8/12/2019 Pondasi 3 Bor Pile-terzagi
1/23
Site Name :
Type Tower : LIGHT DUTY-72m
PERENCANAAN PONDASI
Lpile
Keterangan :Lebar Pondasi (B) = 2.50 mTebal Pondasi (T) = 0.40 m
Kedalaman Pondasi (D) = 1.50 mPedestal (C) = 0.55 m
F = 0.50 mH = 2.00 m
L pile= 10.50 m
1. BEBAN RENCANA :Gaya Tekan 68.26 TonGaya Uplift 59.50 Ton
Gaya lateral 4.35 Ton
2. DAYA DUKUNG PONDASI TIANG BOR:**** Daya Dukung Tekan Tiang Bor Tunggal:Qcult= (Nc*cu*Ab) + (ca*As)
= (9*cu*Ab) + (a cu*As)
Ket : cu = undrained shear strength pada ujung tiang bor = qc/15 (kg/cm2)
ca = adhesi rata-rata sepanjang selimut tiang = acu (kg/cm2)
a = koefisien adhesi
cu = undrained shear strength rata-rata sepanjang selimut tiang (kg/cm2)
D
BT
C
F
H
8/12/2019 Pondasi 3 Bor Pile-terzagi
2/23
Dari data sondir :
qc= 250 Kg/cm2 , Pada Elevasi - 12.00 (pada ujung tiang)cu = qc/15
= 16.667 kg/cm2
qc= 20.0 Kg/cm2 , (rata-rata qcsepanjang tiang)cu = qc/15 (undrained shear strength rata-rata sepanjang tiang)
= 1.33 kg/cm2
= 13.3 ton/m2 ( dari grafik aVS cudiperoleh a= 0.4 )Dipakai : Tiang borf30 cm
Ab= 706.5 cm2
pf= 94.2 cm , L pile= 10.50 m
As= pfLpile
= 98910 cm2
Qcult= (9*cu*Ab) + (a cu*As)
= 105975 + 52752
= 158727 kg= 158.73 ton
Qcall= Qc ult/SF
= Qc ult/2.5
= 63.491 ton (tekan)
**** Daya Dukung Tarik Tiang Bor Tunggal:QTult= (ca*As)
= (a cu*As)
Ket : ca = adhesi rata-rata sepanjang selimut tiang = acu (kg/cm2)
a = koefisien adhesi
cu = undraine shear strength rata-rata sepanjang selimut tiang (kg/cm2)
Dari data sondir :
qc= 20.0 Kg/cm2
(rata-rata qcsepanjang tiang)
cu = qc/15 (undrained shear strength rata-rata sepanjang tiang)
= 1.33 kg/cm2
= 13.3 ton/m2 ( dari grafik aVS cudiperoleh a= 0.4 )
Dipakai : Tiang borf40 cm
Ab= 1256.0 cm2
pf= 125.6 cm , L pile= 10.50 m
As= pfLpile
= 131880 cm2
QTult= (a cu*As)
= 70336 kg= 70.34 ton
QTall= QT ult/SF
= QT ult/3
= 23.445 ton (tarik)
8/12/2019 Pondasi 3 Bor Pile-terzagi
3/23
**** Daya Dukung Lateral Tiang Bor Tunggal:Hall= ( k.f.da) / b
Ket : Ha = Daya dukung mendatar yang diijinkan (kg)
k = Koefisien reaksi lapisan tanah di bawah permukaan dalam arah lateral (Kg
f= Diameter tiang (cm)
da = Besarnya pergeseran normal (cm)
b =4 ( k.f )/4EI
E = Modulus elastisitas bahan tiang (Kg/cm2)
I = Momen Inersia penampang (cm4)
I = 125600 cm4
fc'= 189 kg/cm2
Ec = 204328 kg/cm2
k = 0.50 kg/cm3
da = 1.00 cm
b = 0.003736
Hall= ( k.f. da) / b
= 5353.2 Kg= 5.00 Ton (lateral)
Daya Dukung Bored pile Group :Jumlah Tiang bor (s) = 3effisiensi group (x) = {16-(s-1)}/16 (Fled formula)
= 0.88
jarak antar tiang (m) = 1.50 mjarak ke tepi (n) = 0.50 mLebar Pondasi (B) = 2.50 m
Qcompr.total= s (x*Qcomp.tunggal) = 166.66 TonQtension total= s (x*Qtension tunggal) = 61.54 TonHall total= s (x*Hall) = 13.13 Ton
3. KEAMANAN TERHADAP UPLIFT/TARIK :Volume Beton (Vb) = {(m+2n)*B*T} - {(msin60)*0.5m*T} + {C*C*(H-T)}
= 2.59 m3
Berat Beton (Wb) = Vb * 2.4 t/m3= 6.23 Ton
Volume Tanah (Vs) = (Berbentuk limas terpancung terbalik dengan sudut 300)
= [{B+((D-T)/cos30)}2 * 1/3*{(Bcos30)+(D-T)}] - [B
2* 1/3Bcos30] - [
= 10.63 m3
Berat tanah (Ws) = Vs * 1.6 t/m3= 17.00 Ton
Qtension total= s (x*Qtension tunggal)
= 61.54 Ton (daya dukung tarik bored pile total)
Wtot= Wb + Ws + Qtension total= 84.77 Ton
Gaya Uplift = 59.50 Ton < W Total= 84.77 Ton
mm
mn
B
n
8/12/2019 Pondasi 3 Bor Pile-terzagi
4/23
8/12/2019 Pondasi 3 Bor Pile-terzagi
5/23
5. KEAMANAN TERHADAP SLIDING/GESER :d= Koefisien friksi = 0.45
H all= 13.13 Ton (daya dukung lateral bored pile total)
P = Gaya Tekan + Berat Beton (Wb)= 74.49 Ton
Gaya Lateral = 4.35 Ton
SF sliding= (P*d+ H all )/ Lateral= 10.72 > 1.5 (OK)
6. PENULANGAN :Mutu Beton :
fc' = 18.9 Mpa (K-225)
Mutu Tulangan :
fy= 400 Mpa (BJTD40) D > 13mm
fys= 240 Mpa (BJTP24) f< 13mm
A. PEDESTALfaktor beban = 1.3
Ptot = Gaya Tekan + Berat Pedestal
= 69.42 Ton Pu= 1.3* Ptot= 90.25 Ton
Gaya Tarik = 59.50 Ton Tu= 1.3* tarik = 77.35 Ton
Momen = Lateral*(H-T)= 6.96 Ton.m Mu= 1.3* Momen = 9.05 Ton.m
Penulangan Utama:
C
- Akibat Tekan:
Pu= 90.25 Ton
Pu= f 0.8*(0.85fc'*(Ag-As) + As*fy)
{Pu/(0.65*0.8)}-0.85fc'Ag
C = 0.55 m As1 = -81.37 cm2
Ag= C*C
= 0.3025 m2 - Akibat Tarik:
= 3025 cm2
Tu= 77.35 Ton
Tu= f As*fyAsmin= 1%* Ag (Tu/0.7)
Asmin= 30.25 cm2
fy
As2= 27.63 cm2
- Akibat Momen (bolak-balik):
Mu= 9.05 Ton.m
Mu=fAsfy(d-1/2a)
Mu=0.8 Asfy(d-1/2a) , dimana a= Asfy/0.85fc'b
Mu=0.8 Asfy(d-(Asfy/
1.7fc'b))
As= Mu /{0.8fy(d-(Asfy/
1.7fc'b))}
As=
C
fy- 0.85fc'As=
8/12/2019 Pondasi 3 Bor Pile-terzagi
6/23
AsPerlu= Max( As min, As1, As2, As3)
AsPerlu= 30.25 cm2 , digunakan besi : D 16( 16 D16 )
Penulangan Sengkang:
Gaya Lateral = 4.35 Ton Vu= 1.3* tekan = 5.66 Ton
Vc= 1/6fc'1/2bd= 19.93 Ton
Vs = Vu/f- Vc , f= 0.75
= -12.39 Ton (Sengkang minimum)
Dicoba : f10 mm Av = 2.1/4. p f
2 = 1.57 cm2
smin