Project Monitoring ( 监测 )

And Control

Presented by Basker George

Page 2: Project Monitoring ( 监测 ) And Control Presented by Basker George

Project Monitoring & Control

How will a Project Manager know whether the project is following the desired path as per the Project Plan?

To know that, one must have visibility ( 可见度 ) about the true status of the project.

As software itself is invisible ( 看不见的 ) , Visibility in a software project is obtained by observing ( 注意的 ) effects ( 动产 ).

Providing proper visibility is the main purpose of Project Monitoring.

Page 3: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont… Qualitatively Monitoring & Controlling

a Project is a requirement of : Quantitative Process Management KPA at

CMM Level 4. Software Quality Management KPA at

CMM Level 2. Software Project Tracking & Oversight

KPA at CMM Level 2.

Page 4: Project Monitoring ( 监测 ) And Control Presented by Basker George

Project Monitoring When project is executed, it is important that

it be properly monitored. This ensures that the project follows the

desired path. Project monitoring has two aspect

1. elicit 2. apply control mechanism. 1. Elicit: Collect data about current ( 现在 ) state of

project Interpret ( 解释 ) to make judgment ( 判断 )

about the current state

Page 5: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont…

If the current state is a “Desired ( 渴望的 ) State”, then monitoring provides assurance ( 确信 ) that the project is moving along the planned path.

If monitoring reveals ( 显示 ) that project state is not healthy, Some action has to be taken to rectify( 矫正 ).

2. Control: That is, CONTROL action has to be performed

to bring back the project “Back on Track”.

Page 6: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont…Apply management

control

Analyze & Predict ( 预知 )

Execute Project

GatherMeasurements

Page 7: Project Monitoring ( 监测 ) And Control Presented by Basker George

Data Collection The foundation for monitoring & control is that,

timely information should be obtained about the project at different times, during the period of execution of the project.

We can have rules & models to analyze and interpret data

But, the question is, Which data should be collected? The important data to be collected for project

monitoring & Control are: Effort Schedule Defects and Size

Page 8: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont… Collecting these data is a challenging

( 有挑战性的 ) activity. People resist ( 抵抗 ) providing these

data about their work, fearing that the data may be used against them.

These and other people-related issues must be resolved to have success on data collection.

We shall study how metrics are collected & what tools are used to help in collecting data.

Page 9: Project Monitoring ( 监测 ) And Control Presented by Basker George

Effort Data

Effort is an important data which can determine the COST of a project.

Hence tracking ( 跟踪 ) of effort should be a key activity during monitoring.

By monitoring efforts, We can evaluate whether the project is executing within budget.

These effort data will be used to compute various component of PCB (Process Capability Baseline)

Page 10: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont… Eg: The Weekly Activity Report is used

to capture Efforts. A WAR entry by a employee consists of

sequence of record, one for each week. Each record consists of

Program Code Module Code Activity Code Activity Description Hours for Monday through Sunday

Page 11: Project Monitoring ( 监测 ) And Control Presented by Basker George

Defect Data Defect Data is more important than

Effort Data, because it has direct relationship with Software Quality.

Defect can be something that is found in some work product of the project

The presence of defect can have adverse ( 不利的 ) effect in achieving the goal of the project.

Page 12: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont… Defect data are used for Managing

the Project. At Infosys, the Defect Control

System (DCS), a commercially available tool is used in project for logging & Tracking defects.

Page 13: Project Monitoring ( 监测 ) And Control Presented by Basker George

Life Cycle Of Defect Life cycle of defect has three state Submitted, Fixed & Closed. A defect that is not closed is called

open.

Submitted Fixed Closed

Entered by

Submitter

Fixed by

Author

Closed by

Submitter

Page 14: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont… Defect entered into DCS has the following fields:

Project Code Description of defect Module code, Program Name Review type Status (open, closed or Fixed) Submitter, Owner, Date of submission Stage Detected, Stage Injected ( Why ?) Severity of defect. (Critical, Major, Minor, Cosmetic)

Page 15: Project Monitoring ( 监测 ) And Control Presented by Basker George

Size Measurement Size is an important measurement It has direct effect on productivity Quality metrics are expressed with

respect to Size. Size measurement are used to

predict & control of project.

Page 16: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont… LOC & Number of program of different

complexity metrics can be used for estimation.

But it cannot be used to measure productivity, because it depends on programming language.

Therefore for creating a baseline & comparing performance, function point are used to measure size.

Page 17: Project Monitoring ( 监测 ) And Control Presented by Basker George

Project Tracking Project tracking helps Project Leader &

Senior management to have visibility into the project.

The mechanism involved in project tracking are: Activity Tracking Defect Tracking Issues Tracking Status Report

Page 18: Project Monitoring ( 监测 ) And Control Presented by Basker George

Activity Tracking Activities of a project are scheduled by

Microsoft Project (MSP). Hence MSP is used to track activities. Every day, the project leader checks the

status of the project & updates the MSP A weekly project meeting is usually held to

discuss project schedule & other issues MSP features is used to determine which

activities are lagging, percentage of task done & effect on the overall project.

Page 19: Project Monitoring ( 监测 ) And Control Presented by Basker George

Defect Tracking Defect at Infosys is usually tracked

using a commercial tool DCS. The defect tracking has been

discussed previously…………..

Page 20: Project Monitoring ( 监测 ) And Control Presented by Basker George

Issues Tracking Many small jobs or clarification inevitably

come up during the course of the project. It is an important task for the project

manager to Manage these issues, because there can be many & could delay the project.

Hence they should be Managed & Tracked For Issue log, Spreadsheet or Document

or Defect Tracking System can be used.

Page 21: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont… The status of issue must be

regularly tracked For unresolved issues & issues

open for too long, escalation mechanism need to be used as per Project Management Plan.

Page 22: Project Monitoring ( 监测 ) And Control Presented by Basker George

Status Report Status reporting is a main mechanism for

providing visibility to senior management.

It is used to ensure that project continues to progress according to plan.

To resolve any pending issues. It is given by Project Leader to his or her

superior & also to the customer. It can be on a weekly basis.

Page 23: Project Monitoring ( 监测 ) And Control Presented by Basker George

Cont… The status report contain: Customer complaint Milestone achieved this week Milestone missed this week & reason Milestone planned for next week Issues requiring clarification or attention Escalation, if any.. Estimated work versus available time by

milestone Number of requirement change Major changes from the plan