18

PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100
Page 2: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100
Page 3: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100
Page 4: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

BIOGAS UPGRADING

Jevnaker Norway

Carborex®MS 400

Page 5: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Membrane Biogas Upgrading

Page 6: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

BIO LNG Production

Page 7: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

BIO LNG Production

Upgrading Polishing Liquefaction

• Pressure Swing Adsorption• Temperature Swing Adsorption• Membranes• Membrane Contactors• Amine scrubbing• Cryogenic upgrading

Page 8: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Lelystad PILOT (2013-2015)

• Max. 50 Nm3/h raw biogas

• Fluctuating biogas compositions

• Upgrading of biogas to LNG Quality (100 ppm)

• Liquefaction with Sterling Cryogenerators.

• 100-300 ppm CO2 in outlet gas

• Innovative and one-of-a kind solution

• Reduction of footprint

• Benefits of membrane technology

History DMT with BIOLNG

Page 9: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Temperature Swing Adsorption

• Regeneration by increasing Temperature (90 C)• Reduces CO2 very selective from 1,5-2 % to <50 ppm• Robust system, longer cycles, less fluctuations• No methane loss

Page 10: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100
Page 11: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Total system

Compact and containerizedFully integratedEasy to operateFast startup of system24/7 service

Capacity: 5 – 10 tons per day

Page 12: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Flexible solutions

The possibility to change from Gas2Grid to BIO-LNG

Page 13: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Concept

Gas to Grid• Business case based on Gas2Grid• Standardized Carborex MS:• Carborex MS can be used for both options• Carborex MS + LNG:

• Dry processes, no chemicals or water• Energy consumption < 1,5 kWh/kg

biomethane• Modelar build up

Page 14: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

• Business case with ROI of 3-4 years is possible• Raw biogas price has significant effect: Increase €0,235 per kg when increase of €0,10 per Nm3

• Electricity price has significiant effect: €0,02 p.kg / €0,01 p kWh

0

0.5

1

1.5

2

0 0.1 0.2 0.3 0.4 0.5 0.6

Pri

ce B

ioLN

G (

euro

/kg)

Price raw Biogas (Euro/Nm3)

Biogas vs LNG price

0

20

40

60

80

100

0 0.2 0.4 0.6

RO

I (%

)

Raw biogas price (Euro/Nm3)

ROI vs. Raw biogas price at different LNG price

LNG price 1,30LNG price 1,40LNG price 1,60Lineair (LNG price 1,30)Lineair (LNG price 1,40)Lineair (LNG price 1,60)

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

0 0.2 0.4 0.6

BIO

LNG

pri

ce (

Euro

/kg)

Raw biogas price (Euro/Nm3)

Raw biogas vs. BIOLNG price

Electricity (0,085 euro)

Electricity price 0,00(euro)

Electricity price 0,05(euro)

Electricity price 0,10(euro)

Electricity price 0,15(euro)

Electricity price 0,20(euro)

Business Case

Page 15: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Investment routes

1.Sale of Biogas or Biomethane to DMT

➢ Long term contracts on Sales of Biogas or Biomethane to DMT

➢ BOOM concept➢ Necessary permits for Bio-LNG to be arranged by DMT➢ Free access for Bio-LNG producer on site➢ Site works on cost of DMT➢ LNG installation remains part of DMT➢ Annual escalations depending on type off-take contract

DMT

2.Full CAPEX investment route

➢ Rough investment Euro 0,16 per Kg LNG➢ Necessary permits to be arranged by DMT➢ Up-time guarantee DMT on Bio-LNG➢ Various off-take contracts possible to be facilitated by

DMT➢ Possible subsidy in joint request and facilitated by DMT

Page 16: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Conclusions

• Proven and robust concept

• Standardized and scalable

• Flexibility in cooperation

WE ARE READY!

Page 17: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Harmen DekkerBusiness Development Manager

+31 6 [email protected]

Page 18: PowerPoint Presentation · 2019. 11. 28. · Lelystad PILOT (2013-2015) • Max. 50 Nm3/h raw biogas • Fluctuating biogas compositions • Upgrading of biogas to LNG Quality (100

Please visit our Youtube channel for latest animations and product video’s

DMT Environmental Technology

Or follow us on Social Media

DMTenvironmentaltechnology

DMT_ET

DMT Environmental Technology