-160.250.253.221.2140.250.254.641.1630.250.254.590.86COLUMNETA 210.250.154.760.36210.250.154.760.36

02.04.04.03.02COLUMNAS ENCOFRADO Y DESENCFRADO M238.34COLUMNA C1EJE 1-1; 4-4620.253.229.66EJE 2-2 EN A,C,D320.254.646.96EJE 2-2 EN A,B,C,D410.104.641.86EJE 2-2,3-3 EN B230.254.646.96EJE 3-3 EN A,C 220.254.594.59EJE 3-3320.254.596.89

COLUMNETA 220.250.154.760.71220.250.154.760.71

02.04.04.03.03COLUMNAS ACERO Fy=4200 KG/CM2 KGLONGITUDFACTOR556.87COLUMNAS C1DISTANCIA TOTAL4.64EJE 1-1,4-4 Refuerzo vertical = 1/2 644.701.01113.930.0520.1EJE 2-2 Refuerzo vertical = 1/2 446.531.01105.460.1101EJE 3-3 Refuerzo vertical = 1/2 346.761.0181.940.1560.9EJE 1-1,4-4 Refuerzo transversal (estribos) =1/4 6251.010.5684.840.2142.64EJE 2-2 Refuerzo transversal (estribos) =1/4 4351.010.5679.18TOTAL32EJE 3-3 Refuerzo transversal (estribos) =1/4 3321.010.5654.30COLUMNETA EJE A-A Refuerzo vertical = 3/8 245.300.5623.74EJE A-A-A Refuerzo transversal (estrivos) = 3/8 2350.770.2513.48

02.04.04.04VIGAS02.04.04.04.01VIGAS CONCRETO F'C= 210KG/CM2 M38.07VP1 2-2110.000.400.251.00VP2 EJE 1-117.40AREACAD0.110.82VP2 EJE 3-3; 4-427.80AREACAD0.111.73V3 EJE 2-217.80AREACAD0.060.48V4 EJE A-A, B-B C-C ENTRE 2-436.780.250.201.02V4 EJE B-B C-C ENTRE 1-224.820.250.200.48V4 EJE D-D ENTRE 1-226.780.250.551.86CANAL PLUVIAL116.90AREACAD0.040.68

02.04.04.04.02 VIGAS, ENCOFRADO Y DESENCOFRADOM234.91VIGA PERALTADAEJE 1-1 ENTRE D-A 17.400.191.3916.900.281.9011.600.250.40EJE 2-2 ENTRE D-A16.900.191.31112.130.404.8518.080.100.8111.000.250.25EJE 3-3 ENTRE C-A17.000.191.3217.000.281.9311.600.250.40EJE 4-4 ENTRE C-A17.000.191.3217.500.282.0710.250.25VIGA EJE 2-2 ENTRE C-A16.500.251.63EJE A-A; B-B; C-C ENTRE 3-431.280.250.96EJE B-B ENTRE 3-413.400.100.34EJE B-B ENTRE 2-311.280.250.32EJE B-B; C-C ENTRE 1-224.560.252.28EJE D-D; ENTRE 1-220.530.250.26CANAL PLUVIALEJE 1-128.400.25=4.2028.50=0.254.25116.900.152.53

02.04.04.04.03 VIGAS ACERO FY=4200KG/CM2KGLONGITUDFACTOR758.67EJE 1-1 VP-2217.821.0115.80417.821.6050.055111.310.5637.49EJE 2-2 VP-14110.981.0144.342110.981.6035.146811.260.5647.98EJE 2-2 V-3417.721.0131.194810.960.5625.86EJE 3-3, EJE 4-4 VP2 227.681.0131.05427.681.6098.304821.310.5670.56EJE A-A; B-B, C-C V-4237.021.0142.55237.221.0143.764430.860.5663.57EJE B-B ,C-C , V-4225.841.0123.61226.091.0124.603220.860.5630.82EJE D-D V-4215.861.0111.83216.111.0112.343710.860.5617.82

02.04.04.05LOSA ALIGERADA H=0.20 M. 02.04.04.05.01LOSAS ALIGERADAS, CONCRETO F'C=210 KG/CM2M2100.56LADO B16.788.5057.63LADO A 14.828.4040.4910.793.072.44

02.04.04.05.02LOSAS ALIGERADAS, ENCOFRADO Y DESENCOFRADO NORMALM312.50LOSA LADO B18.506.780.052.88LOSA LADOA18.404.820.052.0210.793.070.050.12 VIGUETAS LADO B1817.330.100.206.24 VIGUETAS LADO A124.820.100.201.1650.790.100.200.08

02.04.04.05.03LOSAS ALIGERADAS, ACERO GRADO 60KGLONGITUDPARCIAL528.10LOSA LADO BAcero de refuerzo Positivo 1/2" 186.271.01113.99Acero de refuerzo del Superior 1/2" 186.421.01116.72Acero de refuerzo del superior = 3/8 181.800.5618.14LOSA LADO AAcero de refuerzo Positivo 1/2" 125.721.0169.32Acero de refuerzo del Superior 1/2" 125.381.0165.18Acero de refuerzo Positivo 1/2" 56.131.0130.97Acero de refuerzo del Superior 1/2" 25.821.0111.77

en Viguetas lateralesLOSA LADO Bestribamiento con acero de 1/4"340.240.252.070.793Acero de temperatura0.25aceros de temperatura = 1/4 258.900.2555.63LOSA LADO Bestribamiento con acero de 1/4"100.240.250.61Acero de temperaturaaceros de temperatura = 1/4 198.800.2541.80aceros de temperatura = 1/4 32.570.251.92

02.04.04.05.04LOSAS ALIGERADAS, LADRILLO HUECO DE ARCILLA 15X30X30 CMUND837.658.336.788.50480.068.334.828.40337.278.330.793.0720.32

02.04.04.06COLUMNETAS Y VIGUETAS DE CONFINAMIENTO02.04.04.06.01COLUMNETAS Y VIGUETAS, CONCRETO F'C= 210KG/CM2M31.01COLUMNETAS 0.25 X 0.15 100.250.151.250.47COLUMNETAS 0.25 X 0.15 EJE A-A 20.250.153.230.24VIGUETAS51.600.150.250.30

02.04.04.06.02COLUMNETAS Y VIGUETAS, ENCOFRADO Y DESENCOFRADO NORMALM29.09COLUMNETAS 0.25 X 0.15 1020.151.253.75COLUMNETAS 0.25 X 0.15 EJE A-A 220.153.301.98VIGUETAS 0.25X0.15521.600.152.40521.600.060.96

02.04.04.06.03COLUMNETAS Y VIGUETAS, ACERO FY=4200KG/CM2KG98.70Refuerzo vertical 3/8" 1042.100.5647.04Refuerzo Transversal (ESTRIBOS) 1/4" 1090.720.2516.20COLUMNETAS 0.25 X 0.15 EJE A-A Refuerzo vertical 3/8"