Upload
others
View
8
Download
0
Embed Size (px)
Citation preview
1
PRUEBA FUNCIONAL
Optimux 16 E1
LINEA:
S.E. LVD – S.E. LVN
FECHA:
June 1st, 2011
CONFIGURACION Y AJUSTES DEL MUX RAD 34 DEL ENLACE
LVD – LVN EL DIA 12 JUNIO 2012
ING. SAMUEL VALLE ([email protected])
ING. JOSE DE JESUS SANCHEZ MATUS (CFE SAT ISTMO [email protected])
RESULTADOS DEL EQUIPO DE PRUEBA SDH – PDH TEKTRONIX CTS 850
LVD – LVN
EL DIA 12 JUNIO 2012
ING. SAMUEL VALLE (RFL Electronics)
ING. JOSE DE JESUS SANCHEZ MATUS (CFE SAT ISTMO Comunicaciones)