Brief:
Located just around the corner from Harrods, we were asked to create a handsome, elegant and comfortable interior for the family to use when they were visiting London. As this building is Grade II listed, liaison with the Managing Agents and local Council was necessary for all the refurbishment work we wanted to carry out.
Solution:
Neutral, silvery tones, accented with highly pol-ished dark wood furniture gave the living room drama and glamour. Textured wallpaper was used throughout the apartment and this added an ele-ment of richness to all the rooms.
All three ensuite bathrooms were clad in marble slab and tile and we managed to upgrade two mac-erating WC’s to normal ! ushing systems.
3 bedrooms; Grade II listed; Completion: June 2012; Total cost: £500,000
; - 0 5 <= /> ? 2 7 > @ 8 1 3 A 7 1 < 8 1 -
Brief:
We were brought in to renovate and redecorate this 5 bedroom home arranged over 5 ! oors, including the basement which we renovated from an existing garage into a family room, shower and utility area.
" e family wanted to change the feel of the house to something more grown up and elegant.
Solution:
Contemporary, Italian furniture was used through-out and a colour palette of earthy tones, along with natural materials such as wool, silk and leather gave this home a so# , sumptuous and feminine appeal.
Working closely with specialist joiners and stone masons to design and create the living room media unit, this turned out particularly well and acted as the focal point for the room. Bespoke joinery was also designed for the master bedroom, all of the bathrooms and basement family room.
5 bedrooms; Completion: October 2012; Total cost: £665,000
Plasma TV
TBC
Low level cabinets below
glass shelving with bevelled
mirrored back and sides
ELEVATION A
A
LIVING ROOM
CLOAK ROOM
Low level cabinets below
glass shelving with bevelled
mirrored back and sides
FIRST FLOOR
Fireplace
Framed bookcase with 25mm
thick adjustable shelves
B
STUDY
ELEVATION B
LIVING ROOM SPECIFICATION:
· Base cabinets to have 80mm
(150mm into curtain corner)
high-gloss clear lacquered grey
stained Oak framing with doors in
grey matt painted finish
· Shelving to have 80mm (150mm
into curtain corner) high-gloss clear
lacquered grey stained Oak framing
with bevelled mirrored internal
backs and sides
· Shelves to be 10mm toughened
glass
· Doors on touch latches
· Spotlighting within top of shelving
units
STUDY SPECIFICATION:
· Bookshelves to have 80mm
high-gloss clear lacquered grey
stained Oak framing
· 25mm shelves in grey matt painted
finish
· Carcass back to be grey matt
painted finish
· Lighting TBC
Concept:
Floorplans with joinery detail
Concept:
Floorplans with joinery detail
SECOND FLOOR
BEDROOM 1
BEDROOM 2
ENSUITE 1
A
ELEVATION A - Exterior View
Double wardrobe
ELEVATION A - Interior View
Double wardrobe Double wardrobe Double wardrobe Drawers below
adj shelving
Half hanging
below pull down
half hanging
Half hanging
below pull down
half hanging
Shoe shelves below
pull down tall
hanging below shelf
SPECIFICATION:
· 22mm thick flat doors in light grey
stained Oak with clear matt lacquer
· 18mm veneered carcassing with
cedar backs
· Solid wood dovetailed drawer
boxes on Blum full ext runners
· Chrome hanging rails
· Adjustable shelves to have 30mm
solid front downstand
· Doors on touch latches
· LED lighting within wardrobes on
pressure switch
Standard Chartered Bank, Corporate box at Twickenham Stadium
RFU, Corporate boxes at Twickenham Stadium
Harlequins, Lounges & bars at Twickenham Stoop Stadium
B / - 2 : - . : A 7 - . / 1 . 1 :C - 2 DE A > ., > . - / 1 9 > F : 1 8 5 6 2 - 2 : . 1 G @ . 9 5 8 7 0 1 2 /3 H ? 5I D 1 2 7 - 0 B / - : 5 @ 0Brief:
SCB have a very strong corporate identity and a long history in Asia and the Middle East. " is was our starting point for the brief. A# er visiting their headquarters in London, we felt we had a good sense of what they would be looking for. Earthy col-ours, natural textures and $ nishes as well as com-fort and function were all de$ ning factors.
SCB wanted to be able to o% er both a formal expe-rience and a casual, lounge feel, depending on who they were entertaining.
Solution:
We designed a bespoke bar for SCB, which housed not only the fridges and glassware and served as a the placement for bu% et food, but also contained a secret sliding unit to hold the folding table when not in use.
Banquet seating was bespoke designed to be usable in both the “formal” and “informal” rooms sets.
10-12 person box; Completion: January 2012; Total cost: £25,000
J ; K H ? 5I D 1 2 7 - 0 B / - : 5 @ 0 E A > ., > . - / 1 9 > F : 1 8 5 6 2 - 2 : . 1 G @ . 9 5 8 7 0 1 2 /
Brief:
We were asked to come up with a universal design that could be used in updating around 20 boxes (of varying sizes) throughout the East and West stands of the stadium.
Solution:
Contemporary design, quality $ nishes, upgraded facilities and bespoke joinery throughout meant that the RFU could realise a better mark-up on the lease of these boxes.
10 - 26 person boxes; Completion: September 2012; Total cost: £93,900
L - . < 1 M @ 5 2 8 H ? 5I D 1 2 7 - 0 B /> > , B / - : 5 @ 0 E N > @ 26 1 - 2 : 9 - . : 1 8 56 2
Brief:
We were asked to come up with several designs for 5 di% erent areas within the stadium. " e designs needed to be universal, but with elements of change to di% erentiate between the bars or lounges accord-ing to the clientele for each. We also needed to allow for di% erent room set-ups and durability was also a consideration.
Solution:
We worked closely with the Harlequins operations, catering and sales teams to create a neutral back-ground to show o% the Harlequin colours and the use of di% erent materials (wood, metal, stone) added texture and dimension to each space.
20 - 88 person lounges/bars; Completion: September 2013; Total cost: £126,500