31
1 Portfolio & CV Robertus de Bruin Augustus 2014

Portfolio & cv l R de Bruin

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Portfolio & cv l R de Bruin

1

Portfolio & CVRobertus de Bruin

Augustus 2014

Page 2: Portfolio & cv l R de Bruin

2

Page 3: Portfolio & cv l R de Bruin

3

ContentCurriculum Vitae

Portfolio

New Media Platform2014TU DelftAfstudeer studio

Geselecteerde projecten

Informeer Brussel2012TU DelftMaster 1 studio

FMR HU Utrecht2011HU UtrechtHU afstudeer project

Groei en transformatie2011TU DelftPre-Master

5

9

10

18

24

28

Page 4: Portfolio & cv l R de Bruin
Page 5: Portfolio & cv l R de Bruin

5

Curriculum Vitae

Page 6: Portfolio & cv l R de Bruin

6

PERSOONSGEGEVENS

OPLEIDINGEN

WERKERVARING

Curriculum Vitae Robertus de Bruin, ir

Adres: Goedestraat 120 3572RX Utrecht

E-mail: [email protected] nr.: 0630415372

Nationaliteit: NederlandsGeboortedatum: 02-02-1986

Architectenregister registratie nr.: 1.140715.017

2014 Master Architecture, Urbanism and Building sciences TU Delft

2012 Bachelor Bouwkunde Hogeschool Utrecht

2011 Pre-Master Architecture, urbanism and Building sciences TU Delft

2007 MBO Werktuigbouwkunde Scutos, Utrecht

2003 VMBO Elektrotechniek ‘tGilde,Gorinchem

2012- Robertus de Bruin Bouwwerkzaamheden [o.a. bouwaanvraag, wonningsplitsing, woningsamenvoeg ing,aanbouw, interieur ontwerp, interieurbouw en verbouw]

2012 Blauw Architecten Bachelor afstudeer stage [o.a.duurzaamheid,energie-neutraal,flexwerken]

2009 Blauw Architecten Stage [o.a.etaillering,rendering,maquettebouw,definitiefont werp, verkoop tekeningen]

Page 7: Portfolio & cv l R de Bruin

7

SOFTWARE

NOMINATIES

OVERIGE INFORMATIE

Tekensoftware: Graphisoft Archicad BIM Vaardig Autodesk Revit Basis kennis Autodesk Autocad Vaardig Arkey systems Basis kennis Google Sketch-up Vaaridg

Grafisch: Indesign Vaardig Illustrator Vaardig Photoshop Vaardig Artlantis render studio Vaardig Coreldraw Basis kennis

Overig: MSOffice Vaardig

Talen: Nederlands Engels

Overige interesses: Gitaar spelen, wielrennen, surfen, muziek, meubelen bouwen.

Referenties: R.M. Lichtenberg, Architect Blauw Architecten C.A. Ter Beek, Architect Blauw Architecten

2007-2009 A&A Techniek Hoofd engineer, tekenaar, werkvoorbereider [o.a. leiding geven, machine ontwerp en ontwikkeling]

2004-2006 Diverse opleidingsgerelateerde stages [uitvoerende werkzaamheden]

2014 Archiprix NewMediaPlatform,Chicago

2012 Holland-ontwerp Award FMR Hogeschool Utrecht, Utrecht

Page 8: Portfolio & cv l R de Bruin

8

Page 9: Portfolio & cv l R de Bruin

9

Portfolio

Page 10: Portfolio & cv l R de Bruin

10

NEW MEDIA PLATFORMPROJECT INFORMATIE

Locatie: Chicago

Datum: september 2013- juli 2014

Programma: Stedenbouwkundige visie ll New media platform

oppervlakte: 2km2 ll 10.000m2

Software: Archicad Artlantis Photoshop Illustator IndesignNominatie: Archiprix

Eindcijfer: 9

OMSCHRIJVING

De stad Chicago is een van de meest gesegregeerde steden van de Verenigde Staten, waarbij South Chicago dagelijks kampt met gangs, criminaliteit en geweld. Dit wordt o.a. in stand gehouden door de monofunctionele wijken die geen uitweg bieden aan dit bestaan. Een leeg gebied van 2 km2 tussen South Chicago en de kust van Michigan Lake biedt de mogelijkheid om hier verandering in te brengen.Om de kans van slagen van deze ontwikkeling zo groot mogelijk te maken, wordt South Chicago hier vanaf het begin bij betrok-ken. De wijk wordt versterkt met faciliteiten zoals sportcentra e.d. Tegelijkertijd zorgen incubatoren voor toestroom van nieuwe ge-bruikers. Omhieraanbijtedragenhuisvesthet‘newmediaplatform’zowelwijk gebonden culturele programma’s als ruimte voor startendeondernemers.Door het overlappende thema ‘newmedia’wordtinteractie gestimuleerd. De leegte en tevens hoofdrouting in het midden van het gebouw faciliteert deze (verticale) interactie. Daar-naast wordt de interactie op iedere verdieping verder gefaciliteerd door middel van een informeel werkplein. De gevel bestaat groten-deels uit 3d geprinte luiken die een grote rol spelen in het regelen van het binnenklimaat. Naast het regelen van de zontoetreding, vormen de luiken, wanneer ze over elkaar heen worden gesloten, eenextraisolerendelaagomhetgebouw.Opdezemanierkun-nendeextremeklimaatpieken(-30ºC)wordenopgevangen.

TU DELFT COMPLEX PROJECTS AFSTUDEER STUDIO

Page 11: Portfolio & cv l R de Bruin

11

Page 12: Portfolio & cv l R de Bruin

12

Page 13: Portfolio & cv l R de Bruin

Public transportWork

Health

Art

Housing

EducationHolistic city

(South Works)

13

Page 14: Portfolio & cv l R de Bruin

14

GSEducationalVersion

1

1

4

4

2

2

3

3

F

AA

B B

C

D

C

D

E

F

E

07

10.800 17.000 10.800

8.300

8.300

8.300

8.300

5.400

ExhibitionStorage KitchenWardrobe

Exhibitionspace

Restaurant

Foyer

GSEducationalVersion

1

1

4

4

2

2

3

3

F

AA

B B

C

D

C

D

E

F

E

05

06

10.800 17.000 10.800

8.300

8.300

8.300

8.300

5.400

Storage

Locker roomArchive

Youmediachill out

YoumediaWorkshop

Media Library

Media Library

Storage

YoumediaWorkshop

YoumediaWorkshop

YoumediaWorkshop

YoumediaStudio

1ste verdieping

2e verdieping

A

A

Page 15: Portfolio & cv l R de Bruin

15

GSEducationalVersion

E

10.800 17.000 10.800

8.300

8.300

8.300

8.300

5.400

Storage Print room

Meetingroom

office

officeofficeofficeoffice

office

office

office

office

office

office

office

office office

Openoffice

square

1

1

4

4

2

2

3

3

F

AA

B B

C

D

C

D

E

F

GSEducationalVersion

1

1

4

4

2

2

3

3

F

AA

B B

C

D

C

D

E

F

E

05

06

10.800 17.000 10.800

8.300

8.300

8.300

8.300

5.400

Storage

Locker roomArchive

Youmediachill out

YoumediaWorkshop

Media Library

Media Library

Storage

YoumediaWorkshop

YoumediaWorkshop

YoumediaWorkshop

YoumediaStudio

GSEducationalVersion

E B AB B B

±0

+3.000

+7.500

+13.500

+17.500

+21.500

+25.500

+29.500

+33.500

+37.560

GSEducationalVersion

E

10.800 17.000 10.800

8.300

8.300

8.300

8.300

5.400

Storage Print room

Meetingroom

office

officeofficeofficeoffice

office

office

office

office

office

office

office

office office

Openoffice

square

1

1

4

4

2

2

3

3

F

AA

B B

C

D

C

D

E

F

GSEducationalVersion

E

10.800 17.000 10.800

8.300

8.300

8.300

8.300

5.400

Storage Print room

Meetingroom

office

officeofficeofficeoffice

office

office

office

office

office

office

office

office office

Openoffice

square

1

1

4

4

2

2

3

3

F

AA

B B

C

D

C

D

E

F

GSEducationalVersion

E

10.800 17.000 10.800

8.300

8.300

8.300

8.300

5.400

Storage Print room

Meetingroom

office

officeofficeofficeoffice

office

office

office

office

office

office

office

office office

Openoffice

square

1

1

4

4

2

2

3

3

F

AA

B B

C

D

C

D

E

F

GSEducationalVersion

E

10.800 17.000 10.800

8.300

8.300

8.300

8.300

5.400

Storage Print room

Meetingroom

office

officeofficeofficeoffice

office

office

office

office

office

office

office

office office

Openoffice

square

1

1

4

4

2

2

3

3

F

AA

B B

C

D

C

D

E

F

Doorsnede AA

5e verdieping

Page 16: Portfolio & cv l R de Bruin

16

SECTION AND FACADE 1:50

GSEducationalVersion

4

01

03

04

+7.500

+13.500

+17.500

+21.500

+25.500

+29.500

+33.500

+37.560+37.746

8.300

D CD C A

Page 17: Portfolio & cv l R de Bruin

17

Page 18: Portfolio & cv l R de Bruin

18

INFORMEER BRUSSELPROJECT INFORMATIE

Locatie: BrusselDatum: februari - juli 2012

Programma: Informatie paviljoen Oppervlakte: 450m2

Software: Archicad Artlantis Photoshop Illustator IndesignEindcijfer: 8,5

TU DELFT MSC1 MATERIALISATION STUDIO

OMSCHRIJVING

Voor de nieuwe ontwikkeling van het Europees kwartier is een nieuw masterplan door Christian de Portzamparc ontworpen. Ech-ter,doordathetgebiedenkelzakelijkgebruiktwordtishet’savondleeg en splitst het gebied de aangrenzende wijken op in tweeën. Dit plan introduceert nieuwe routes en een programmatische di-versiteit in het gebied die de connectie met de rest van de stad versterkt.

Om de bewoners te informeren over de toekomstige ontwikkeling, wordt een tijdelijk informatiepaviljoen geplaatst. Het nieuwe pa-viljoen introduceert één van de nieuwe routes; door omhoog en omlaag te golven ontstaan er diverse binnenruimtes, dakterrassen en een openlucht theater. Zo ontstaat een heldere beweging waar men zich over, onder en doorheen kan bewegen.

Door het tijdelijke karakter van het programma zijn zoveel mogelijk duurzame en herbruikbare materialen toegepast. Zo bestaat het paviljoen uit een stalen constructie, bekleed met houten latten, die veelal in geprefabriceerde panelen kunnen worden aangebracht. Daarnaast zijn de binnenruimtes allemaal zelfstandig geklimati-seerd.

Page 19: Portfolio & cv l R de Bruin

19

0

636

3.900

4.554

5.292

2.000

2.636

5.900

6.554

7.292

2.780

3.278

1.320

FACADE(curved) Beams 80x80Plywood 18mmHollow section 80x50x5Water-resistand plywood 18mmVapour permeable foilHE260ARecycled cotton isolation 100mmBeams 100x50Vapour proof foilMDF plate 18mm white

Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white

TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70

1 2

1:20

636

3.900

4.554

5.292

Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white

FACADE(curved) Beams 80x80Plywood 18mmHollow section 80x50x5Water-resistand plywood 18mmVapour permeable foilHE260ARecycled cotton isolation 100mmBeams 100x50Vapour proof foilMDF plate 18mm white

Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white

TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70

RoofBitumenFlameproof Isolation 150mmVapour proof foilHE260AMDF plate 18mm white

TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70

doorsnede 1:100

doorsnede 1:100

636

3.900

4.554

5.292

Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white

FACADE(curved) Beams 80x80Plywood 18mmHollow section 80x50x5Water-resistand plywood 18mmVapour permeable foilHE260ARecycled cotton isolation 100mmBeams 100x50Vapour proof foilMDF plate 18mm white

Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Isolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white

TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70

RoofBitumenFlameproof Isolation 150mmVapour proof foilHE260AMDF plate 18mm white

TerraceBeams 80x80Water-resistant plywoodIPE 400Beams 240x70

doorsnede 1:100

doorsnede 1:100

Programme

< 15 M

15 M - 30 M

30 M - 55M

55 M - 75 M

75 M - 100 M100 M - 200 M

Morphology Location

Existing morphology

Morphology part demolished

Morphology future with realised masterplan

Heights future with realised masterplan

rue de la loi

rue de la loi

rue de la loi

location

Scale 1:2500 | Dead end pedestrian routes

Current situation

The ongoing pedestrian routes on the Wetstraat are currently blocked by closed building blocks.

Scale 1:2500 | Connecting pedestrian routes

Current situation

Future connection

By opening up the building blocks on the Wetstraat the pedes-trian routes are connected. Important advantages are the linking of public spaces Nord and South of the Wetstraat and the redress-ing of the claustrophobic atmosphere of the Wetstraat.

Second nature: Technical networks Pedestrian and cycle traffic | PEDESTRIAn RoUTES

SCALE 1: 20.000 Current situation

The ongoing pedestrian routes on the Wetstraat are currently blocked by closed building blocks.

SCALE 1:20.000 | ConnECTInG PEDESTRIAn RoUTES

Current situation future connection

by opening up the building blocks on the Wetstraat the pedestrian routes are connected. Important advantages are the linking of public spaces nord and South of the Wetstraat and the redressing of the claustrophobic atmosphere of the Wetstraat

connecting ribbon

200

1392

Lunch room

Bar

Berging

Exposition room

Terras

Open air theatre

Interactive

exposition room

10° 10°

10°

10°

10°

16,67°

16,6

16,6

13,3

13,3

13,33

°

FACADE(curved) Beams 80x80Plywood 18mmHollow section 80x50x5Water-resistand plywood 18mmVapour permeable foilHE260ARecycled cotton isolation 100mmBeams 100x50Vapour proof foilMDF plate 18mm white

A

B

B

B

B

B

B

B

B

B

B

B

B

BB

B

B

Programmameeting room

interactive exposition space

exposition space

lunch room

Programme

connecting to the park perpendicular to the Wetstraat

connecting the roofslab to the ground level. making space for the future and presant residents

Floorplan

Section 1

Section 2 east facade

Section 1:20location connections “open block”

robertus de Bruin4111370

Page 20: Portfolio & cv l R de Bruin

20

200

1392

Lunch room

Bar

Berging

Exposition room

Terras

Open air theatre

Interactive

exposition room

10° 10°

10°

10°

10°

16,67°

16,6

16,6

13,3

13,3

13,33

°

A

B

1

2

3

4

5

6

7

8

9

10

11

1213

14

15

5'

4'

1'

8'

11'

12'

Page 21: Portfolio & cv l R de Bruin

21

200

1392

Lunch room

Bar

Berging

Exposition room

Terras

Open air theatre

Interactive

exposition room

10° 10°

10°

10°

10°

16,67°

16,6

16,6

13,3

13,3

13,33

°

A

B

1

2

3

4

5

6

7

8

9

10

11

1213

14

15

5'

4'

1'

8'

11'

12'

Page 22: Portfolio & cv l R de Bruin

22

01

02636

3.900

4.554

5.292

Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white

A B

doorsnede 1:100

doorsnede 1:100

1.39218

109

250

1810

049

3080

738

80

R= 1592

80 18 80 813 18 135 130 100 18

FACADE(curved) Beams 80x80

Plywood 18mmHollow section 80x50x5

Water-resistand plywood 18mmVapour permeable foil

HE260ARecycled cotton insolation 100mm

Beams 100x50Vapour proof foil

MDF plate 18mm white

Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white

FACADEBeams 80x80

water-resistant plywood 18mmHollow section 80x50x5

Thermal separation

5'

1.392

1810

925

018

100

4930

8073

8

80

R= 1592

80 18 80 813 18 135 130 100 18

FACADE(curved) Beams 80x80

Plywood 18mmHollow section 80x50x5

Water-resistand plywood 18mmVapour permeable foil

HE260ARecycled cotton insolation 100mm

Beams 100x50Vapour proof foil

MDF plate 18mm white

Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white

FACADEBeams 80x80

water-resistant plywood 18mmHollow section 80x50x5

Thermal separation

5'

1.392

1810

925

018

100

4930

8073

8

80

R= 1592

80 18 80 813 18 135 130 100 18

FACADE(curved) Beams 80x80

Plywood 18mmHollow section 80x50x5

Water-resistand plywood 18mmVapour permeable foil

HE260ARecycled cotton insolation 100mm

Beams 100x50Vapour proof foil

MDF plate 18mm white

Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white

FACADEBeams 80x80

water-resistant plywood 18mmHollow section 80x50x5

Thermal separation

5'

1.392

1810

925

018

100

4930

8073

8

80

R= 1592

80 18 80 813 18 135 130 100 18

FACADE(curved) Beams 80x80

Plywood 18mmHollow section 80x50x5

Water-resistand plywood 18mmVapour permeable foil

HE260ARecycled cotton insolation 100mm

Beams 100x50Vapour proof foil

MDF plate 18mm white

Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white

FACADEBeams 80x80

water-resistant plywood 18mmHollow section 80x50x5

Thermal separation

5'1.392

1810

925

018

100

4930

8073

8

80

R= 1592

80 18 80 813 18 135 130 100 18

FACADE(curved) Beams 80x80

Plywood 18mmHollow section 80x50x5

Water-resistand plywood 18mmVapour permeable foil

HE260ARecycled cotton insolation 100mm

Beams 100x50Vapour proof foil

MDF plate 18mm white

Terrace/roofCurved beams 80x80mmAluminium frame 30x50x3mmBeams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70mmMDF plate 18mm white

FACADEBeams 80x80

water-resistant plywood 18mmHollow section 80x50x5

Thermal separation

5'

Page 23: Portfolio & cv l R de Bruin

23

01

02636

3.900

4.554

5.292

Terrace/roofCurved beams 80x80Aluminium frame 30x50x3Beams on rubberBitumenFlameproof Insolation 150mmVapour proof foilHE260ABeams 240x70MDF plate 18mm white

A B

doorsnede 1:100

doorsnede 1:100

1810

925

018

100

5030

8073

8

900 128 24

27

80

1.39

2

Terrace/roofCurved beams 80x80

Aluminium frame 30x50x3Beams on rubber

BitumenFlameproof Isolation 150mm

Vapour proof foilHE260A

Beams 240x70MDF plate 18mm white

Prefabricated curved wood panelCurved oak beams 80x80mm

nailed on 18mm waterproof multiplex

Prefabricated steel frameworkHollow section 80x50mm

steel reinforcing strip 8mmUNP 240

Thermal separation

Adjustable steel profile for construction ofterrace structure

1810

925

018

100

5030

8073

8

900 128 24

27

80

1.39

2

Terrace/roofCurved beams 80x80

Aluminium frame 30x50x3Beams on rubber

BitumenFlameproof Isolation 150mm

Vapour proof foilHE260A

Beams 240x70MDF plate 18mm white

Prefabricated curved wood panelCurved oak beams 80x80mm

nailed on 18mm waterproof multiplex

Prefabricated steel frameworkHollow section 80x50mm

steel reinforcing strip 8mmUNP 240

Thermal separation

Adjustable steel profile for construction ofterrace structure

1810

925

018

100

5030

8073

8

900 128 24

27

80

1.39

2

Terrace/roofCurved beams 80x80

Aluminium frame 30x50x3Beams on rubber

BitumenFlameproof Isolation 150mm

Vapour proof foilHE260A

Beams 240x70MDF plate 18mm white

Prefabricated curved wood panelCurved oak beams 80x80mm

nailed on 18mm waterproof multiplex

Prefabricated steel frameworkHollow section 80x50mm

steel reinforcing strip 8mmUNP 240

Thermal separation

Adjustable steel profile for construction ofterrace structure

1810

925

018

100

5030

8073

8900 12

8 2427

80

1.39

2

Terrace/roofCurved beams 80x80

Aluminium frame 30x50x3Beams on rubber

BitumenFlameproof Isolation 150mm

Vapour proof foilHE260A

Beams 240x70MDF plate 18mm white

Prefabricated curved wood panelCurved oak beams 80x80mm

nailed on 18mm waterproof multiplex

Prefabricated steel frameworkHollow section 80x50mm

steel reinforcing strip 8mmUNP 240

Thermal separation

Adjustable steel profile for construction ofterrace structure

1810

925

018

100

5030

8073

8

900 128 24

27

80

1.39

2

Terrace/roofCurved beams 80x80

Aluminium frame 30x50x3Beams on rubber

BitumenFlameproof Isolation 150mm

Vapour proof foilHE260A

Beams 240x70MDF plate 18mm white

Prefabricated curved wood panelCurved oak beams 80x80mm

nailed on 18mm waterproof multiplex

Prefabricated steel frameworkHollow section 80x50mm

steel reinforcing strip 8mmUNP 240

Thermal separation

Adjustable steel profile for construction ofterrace structure

1810

925

018

100

5030

8073

8

900 128 24

27

80

1.39

2

Terrace/roofCurved beams 80x80

Aluminium frame 30x50x3Beams on rubber

BitumenFlameproof Isolation 150mm

Vapour proof foilHE260A

Beams 240x70MDF plate 18mm white

Prefabricated curved wood panelCurved oak beams 80x80mm

nailed on 18mm waterproof multiplex

Prefabricated steel frameworkHollow section 80x50mm

steel reinforcing strip 8mmUNP 240

Thermal separation

Adjustable steel profile for construction ofterrace structure

1810

925

018

100

5030

8073

8

900 128 24

27

80

1.39

2

Terrace/roofCurved beams 80x80

Aluminium frame 30x50x3Beams on rubber

BitumenFlameproof Isolation 150mm

Vapour proof foilHE260A

Beams 240x70MDF plate 18mm white

Prefabricated curved wood panelCurved oak beams 80x80mm

nailed on 18mm waterproof multiplex

Prefabricated steel frameworkHollow section 80x50mm

steel reinforcing strip 8mmUNP 240

Thermal separation

Adjustable steel profile for construction ofterrace structure

1810

925

018

100

5030

8073

8

900 128 24

27

80

1.39

2

Terrace/roofCurved beams 80x80

Aluminium frame 30x50x3Beams on rubber

BitumenFlameproof Isolation 150mm

Vapour proof foilHE260A

Beams 240x70MDF plate 18mm white

Prefabricated curved wood panelCurved oak beams 80x80mm

nailed on 18mm waterproof multiplex

Prefabricated steel frameworkHollow section 80x50mm

steel reinforcing strip 8mmUNP 240

Thermal separation

Adjustable steel profile for construction ofterrace structure

1810

925

018

100

5030

8073

8

900 128 24

27

80

1.39

2

Terrace/roofCurved beams 80x80

Aluminium frame 30x50x3Beams on rubber

BitumenFlameproof Isolation 150mm

Vapour proof foilHE260A

Beams 240x70MDF plate 18mm white

Prefabricated curved wood panelCurved oak beams 80x80mm

nailed on 18mm waterproof multiplex

Prefabricated steel frameworkHollow section 80x50mm

steel reinforcing strip 8mmUNP 240

Thermal separation

Adjustable steel profile for construction ofterrace structure

Page 24: Portfolio & cv l R de Bruin

24

FMR HU UTRECHTPROJECT INFORMATIE

Locatie: Utrecht, Uithof

Datum: september 2011- januari 2012

Programma: Facultiet maatschapij en recht

Oppervlakte: 16.500m2

Software: Archicad Artlantis Photoshop Illustrator IndesignNominatie: holland-ontwerp Award

Eindcijfer: 8

HOGESCHOOL UTRECHT AFSTUDEER PROJECT

OMSCHRIJVING

De ambitie van dit project was om een duurzaam, energie neutraal gebouw te realiseren. Studie liet blijken dat dit niet realistisch was voor deze locatie op dit schaalniveau. Door de schaal te vergroten voor deze ontwikkeling – door de gehele Uithof incl. het medisch centrum erbij te betrekken – is het mogelijk om energiebronnen als geo-warmte toe te passen. Deze warmte wordt op ongeveer 5 km diepte uit een aquifer gehaald. Hoewel de techniek zeer kostbaar is, is het rendabel op deze schaal.

Naast het energie vraagstuk, dient de faculteit duurzamer gemaakt te worden. Om dit te bewerkstelligen is er rekening gehouden met onderwijsveranderingen,energieefficiëntieenstedenbouwkundi-ge inpassing. Zo wordt de hoofdentree verplaatst naar de hoofdas van de Uithof en wordt het interieur aangepast om toekomstige onderwijsveranderingenoptekunnenvangen.Specifiek,wordenonderwijsruimtes kleiner gemaakt en collegezalen groter. Tevens worden er meer zelfstandige werkplekken gerealiseerd voor stu-denten?enzullen(gast)docentengebruikmakenvanflexplekkenomderuimteefficiëntertegebruiken.

Page 25: Portfolio & cv l R de Bruin

25

6.1 Noordgevel vanaf het westen

63

Page 26: Portfolio & cv l R de Bruin

26

Projectnaam

Adres

Opdrachtgever

TekeningnummerFormaat Schaal Datum

FACULTEIT MAATSCHAPPIJ EN RECHT

HEIDELBERGLAAN 7, UTRECHT

A1 1:200 03/01/2012

PLATTEGROND

Studenten

DORIS HARDING 1519470

ROBERTUS DE BRUIN 1528918

S ruimte 01M ruimte 02XL ruimte 03WC 04Berging 05Onderwijsbureau 06Repro 07ICT balie 08Winkel 09Bilbitheek 10Espressobar 11Restaurant 12Keuken 13Receptie 14Studielandschap 15docentenwerkplek 16Trolley ruimte 17Toneelzaal 18Kleedkamer 19Overlegruimte 20Fietsenstalling 21Technische ruimte 22Overig 23

RUIMTENUMMERS

14

7.200 7.200 7.200 7.200 7.200 7.200 7.200 3.600

7.200 7.200 7.200 7.200 7.200 21.600 7.200 3.600

4.500 4.500 4.500

+3400

A

+3400

+3400

+3400

+3400P = 0

B

B

1234567891011

A

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

S

T

U

H'

G'

10' 9'12131415161718

R

192021

S'

2.10

05.

100

5.10

05.

100

3.60

07.

200

7.20

03.

600

7.20

07.

200

7.20

03.

600

7.20

07.

200

10.8

005.

100

5.10

0

4.500 4.500 4.500 4.500 3.600 3.600 3.600 3.600 7.200 3.600

7.20

03.

000

7.20

0

4.500 4.500 4.500 4.500 3.600 3.600 3.600 3.600 7.200 3.600

04

+3400

+3400

+3400

+3400

+3400

+3400

+3400

+3400

+3400

+3400

Lift

Lift

02

01

01

01 01

01 01

020202

03 03

03

02

01

01

02

04

0404

04

15

16

15

04

10

17

2222

20 20

18

19

19

05

05

2222

05

02

23

04

04

1515

Lift

03

1E VERDIEPING

Projectnaam

Adres

Opdrachtgever

TekeningnummerFormaat Schaal Datum

FACULTEIT MAATSCHAPPIJ EN RECHT

HEIDELBERGLAAN 7, UTRECHT

A3 1:200 03/01/2012

DOORSNEDE AA & BB

Studenten

DORIS HARDING 1519470

ROBERTUS DE BRUIN 1528918

ALUMINIUM WATERSLAG MET KOPSCHOT

±0

+3.400

+6.800

+10.200

+13.600

+17.000

+17.493

2.100 5.100 5.100 5.100 3.600 7.200 7.200 3.600 7.200 7.200 7.200 3.600 7.200 7.200 3.600 7.200 5.100 5.100

BB1 BB2

A B C D E F G H J K L M N P Q R S T U

20

22

21

±0

+3.400

+6.800

+10.200

+13.600

+17.000

3.600 7.200 7.200 7.200 7.200 7.200 7.200 7.200 7.200 3.600

1234567891010'

DOORSNEDE BB

DOORSNEDE AA

Page 27: Portfolio & cv l R de Bruin

27Projectnaam

Adres

Opdrachtgever

TekeningnummerFormaat Schaal Datum

FACULTEIT MAATSCHAPPIJ EN RECHT

HEIDELBERGLAAN 7, UTRECHT

A3 1:40 03/01/2012

DOORSNEDE BB1 & BB2

Studenten

DORIS HARDING 1519470

ROBERTUS DE BRUIN 1528918

ALUMINIUM WATERSLAG MET KOPSCHOT

BA

01

02

03

04

05

06

08

07

+2.921

+3.450

+4.297

+5.610

+7.697

+9.010

+9.752

+10.250

+11.097

+13.600

+12.410

+13.900

+14.093

P=0

+6.850

MV=0

Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc

Gevelopbouw:Composietplaat 15mmFlexibele lijm 3mmAluminium achterconstructieWaterkerende dampopen folieAerowool 190mmDampdichte foliePrefab betonnen binnenblad 130mmstuc

U

11

12

13

15

16

P=0

+3.450

+4.297

+5.610

+6.850

+7.697

+9.010

+10.250

+11.097

+12.410

+13.650

+14.497

+15.810

+17.000

+17.300

MV=-50

+17.493

Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc

Deur, geperforeerd aluminium en staalVliesgevel CW 60

DOORSNEDE BB1 DOORSNEDE BB2

Projectnaam

Adres

Opdrachtgever

TekeningnummerFormaat Schaal Datum

FACULTEIT MAATSCHAPPIJ EN RECHT

HEIDELBERGLAAN 7, UTRECHT

A3 1:40 03/01/2012

DOORSNEDE BB1 & BB2

Studenten

DORIS HARDING 1519470

ROBERTUS DE BRUIN 1528918

ALUMINIUM WATERSLAG MET KOPSCHOT

BA

01

02

03

04

05

06

08

07

+2.921

+3.450

+4.297

+5.610

+7.697

+9.010

+9.752

+10.250

+11.097

+13.600

+12.410

+13.900

+14.093

P=0

+6.850

MV=0

Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc

Gevelopbouw:Composietplaat 15mmFlexibele lijm 3mmAluminium achterconstructieWaterkerende dampopen folieAerowool 190mmDampdichte foliePrefab betonnen binnenblad 130mmstuc

U

11

12

13

15

16

P=0

+3.450

+4.297

+5.610

+6.850

+7.697

+9.010

+10.250

+11.097

+12.410

+13.650

+14.497

+15.810

+17.000

+17.300

MV=-50

+17.493

Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc

Deur, geperforeerd aluminium en staalVliesgevel CW 60

DOORSNEDE BB1 DOORSNEDE BB2

Projectnaam

Adres

Opdrachtgever

TekeningnummerFormaat Schaal Datum

FACULTEIT MAATSCHAPPIJ EN RECHT

HEIDELBERGLAAN 7, UTRECHT

A3 1:40 03/01/2012

DOORSNEDE BB1 & BB2

Studenten

DORIS HARDING 1519470

ROBERTUS DE BRUIN 1528918

ALUMINIUM WATERSLAG MET KOPSCHOT

BA

01

02

03

04

05

06

08

07

+2.921

+3.450

+4.297

+5.610

+7.697

+9.010

+9.752

+10.250

+11.097

+13.600

+12.410

+13.900

+14.093

P=0

+6.850

MV=0

Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc

Gevelopbouw:Composietplaat 15mmFlexibele lijm 3mmAluminium achterconstructieWaterkerende dampopen folieAerowool 190mmDampdichte foliePrefab betonnen binnenblad 130mmstuc

U

11

12

13

15

16

P=0

+3.450

+4.297

+5.610

+6.850

+7.697

+9.010

+10.250

+11.097

+12.410

+13.650

+14.497

+15.810

+17.000

+17.300

MV=-50

+17.493

Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc

Deur, geperforeerd aluminium en staalVliesgevel CW 60

DOORSNEDE BB1 DOORSNEDE BB2

Projectnaam

Adres

Opdrachtgever

TekeningnummerFormaat Schaal Datum

FACULTEIT MAATSCHAPPIJ EN RECHT

HEIDELBERGLAAN 7, UTRECHT

A3 1:40 03/01/2012

DOORSNEDE BB1 & BB2

Studenten

DORIS HARDING 1519470

ROBERTUS DE BRUIN 1528918

ALUMINIUM WATERSLAG MET KOPSCHOT

BA

01

02

03

04

05

06

08

07

+2.921

+3.450

+4.297

+5.610

+7.697

+9.010

+9.752

+10.250

+11.097

+13.600

+12.410

+13.900

+14.093

P=0

+6.850

MV=0

Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc

Gevelopbouw:Composietplaat 15mmFlexibele lijm 3mmAluminium achterconstructieWaterkerende dampopen folieAerowool 190mmDampdichte foliePrefab betonnen binnenblad 130mmstuc

U

11

12

13

15

16

P=0

+3.450

+4.297

+5.610

+6.850

+7.697

+9.010

+10.250

+11.097

+12.410

+13.650

+14.497

+15.810

+17.000

+17.300

MV=-50

+17.493

Gevelopbouw:Geanodiseerd GeperforeerdeAluminium cassetteAluminium achterconstructieWaterkerende dampopen folieAerowool isolatie 190mmDampdichte folieBeton prefab 130mmStuc

Deur, geperforeerd aluminium en staalVliesgevel CW 60

DOORSNEDE BB1 DOORSNEDE BB2

Page 28: Portfolio & cv l R de Bruin

28

GROEI EN TRANSFORMATIEPROJECT INFORMATIE

Locatie: Leidschendam

Datum: februari - juli 2011

Programma: Basisschool en BSO

Oppervlakte: 4.200m2

Software: Archicad Artlantis Photoshop Illustator IndesignEindcijfer: 8

TU DELFT PRE-MASTER

OMSCHRIJVING

Basisschool‘develden’teLeidschendam(CieArchitecten)isaanuitbreiding toe en moet worden voorzien van een buitenschoolse opvang. Zodoende wordt het gehele gebouw verbreed en zorgen tweepatio’svoorlichttoetreding.Beidepatio’shebbenhuneigendoel en identiteit.Eén vandepatio’s vormteengecontroleerdebuitenruimte voor de jongere kinderen. Door één hoek van het ge-bouw omhoog te trekken ontstaat een helder stedenbouwkundig gebaar en kan de entree, via de tweede patio, in het hart van het gebouw worden geplaatst.

Flexibele ruimtes die gemakkelijk van onderwijsruimte tot BSOruimte kunnen worden getransformeerd vormen het uitgangspunt van het interieur. Lokalen worden in groepen van twee of drie ge-clusterd en grenzen aan een tussenruimte. Deze tussenruimte kan tijdens lesuren voor individueel werk worden gebruikt. Terwijl detussenruimte,tijdensBSOuren,d.m.v.flexibelewandenbijhetlokaal wordt betrokken. Hierdoor ontstaat een andere ruimte die een duidelijk onderscheid maakt tussen de BSO en onderwijs pe-riode. Iets wat erg belangrijk is voor de ervaring van de kinderen.

Page 29: Portfolio & cv l R de Bruin

29

Huidige situatie

Toe te voegen programma

Veranderen richten

Met het programma de vorm sluitenen beide patio’s een andere indentiteit geven en twee patio’s creërenOpenen naar de wijk door de kop op te tillen

Bestaande situatie

Toe te voegen programma

Het gebouw verbreden

Patio’smakenhetgebouwbruikbaar

Het gebouw opent zich naar de wijkenbeidepatio’skrijgenhuneigen identiteit

Page 30: Portfolio & cv l R de Bruin

30

Bijlage 1 Plattegronden

Page 31: Portfolio & cv l R de Bruin

31