9
Pre-Proposal Meeting January 16, 2008 US 95, Garwood to Sagle, Bonner County, Sagle KN 09781 US 95, SH-53 to Ohio Match Road, Kootenai County KN 011010

Pre-Proposal Meeting January 16, 2008

Embed Size (px)

DESCRIPTION

Pre-Proposal Meeting January 16, 2008. US 95, Garwood to Sagle, Bonner County, Sagle KN 09781. US 95, SH-53 to Ohio Match Road, Kootenai County KN 011010. GARVEE Transportation Program Overview. US 95, Garwood to Sagle, Bonner County, Sagle. - PowerPoint PPT Presentation

Citation preview

Pre-Proposal Meeting January 16, 2008

US 95, Garwood to Sagle, Bonner County, Sagle KN 09781

US 95, SH-53 to Ohio Match Road, Kootenai CountyKN 011010

GARVEE Transportation Program Overview

US 95, Garwood to Sagle, Bonner County, Sagle

US 95, Garwood to Sagle, Bonner County, Sagle

US 95, Garwood to Sagle, Bonner County, Sagle

Project Overview

•Approximate Project Limits – M.P. 465.3 to 469.75

•New four-lane highway with limited access

•Frontage roads are planned on both sides of U.S. 95

• The Preliminary Design includes:

•Limited Preliminary design for the new four-lane divided highway

•TS&L for 3 Interchanges and 1 Underpass

•Realignment of Railroad at the curve near M.P. 467

•Right-of-way plans and legal descriptions

Dufort R

d

Monarch R

d

US 95, Garwood to Sagle, Bonner County, Sagle

Project Information

Concept Report

Draft Environmental Document

Preliminary Mapping

Preliminary Total Ownership Map

Draft Phase 1 Report

Conceptual DEIS Plan View

IS&T for US 95, SH-53 to Ohio Match Road, KN 011010

Project Background

• 4 Lane Divided Highway

• No major structures

• Estimated start of construction June ’08

• Completion anticipated to be End of ‘09

• Includes winter shutdown

Requirements

• Idaho Inspector Qualification Program

• WAQTC qualified

• Environmental Inspection

• Comply with Consent Decree

• Field Rates must be approved by ITD

ITD has first right of refusal to any and all IS&T

IS&T for US 95, SH-53 to Ohio Match Road, KN 011010

Anticipated Quantities:

Project Length: 3 Miles

Borrow: 98,500 CY

Aggregate Base: 233,000 Tons

Pipe Culvert: 1,000 Feet

Traffic Signals: 2

Superpave HMA: 71,000 Tons

US 95, Garwood to Sagle