VIGAS DE CIMENTACION
01 TRABAJOS PRELIMINARES
OBRAS DE CONCRETO SIMPLE03
MOVIMIENTO DE TIERRAS02
OBRAS DE CONCRETO ARMADO04
ZAPATAS
COLUMNAS
ENCOFRADO Y DESENCOFRADO M2 2,252.1150.54519.871,681.70
04.01
34.3165.64NORMAL PARA SARDINELES
F'C=210 KG/CM2
04.01.03ZAPATASDESENCOFRADO NORMAL EN
4,791.672,012.612,698.0444.95106.60
04.01.01
04.01.02
M3CONCRETO EN ZAPATAS 15,500.32302.2113,101.992,096.12352.3643.99
1,632.33
M2
6.05
03.0525% P.M.SOBRECIMIENTOS MEZCLA 1:8 + 1,605.6768.18878.83
MEZCLA 1:8 + 25% P.M.
265.40
40.01
M303.041:10 + 30% P.G.CIMIENTOS CORRIDOS MEZCLA 3,966.9191.592,950.67
658.66
03.06
KG
CONCRETO EN SARDINELES
4,792.18
52.37965.72614.24282.41
M2
M3
66.80NORMAL EN SOBRECIMIENTOSENCOFRADO Y DESENCOFRADO 2,672.6746.091,089.511,537.07
03.07
5.78
8,020.10
4.50
M304.03.02F'C=210 KG/CM2CONCRETO EN COLUMNAS 27,978.00
411.85
19,230.66
984.22
436.2764.13M304.03.0104.03
FY=4200 KG/CM2 GRADO 60ACERO ESTRUCTURAL
727.24
900.66
COLUMNASDESENCOFRADO NORMAL EN ENCOFRADO Y 46,519.09855.6317,166.58
7.87
51.65
10,123.99
M204.03.03F'C=175 KG/CM2CONCRETO EN COLUMNAS 3,241.2689.252,167.79
28,496.88
04.025,681.46147.744,434.451,099.27373.7815.20
13,518.68
04.02.01
04.02.02
FY=4200 KG/CM2 GRADO 60ACERO ESTRUCTURAL 6,399.05170.64
81.02
1,436.23
924.65
M3
4,778.17
1,422.01
3,034.194.503,004.15KG04.02.03VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE
ENCOFRADO Y CIMENTACION F'C= 210 KG/CM2
84.951,864.322,828.9042.75111.77M2
360.50
DESENCOFRADO NORMAL EN
5,491.05
M3
39.01 1,589.03 - 47.83 1,636.86EXCAVACION PARA CIMIENTOS HASTA 2.00 MT TERRENO NORMAL
02.02 M3 140.76 39.01 5,330.58
M3
34.07
TERRENO NORMAL
ENCOFRADO Y
EXCAVACION PARA VIGAS DE 1,134.8753.96
-
1,080.91
160.47
33.31M302.03HASTA 2.50 M TERRENO NORMALEXCAVACION PARA ZAPATAS
02.01
-
616.99
177.57
01.01 VJE 30.00 561.91 2,919.60 2,250.00 11,687.70 16,857.30TRANSPORTE DE HERRAMIENTAS Y MATERIALES
01.02 M2
41.96
M2TRAZO DE NIVELES Y REPLANTEO 504.0295.5991.25317.18434.50434.50
1.4901.03
LIMPIEZA DE TERRENO MANUAL 647.4130.42-
02.04
1.16
(CARGUIO A MANO) REN.=25 M3/DIA196.24
2,337.46690.80175.9117.60 3,096.0203.01 SUB ZAPATA, MEZCLA 1:12
ELIMINACION CON TRANSPORTE 8,057.616,383.68- 1,673.93
CIMENTACION HASTA 1.40 MT
M3
1,741.71
22.34M303.0330% P.G.SUB CIMIENTOS MEZCLA 1:12 +
67.76
50.75
M3
511.85173.9113.25M303.02CEMENTO HORMIGON + 30% P.G.
2,304.31
15.17
26.32 125.70 - 3.79 129.49EXCAVACION PARA SARDINELES HASTA 0.80 MT TERRENO NORMAL
02.05 M3 75.84
41.06
3,239.12
4.92
991.99
62.76
02.07APISONADO MANUALNIVELACION INTERIOR Y
55.99
23.53
4,246.28
792.332.24392.24M202.06MATERIAL PROPIORELLENO COMPACTADO CON
878.62
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y
HUNTER - AREQUIPA - AREQUIPA
GUZMAN DE HUNTER, AREQUIPA"
GOBIERNO REGIONAL DE AREQUIPA
Abril - 2013
02 - CONSTRUCCION DE TALLERES 02
Obra
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Sub Presupuesto
Costo a :Ubicacion
Cliente
M.Obra TotalMaterialItem Descripción Unidad Metrado EquipoPrecio
Presupuesto Desagregado
P.1/5
06
VIGAS
MOLDURAS
MUROS Y TABIQUES DE
REVOQUES, ENLUCIDOS Y
VARIOS
05ALBAÑILERIA
LOSAS ALIGERADAS
ESCALERAS
4,226.95
2,063.14M204.07.04ENCOFRADO DE MADERAADITIVO DESMOLDANTE PARA 46.97
3,713.65
2,911.913.062,348.31
15,868.87
7,185.83
453.89
M
20.63 4,188.17ADITIVO CURADOR DE
7,245.29120.02194.40M2
CONCRETO EN OBRA
05.01
M2
2.03
427.01
M204.07.0104.07
FY=4200 KG/CM2 GRADO 60ACERO ESTRUCTURAL 1,902.51
20.93
1,424.77
91.88
4.50422.78KG04.06.03ESCALERASDESENCOFRADO NORMAL EN
50.73
MUROS DE LADRILLO KK DE
CONSTRUCCIONSELLADO DE JUNTA DE 3,089.2725.091,840.571,223.61
22.14
147.60
10.01
04.07.02CON TEKNOPORTJUNTA DE CONSTRUCCION 221.621.77127.97
04.07.03
217.73
9,827.0706.03
45.98582.00M206.041.5CM.(INC.COLUMNAS EMPOT)
7,525.26
TARRAJEO EXTERIOR
558.72
197.352,987.146,642.5821.91448.52
276.72
C/MORTERO 1:5 X
31.63
ENCOFRADO Y
435.90
COLUMNASTARRAJEO EN SUPERFICIE DE 9,390.00213.75
18,676.38
7,145.66
EMPOT)
296.87M206.05VIGASTARRAJEO EN SUPERFICIE DE 26,760.36
2,030.59
67.27
M2
M206.01
1.0CM.ARCILLA DE SOGA C/M 1:4 X
20,233.47
17.90
6,430.68
40.76
300.78M205.021.0CM.ARCILLA DE CABEZA C/M 1:4 X MUROS DE LADRILLO KK DE
13,526.07
M21:5 X1.5 CM.(INC.COLUMNAS TARRAJEO INTERIOR C/MORTERO 12,589.18246.854,215.388,126.95
3.60
632.94
23,331.89
06.02PRIMARIO C/MORTERO 1:5TARRAJEO DE TIPO RAYADO O 64.441.2222.46
19.89
VIGAS
382.09
CONCRETO EN VIGAS F'C=175 KG/CM2
04.04.03 M2 571.18 47.52 14,456.56 12,251.81 434.10 27,142.47
133.38
DESENCOFRADO NORMAL EN
363.35
04.04.04 KG 7,805.14 4.50 7,883.19 26,303.32 936.62 35,123.13FY=4200 KG/CM2 GRADO 60
04.05.01 M3 68.59
ENCOFRADO Y
04.04.01
2,818.24
581.36
04.03.04 KG 9,627.36 4.50 9,723.63 32,444.21 1,155.28 43,323.12ACERO ESTRUCTURAL
12.08
04.04
04.05
M3 37.61 387.97 3,135.17 10,971.96 484.42 14,591.55CONCRETO EN VIGAS F'C=210 KG/CM2
04.04.02 M3 1.60
FY=4200 KG/CM2 GRADO 60
420.23
UND
5,506.40
3.90
ACERO ESTRUCTURAL
15,963.70 104.68 20,412.60LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO
04.0604.06.01
04.05.04
8.70
5,234.00
1,088.02 2,486.11 81.87 3,656.00CONCRETO EN ESCALERAS F'C=210 KG/CM2
04.06.02 M2 48.06 58.64 1,520.62 1,251.96 45.66
M3
7,485.99
20,009.76 691.39 26,207.55CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
04.05.02 M2
4,344.22
30.18 10,135.05 224.70 17,845.74ENCOFRADO Y
13,299.84FY=4200 KG/CM2 GRADO 60
591.31
ACERO ESTRUCTURAL
DESENCOFRADO NORMAL EN
354.669,960.104.502,955.52KG04.05.03 2,985.08LOSAS ALIGERADAS
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y
HUNTER - AREQUIPA - AREQUIPA
GOBIERNO REGIONAL DE AREQUIPA
GUZMAN DE HUNTER, AREQUIPA"
02 - CONSTRUCCION DE TALLERES 02
Abril - 2013Cliente
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Ubicacion
Obra
Costo a :
Sub Presupuesto
Equipo TotalMaterialM.ObraPrecioMetradoUnidadDescripciónItem
Presupuesto Desagregado
P.2/5
CARPINTERIA DE MADERA
PISOS Y PAVIMENTOS
07 CIELORRASOS
08
13 CERRAJERIA
11
09 ZOCALOS Y CONTRAZOCALOS
15
CUBIERTAS
14
CARPINTERIA METALICA12
PINTURA
10
VIDRIOS, CRISTALES Y SIMILARES
11,803.93 17,124.76M2 353.0959.71490.40 29,281.78
FALSO PISO DE 4" DE CONCRETO
23.351:10 (C:H)CONTRAPISO 5 CM. MORTERO 1:5 5,724.02326.042,735.762,662.2208.02 M2PISO CERAMICO ANTIDESLIZANTE
08.05
245.1408.03
1,949.01
09.02H=10 CMCONTRAZOCALO DE CERAMICO 87.65
M2
2,930.7315.90273.90M09.01
VEREDA DE CONCRETO DE 4" 7,482.97
PISO DE CEMENTO PULIDO E=5
5,168.94
40X40 CM
56.17133.22M2CM. MORTERO 1:4
7,038.96
3,550.3766.171,271.682,212.5239.1790.64M208.04
365.02
M
C/MORTERO 1:5
31.8160.33M206.08C:A 1:5 E=1.5 CM -PUERTAS, VENTANAS Y VANOS VESTIDURA DE DERRAMES EN 1,990.3854.87119.191,816.32
664.23
189.20
36.80
06.07C/MORTERO 1:5 X 1.5CM.TARRAJEO EN SARDINELES 1,161.3420.18476.06665.1023.5949.23M206.06
4,355.01
10.52
07.01
3,700.973,001.9828.70245.26M208.01
TARRAJEO DE CIELO RASO 19,933.06342.968,207.3811,382.7233.71
1,218.07
M2
336.01
BRUÑAS DE 20mm 3,343.3496.10- 3,247.246.61505.80M06.09C/MORT. 1:4REVESTIMIENTO DE ESCALERAS 1,919.10
591.31
904.40
140.16
528.88CANTONERIA DE ALUMIONIO ESTRIADO 2''X1 1/8''
13.01 PZA
383.46
24.66
141.24
942.40 27.36 1,874.16BISAGRA DE ACERO ALUMINIZADO PESADO DE 4''X4''
13.02 PZA
76.00
139.79
VARILLA DE SEGURIDAD DE LISO
M2
12.03 M 16.35 191.55
4.18
2,292.92
274.68
3,131.84PASAMANO DE TUBO F°G° DE 1 1/2" EN ESCALERA
12.04 UND 22.00 24.04
699.13
9.09
2,660.895,735.7114.49591.31
GOLPES
14.01
14.00
1,041.48
PINTURA LATEX CIELO RASO 2
926.92 8,508.89 31.24 9,467.05VIDRIO DOBLE INCOLORO INC. LAMINA DE SEGURIDAD
15.01
P2
1,077.70
2,557.92
1,057.00 8.26 1,339.94CERRADURA PARA PUERTA 2
3.60
PINTURA LATEX VIGAS 2 MANOS
171.48
69.45
8,568.08
2,323.0614.49239.49M215.02MANOS
95.71
3,470.21
CLARABOYA DE FIERRO C/PERFIL 10.02 M2 33.64 194.23 3,656.34 2,497.43
7.08
6,533.90
COBERTURA AZOTEA CON
COB. POLICARBONATO10.03 UND 4.00
Ø1/2"
236.60
1,744.99
380.13
M2
84.95 115.52 186.84 3.46
1,336.63
305.82CERAMICO DE 20 X 30 CM EN 2DO
CON MEZCLA
10.01LADRILLO PASTELERO ASENTADO
272.34 74.25 3,840.00 16,266.87 114.38 20,221.25
50.76
NIVEL
15,831.85
179.89
73.61
19,587.40VENTANA DE MADERA
12.01 M 36.27
294.44
1,278.52
13,416.16
328.61 17,438.98BARANDA METALICA DE Ø 2"12.02 M 175.20 14.60 672.77
480.81
PUERTA DE MADERA TABLEROS
GARGOLA DE CONCRETO, P/DRENAJE EN TECHOS
11.01 M2 51.52 360.57 8,177.26 9,574.47 18,576.57
5,991.35REBAJADOS DE 4.5 MM DE CEDRO
11.02 M2 94.68 206.88
824.84
GOBIERNO REGIONAL DE AREQUIPA
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"
HUNTER - AREQUIPA - AREQUIPA Abril - 2013
02 - CONSTRUCCION DE TALLERES 02
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Obra
Cliente
Ubicacion Costo a :
Sub Presupuesto
Precio TotalEquipoM.ObraMetradoDescripciónItem Unidad Material
Presupuesto Desagregado
P.3/5
CONDUCTORES Y/O CABLES
SISTEMA DE DESAGUE 18
20
SISTEMA DE AGUA FRIA17
APARATOS Y ACCESORIOS SANITARIOS
CAJAS
22
SALIDA DE INSTALACIONES
16
ELECTRICAS
21 CANALIZACIONES Y/O TUBERIAS
19
189.701.64133.72INTERRUPTOR DE CONMUTACION
20.012.00
94.852.00PTO19.06 54.34
783.44
1,358.0929.2547.82M321.01
CAJA DE PASE RECTANGULAR 46.880.4631.0020.02 23.44PTOPTO
INTERRUPTOR UNIPOLAR DOBLE
CAJA DE PASE DE 200X200X100 MM 16.460.238.527.7116.461.0015.42
19.02
19.03BIPOLAR DOBLE - PAREDSALIDA DE TOMACORRIENTE 4,377.0033.753,215.501,127.75175.08
1,054.48
PTO
214.89
SALIDA DE TECHO 13,872.0061.207,675.846,134.96136.0019.01
34.00
-
25.00
14.004.48460.96150.4076.988.00PZA19.05
INTERRUPTOR UNIPOLAR SIMPLE 7.84
PTO
75.32
62.00
PZA19.04BIPOLAR DOBLE - PISOSALIDA DE TOMACORRIENTE 13,323.18101.069,852.423,369.70
615.84263.20
298.90
11,238.64833.00123.4498.00M22.01
TUBERIA PVC-SAP Ø50MM 640.926.32
333.20
CONDUCTOR TIPO N2XH 3-1x35
6.5498.00M21.07TUBERIA PVC-SAP Ø40MM 82.161.1741.34
22.03
8.82
336.88
3-1x6mm2 + 1x6mm2(T)CONDUCTOR TIPO NH-80 873.808.84575.96289.0025.70
PTO
M
25.48
CONDUCTOR TIPO NH-80
12,097.12
1.04301.8434.0084.224.00M22.02mm2
13.00
3-1x16mm2 +1x16mm2 (T)
36.38
41.68559.56500.24275.374.00UND21.03PROPIO (REDES EXT.ELEC.SANIT).
39.65
1,379.77
0.70x0.70x0.70 m
127.871,215.5225.7953.50M321.02REDES EXT.SANIT.ELECT.EXCAVACION DE ZANJAS PARA 1,398.74
RELLENO MANUAL CON MATERIAL
TUBERIA PVC-SAP Ø20MM
M21.06TUBERIA PVC-SAP Ø25MM 153.632.4368.8582.355.6927.00
1,101.48
21.05
BUZON DE REGISTRO
111.601.8048.8061.005.5820.00M21.04
40.65
M
285.80
152.58
PTO17.01
LLAVELAVATORIO DE PARED BLANCO 1 1,714.8011.58
63.15
385.02
484.50
6.00PZA16.01
MANOSPINTURA LATEX EN DERRAMES 2 359.33
3.83
1,318.20
9.0280.96124.259.27M
TUBERIA PVC-SAP 1/2" 90.201.7010.00
55.10
200.79
10.00M17.02SALIDA DE AGUA FRIA PVC-SAP 1/2" 631.5014.50132.50
33.40
1,767.96
5.96
14.49163.56M215.04Y COLUMNAS 2 MANOSPINTURA LATEX INTERIOR MUROS
736.02
94.29
47.43
3,174.4712.82392.88M215.03
102.00
H=0.60
5,036.72
394.11
7.2349.70M15.06MANOSPINTURA LATEX EN ESCALERAS 2 588.73
1,586.53
182.84
22.55
14.4940.63M215.05MUROS Y COLUMNAS 2 MANOSPINTURA LATEX EXTERIOR 2,369.98
11.78
2.951.4225.0047.6037.012.00PZA18.04
503.61168.67
18.05
66.4299.30
17.03
8.20
209.04
18.03TUBERIA PVC SAL 4" P/DESAGUETUBERIA PVC SAL 2" P/DESAGUE
SUMIDERO DE BRONCE 2"CAJA DE REGISTRO 0.60x0.30 200.642.90100.8496.90100.322.00
74.02
18.06
REGISTRO DE BRONCE 2"119.242.8421.2095.2029.814.00PZA
M
PZA
4.84
60.00161.4856.58
8.57
PZA
20.57
BRONCE 1/2"4.84
273.08
4.00
106.76161.4868.274.00PZA17.04TUBERIA PVC-SAP 3/4"VALVULA DE COMPUERTA DE
M 206.82288.2221.16
17.05
23.80
226.32
18.02SALIDA DE DESAGUE EN PVC 2" 749.6018.01
PRE-FABRICADAS P/VALVULASCAJAS METALICAS
PTO 10.00 74.96 605.60 125.80 18.20
HUNTER - AREQUIPA - AREQUIPA
GOBIERNO REGIONAL DE AREQUIPA
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"
02 - CONSTRUCCION DE TALLERES 02
Abril - 2013Cliente
Sub Presupuesto
Obra
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Costo a :Ubicacion
Precio EquipoMaterial TotalM.ObraMetradoUnidadDescripciónItem
Presupuesto Desagregado
P.4/5
23
ARTEFACTOS25
VARIOS, LIMPIEZA
TABLEROS
POZO DE PUESTA A TIERRA
26
301,549.67
24
477,160.45 34,453.53
28.00
506.24 2,818.40 15.20 3,339.84ARTEFACTO FLUORESCENTE HERMETICA 2x36W
5,334.00PZA 207.88 14.28472.36
208.74
92.00
25.03 5,820.64
416.33 6.83 764.83POZO A TIERRA PARA R < 25 OHMIOS
25.01 PZA 2,910.88201.34
16.00
15,525.00 87.40 18,523.28ARTEFACTO FLUORESCENTE REJILLA 2x36W
25.02 PZA
259.00
26.04
23.36
UND 8.00 131.37 166.00 880.00 4.96BOTIQUIN DE PRIMEROS AUXILIOSEXTINGUIDORES DE 6 KG
1,200.00
M2 434.50 2.34 986.31 - 30.42 1,016.73LIMPIEZA FINAL DE OBRA1,050.96
SEÑALES DE SEGURIDAD Y
EMERGENCIA
26.01 PZA 14.00
341.67
66.64
1,165.12
26.03
327.04
EQUIPO AUTONOMO DE LUZ DE
EVACUACION26.02 UND 4.00 300.00 - 1,200.00 -
1.40
1.001,416.5610.121,068.96337.481,416.561.00PZA23.02
TABLERO DISTRIBUCION TD-1
764.83
10.12
1,512.72
TABLERO DISTRIBUCION TD-21,382.58 1,382.58PZA23.01
mm2CABLE DE COBRE DESNUDO 25 212.102.25133.9575.9014.1415.00M22.04
337.48
24.01
1,034.98
UND
23.03
TABLERO DISTRIBUCION TD-5 10.12337.481,512.721.00PZA23.05TABLERO DISTRIBUCION TD-4 1,512.7210.12
1.00
1.00
1,165.12PZA 1,113.12 337.48 765.52 10.12
1,512.72TABLERO DISTRIBUCION TD-3
23.04 PZA 1.00 337.481,113.12
914,809.11
Son : NOVECIENTOS CATORCE MIL OCHOCIENTOS NUEVE CON 11/100 NUEVOS SOLES
COSTO TOTAL PRESUPUESTAL
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y
1.80 %
GUZMAN DE HUNTER, AREQUIPA"
7.40 %
GASTOS DE LIQUIDACION
GOBIERNO REGIONAL DE AREQUIPA
HUNTER - AREQUIPA - AREQUIPA
14,636.95GASTOS DE SUPERVISION 3.30 %GASTOS GENERALES 60,174.11COSTO DIRECTO 813,163.65
26,834.40
Abril - 2013
02 - CONSTRUCCION DE TALLERES 02
Costo a :
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Obra
Sub Presupuesto
Cliente
Ubicacion
Descripción TotalUnidad Metrado Precio M.Obra Material EquipoItem
Presupuesto Desagregado
P.5/5