MECHANICAL ENGINEERING AND INDUSTRY
QUANTITY TAKE-OFF
PROCEDURE
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 2/20
MECHANICAL ENGINEERING AND INDUSTRY
QUANTITY TAKE-OFF
PROCEDURE
Rev Date Revision Description By Checked Approved
0 4/12/2001 Issued for Implementation R.G.H. A.G. M.KH.
1 2/10/2002 DAR Logo Reised R.G.H. A.G. M.KH.
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 3/20
TABLE OF CONTENTS
1. Introdut!on
". In#trut!on#
$. Gu!d% Not%#
Att&'(%nt A – Standard Take-off Sheets
Att&'(%nt B – Guidelines for the Preparation of
Method of Measurement (MOM)
Att&'(%nt C – Sample BOQ
Att&'(%nt D – Method of Calculatin !uct "rea
Att&'(%nt E – Sample Take-off Stamp
!R"#M$#01 R$% 1 #
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 4/20
1.1 Pur)o#%
1." D%*!n!t!on#
1. INTRODUCTION
This $ooklet pro%ides proceduresand standard forms to $e used $&
the desin enineers and
draftsmen for 'uantities take-off
and preparation of the
mechanical $ill of 'uantities
The intent of these procedures
and standard forms is to assure
that 'uantities are measuredaccuratel& and consistentl&
amon all enineers and 'uantit&
takers
The proect enineer is
responsi$le for ensurin that
these procedures and forms are
used* and 'uantities are accurate
and checked
T&+%-o** Dr&,!n# draft +,or
Tender that are coordinated and
sined $& the draftsman and the
proect enineer
Qu&nt!t/ T&+%r a draftsman
assined $& the proect enineer
to measure and take off the
'uantities from the +Take-Off prints
!R"#M$#01 R$% 1 .
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 5/20
".1 R%#)on#!0!!t!%#
"." 2T&+%-O**3 Pr!nt#
".$ 2T&+%-O**3 S'%%t#
". INSTRUCTIONS
Proect enineer shall $eresponsi$le for manain the
'uantit& take-off task* orani/in
the forms of $ills in coordination
0ith the MCC and PM* and
e1ercisin the necessar& checks
on the measured 'uantities
Proect enineer shall prepare a
set of draft final dra0ins* stampit +Take-Off Prints and i%e it to
the assined 'uantit& takers
2ach print shall $e sined after
completion of the take-off $& the
assined draftsman and proect
enineer
The complete set of take-off
prints shall $e kept 0ith the
proect enineer in a la$eled file
indicatin the proect no and
+Take-Off Prints and Sheets
,illed in Take-Off sheets (as per
the attached standard forms) shall
$e sined $& the 'uantit& taker
and the proect enineer and $e
kept also in the take-off file 0iththe prints
!R"#M$#01 R$% 1 .
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 6/20
".4 M%t'od o* M%&#ur%(%nt
5MOM6
".7 B! o* Qu&nt!t!%# 5BOQ6
The proect enineer shall make
sure that he and the 'uantit&
takers are full& a0are of the
details of the standard MOM (as per the cop& included in
"ttachment B)* and that the
'uantities of the items that are
not included 0ith other items
rate* are all identified and
measured separatel&
The proect enineer shall $e
responsi$le of preparin the $illsof 'uantit& in the re'uired final
form $ased on the 'uantities of
the take-off sheets usin the
procedure set for in the Q"
manual 3e shall also do the
necessar& checks and transfers
the $ills to the MCC as per the
set procedures
The form of the Standards
Mechanical Master Bill is as per
the e1tracts included in
"ttachment C
!R"#M$#01 R$% 1 4
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 7/20
$.1 M%&#ur!n Qu&nt!t!%# *ro(
2T&+%-O**3 Pr!nt
5Dr&*t#(&n6
$." 2T&+%-O**3 S'%%t# 8 Pr!nt#
$.$ C'%+!n Qu&nt!t!%#
$.4 M%&#ur!n P!)% Br&n'%#
$. GUIDE NOTES
5hen measurin 'uantities from
dra0ins* the measured items
shall $e marked in &ello0 color*
and 0hen a dra0in is full&
measured* the same e1ercise
should $e repeated tickin in red
a$o%e the measured items
The +Take-Off sheets related toa dra0in should $e sined $&
the draftsman and attached to the
+Take-Off print Once done* it
should $e passed to the P2 for
checkin Once checked* the P2
shall sin the sheets +Checked
and put the sheets and print in the
take-off file
5hile checkin the 'uantities the
P2 shall e1ercise spot checks on
each Take-Off print and compare
the measured 'uantities 0ith
kno0n 'uantit& indicators
,or measurin pipe %ertical
$ranches consider the follo0in
ele%ations of fi1tures connections
from finished floor le%el6
9&#t% 5(6 9&t%r 5(6
- BT - 78
- 9": 4; ;8
- S<=> 4; ?8
- MS*S .8 ?8
- 25C (,T) #8 48
- 25C (,:) #8 @8
- A 48 #;
- S3 - 88
!R"#M$#01 R$% 1 ;
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 8/20
$.7 M%&#ur!n Dut,or+
$.: Ao,&n%# on M%&#ur%d
Qu&nt!t!%#
9&#t% 5(6 9&t%r 5(6
- B #8 #8
- 5T* 3B - 48
- !, ;8 ;8
- 9o0 le%el%ent main
#8 -
- ,3C - #8
- 9o0 9e%el
5ater main
- ;8
,or measurin the duct0ork refer
to the method indicated in
"ttachment !
,or duct 0eiht use an& of the
certified soft0are prorams
The follo0in safet& allo0ances
should $e applied
- !uct0ork #@D
(allo0ed for in the
soft0are proram) for
oints* supports and 0aste
-Pipin 8D
- Pipe insulation ;D
- !uct insulation 8D
"lso allo0ances should $e made
for unforeseen 'uantities for the
follo0in items6
-<solatin and drain %al%es(#-#; dn) 8D
!R"#M$#01 R$% 1 E
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 9/20
$.; T'!n# to 0% Con#!d%r%d
Plumbing P&/ Att%nt!on *or t'% M&t'
L!n%# &nd not to Du)!&t%
It%(#
− Grates and frames for
trenches are to $e
counted in linear meters
and accordin to the
0idth (e16 488 mm ⇒
0ide ;8 m)
− 5hen measurin the
pipin* take intoconsideration the sla$
thickness and the e1act
heiht of the floor <n
addition* the ,loor
!rain and floor
cleanouts drop and trap
should $e measured
216 the floor cleanout
drop $elo0 sla$ 0iththe el$o0 is around E8
cm) 3o0e%er this
should $e e1actl& taken
from the details sho0n
on the correspondin
dra0ins
− 5hen measurin
pipin* the lenth
should $e taken across
all %al%es and fittins
216 for the pumps* pipe
lenth starts from the
dischare of the pump
across all fittins
− On the as $uilt
dra0ins* the C<9 and
the ,<9 are al0a&s
sho0n These should $e
!R"#M$#01 R$% 1 7
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 10/20
e1actl& taken for the
rises and drops of the pipes 216 0hen the
pipe is mo%in at C<9
;88 and then drops to
,<9 888 and theheiht of the floor is
.;88 this means that
&ou ha%e to su$tract
the C<9 and the ,<9
from the heiht of the
floor ie .;88 – ;88 –
888 F #888 or the
pipe should drop $&
# m− The most important
thin is to make sure of
the sanitar& details
,ollo0 the as $uilt
dra0in concernin this
topic ie le%el of
fi1ture from ,,9 to $e
considered
− The fire hose ca$inet
pipe should $e
calculated in the
follo0in manner6 pipe
drops from a certain
ceilin le%el to ,,9 F
888 then add 84
84E F 8@E m
,3C !etail6
!R"#M$#01 R$% 1 @
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 11/20
HVAC
− Sprinkler drop or rise
(pendant or upriht)should $e measured
Sometimes #8 cm*
sometimes 48 cm*
sometimes @8 cm <n
addition to the rise of
the pipe itself to
distri$ute thru
sprinklers Check the
detail
− !rainae outside
$uildin should $e
separate These pipes
are those from the
$uildin to the <CHs and
the connection $et0een<CHs
− :C pipes should rise
around m a$o%e roof
P&/ Att%nt!on *or t'% M&t'
L!n%# &nd not to Du)!&t%
It%(#
−
!uct0ork should $ecarefull& measured
takin into
consideration all drops
and rises* C<9 le%els*
sla$ thickness and e1act
heiht of floors <n
addition* duct end
should $e taken as si/e
0ith lenth /ero 216
!R"#M$#01 R$% 1 ?
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 12/20
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 13/20
− ecommended duct
0eiht proram is the
e1cel %alidated
proram
− "ll mi1in $o1es and plenum $o1es on
"3AHs and on Slot
linear diffusers are to $e
taken
− ,le1i$le ducts are to $e
measured as linear
meters not as counta$le
item
− !umm& linear diffusersare to $e taken
− 5hile measurin the
pipin on "3AHs* $e
careful for the drops
and rises of the pipes $&
readin all the sections
("-"* B-BI) taken
from the plan
!R"#M$#01 R$% 1
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 14/20
ATTACHMENT A
St&nd&rd T&+%-O** S'%%t#
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 15/20
PLUMBING
T&+%-O** S'%%t#
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 16/20
H<AC
T&+%-O** S'%%t#
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 17/20
ATTACHMENT B
Gu!d%!n%# *or t'% Pr%)&r&t!on o*
M%t'od o* M%&#ur%(%nt 5MOM6
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 18/20
ATTACHMENT C
S&()% BOQ
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 19/20
ATTACHMENT D
M%t'od o* C&u&t!n Dut Ar%&
8/9/2019 q-takeoff
http://slidepdf.com/reader/full/q-takeoff 20/20
ATTACHMENT E
S&()% T&+%-o** St&()