35
Bilad Al-Duha PRESENTATION June 2016 1

PQ Presentation(BADC) - Rev2

Embed Size (px)

Citation preview

Page 1: PQ Presentation(BADC) - Rev2

Bilad Al-Duha PRESENTATION

June 2016

1

Page 2: PQ Presentation(BADC) - Rev2

CONENTS

2

INTRODUCTION

COMPANY HISTORY

ORGANIZATION CHART

COMPANY GOAL

VISION/MISSION

SCOPE OF SERVICE

EMPLOYEE DETAILS

OWN EQUIPMENT LIST

GLOBAL NETWORK

MAJOR ACTIVITIES

PROJECT EXPERIENCES

PROJECTS PHOTO GALLERY

CERTIFICATE

Page 3: PQ Presentation(BADC) - Rev2

Bilad Al-Duha is the leading Iraqi Mechanical Contractor

providing Construction Services to the Iraqi Oil & Gas ,

Power and industry field as well as overseas country. In

support of its construction activities the Company also

provides engineering and procurement services

including full EPC for small to medium size projects.

With offices in Baghdad, Ahdab, Basrah and Dubai and

its experienced international staff the company has the

capability to perform any pipeline, tank, piping, steel

structure and mechanical installation project in

accordance with international standards. Bilad is ISO

certified and ranks number 1 as Iraqi mechanical

contractor for the Petroleum Industry.

We provide all inclusive mechanical services to our local

Iraqi and growing international client. This includes non

destructive testing and cathodic protection, as required.

As a hard money contractor we own all of our

construction equipment and are in the process to expand

our capability by constructing a full service mechanical

workshop in Basrah.

Over

800 employees

in BADC

INTRODUCTION

3

Page 4: PQ Presentation(BADC) - Rev2

Company history

2008

Started pipe line

construction business

with Petrochina

Company

Established

2011

Opened Missan

Branch office

Carried out Tank

Construction work for

Missan Oil Project

2012

Opened Baghdad

office

Started Tank and pipe

line fabrication

workshop

2013

Established

Corporate office

in Dubai and

Branch office in

Basra

ENI Zubair Tank & Lukoil

Pipe line project

2015

ENI & SHELL Zubair

piping and pipe line &

Zubair DGS PJT

4

Page 5: PQ Presentation(BADC) - Rev2

Organization Chart

5

PresidentMr. Haider Younis

Vice PresidentMr. Nohwoo Park

Project ManagementMr. Maher Nermann

Mr. Alifuhat

ProcurementMr. Oleg Grugorchak

LogisticMr. Ahmed Wahab

Iraq/Iran Project

UAE/ Oman Project

CIS Area Project

FinanceMs. Paula Harfouche

Admin.Ms.Mary Jeann

QA/QCMr.Alex Chaichenko

HRAccount

GA

Page 6: PQ Presentation(BADC) - Rev2

Company Goal

Client Satisfaction/ Growth together with Client

Strong

Teamwork

Vertical

IntegrationContinuous

Progression

6

Page 7: PQ Presentation(BADC) - Rev2

Vision/Mission

Vision

Be an excellent “ EPC Service provider ”

to create greater values to our clients.

Mission

Maintain positive growth of the company

together with our clients offering them the

best quality, technology and service.

7

Page 8: PQ Presentation(BADC) - Rev2

Scope of Service

Engineering

Procurement

Construction

Onshore Oil, Gas and water pipe line

Oil Refineries

Gas plant

Petrochemical Plants

Industrial plants

Water and Sewage treatment plants

Storage Tanks

8

Page 9: PQ Presentation(BADC) - Rev2

Employees Details

CATEGORY NOS. REMARK

Management 5 • Managing Director/Senior Management

Permanent

Employees

Management Staff 15 • Managers, Sr. Engineer, Engineers, Officers

Project management 19 • Sr. Engineer, Engineers, Officers

Tendering Dept. 5 • Sr. Engineer, Engineers, Officers

Planning Dept. 4 • Sr. Engineer, Engineers, Officers

HSE 15• Health, Safety, Environment

- Sr. Engineer, Engineers, Officers

QA/QC 10• Quality Assurance/Quality Control –

Sr. Engineer, Engineers, Officers

Field Personnel 745

• Site engineers, Foreman, Labour’s Mechanic

al, Electricians, Welders, Scaffolding Workers

, Operators, Helpers

Total 818

9

Page 10: PQ Presentation(BADC) - Rev2

Own Equipment list

MAIN EQUIPMENTS AND MACHINERIESDescription NOS.

AUTOMATIC WELDING MACHINE(Vertical & Horizantal) 14

BOOM TYPE WELDING MACHINE 15

SIDE BOOM 45

BOOM TRUCK 5

BOOMLIFT 15

CUTTING MACHINE 5

JACK FOR TANK ERECTION 156

WELDING MACHINE – VARIOUS PROCEESS 245

FORKLIFT – FROM 3 TON TO 10 TON 9

MOBILE CRANE – FROM 15 TON TO 100 TON 18

OVERHEAD CRANES – FROM 2 TON TO 15 TON 6

PAINT MACHINES 12

PIPE BENDING MACHINE 7

PIPE BEVELLING MACHINES 35

PLASMA CNC CUTTING MACHINE 2

PLATE BENDING & ROLLING MACHINE (W:3.5m) 3

PLATE BEVELING MACHINE 4

PORTABLE SAND BLASTING MACHINE 10

PRESS MACHINE 6

PROFILE BENDING MACHINE 2

TRAILER 17

TRUCK 12

VEHICLES 69

10

Page 11: PQ Presentation(BADC) - Rev2

Global Network

BRANCH OFFICES

Iran/ Oman(Under process)

HEADQUARTERS

Dubai

COUNTRY OFFICES

Iraq

WORKSHOPS

Iraq

11

Page 12: PQ Presentation(BADC) - Rev2

Major Activities

Pipe line construction

Tank Construction

Tank Fabrication

Process Skid and Piping spool

Fabrication

Steel structure work

Equipment Installation

Piping erection

12

Page 13: PQ Presentation(BADC) - Rev2

PIPELINE CONSTRUCTIONCAPABILITIES

•Pipe line 8" - 56"

•Trunk Lines

•Flow lines

•Piping 1" - 8“

•Horizontal Directional

Drilling

•Hot Tapping & Stoppling

Major Activity

13

Page 14: PQ Presentation(BADC) - Rev2

TRUNK AND FLOW LINE CONSTRUCTION

CAPABILITIES

•Pre-construction activities

•Trenching

•Stringing

•Bending

•Welding

•Non-destructive testing

•Heat shrinkable sleeves

•Lowering-in

•Backfilling

•Hydrotesting

•Start-up activities

•Valve stations erection

•Thrust Boring

•Horizontal Directional Drilling

•Cathodic Protection

•Fiber Optic Cable Installation

Major Activity

14

Page 15: PQ Presentation(BADC) - Rev2

TANK CONSTRUCTION

CAPABILITIES

•Crude storage

•Water storage

•Natural gas storage

•Floating roof

•Fixed roof

SPECIALIZED SERVICES

•Plate Fabrication

•All related civil

works

•Associated piping

works

Major Activity

15

Page 16: PQ Presentation(BADC) - Rev2

TANK FABRICATION

Bilad Al-Duha is your one-stop resource for all your

Tank fabrication needs. It includes plate material

procurement as per the code requirement.

Bilad Al-Duha owns a mechanical fabrication shop

with all the required equipment for plate cutting,

rolling, beveling and welding.

We build and erect tanks according to API 650, API

620 and API 12D standards.

Major Activity

Capability : 1000 ton/Month

16

Page 17: PQ Presentation(BADC) - Rev2

PROCESS SKID AND PIPE SPOOL FABRICATION

Bilad Al-Duha is your one-stop

resource for all your process skid

and pipe spool fabricating needs.

Bilad Al-Duha owns a mechanical

fabrication shop with all required

equipment for process skids and

pipe spool fabrication.

Major Activity

17

Page 18: PQ Presentation(BADC) - Rev2

STRUCTURAL STEEL WORKS

CAPABILITIES•Structural Steel Supply

•Structural Steel Fabrication

•Structural Steel Installation

•Structural Steel Drafting and

Design

•Safe erection

•Works at Heights

Major Activity

18

Page 19: PQ Presentation(BADC) - Rev2

CAPABILITIES

•Equipment Lifting

•Equipment

Installation

•Tie-In

Major Activity

19

EQUIPMENT INSTALLATION

Page 20: PQ Presentation(BADC) - Rev2

CAPABILITIES

•AG - Carbon Steel

•AG - Stainless Steel

•AG - Low Alloy Steel

•AG – Duplex Stainless

Steel

•AG - Galvanized

Major Activity

20

PIPING ERECTION

Page 21: PQ Presentation(BADC) - Rev2

Project experiences

21

Start Finish

Nasiriya

Basra Gas

Pipeline

Oil

Pipeline

Company

24” and 36” Water Pipeline Carbon Steel

in Ahdeb Oil Field

(20) km

B1 of EXL 2 and 3, 72 km Crude Oil Pipline

10'' and 72 km Gas

Pipeline 16''

Iraq48'' Hdd Pipline Crosing Shat Al

Arab 7 HDD Crossings, 1200 m Each

Water

Resources

Company/NS

CC

2010 2012 26,000,000

CNPCC/CPEC

C

2008 12,000,000Iraq 40 km Gas Pipeline of 42” dia

South Oil

Company

SOC

2008

Iraq WS2 Pipeline

CNPCC/CPEC

C2010 2011

4,500,000

Iraq

3 Nos. of 2000 m3 Diesel Tanks-Fixed

Roof Type

Steel structure : 2,900ton

Piping : 85,000DI

Samawa

Refinery2008Samawa Refinery

Kut Depot extension

Ahdleb Oil Field Pipeline Phase 1

Ahdleb Oil Field Pipeline Phase2

2009 15,000,000

Iraq

2 Nos. of 10000 m3 Gasoline Storage

Tanks-Carbon Steel-Floating Roof Type.

Piping Network 6”, 8” and 12” dia.

2010 2011 12,000,000

27,000,000

Iraq B2 of EXL 3 32 km Gas Pipeline 16''CNPCC/CPEC

C9,000,000

2008 2009

Iraq

Contract

Value

(USD)

Project

Duration Country Title Project Brief Client

2010 2011

Page 22: PQ Presentation(BADC) - Rev2

Project experiences

22

Start Finish

Iraq Majnoon Oil Field

Construction of 30 km 20'' Pipline

Piping erection: 70,00DI

Steel structureerection : 2,540ton

Equipment : 900ton

SHELL/CPP 2011 2012 16,000,000

Iraq Baqouba Gas Pipeline32” Gas Pipeline from Naft Khana to

Mansouriya Power Plant Station (40) kmIGC 2011 2012 33,000,000

Iraq Karbala Power Plant Station

8 Fixed Roof Tanks (size 2000 m3) With

Two Units and Network

Tankage area Piping erection: 55,500DI

Steel structure erection: 2,500ton

BETA 2011 2012 14,000,000

Iraq Stell Structure

Superstructure (Steel) Pipe Rack Inside

CPF

Steel Structure erection :3,000ton

CNPCC/CPEC

C2011 2012 3,600,000

Country Title Project Brief Client

Project

Duration

53,000,000Iraq 6” Flow Line and 16” Trunk Line 120kmCNPCC/CPEC

C2011

Contract

Value

(USD)

2012FSF Pipeline

2012 3,500,000Diwaniya Power Plant Station STX Iraq 8 Fixed Roof Tanks (size 2500 m3) 2011

Page 23: PQ Presentation(BADC) - Rev2

Project experiences

23

Start Finish

Iraq Garraf CPF

Piping erection : 75,450DI

Steel structure erection : 2,700ton

Equipment erection : 3,200ton

Weatherford,

Petronas2012 2012 12,000,000

104 km 48” Pipeline Construction

(E&I Works, OHL, Telecom Systems)

Water Lukoil

Crossings for The West Middle East

Qurna Field (2nd Phase)

IraqFao Terminal. Crude Oil Loading

FarmPiping erection : 45,000DI

Leighton

Offshore /

South Oil

Company

2014 2014 5,000,000

IraqZubair IPF’s & Interconnection

Piping

Pipeline Rehabilitation Project included

extensive E&I Works

Basrah Gas

Company2015 15,000,000

Iraq Zubair new DGS Project Tank erection work(7Nos, 1600 ton)Samsung

Engineering2016 4,730,000

2013 30,000,000

Iraq

4x5000 m3 Floating Roof Tanks at Mussaib

Power Plant

Steel structur: 4,500ton

Piping erection: 56,500DI

BOP equipment erection: 750ton

15,000,000

Iraq 104 km 48” Pipeline ConstructionTechno

engineering 2012

Mussaib Power Plant Project

Country Title Project Brief Client

Project

Duration

8,500,000

Contract

Value

(USD)

Iraq850 m Water Canal Crossing, 42'' Pipe by

Open Cut.2013 2014

Ministry of

Electricity2012 2013

Page 24: PQ Presentation(BADC) - Rev2

Major Current Client

24

Page 25: PQ Presentation(BADC) - Rev2

Projects Photo Gallery

25

Page 26: PQ Presentation(BADC) - Rev2

1.Hammar Project

Tank erection

26

Page 27: PQ Presentation(BADC) - Rev2

2.Missan Oil project

Tank erection

27

Page 28: PQ Presentation(BADC) - Rev2

3. Diwaniyah Power plant Project

Tank erection

28

Page 29: PQ Presentation(BADC) - Rev2

4. Musayyib Power plant Project

Tank erection

29

Page 30: PQ Presentation(BADC) - Rev2

5. Ahdleb Oil Field PipelineProject

Pipe line

30

Page 31: PQ Presentation(BADC) - Rev2

6. Zubair IPF’s & Interconnection Piping project

Pipe line

31

Page 32: PQ Presentation(BADC) - Rev2

7. Water crossings for west Qurna field Project

Pipe line

32

Page 33: PQ Presentation(BADC) - Rev2

8. Zubair New DGS Project

Tank erection by Hydraulic jack equipment