PELATIHANQUANTITY SURVEYING
(rN-HOUSE TRAINING)11-13 OKTOBER 2000
PT WIJAYA KARYAJL. DI PANJAITAN KAV, 9 JAKARTA TIMUR
r'i.i1ii
i,l.itr
T;{
:
MATERI PELATIHANQUANT|TY SURVEYTNG
DISUSUN OLEH :
lR. IRIANTO PURWOSUNU M.Eng.Sc.AGUS PITIHANTOAGUS PRASETIOFAISYAL SYAHRIT
MOCH. RrFQr HERU MARYONOSTAMET RIYADI
FI
DAFTAR ISI
L.4*,'BAB 1 PENGANTAR
1.1. PENGERTIAN UMUM
1.2. PROFESI
1
1
2tt
BAB 2 LINGKUP KERJA QUANTITY SURVEYING
2.1. TAHAPAN PRATENDER
2.2. TAHAPAN TENDER
2,3. TAHAPAN PASCATENDER
3
3
4
4
BAB 3 BILL OF QUANTITIES 73.1. FUNGSI 73.2. BAGIAN-BAGIAN BILL OF QUANTITIES BUILDING WORKS 93.3. BAGIAN.BAGIAN BILL OF QUANTITIES CIVIL WORKS 14
BAB4 METHOD OF MEASUREMENT
4.1. FORMAT'DIRECT BILLING PAPER'
4.2. STANDARD METHOD OF MEASUREMENT FORBUILDING WORKS
4.3. CIVIL ENGINEERING STANDARD METHOD OFMEASUREMENT (CESMM)
LAMPIRAN
17
17
20
21
28
PELATIHAN QUANTIry SURVEYING
i'i
,i
i
QUANTITY SURVEYING
BAB 1PENGANTAR
1.1. PENGERTIAN UMUM
Pada awalnya Quantity Surveying merupakan suatu lingkup pekerjaanprofesional yang memfokuskan diri pada bidang perhitungan kuantitas danpenentuan item-item pekerjaan suatu proyek konstruksi yang kemudiandituangkan dalam bentuk Daftar Kuantitas (Bills of Quantities / BQ) dimana BQ inimenjadi bagian dari dokumen tender. Sedangkan orang yang melaksanakanpekerjaan tersebut dikenal dengan nama Quantity Surveyor (disingkat : QS).Sebagai konsultan, QS ini juga membuat estimasi biaya proyek (di sini dikenaldengan istilah Engineer Estimate) dalam konteks proyek konstruksi, dan bidangpengendalian biayanya. Pengendalian yang dimaksud di sini mencakuppengendalian pada saat perencanaan dan pelaksanaan. Sehingga obyektif utamapembangunan yaitu prqyek yang mempunyai nilai ekonomi dapat tercapai.Kualitas yang dihasilkan memenuhi harapan, biaya pembangunan yangekonomis, serta jadwal pelaksanaan yang tepat waktu.Pengetahuan Quantity Surveying ini mulai dikembangkan pertama kalinya dilnggris, kemudian menyebar ke negara - negara persemakmurannya.. Di AmerikaSerikat dan benr-ra Erooa lail$rt spesialisasi di bidang Quantity Surveying inilebih populer dengan istilah "Qbst Estimating". Di lndonesia, spesialisasi di bidang
..
Quantity Surveying ini, dikengl melalui konsultan - konsultan QS yang datang dariSingapura, Malaysia dan Australia. Mereka umumnya bekerja untuk perusahaan-perusahaan konsultan yang. berskala internasional untuk proyek - proyekkomersial swasta, yakni : bangunan gedung bertingkat tinggi, seperti : hotel,pusat perbelan.jaan dan apartemen. Proyek - proyek sejenis ini umumnya dikelola
proyek konstruksi milik pemerintah, peran"satu atap" dengan konsultan ManajemenMereka biasanya dikenal sebagai Quantity
oleh investor swasta lang tetkait dengan porsi pendanaan dari investor asingataupun kreditor asing. Untukiilroyek -Quantity Surveyor biasanya di.jadikanKonstruksi atau Konsultan Perencana.
Engineer.
PELATIHAN QUANTITY SURVEYING
1.2. PROFESI
Dalam perkembangannya, Quaritity l,surveying menjadi suatu bentuk keahlianprofesional yang berhubungan dengan aspek - aspek ekonomi bangunan, dimana Quantity Surveyor dikenal sebagai Konsultan Biaya pembangunan(Building Cost Consultant / Building Economist). QS disini berperan dalamperencanaan dan pengendalian biaya suatu proyek konstruksi, besertapenanganan aspek - aspek konfaktualnya. Sesuai dengan spesialisasiprofesinya, QS menawarkan jasa kdnsultasinya kepada investor proyek atau
' r,pemilik proyek untuk kepentingan petgendalian biaya pelaksanaan proyek agarpembiayaan proyek optimal dan tidak'melebihi anggaran yang direncanakan. qqg-Pelaksana Pekeriaan / Kontraktor, 'Q-S berperan sebagai perencana biaya--''-'-_---pelaksanaan proyek konstruksi dan pengendali Kontrak / Perjanjian. Kerja. Dalamhal menciptakan peluang klaim, QS berperan sebagai perintis dan sekaligus
Guna menunjang efektivitas pekerjaan ulama QS dalam hal perhitungan kuantitasdan penentuan item-jtem pekerjaan suatu proyek konstruksi, maka perluditerapkan suatu Metoda Penghitungein Kuantitas yang baku/standar, misalnya.:SMM (Standard Method of Measurei;i;pnt) for Bulding Works dan CESMM (CivilEngineering Standard Method of liiiasurement). Standar ini dapat menjadialternatif acuan untuk standarisasi perhitungan kuantitas yang terkait denganrtem-item peker.jaan bangunan gedungi btaupun bangunan sipil.
-7
j9lgglabtY\sehingga keberhasildrt klaim akan sangat tergantung pada[ "keterampilagT QS menyajikan detaili, perhitungan dan analisa serta data-data\?"---}/
ben-d[k-u ng nya.
FPELATIHAN QUANTITY SURVEYING
BAB 2LINGKUP KERJA QUANTIW SURVEYING
Sebagai Konsultan Biaya bidang jasa konstruksi, lingkup kerja eS dimulai sejakproyek masih dalam tahap konsep sampai dengan selesainya pelaksanaankonstruksi proyek yang dibangun oleh kontraktor dan diserahkan kembali kepadapemilik proyek untuk digunakan.Secara umum, lingkup kerja QS dipandang dari sisi konsullan dapat dibagimenjadi 3 (tiga) tahapan :
2.,1. TAHAPAN PRA TENDER
Dalam tahapan ini setidaknya adatanggungjawab QS, yaitu :
5 (lima) item kegiatan yang menjadi tugas dan
'1. Menyusun anggaran proyek. QS menyajikan gambaran kuantitatif proyek,yaitu berupa rencana biaya proyek. Berdasarkan input dari feasibility studydan perencanaan / desain, ada beberapa alternatif rencana biaya yang dapatdiajukan oleh QS yang akan dipilih dan diputuskan oleh pemilik proyek danditetapkan sebagai anggaran proyek atau dikenal dengan istilah ,,budget',.
2. Memberi sumbang saran untuk alternatif desain proyek sehubungan denganoptimalisasi biaya proyek.
3. Menyusun Bill of Quantities berdasarkan klasifikasi pekerjaan yang telahdisiapkan sebelumnya.
4. Memberi rekomendasi pendanaan proyek.5. MenyiBpkan dokumen tender berserta format - format administratifnya.
II.i.]
PELATIHAN QUANTITYSURVEYING
2.2. TAHAPAN TENDER
Dalam tahapan ini ada 2 (dua) item kegiatan utama eS, yaitu :1. Evaluasi lender, yakni evaluasi terhada'p proposal _ proposal penawaran
peserta tender, serta memberi rekomendasi kepada panitia tender tentangpeserta tender yang layak untuk ditunjuk sebagai pemenang tender.
2. Menyiapkan format Kontrak/perjanjian Kerja antara pemilik proyek dengankontraktor pemenang tender, berikut persyaratan _ persyaratanadministratifnya.
2.3. TAHAPAN PASCATENDER
setidaknya ada 7 (tujuh) item kegiatan yang meribatkan es dalam tahapan ini,yaitu :1 . Menyusun rencana Cash-Flow I Disbursement untuk pemilik proyek.2. Memberi rekomendasi pembayaran prestasi fisik pekerjaan yang
dilaksanakan oleh Kontraktor daram bentuk Interim payment sampai Fina!Payment.
3. Menghitung dan menilai Pekerjaan Tambah atau pekerjaan Kurang.4. Memeriksa dan menilai sumber daya material, alat dan pekerja yang tersedia
dan/atau terpakai di lapangan.5. Evaluast dan negosiasi klaim yang diajukan Kontraktor.6. Menyusun Laporan prestasi dan keuangan proyek untuk pemilik proyek,
berikut penyerapan dana untuk proyek yang diarokasikan dari pihak lnvestor /Bank / lnstitusr K6uangan tertentu.
7. Menyiapkan administrasi serah-terima pekerjaan besertapendokumentasiannya untuk keperluan pembayaran akhir kepada kontraktor.
Selain daripada itu, terdapat beberapa bidang kerja atau pekerjaan yang bisadiserahkan kepada QS untuk dilaksanakan, yaitu :'1. Menyusun Studi Kelayakan proyek, ditinjau dari segi finansial dan nilai
ekonomi.2. Menengahi perselisihan berkenaan dengan pelaksanaan proyek (arbritrase).3. Menyusun Life Cycle Cosfrng suatu proyek konstruksi.
f,
PELATIHAN QUANTITY SURVEYING
6.
7.
B.
Bagi Kontraktor, peran QS sangat dominan dalam beberapa lingkup pekerjaan,terutama yang berkaitan dengan penghitung_an k!_an.U!aqpkerjan lgrengelggn.ery9lgry4Fn p19vg_pere$e]]1ellpe!_etexn, dan- !! m t9[lq3!]q1gfeyq qeuatau. perpanjangan waktu pelaksanaan pekerjaan. Lingkup kerja yang dimaksud,antara lain adalah :1. Review kuantitas pekerjaan dan estimasi harga satuan pekerjaan untuk
proposal penawaran, termasuk didalamnya review syarat - syarat kontraktual.2. Melengkapi format Bill of Quantities.3. Menyiapkan RAB Tender dan RAB Pelaksanaan.4, Pengendalian kontrak baik dengan pemilik proyek ataupun dengan
subkontraktor, termasuk didalamnya adalah pengajuan variation orders ataupekerjaan tambah / kurang.
5. Menyiapkan dan mengajukan tagihan prestasi bulanan.Kiaim tambahan biaya dan waktu pelaksanaan akibat perubahan kerja.Negosiasi nilai akhir seluruh pekerjaan.Menyiapkan Laporan Proyek Selesai.
Secara terpisah, lingkup kerja QS pada butir - butir 1 ( review syarat - syaratkontraktual ), 4, 6 dan 7 dapat djtangani oleh Adminislrator Kontrak. Untuklingkup kerja butir 3,5 dan butir 8 dapat ditungr;;;-frng;-Komersiat,sedangkan butir 1 & 2 ditangani oleh begian estimasi.Guna mengoptimalkan pelaksanaan peieffiffialseorangdirinya dengan ilmu pengetahuan dan pemahaman aplikasidimensi proyek, yattu : teknologi, ekonomi, legal , dan manajemen.
" Teknologi
Menguasai metode - metode kerja yang terkini dalam industri konstruksi secaraumum, serta mengikuti pengalaman
- pengalaman aplikasinya, aktual di
lapangan dalam kondisi yang berbeda -
beda,
QS perlu membekaliterhadap 4 (empat)
PELATIHAN QUANTITY SURVEYING
..t
'i
ti
l
. Ekonomi
Memahami konsep Conslruction Financing, Cost planning & Control, Life CycleCostjng, serta Value Engineering untuk menciptakan suatu proyek konstruksiyang ekonomis.
. Legal
Memahami segala bentuk perundang-undangan negara yang berkaitan denganjasa pekerjaan pemborongan / konstruksj, serta menguasai aspek - aspekkontraktual pada pekerjaan yang ditanganinya.
. . Manajemen
Memahami dan menguasi aspek - aspek manajemen proyek konstruksi.
:.
PELATIHAN QUANTITY SURVEYING
d-
I
'III
II1.
iiII
i
:'I
lr!.lrt:ti:i:f'i.
I:
I
:
I!.t:I
,
:
i.lliI
iIi
I!;Ir.Iii.i't,Ilit.L
Il.
r
T.Etli&liiit't,tsH
iii,,;I
BAB 3BILL OF QUANTITIES
Bill of Quantities berfungsi sebagai wacana penawaran harga yang menjadibagian utama dalam proposal penawaran harga. Dalam format tabular, Bill of
Quantities merangkum semua item pekerjaan yang masuk bagian dalamPekerjaan yang ditenderkan. Komponen utamanya adalah daftar item pekerjaanbeserta uraian teknisnya, dan kuantitas masing-masing item pekerjaan. ltem -item pekerjaan yang dicantumkan harus diindikasikan sesuai dengan Gambar /Desain Rencana dan Spesifikasi Teknis Dokumen Tender.
3.1. Fungsi
Dalam tahapan Pra Tender, Bill of Quantities, menyajikan rangkaian itempekerjaan yang secara keseluruhan merupakan Pekerjaan yang ditenderkan'Konsultan QS yang bekerja untuk Pemberi Tugas atau Pemilik Proyek bertugasuntuk menyiapkan perangkat Bill of Quantities Pekerjaan yang akan ditenderkan.Bill of Quantities disusun berdasarkan desain / gambar rencana dan spesifikasiteknis yang sudah distapkan oleh team perencana / konsultan teknik' Format Billof Quantities yang teknis-kredibel, adalah format BQ yang secara lengkapmeliputi semua item pekerjaan berikut semua sub-item pekerjaan terkait, sesuaidengan desain rencana dan spesifikasi teknis yang ditentukan; sebagai contoh,
Pekerjaan Suplai Beton Cor, harus diuraikan atas beberapa sub-itemnya, yangdibedakan atas beberapa kelas / nrutu beton. Disamping itu, BQ harus pulamencerminkan tipe kontrak pekerjaan yang akan diberlakukan dalam Pekerjaanyang ditenderkan, misalnya: kontrak harga satuan, atau kontrak lump sum. Uraian
mengenai tipe - tipe kontrak pekerjaan secara terinci akan disajikan dalam sesipelatihan Manajemen Kontrak di waktu mendatang. Komponen penting BQlainnya, adalah jenis mata uang yang diberlakukan dalam Pekerjaan, baik dalamtipe harga satuan ataupun tipe lump sum. Kuantitas yang tercantum dalam tabel
BQ adalah sesuai kuantitas desain / gambar rencana.Dalam tahapan Tender, Bill of Quantities, setelah dilengkapi dengan harga satuanpenawaran dan harga total penawaran oleh Peserta Tender, mencerminkan
.."':iaPELATIHAN OUANTITY SURVEYING
kualitas penawaran dari Peserta Tender yang mengajukannya. Beberapa aspekstrategi penawaran dapat "dibaca" melalui BQ yang diajukan dalam tahapan ini,seperti misalnya : tingkat kewajaran harga satuan pekerjaan, apakah over-estimated atau under-estimated, atau bahkan mis-estimated. Ada beberapa faktorteknis maupun non teknis yang dapat "mewarnai" stralegi penawaran ini.Mengingat terbatasnya thema yang diberikan dalam sesi Pelatihan QS ini, seluk-beluk mengenai strategi penawaran tidak dibahas. BQ versi Tender inilah yangmenjadi acuan fundamental dalam evaluasi tender oleh Panitia Tender, dengantanpa mengabaikan aspek - aspek lainnya, seperti : metoda kerja, penjadwalantahap pekerjaan, syarat-syarat pembayaran, dan lain{ainnya. Tingkat kompetisidiantara para nominasi Pemenang Tender dapat dilihat dari komparasi item - itemPekerjaan dominan yang ditunjukan dalam BQ. ltem pekerjaan dominan inimemegang "kartu truf'dalam posisi tawar-menawar dengan Pemberi Kerja atauPemilik Proyek.
Tahapan terakhir, yaitu tahapan Pasca Tender, dimana pada tahapan ini semuaproposal penawaran dibuka, dlperiksa dan diumumkan oleh Panitia Tender. Padatahapan ini, biasanya 3 (tiga) peringkat pertama Peserta Tender memiliki peluangyang reiatif sama besarnya untuk memenangkan Tender. Di samping aspek -aspek non teknis, aspek teknis menjadi salah satu kriteria pokok dalam prosesnegosiasi penentuan Pemenang Tender. Dalam hal espek inilah, BQ menjadisalah satu "tool" yang "berbicara" dalam proses evaluasi tender; sehingga kualitasBQ yang ditampilkan dalam proposal penawaran akan sangat menentukan besar-kecilnya nilai tambah bagi nominator Pemenang Tender. Setelah penentuanPemenang Tender, BQ Tender dikembangkan menjadi BQ Pelaksanaan.Kelemahan - kelemahan pada BQ Tender seperti : over/under estimated price,ataupun mis-estimated price seyogyanya dapat dikoreksi dalam BQ Pelaksanaanuntuk mencapai optimalisasi RAB Pelaksanaan.
PELATIHAN QUANTITY SURVEYING
3.2. Bagian-Bagian Bill of Quantities Building Works.
Secara umum item/ bagian-bagian didalam Bill of Quantities untuk konstruksi
bangunan gedung adalah :
a. preliminaries.b. Building Works & External Workc. Prime Cost Sum & Provisional Sum
a. Preliminaries.Dalam Standard Method of Measurement (SMM) Section ll telah memberi garispanduan secaTa umum item-item preliminaries yang harus dibuat oleh seorang
Quantity Surveyor. Susunan preliminaries terdiri dari sub-bagian bagian yang
merinci semua jenis pekerjaan persiapan yang akan dilaksanakan dalam proyektersebut. Dengan demikian harga yang ditawarkan akan menjadi lebih kompetitivekarena item-item pekerjaan persiapan sudah ditentukan tersendiri tanpamemasukan kedalam harga satuan setiap pekerjaan.Adapun sub-bagian antara lain :
a. Lingkup/ jenis pekerjaan.Menerangkan lingkup/ jenis pekerjaan yang akan dilaksanakan olehkontraktor sesuai dengan kondisi kontrak, termasuk pengadaanbahan/material dan prasarana-prasaTana lain yang diperlukan
b. Site inspection.Menerangkan kondisi umum lapanganpekerjaan.
I
dan menjelaskdn lokasi
c. Condition of GontractMenerangkan syarat-syarat kontrak yang digunakan dalam proyektersebut item-item dalam syarat-syarat kontrak yang mempunyaiimplikasi pada biaya perlu diperhitungkan sebagai pekerjaanpreliminanes. Masuk dalam klasifikasi ini antara lain : Asuransi,performance bond.
---F
F:PELATIHAN OUANTITY SURVEYING
I
,i
d. General matterDalam bagian ini menguraikan beberapa ketentuan/persyaratanadministrasi menyangkut beberapa materi seperti : Prasaranaproyek, cara pembayaran, setting out, sub letting, variation,protection, watet and electric, removal of rubbish dan sebagainya.
yang penting dalam setiap pekerjaan preliminaries ini adalah strategiestimator untuk mengestimasi item=item preliminaries tersebut, mengingatbeberapa item preliminaries merupakan "unpriced" ltem. Oleh karena itupengalaman dan keahlian dalam menganalisa setiap projek yang dikerjakansangat dituntut untuk menghargakan pekerjaan Preliminaries.
b. BUILDING WORKBill of Quantities untuk "Building work" adalah disusun berdasarkan "ElementalWork" . Setiap elemen tersebut akan memperinci item-item pekerjaan yangterdapat dalam ruang lingkupnya, sehingga dalam setiap perhitungan kuantitiyang dilakukan tidak akan terjadi "overlap" perhitungan. hal ini karena setiap"Taker Off' tahu batasan setiap elemen yang dihitung .secara garis besar susunan elemen yang dalam format BQ secara lengkapnya
adalah sebagai berikut :
Daftar Elemen
1. SUB.STRUCTUREYang meliputi :
'1A. Piling.Meliputi semua pekerjaan piling didalam konstruksi.
18. Pekerjaan Finishing lantai paling bawah (Work Below Lowest FloorFinish)Meliputi semua pekerjaan bagian bawah lantai dasar ("ground floor") danpekerjaan penggalian yang berkaitan. Termasuk dalam lingkup ini juga pekerjaanuntuk kolom bases, pile cap, slop, colum stump serta lantai bawah sertapekerjaan penggalian untuk basemen.
PELATIHAN OUANTITY SURVEYING
I
I
l,i.iI
2. SUPER-STRUCTURE
2A. Kerangka (Frame )Meliputi pekerjaan kerangka ; termasuk kolom, Floor Beam, Roof Beam.
28. Lantai atas (Upper Floor)Meliputi pekerjaan Lantal bagian atas, balcony dan sejenisnya.
2C. Atap ( Roof )Meliputi pekerjaan Konstruksi atap termasuk didalamnyabagian-bagian pelengkap atau accessories atap.
penutup atap dan
20. Tangga ( Stairs )meliputi semua pekerjaan yang terdiri atas tangga dan "Landing stairs"termasuk juga finishing /a$essories yang terdapat di tangga.
.J
2E. Dinding bagian Luar (External Wall )meliputi bagian dinding bagian luar termasuk jugawalling".
"Cladding, dan Curtain
2F. Jendela dan Pintu bagian luar (Window and External Door. )Meliputi pekerjaan jendela dan pintu luar yang terdiri frame, ironmongery, kacadan lintel.
2G. Dinding bagian dalam dan dinding pembagi (lnternal Wall and Partition)Dinding bagian dalam (tern'suk didalamnya dinding beton yang tidak dihitungdalam bagian kerangka atau dinding bagian luar (lihat 2A dan 2E)'
2H. Pintu dalam ( lnternal Door )lMeliputi bagian pintu bagian dalam yang terdiri atas frame, ironmongery' kacadan lintel.
FPELATIHAN QUANTITY SURVEYING
I
3. FINISHES3A. Finishing dinding dalam (lnternal Wall Finishes')Meliputi pekerjaan finishing permukaan dinding dan tiang pada bagian
dalam'
3B. Finishing lantai dalam (lnternal Floor Finishes)Meliputi Pekerjaan plaster, Skirting dan Finishing permukaan lantai (tidak
termasuk item yang terdapat pada bagian tangga )
3C. Finishing plafond dalam (lnternal Ceiling Finishes')Meliputi peker.laan plaster dan kemasan bagian bawah
plafond (tidak termasuk
item yang terdapat pada bagian tangga' tetapi termasuk pada bagian tepi dan
bagian bawah beam.
3D.Finishing Luar (External Finishes )Meliputi pekerjaan Finishing pada bagian permukaan dinding luar ' sertapermukaan lantai dan plafond bagian luar'
4. KELENGKAPAN (FIfiING DAN FURNISHING )Meliputi pekerjaan sepertr Fitting and Fixture (shelving'
(item ini tidak termasuk dalam pekerjaan finishingperalatan mekanik seperti : Gymnasium equipment)
.
cupboard, Pekerjaan senidiatas), Peralatan (bukan
s. FASILITAS (SERVIcES)Meliputi :
5A. Kelengkapan kebersihan (Sanitary appliance)'seperti : Bath ' basin' Sink'
Urinal and accessories lainYa'
58. Pekerjaan pipa air bersih dan kotor (Plumbing lnstallation) seperti : Hot and
cold waler services, soil, waste and vent pipe)
5C. Pembuangan (Refuse Disposal) seperti :waste compactor' waste bin'
5D'Airconditiondansistempengudaraan(Air-conditioningandVentilationSystem) seperti : Air conditioning' and mechanical ventilation'
5E. Pemasangan listrik (Electrical lnstallation)5F. Pemasangan pencegah kebakaran (Fire Protection installation) seperti :Fire
fighting and warning installation : dry riser' sprinkles)'
5G.PemasanganLiftdankonveyor(Liftandconveyorinstallation)Seperti:lift,Escalator, travelators, conveyor'
t2
PELATIHAN QUANTITY SURVEYING
5H.Pemasangan alat telekomunikasiseperti:telephone .
(Communication installation)
51. Pemasangan khusus (Special lnstallation) seperti : security system .
Note : Pekerjaan Services pada item ( 5D, 5E, 5F, 5G, 5H, 51) merupakanpekerjaan dalam Prime cost Sum ( pekerjaan yang diberikan kepada NominatedSub-Contractor).
C. PEKERJAAN LUAR (EXTERNALWORK)Meliputi :1A .Pekerjaan Lapangan.
Meliputi pekerjaan Pembersihan Lapangan (site) dan pekerjaan merobohkanbangunan(demolition work).Retaining Wall, Jalan, Landscape, turfing, Fencingdan Gate.
28. Saluran air permukaan (Surface Water Drainage)3C. Fasilitas luar (External Services) seperti :fire Hydrant, Site Lighting.4D. Fasilitas pendukung (Ancilary buiiding) seperti :Sub-station, stores.5E. Fasilitas rekreasi ( Recreasional facilities) seperti :PlayEround, outdoorgames.
P. PRIMECOST SUM & PROVISIONAL SUMPengertian Pnme Cost Sum merupakan sejumlah biaya yang digunakanuntuk pekerjaan-pekerjan khusus/spesialis seperti : pekerjaan untuk ,'Mechanical & Electrical Jenis pekerjaan ini pada umumnya akandilaksanakan oleh sub-kontraktor. Sedangkan Provisional Sum merupakansejumlah cadangan biaya yang yang tidak dapat ditentukan atau diketahui
-__-'-'--'--..-_\secara pasli s_qqrasa tender dilaksanakan. Oleh sebab itu biaya provisional
__,----.'-
Sum ini akan dievaluasi kembali sewaktu pelaksanaan kerja apakahdigfnakan untuk pelaksanaan pekerjaan ataupun tidak.
Untuk cara perhitungan setiap item pekerjaan akan disampaikan dalam topik"Methode Of Measurement for Building Work"Sebagai gambaran bentuk format preliminaries dan format Bill of Quantitiesberdasarkan elemen seperti dalam lampiran 1
w.
IPELATIHAN QUANTITY SURVEYING
-__-T
3.3. Bagian'Bagian Bill of Quantities Civil Works
Dalam format yang standar untuk BQ pekeriaan Sipil ada terdapat beberapa
bagial Yang utama Yaitu :
1 . List of PrinciPal Quantities
2. Preamble3. DaYwork Schedule4. Work ltem ( dikelompokkan ke dalam beberapa bagian' teramasuk disini
adalah General ltem atau Preliminary Works)
5. Grand Summary'
3.3.1. List of PrinciPal ltem
Berupa tabel item-item pekerjaan beserta sub-sub itemnya' dan dilengkapi
dengankuantitasmasing-masing.Tabelinimerupakanpetunjukpraktisyangberguna untuk memberi gambaran umum mengenai kuantitas
pekerjaan'
sehingga kontraktor dapat menilai kemampuannya sendiri apakah ia mampu
melaksanakan pekerjaan tersebut dengan kemampuan sumber daya yang
dimilikinYa.
3.3.2. PreamblePreamble atau penjelasan yang terdapat dalam BQ Civil Engineering Works
adalah untuk memberikan penjelasan tentang metoda atau cara perhitungan
kuantitas/volurne pekerjaan yang cara atau metodanya tidak mengikut standar
perhitungan atau CESMM' Penjelasan ini diperlukan untuk menyamakan persepsi
dan interpretasi setiap kontraktor yang mengikuti tender dalam mengestimasi ttem
pekerjaan tesrebut.
3.3.3. Daywork ScheduleBagian ini, apabila disyaratkan dalam dokumen tender' harus mengikuti
salah
satu dari (2) dua persyaratan sebagai berikut :
. Tabel varian klasifikasi pekerja' material dan peralatan yang diperlukan untuk
melaksanakan pekerjaan harian (daywork basis)' Kontraktor diminta untuk
melengkapinya dengan harga-harga satuan sumber dayanya beserta kondisi-
' kondisinYa, atau
T4
PELATIHAN QUANTITY SURVEYING
. Tabel tarif standar pekerjaan harian, dengan menambahkan persentaseallowance tertentu untuk sumber daya- sumber daya : pekerja, material danperalatan. Sebagai contoh : Schedule of Dayworks, yang diterbitkan olehFederation of Civil Engineering Contractors, diterbitkan di lnggris dandiberlakukan di lnggris serta negara-negara persemakmuran.
3.3.4. ltem-item PekerjaanTermasuk dalam bagian ini, beberapa sub bagian yang dapat diuraikan sebagaiberikut:
= Pengelompokkan
Item-item pekerjaan dikelompokkan berdasarkan kondisi alam, lokasi dan urutanpekerjaan yang dapat menentukan pola Metoda Kerja yang dipilih.
= Heading dan Sub-Heading
Setiap item pekerjaan harus dipisahkan atas bagian heading dan sub-headingnya.
:t DescriptionsMengindentifikasikan jenis pekerjaan yang disebutkan dalam item pekerjaanterkait. lndentifikasi pekerjaan di sini harus mengacu pada Spesifikasi Teknis danDesain/Gambar rencana.
= Range of Dimension
Eatasan dimensi yang berlaku bagi setiap komponen item pekerjaan.
:r KuantitasKuantitasA,/olume djhitung dari gambar rencana dengan mengikut aturan maindari Civil Engineering Standard Method of Measurement (CESMM) atau kecualiditentukan lain yang telah dijelaskan dalam Preamble atau penjelasan.
General ltemGeneral ltem adalah merupak bagian dari Work item yang biasanyadikelompokkan tersendiri. General item ini dalam CESMM d jklasifikasikan dalam"Class" A yaitu item-item pekerjaan diiuar atau tidak termasuk dalam pekerjaanutama (permanent works). General item ini juga biasa disebut sebagaiPreliminaries Item.
15
PELATIHAN OUANTIry SURVEYING
Dalam BQ Civil Works, General item ini adalah item-item yang dikehendaki dalamkontrak yang harus kontraktor laksanakan atau sediakan selama kontrak. DalamBQ, general item dikelompokkan atau terdiri dari beberapa bagian :1. Contractual Requirement2. Specified Requirement3. Method Related Charges.
Contractual Requirement adalah kewajiban kontraktor untuk melaksanakanatau menyediakan karena disyaratkan dalam kontrak. Contoh Contractualrequirement: Peformance Bond, lnsurance of the Works, Third Party lnsuranceetc.
Specified Requirement item yang ditentukan oleh Klien atau Engineer dimanakontraktor harus melaksanakan atau menyediakannya. Salah satu contoh dariSpecified requirement ini adalah akomodasi untuk Engineer seperti kantorlapangan, laboratorium dan lain-latn.
Method Related Charges adalah item-item yang harus diisi oleh kontraktor didalanr space/ruangan yang telah disediakan dalam BQ. Dalam BQ, MethodRelated Charges ini ruangannya diblarkan kosong dan diserahkan kepadakontraktor untuk mengisikan item-item yang menurulnya adalah item yangdiperlukan dalam melaksanakan pekerjaan akan tetapi tidak dapat dimasukkandalam komponen harga dalam harga satuan karena tidak proporsional dengankuantitas pekerjaan tersebut. Sebagai contoh Method Related Charges,kontraktor mengisikan item peralatan (Plant) untuk pekerjaan beton yaitu TowerCrane. Biaya transport, sewa dan pemeliharaan peralatan tersebut tidaksebandjng atau proporsional dengan jumlah kuantitas beton dalam pekerjaantersebut, artinya jika biaya tower crane tersebut dijadikan komponen harga satuanbeton, maka harga satuan pekerjaan beton tersebut akan sangat tinggi. Sebagaialternatif tower crane tersebut dimasukkan dalam ttem Method Related Charges.
3.3.5. Grand SummaryMerupakan rangkuman dari total setiap bagiannantjnya ditotalkan, jumlah akhir iersebut adalah nilai poleh kontraktor untuk Pekerjaan tersebut.
16
PELATIHAN QUANTIry SURVEYING
BAB IVMETHOD OF MEASUREMENT
Bab ini memberikan gambaran terinci mengenai Method ,of Measurement dalamkaitannya dengan penyusunan Bill of Quantities. Method of Measurement yangdimaksud adalah metoda penghitungan kuantitas pekerjaan untuk item - itempekerjaan yang akan ditampilkan dalam format Bill of Quantities. Metodapenghitungan int dibedakan untuk pekerjaan bangunan Sipil dan pekerjaanBangunan Gedung. Untuk pekerjaan bangunan Sipil metoda penghitungan yangakan diipakai dan diterangkan adalah mengacu pada Civil Engineering StandardMethod of Measurement 3rd edition (CESMM3) yang diterbitkan oleh Thelnstitution of Civil Engineers yang berkedudukan di lnggris. Sedangkan untukpekerjaan bangunan Gedung metoda penghitungannya mengacu kepadaMalaysian Standard Method of Measurement of Building Works yang diterbitkanoleh lnstitution of Surveyors Malaysia (lSM).Disamping itu juga akan diterangkan mengenai format - format standarperhitungan yang.'bisa dipakai didalam proses penghitungan suatu kuantitaspekerjaan. ;
,a'
4.1. Format oir"$ailting Rup"r.I'
Perhitungan kuantitas pekerjaan suatu proyek konstiuksi pada dasarnya hanyamembutuhkan penggtahuan ilmu geometri ( bentuk bangunan ) dan aritmatikdengan rumus - rurius luas dan isi suatu bentuk bangunan yang ada pada bagian
'.".i istruktur bangunan;,iyang mana tiap - tiap individu orang mempunyai cara dan+'pandangan yang brirlainan dalam proses peng hitungannya..
INamun permasalahannya adalah membuat format perhitungan yang sedemikianrupa sehingga memudahkan untuk dilakukan pemeriksaan / pengontrolan ulanghasil perhitungan tersebut. Terlebih apabila perhitungan kuantitas tersebutmelibatkan proyelt konstruks' dengan bentuk dan besaran yang kompleks,
'ffrkomponennya banyqk, maka harus dilakukan dengan format yang terstruktur.Oleh karena itu sborang QS atau Estimator harus dapat menyusun perhitungan -perhitungan tersebut dalam suatu format dan prosedur yang jelas sehinggamudah dikoreksi / pengecekan ulang dan akurat.
t7
PELATIHAN QUANTITY SURVEYING, ^)
, v^ r,!..,. !,Terdapat beberapa format teknik /peng hitungan kuantitasoleh seorang QS, diantaranya adalah :- iraditional Dimerlsion / Taking off paper.- Slip Short Paper .- Direct Billing Papbr.Dalam kesempatan ini pembahasan adalah memperkenalkan mengenai formatDirect Billing Paper dengan pertimbangan lebih efektif dan relatif mudahdipahami.
Format Direct Billing Paper berfungsi sebagai wacana unluk mendokumentasikanpenghitungan kuantitas per item pekerjaan. Format ini terdiri atas 6 ( enam )kolom, yang masing - masing (secara berurutan dari kiri ke kanan ) berfungsisebagai berikut :
. Kolom 1Kolom ini disebut juga "timesing column" atau kolom pengali. Menyatakanjumlah bagian pekerjaan yang berdimensi sama ; misalnya pilar bangunandengan ukuran panjang, lebar dan tinggi yang sama sebanyak 6 (enam) buah,maka angka 6 (enam) ditulis pada kolom ini.
. Kolom 2Kolom ini disebut juga "dimension column" . Menyatakan dimensi satu buahpilar tersebut, misalnya : 3.00 x 0.75 x 0.50 m.
. Kolom 3Kolom ini disebut juga "squaring column". Menyatakan kuantitas seluruh bagianitem pekerjaan hasil dari perkalian antara data kolom 1 dan kolom 2, dalamcontoh ini adalah sebesar = 6 x (3.00 x0.75 x 0.50 ) m3 = 6.75 m3.
yang bisa digunakan
, !;':
...
t9
PELATIHAN
. Kolom 4Kolom ini disebut sebagai "description column" atau kolom keterangan /deskripsi item pekerjaan. Menguraikan data teknis bagian pekerjaan yangdihitung.
l9
PELATIHAN QUANTITY SURVEYING
4.1 STANDARD METHOD OF MEASUREMENT FOR BUILDING WORKUntuk bangunan gedung, metode perhitungan yang dipakai adalah berdasarkanSMM for Building Work (Standard Method of Measurement). Dalam SMM inimengandungi 3 bagian utama yang dikelompokan sebagai berikut: '
a. Prinsip-prinsip Umum Perhitungan.b. Prillminariesc. Klasifikasi Pekerjaan.
a. Prinsip-prinsip UmumPrinsip-prinsip umum ini mengandung ketetntuan-ketentuan mengenai Bill OfQuantities, metode perhitungan, dan batasan perhitungan kuantitas. Disampingitu ada beberapa ketentuan seperti : pengurangan kuantitas, satuan kuantitasyang digunakan serta pekerjaan PROVISIONAL (jika tidak diketahui denganpasti).
b. PreliminariesDalam bagian preliminaries telah dUelaskan dalam sesi sebelumnya dalam sub-topik Bill of quantity. ic. Klasifikasi Pekerja;n
Pada bagian ini mendraikan item-item pekerjaan, ruang lingkupnya, bentuk-bentuk konstruksi yanqferkaitserta pekerjaan-pekerjaan penunjangnya diuraikandengan jelas. Klasifika$ pekeiaan sebagaimana didalam SMM Building Wor.ksf,radalah :
a. pekerjaan galian (excavatot) Ib. Pekerjaan Betorf (concretor)c. Pekerjaan bata (SricklayeQd. Pekerjaan atap (roofer!,e. Pekerjaan pavior.f. Pekerjaan konstruksi baja.g. Pekerjaan plumbing.h. Pekerjaaan listrik.dll.
:
Lebih lanjut , SMM membagi kAsifikasi pekerjaan .atas Elemen-elemen sepertiyartg diterangkan dalam topik "Bill of Quantity for tsuilding Works"
20
PELATIHAN QUANTITY SURVEYING
4.2.: CESMM ( Givil Engineering Slandard Method of Measurement )
CESMM dipakaii sebagai acuan untuk menghitung kuantitas pekerjaan _pekerjaan; bangunan Sipil, sebagai ,,aturan main" dalam penyusunan Bill of
ClassiflcatidS
Tanah, Beton, Pepipaan, PekerjBan Metal, pekerjaan Jalan,iferowongan, dan
dari : Geneial
pekerjaan ini dapat dSetiap klasifikasisebagai ltemcontoh, PekerjaanDivition) berupaDivilion) berunaberuga strata k
;:dilengkapi beberapa
ipeke{jaan, batas/limit
ICara'pengh itu ngan:Menghuraikan
""ru purilhitu
an Salur,{r Air. Untuk lengkapnya, daftar klastfikasirada lampjfal makalah presentasi ini.n terdiri. {ta_s 3 (tiga) bagian/divlsions yang disebut',", O"rrpi$n"ran teknis item pekerjaan. Sebagaifanafr (eir$works): bagian uraian pertama ( =First
atas 25 buah klasjfikasj pekerjaan, yang antara lainPenyelidikan Tanah, Pembersihan Lahan, pekerjaan
n,i gglian tanah, bagian kedua (=gs6en6
setiap klasifikasi pekerjaansepqrti: caia penghitungan, definisi item
[, dan uraian pelengkap.
"
ltuantitas berdasarkan Spesifikasi Teknik,":;!
Ir.i ,,;:
klasifikasi pekerjaan terkait.
21
.BMenguraikuantitas.
. Urai
Gambaradiberikan
Didalam
Selain itu
item
eMDidalam
peng
henda
asumsr
Sebagai
dikenal
masuk dalam penghitungan
Item Descriptions.Work Glassification tersebut
h selama proses penghitungantruksi sipil (Taking off process )
niities adalah sebagai berikut :
lai proses penghitungan kuantitasyang diberikan oleh Arsitek atau
Paper, Penggaris Berskala, alat tulis
secara
ran" proyek
ngetahui dtersebut.
spesrfikasi .serta standar metodeu "tidak terbaca" dan tidak tercantum
kan dan/atau diberikan asumsi -a Klien /L Konsultan Perencana.
dibuatlah. dbftar pertanyaan yangQuerry Lisladalah seperti berikut:
14'
.{&'11
keseluruhan besertasecara keseluruhan.
memilah-milah item -
L""t"II
tnl
LI
II:PROJECI1 : Proposed R.C. Retaining WallELEMENT : External WorkDATE :1.0-10-2000TO ; Mr. Richar.d - Graha Karya Consultant
Prepared by:
(Mr. Sanjaya )
QUERY LIST'
r i,i
;?I;4
t,,r
.'
Answered by:
i\lr. Richard
FROM
ITEM QIJERRY ':, ASUMPTION/ANSWER REMARKS1 Giade of cohcrete not
ist?ted| 'c
.t.,i
tI
,.lDepth of toe;' beam,: notstated
'I
Asuntmed Grade C15 fori.lean .concrete and . GradeC25 .for Retaining wallstructures. Both used20mm aggregate.
The d'epth is 600mm
17
PELATIHAN QUANTITY SURVEYING
. Membuat Taking off list (daftar item pekerjaan)Berdasarkan gambar, spesifikasi, CESMM dan Querry List, disusunlah item - itempekerjaan berdasarkan klasifikasi item pekerjaan ( works classification ) yangterdapat dalam CESMM. Contoh Taking off tist adalah seperti berikut :
ProjectElement
Dwg. No.
Job No.
: Proposed R.C. Retaining Wall: External Work :i
: J U B/QSV30 1 /o KT99 I Pzl 2
Taker off : Sanjaya
Date :10/10/2000:1
TAKING OFF LIST
. Proses Penghitungan (Taking off)''Langkah selanjutnya ad3lah melakuk$n penghitungan kuanlitas item pekerjaan
yang terdaftar dalam "taking off list" yang dituangkan dalam'Direct billingPada prinsipnya adalah merupakan proses penghitungan geometri dan
hanya penuangannnya dalam kertas menggunakan "gaya bahasaoff QS". Mengenai gaya bahasa taking off QS ini akan diterangkan dalam
secara tersendiri. Sedangkan untuk uraian item pekerjaan mengacu
r''
i'.'
ITEM DESCRIPTION UNITln-Situ Concrete : \/
1 Provision of Concrete-ddsigned mix C15 (F233) m32 Provision of Concrete-ddsigned mix C25 (F253) m3
Placing of concrete mass bli{rding (F51 1) m34 Placing of concrete reinforced beams (F663) m3
Placing of concrete reinforced bases (F624) m36 Placing of concrele reinfoiced wall (F643) m3
Concrete Ancillaries:7 Formwork wqll (G145) m2
Reinforcemeht deformed h.y. nom. size 12mm dia.(G524) t
24
/PELATIHAN QUANTITY SURVEYING
kepada CESMM. Contoh penampilan proses penghitungan adalah sepertiberikut:
Lcan Concrete 50nrm Tlr.
Provision (Q Placina Concrete ILensht Width1.20.000 (a) 2.500 .05 0
(b) 0.600of concrete desigrcd mix
15 20rrm aggregate cement to BSl2 ol BS 146 all accordance rvith BS5323
(F233)&
Dg 01' concrctc nrass blinclingtltickness not exceeding l5Ornm
(F511)120.002.5 0
0.05
DIRI]CT BIT,LING PAPERProjcct : Proposed RC Retrining Wall Taker off: Sanjaya Job No :Element : Extemal Works Calculated: Date
t0/10/200Dwg No. : ruB/QSV301/OKT99/P2/2 Checked:
In-sitlr Concrctc: -t,rK(
.);srtrcatlon \
; Description of work )\ item based on I\ CESMM & specs. i
I
__li Code of ,uork (I itern based on ;'tCssriaira----J
25
PELATIHAN QUANTITY SURVEYING
Dalam contoh diatas adalah dua item pekerjaan berbeda yang mana dari segilokasi dan penghitungannya sama sehingga bisa digabung dengan menggunakantanda "&" (dan), tetapi nantinya dalam urainya di BQ harus dibedakan mengikutiklasifikasi item pekerjaannya.
. Menyusun Bill of QuantitiesSetelah semua proses taking off / penghitungan selesai, maka item - itempekerjaan dalam format direct billing paper dipindahkan ke format BQ . Sebagaicontoh adalah sepedi berikut :
26
PELATIHAN QUANTITY SURVEYING
P roj ectElement
Bill No.
Bill of Ouantities: Proposeil RC Retaining Wall: External Works
:1Page : I
Nunrbcr Dcscription lJnit Quantity llatc(Rp)
Anrount(Rp)
F233
F253
F5ll
Ir663
F 624
PART I : IN SITU CONCRETE
nrJ
nrJ
nr]
mJ
m3
t9
426
i9
22
2?s
Provision of concrctc
Dcsignccl nrix Cl5 20nrnraggregate cenrcnt to BS l2 or BS146 all accordancc rvith BS 5328
Designcd nrix C25 20mrlagglcgate cen]ent to BS l2 or BSl.l6 all accorclance wilh BS 5323
Placinq Concrete:
Nlass blindiug thickncss.excccdiug 15Omm
Rcirtlblced bcanrs cross scctionalalea 0.1 - 0.25 m2 to be placedagaints on cxcavated surfaces
Reinforccd bascs thicknessexceedin-q 500nrn
Total
27
Element No. '1 - Work Belgw Lowest Floor Levelrllem Dpccridtion
Excavale oversite to reduce level average150mm deep commencing from platform jevel(tlnished ground level) and gel out, deposit andspread in making up levels where directedand remainders load and cart away from siie
Excavale pit tor pile cap notexceeding 1.50m deep
Excavatc trcnch for 0round bcam not cxcceding1.5m deep
qEADE 1.s .cq\qBEIE 4! DElq8lqE-q:
50mm lhick blindinO under pilc cap.
50mm thick ditto uirder ground beam.
READY-MIX GRADE 25 CONCRETE AS DISCRIBED:
6 Pile cap7 Column stump8 Ground Beam.
HIGH TENSILE STEEL ROD REINFORCEMENTTO BS 444S AS DESCRTBED tN:-Pile Cao
12mm Diameter bar
Colunrn Slumo
12mm Diameter bar
Ground Beam.
'1zmm Diameler bar-!
'16mm Dilto
NlILD STEEL ROD REINFORCEI\,4ENT TO BS4449 AS DESCRIBED lNr-
Column Slump
6mn Diarneter links.
Ground Beam.
2
{3M3
M2
M2
M3
t\,13
M3
4
5
11
12
Kg
Kg
Kg
Kg
Kg
I
I
l4 6mm Diameter slrirrup.
TO COLLECTION
BILL NO. 1 - DEWAN SERBAGUNA--'
Element No. 1 - Work Below Lowest Floor Level
SAWN FORMWORK AS DESCRIBED TO:
Sides of pale cap.
Ditto column stump
Ditto ground beam.
ANTI-TERMITE TREATMENT ALL AS DESCIBEDAND STRICTLY IN ACCORDANCE TO THETHE IVANUFACTURER'S INSTRUCTIONS TO THETHE UNDERSIDES AND STDES OF!
Pile cap
Ground beam
'150mm Thick bed of hardcore as described,spread, levelled, well watered and consolidatedunder slab.
Ditto, to Apron
50mm thick lean concrele as described under slaband apaon
Ditlo, to apron
READY-I\,IIX GRADE 25 CONCRETE ASDESCRIBEO:
125mm Thrck ground slab
oitto, to apron slab
TWO LAYER OF BRC A7 OR OTHER EQUALAPPROVED SIEEL FABRIC REINFORCEI\4ENT.WELLLAPPEDAT JOINIS AND NOTCHING ROUNDOESTRUCTIONS (MEASURED NETT . NOALIQIVANCE MApE FOR LAPS) EMBEDDED tNl-l25mm Thick ground stab
Ditto lo apron slab
DEWAN SERBA GUNA
BILL NO. 1 . DEWAN SERBAGUNA
Element No. 1 - Work Below Lowest Floor Level
SAWN FORMWORK AS DESCRIBED:-
DEWAN SERBA GUNA
M
M
M2
2.
3
4
5
125mm High sawn formwork as described to edgeof concrele
50mm high lo drop
120mm high to drop
o.25mmThick polythene sheet damp proofmembrane well lapped at joints laid on sand blinding(measured nett - no allowance made for laps).
Anti Termite Treatment to ground floor slab all asdescribed and strictly in accordance to themanLrfacturers insttuclion
M2
iP.0o:G/4/1i3 TO COLLECTION
AN SERBAGUNA
- Work Below Lowest Floor Level DEWAN SERBA GUNA
COLLECTION
FROM PAGE G/4/1/1
FROI\,,I PAGE G/4/i/2
FROM PAGE G/4/1/3
. TOTAL CARRIED TO SUMMARY OF DEWAN SERBA-GUNA
READY-MIX GRADE 25 CONCRETE ASDESCRIBED lNt
1
2
3
Columns.
Stiffeners (Provisional)
Roof beam
HIGH IENSILE STEEL ROD REINFORCEMENITOBS 4449 AS DESCRIBEDT-
Columns
12mm Diameter Bar
Stiffeners {P.ovisional)
5 12mm Oiameler RarFloor Beam.
6 12mm Diameter Bar7 16mm Ditto
MILD STEEL ROD REINFORCEMENT TO BS444S AS DESCRIBED:-
Columns.
8 6mm Diameter BarStiffeners {Provisional)
I 8mm Diameter as llnks.Floor Beam.
l0 6mm Diameter as links.
t3M3
M3
K9
Kg
Kg
Kf
Kg
Kg
TO COLLECTION
i
SAWN FORMWORK AS DESCRIBED TO:
11
13
Sides of columns.
Sides of stiffeners (Provisionat)
Sides and softltf roof beam
M2
M2
M2
NO. 1 - DEWAN SERBAGUNA
No. 2 - Frame
COLLECTION
FROM PAGE G4l2/1
FROM PAGE G4/2/2
oesci[iio-
l.-.1.
TOTAL CARRIED TO SUMMARY OF DEWAN SERBA.GUNA
CONTOHPRELI MI NARI ES
BILL 1 . PRELIMINARIES
Preliminarv ltems
The Preliminary ltems as set out hereunder are deemed to apply to thewhole of the Works and the Contractor must allow for any cost incurredin connection therewith. The amount inserted by the Contractor for suchPreliminary ltems shall be deemed to apply to the whole of the Workscarried out under this Contract.
The monetary vaiue of any items which are left unpriced shall bedeemed to have been included in the rates in the Bills of euantitiesagainst each item of work.
For the basis of progress paymenls only, the following broad principleshall be adopted for preliminary principle items :-
a) Generally the cosls of the Preliminary ltems less initjal and final costshall be spread throughout the progress of lhe work related to theperiod of the Contract, or related to the percentage of workexecuted.
b) Only in certain cases, Preiiminary ltems shall be paid as a LumpSum at a define time in the Contract period.
The method for paying Prelirninary ltems shall be at the discretion of theS.O. lt shall be the Contractor's responsibility to provlde all informationrequired by the S.O. to substantiate the initial cost and to provide detailworking of Preliminary ltem build up when requested by the S.O.
Method of B:llinq
The Contractor's attention is drawn to the fact that these Bills ofQuantities have been arranged in an ELEMENTAL FORM i.e. the itemsare grouped under Elements and within each Element, the items havebeen set out, as far as possible,in Trade Order.
The description of work and materials in the Bills of euantities are to beread in conjunction with the "Preambles To All Trades and theSpecification" contained in the tender document.
(M'rIl/ K I NRARA/P32,/ 95 )
TO COLI,ECTION :
CONTOHPRELIMINARIES
Definitions (Gont'd)
Employer
Architect
Structural Engineers
Civil Engineers
Quantity Surveyors
Government
!
Contractor
Nominated Sub-Contractor
TETUAN PERUMAHAN KINRARABHD.
MAS OTHMAN ASSOCIATES.9'136, Jalan Bandar 4,Taman Melawati,53100 Kuala Lumpur.
IKTISAS IilIGENIETJRS SDN, BHD.
Lot 303,Lorong Selangor,Fasa4B,l"rrsat Banclar Melawati,Taman Meiawati,53100 Kuala l-umpur.
RANHILL BEITSEKUTU SDN.BHD.Wisma Ranhill, No. 2-12,Jalan Setiaurangsa 10,Taman Setiarvangsa,54200 Kuala L.umpur'.
KSK ASSOCIATES SDN Bi.ID,298, Jalan S$4 Ci 5Taman Raszr Sayang47301 Petaling JayaSelangor Daru j Ehsan
Wherever iitc ierin "Government"appears in the Contract Document,this shall be ieacl as PerumaharrKinrara Bhd.
The Party contracting lbr the Worksand to whom the Contract for theBuilding Works is awarded
The person, persons or firmnominated by the Employer tocarry out specific sections of worksunder the direction and supervisionof the Contractor
TO COLI,ECTTONtvrM/xmnene.u p:z /gs )
tII
CONTOHPRELIMINARIES
Nominated Supplier
Site
Works
Approved
As Directed
The person, persons or firmnominated by the Employer tosupply specified articles ormaterials for incorporation into theworks by the Contractor
The land or other places, under, inor through which the Works are tobe executed and any other land orplaces provided by the Employerfor the purposes of this Contract
The whole of the materials, labour,plant and other things necessaryand requisite for the properexeculion of the Contract asshown on the drawings and in theContract Documents and asrequired of the Contractor tocomplete the Contract
shall mean as approved by the S.O.
shall mean as directed by the S.O.
The Work comprises the construction and completion of thePembangunan 99 unit rumah berangkai 2 tingkat, fasa 4C14, diSektor 3, Bandar Kinrara, diatas lot-tot ,l}O4,3jg7 A 3198 MukimPetaling, Selangor Darul Ehsan.The Works include the following wjth associated External Works andServices :-
The construction and completion of the following:_
i. Rumah Berangkai 2 tingkat - 99 Unit
The construction and completion of external work comprisingsite preparation, road hardstanding and paving, surface water
Scope And General Description Of Works
a)
b)
(MTM/KINRARA/P32l95 )TO COLI,ECTION :
CONTOIIPRELIMINARIES
drainage, sewerage and external waler reticulation
c) Prime Cost Sums have been included ContigenciesDrawing showing the overall dimensions and sizes relating to theworks are supplied together with the Tender Documents.
The contractor shall study the Tender Drawings and Tender Documentsand satisfy himself as to the full extent, character and nature of theworks. No claims resulting from failure to do so will be admitted.
"Site"
The site of the proposed Works is located at lot-lot 1804,3197 & 3198Mukim Petaling, Selangor Darul Ehsan.The Contractor shall be deemed to have visited the site of the Worksand make h jmself thoroughly acquainted with the location, facilities ofaccess, type of soil to be excavated, jocal conditions as to supply oflabour, materiais, services, etc. existing neighbouring structures,weather conditions, water table level, flood waters, etc. and other siteconditions which may affect their tender. No claims will be allowed onthe grounds of ignorance of the conditions under which the Works willbe executed.
The Contractor shall be deemed to have taken note of the restrictivenature of the site and its effect on their attendance upon the NominatedSub-Contractors especially on the provision of storage spaces (seeClause on "Nominated Su b-Contractors,,). lt should be noted that itis the sole responsibility of the Contractor to provide space only for thestorage of the Nominated Sub-Contractor,s materials, tools andequipment and if due to site restriction and/or objection by the S.O. toallow bulk storage on the suspended floor (which may not have beendesigned to take such loading), the Contractor shall be deemed to haveallowed in his tender for providing alternative storage spaces elsewhereaway from the site and pay for all the necessary storage charges, costof additional security, insurance premiums, double handling cost,transport and all other costs and expenses involved in complying withthese CIauses.
Access And Eqress
The Contractor shall aliow for providing and maintaining the sitecommon access roads within and adjacent to the site.
0.{TM/ K I NRARA/ P3 2 / 9 5 )
TO COLI,ECTION :
t PRELIMINARIES
A Form Of Contract
The amount appearing as the total of the General Summary at the endof these Bills and marked "Carried to Form of Tender" shall betransferred to the Tender Form without any alteration or rounding off.
The Form of Contract will be the P.W.D Form 2034 (1O/83)StandardForm of Contract where Quantities form part of the Contract. A mpy ofthe said Form which forms part of the Tender Table Documents isavailable for inspection by the Tenderer during normal office hours onany working day up to the time appointed for receiving tenders.
A summary of the Schedule of Contract Conditions is listed below andthe Contractor is to allow against each Clause Title or in his prices foranything in these Conditjons considered to have monetary value.
Amplification Notes, Amendments And Modifications ToConditions Of Contract
Amplification notes, amendments and modifications to the variousClauses of the Conditions of Contract are given here below for theattention and compliance of the Contractor. The amplification notes,amendments and modiflcations shall be compiementary to and be readconjointly with the general provision of the Conditions of Contract. TheContractor shall have allowed and be deemed to have allowed in theContract Sum for all expenses in compliance with the amplificationnotes, amendments and modifications to the Conditions of Contractcontained here below.
(Note: The words added to the headings of the Clause of theConditions of Contract listed below are inserted purelyfor the guidance of the Contractor who will, nevertheless,be fully responsible for taking all the implications of theConditions of Contract into account).
Clause 1 Definition and lnterpretation
The initial "S.O." means the "Superintending Officei'who shall be S.O.or his representatives delegated by him to act on his behalf.
( MTM/KI NRARA/ P3 2,/ 9 5 )
TO COLI,ECTION :
CONTOHPRELI MINARI ES
The Contractor is reminded that it is an obligation for him to check fordiscrepancies in or between all Architectural, Structural, Civil drawingsand other details as shown as drawings are issued and shall reportiothe S.O. of any discrepancies and request for further instruction. TheContractor shall absorb all additional cost due to his failure to complywith these requirements and/or to co-ordinate the various constructionrequirements and/or to request for instruction on time.
Clause 2
Clause 3
Clause 4
Clause 5
Clause 6
Clause 7
Clause I
Clause 9
Clause '10
Clause 1 1
Clause 12
Clause 13
Clause 14
Duties of S.O. and S.O.,s Representative
S.O.'s Right to Take Action
Scope of Contract
S.O.'s lnstructions
Notices
Contract Documenls
Sufficiency of Contract Documenls
Materials and Workmanship
Unfixed Materials and Goods
Statutory Obligations
Fossils etc.
Patent Rights and Royaltles
Setting out
The Contractor is to allow for giving all requisite notices to the LocalAuthorities and all other Authorities and for conforming in all respectsto their requirements and for obtaining all licences and'paying ali feesor charges including any rates or taxes legally demandabie.
a) The Contractor is to allow for providing all necessary labour,rods, pegs, instruments, etc. required for setting out the whole
(MTM,/KI NFARA,/ P3 2 /95 )
TO COLLECTION :
CONTOIIPRELIMINARIES
b)
c)
d)
of the works, also all labour and attendance required by theS.O. for checking this work.
Provide for engaging a Licensed Land Surveyor to prepare andexecute all survey works.
Establish bench marks approved by the S.O. and such benchmarks must be tied up to an existing Government bench mark.
Check and confirm actual boundaries of site (where they relatelo this contract) and agree same with the S.O. and the ;le;antLocal Authorities, Form and leave permanent marteri loitypeto be approved by the S.O.) indicating actual confines of site.
Provide for notifying the S.O. when the excavations are readyfor filling.
Aliow for providing theodolites, level and such like instrumentsand attendance for the S.O. in recording and checking of levelsand setting out of the Works throughout the contraciperiod.
The Contractor will be responsible for the accuracy of locatingand positioning each pile cap position and verify the setting upupon completion of pile cap.
Any errors in setting out and any consequential loss to theEmployer will be made good at the Contracior's expense tt ihesatisfaction of the S.O..
Any assistance given by the S.O. in sefiing out will not relievethe Contractor of his responsibili{y to iet out me WoiXsaccurately.The Contractor shall conduct separate surveys of the Site andWorks as follows :-
i) lmmediately after taking possession of the Site andbefore commencing any work the Contractor shall surveythe levels of the Site, the positions and levejs of allWorks on the Site and submit to S.O the survey planenclosed by Lisence Surveyor for.approved piior toproceed.
e)
s)
h)
i)
(MTM/KINRARA/ P3 2 /95 )TO COLLECTION :
CONTOHPRELIMINARIES
Damaqe To Existinq Adioininq And Adiacent Buildinqs OrProperties
The issue of the Final Certificate of Completion shall not be taken torelieve the Contractor of the liability for any damage caused to existingadjoining and adjacent buildings or other properties due to thenegligence of the Contractor in carrying out the Works.
Cover Up And Protect
The Contractor is to cover up and protect the Works from the weatherand suspend all operations during adverse or inclement weatherconditions, which, in the S.O.'s opinion, will be detrimental to the Works.
Temporary Buildinqs
The Contractor shall provide, maintain, alter, shift and adapt (as andwhen necessary during progress of the Works) on the site in positionsdirected by the S.O. adequate, secure and watertrght temporarybuilCings for use during the execution of the Contract. These buildingsshall be erected by the Contractor and approved by the S.O. within twoweeks of taking possession of the site and shall be removed, clearedaway and their sites cleared and cleaned and reinstated to their originalcondition within one week of receipt of orders from the S.O. for theirremoval. .All temporary buildings shall be constructed and maintained accordingto the requirements of Local and other relevant Authorities and theContractor is to pay all charges in connection therewith.
Provide and maintain adequate lock-up weatherproof sheds forsafestorage of buildings materials including lhe materials of Sub-Contractorsand Suppliers whether nominated or olherwise. Floors to cementstores shall be raised at least 300mm above ground level.
Provide and maintain a well lit and ventilated portable cabin for use ofthe General Foreman including proper storage facilities fordrawings, documents, etc.
(T4TM /I{ I NRARA/ P3 2 / 95 ]
TO COLI,ECTTON :
CONTOHPRELIMINARIES
Provide and maintain for the use of the Clerk_of_Works, S.O.,s and otherConsultants' representative, a lock-up, air_conditioned and well litportable cabin/site office of not less than 30 sq. metres with 3 No. deskcomplete with lockable drawers, 12 chairs, 1 No. plan chest, 1 No.drawing board, 1 No.tee square, 2 No. chairs pin boards,white board 6,x 4'with black pen etc. all as instructed by the S.O.
Provide, fix in approved position and maintain two (2) new split air_conditioning units of 1 /z horse power size complete with starter,sampleboard and rack and all ancillary electrical woiks and pay all chargesincluding electricity consumed throughout the duration of ihe Contract_Provide and erect all sanitary conveniences comprising 2 Nos. W.C.and 2 No. urinal bowls for the operatives, supervisory aid site staff inan approved position and in conformity with the requirements of theLocal Authorities; maintain in a clean condition and deodorise groundafterremoval.
Temporarv Buildinos
Upon completion, remove all temporary buildings off site includingcutting off power and water supplies and make good existing ground tothe satisfaction of the S.O.
Temporary Site DrainaqeThe Contractor shall provide, maintain, alter, adapt as required andmove as necessary and clear away when no longer required andl1k^e. Sood lhereafter temporary earthdrain with 2 nos.silt trap size4800rhmx 48mm . including 1 no.wash hough size 6000m x 3600mmall as instructed by the S.O. and ali necessary temporarypumps,drainage, culvert etc., within and around the site io adequatelykeep the site free from water including flood water
Siqnboard
The Contractor shall provide and majntain a signboard in accordanceto the S.O.'s drawings and details as instructed by the S.O. and allowfor the removal of the signboard on compjetion of the Contract.
{MTM/KINRARA/P32,/95 )
TO COILECTION :
CONTOHPRELIMINARIES
The Contractor shall erect it in a position where directed, obtain allnecessary licences and permits and pay all charges in connectiontherewith.
The Contractor shall also alter and adapt from time to time as requiredby the S.O. and Local Authorities and pay all fees and charges.
Advertisement
The Employer reserves the sole right of advertising upon or adjacent tothe Works. The Contractor shall nol allow and must ensure that noadvertisement is displayed without the written consent of the S.O..Permission will only be given for the erection of signs by Sub-Contractors and Suppliers and all such signs shall be to thl approval ofthe S.O..
Water For The Works
Provide clean, fresh water for the Works including that required by theNominated Sub-Contractors.
The Contractor shall provide, install and maintain all necessarytemporary distrjbution around the site (including that required by theNominated Sub-Contractors), to tap from exiiting mains all waterrequired for use in the Works including provision of 'all necessarytemporary meters and plumbing, storage, etc. and clearing away oncompletion. All charges on consumptionby sub contractor / nominated sub contractor shall bedealt solely by the Contractor.
,
Pay all cost and charges in connection therewith. Alter, shift and adaptfrom time to time as necessary.
Provrde temporary artificial lighting and electric power necessary for theexecution of the Works including that requlred by the Nominated Sub_Contractors.All electrical installation shall be carried out under lhe responsibility oflicensed electrical workers.
(MTM/KINRARA/P32 / 95 )
TO COI,TECTION :
rCONTOIIPRELIMINARIES
Watchinq And Securitv
Provide for the employment of efficient watchmen or the services of aSecurity Patrol Group registered licensed as may be consideredreasonable or necessary on the works by day and night and provide allnecessary lighting, warning iamps, guards, barriers ind all safeguardsfor the prevention of fire, accidents and losses for the whole peiiod otthe Works in hand.
The Contractor shall solely be held responsible for the safety fromdamage or theft of all fixed and unfixed materials, plant, machinery,tools and scaffolding, etc. The Contractor shall also be responsible forall Nominated Sub-Contractors, fixed and unfixed materials, goods, etc.delivered and stored on the site. However, the Contractor shall not beresponsible for Nominated Sub-Contractors' plant, tools, equipment andthe like (see Clause on "Nominated Su b-Contractors").Safetv Precautions
Allow here for complying with the relevant Acts or Statutes ofParliament, regulations, etc. relating to safety of persons on or aboutthe site.
Provide sufficient safety helmets for the use of the Consultants andother authorised persons visiting the site.
Ensure that all tools and tackje, gear, staging, scaffolding, ladders,machines, etc. used by the Contractor or any others in connection withthe Works are of adequate strength and safe for use.
The Contractor shall note that all constructional plant used on site musthave the Certificate of Fitness issued by the relevant approvingauthorities and the Contractor shall ensure that all constructional planlare in good working condition and safe for use.
lmmediately discontinue or remove any equipment which becomes orljkely to become unsafe.
The .
Conlractor shall promp y remove from the Works any of hisemployees or representatives or those of any Sub_Contractor or otherparty whose conduct tends to create any danger to themselves orothers or lo the Works.
lI4TM/KTNRARA/ P 32 // 95 )
TO COUJECTION I
CONTOHPREL]MINARIES
First Aid Kit
The Contractor shall be required to provide at his own cost a twocomplete set First Aid Kit which shall be kept and properly maintainedin the contractor and S.O/consultant Site Office. The kit at theConsultant's Site Office shall be in the charge of either the Contracto/ssite representative or some other responsible person who will be on thesite during all working hours to ensure that the First Aid facilities areavailable without delay at ail tjmes when work is in progress. Oneresponsible member of the Contractor's staff shall be trained in simplefirst aid duties.
Helmets And Boots
The Contractor shall provide lhe following items within one(1) month ofthe award of the Contract of a standard and quantity lo be approved bythe S.O. for the sole use of the Employer, S.O., Supervisory Staffs andOfficial Visitors throughout the full duration of this Contraci:-
i) Safety Helmets (StRlM approved)ii) Safety boots (nail proof )iii) Wellington bootsThe above equipment shall remain the property of the Conhador upot.lCompletion of the Contract.
Site Fire Prevention And Fire Fiqhtinq Facilities
The Contractor shall ensure that proper precautions are taken to reducethe risks of fire while the building is under conslruction. Building debrisshall be removed periodically and inflammable goods and fuel areproperly stored. Allow for the provision of fire extinguishers (3 nos. drypowder and 3 nos.Cor)_
MoSquito Prevention
All excavations and portion of the site where water stagnates oraccumulates shall be kept dry by pumping, baling or other operations.
(url.r/rirnem/p:z/gs )TO COLI,ECTION :
i rj tr; .:i 7;,, rr 4+L , i ?- !
_ ; .Lri -r, , 63 .i. .:i_$-; *j
, i T !; iE 4E .5 HE3:,- t !? 5a- id E d-j i I.s ?+E ?I ,.? F.iE Hg;g E$EE ! lII ; i; +:E iE isei: :3c;iili 5-ig:.' "a ;r ;;; ii EE f;: ;:;t :5!: ;i si
, i ii ff ii jii i;i ii i'gr fi;i iiig it iilii; ii ;$ iflt; i;i iiijgi *i=F iEiie li iitr r": :i g" r-q.; !B; iyt EsE! Ft;a ;E:sj i$ --l'1"*FE Fi 'j u;i; i;i jg i;?E iigi gffi ;i !iib.9 a i t4 i g-EZ>! ds j j $ ji ;F, ; ;;; E i ii ;:,'i gi;iiiiEii,iia;,igllilgnEE;itigisgi
ll ii lgiiii ffi ;i iislrii..eislu u;;iil oi s;i o niit9 3 iE g.bL&i
_8E
e64 257!09 ?
,9
trrii1
$i:sji:gFI*i * ? ; -' $s 3IEie sii; r tiE5rg j ii ; I, i ; j'; Il:f,ri iirj j tiEii- ;+ j;,
fi i ;t ;*i iiiiii iFj3, i, i3g:--q n I : ft d:I {':t{
"'n 6! :F'E { C.E ,! 3 J.E "-*'E
=l "r !E rq6;.a n lK *jEif :i;s s
irEi i*;i j ?:i iste iij:ig ;:*i#i:iu::P.e BE !; - {;- S : si; E;E;ig 5fE.Ei EI Effre ii sj i li f r tii iigi;i, {iFiF :i igigiff, 5i if* ii ii i* i; gri, f!;iiii siiiE gg jiEsOsOsesodio
iffff igi i' ii ii
iiisggiiiiii3ilF'
E69-l!!
d r:
,:, .a I.rc;9;o ;g
!i E3, ^ !E,6F i if: .r;5:E J -9e !c -;.i 9= a
-d o ;4i..E ! 3 !eo 5.-5 ;.EEEs .4tpE i ;dE ri I:; E g .;5T.s !; >t 5 5
E f:gE: e :i lEE e d ! EIEF'E 8 N.9 t 6o ? S 5td irBTE ;
"ii Ei;i;t i t"
r : 3 F.o 9;ii t+g;3i { j"i; ii;:*i i :;il Ei*ii i: j;;f 5s=5i: Ii -!i; ig;;;9 :E ;:j gaiii ii E$303e
EZ-t
ri
T.r.?6
?i:,8drgttiii;ilgi:,ilFE;;:
,gA gg"i ,;iij:i i! fi I; g,i:j agEt i!i iiSjf 3f ft ji ,fc?*FjE:s j i:;'12 r..;*llr; E! f i{{ii3'q iis
j fi;, if ij fi ff: iil $E$ g$ ;j igiti.; TJE t;;g :Es+ *E* i $ l* ii i3is ii; jjf sf ii i::3
.r. 3 ee o o e o 3 I e og;ciz
i A .3d .! E,lP "?eii ; ;; i :;i :,ss' a;j I ;g 5 E !t s+gi E ii ; iE: i:i! v;-r: :: '": "'I li; j ;i i *;; ;;! F;EgE ;i 1 ;; *i!i f E; i 5Yr. i.q"tJ iSF; i'" d..E E +i- e!Ei : !5 i !i*: ;s; ; iji : '4 ;a z EEg EEEr q ? !!:;
.!3.:r EEi t !! !tr* --i flE* .!ed[,i d i'r;ti;i!i =!i5r ;. EtF:,Ig;E,E!!,ii E E Hy=,ig;i;;g: i.i; iiq:i;,itSlllr i E: s sa=' i*;i , giig jf i: ::;" g;
="g i;tiiSi.i; ; ;i;; iEg:'FjiEt! i: ;;ii::iiE
ii ?i ii ; if:' iii; {iii ii $i igs ;E Fti rlicii :; i; f; ii;! r;iie i:ii ir ii, 3;i ;5 $;i flfiji g! ;eE il i;il gtl;g 5t;j 5; ses
';E ir i;iirr5
" 5p Fnr Ed; Fj9o o e o o o o s ;ig, o s:= \. s - =li,
JE
i8I
.siq
6,
- *$ir- JYti.: i t
is,ii 3 ,'rlJI
?.sE'
*ll\ tlll I i+l\\;-.
-t I .\-8 tl |
--+c 9ti\gi r\\ I!igId rrr- d.9 < &rf ;5I e*e: E- 96- cEc-'" ae! E,it E_5
-oii -v=-2 "eE '-I E!; z!+gt E* ?sE ...EtEi *; E:q 9 !;Er ;
'fo -:r .EE i 3. *o==; ?4
-lE=-ig:99o
3.i
()
.
'43F
Et
:;:+ r;+ jr; i :"s EE;3:j ;i: lr; i il {i.ssJ4 ti: u-:!; :
-&g iieai i:e fri ; e:- ;;;[jE i;E ;;'g i iii t;
- i;iE :i; ii+! i *f!" !ij i;!; ili. +Ei; j :;;;i;'1! ;;;g iirs ? Ejg 3l;i;i seE; !irji;s js:i ii;j j iii if;
.o E.:: ?, 9 t= *- :-g Bn :?; E!q. 5
.9 . ! rza *P! !Ed i; Fi: r5F !
*3 i6t ;o'i,
"a.! r*.3 .E
= :E3 I?! Eq.i r95 .:{'EE i:8., :EA.: U- ! iii ;5EE .x$";
g ii'del ;t,:: .s2!.9 orEq. E E:!-s iiI; ;'gE sesE .Ei
: E F: :!!: : C:.!
-liooobi!!'i.a d:Fe :q
st s xi;
-.Ei=l-=; | "!4 2 r-3!5BE3:-:;;ii!i:; E !
ciib! g ir';o; 5irEg; f!,ror=E ,!-!1;5 E-I:r:tr: a".o-: !p !EE+t,t ;3-c 3
-
" Z a
rlJoi- !!iqe?I i"!!5&c 3;EE5: da;';
.iI
Ii"
Irii:
! : + F,5; g i E; + ; EjE E E g=
9P ; E! e n . 5i E E s;=n' ; $;: r;.; e f y !- i 2 :;EI c E F! : ; --t *= ;l I
";. i i i;;! *e -: iE;E;;. gEoi.pin3;E :t S 4 alclI::;3 t'-;ti;";iE;t;
E ;1 ; fi ;:rg ; l;igr f{ E zi H:i; I i3!if g dei =g." il 'lF e dsEAEt ;ed{ ig ;g iE3; i aoosoo i
i9.;!t;!Eiti!: t g .i
= e
ii. I p in !"i: e ! ;i :i! I ; ;: ;!3:!.i;icsi.v E: tI xi 5! .E I I !I -ts a9!?c t ii a
'l:! I{ * !; ciilE:;:; ii:Ei$.! Ir ! ; a E!iii"Flt ii F:liE g=i ii sl! H-' *.: Ed : !-i .E3lri ;z 3"{ l;i cEI c; Er !,9 a - EI.:. io x4
= 6: .-,i
l [t 5 5; i;! EEt l!flu^,:.^=29>o ,+ a s " < ' ',r
:.,i: *i ;9 .rF'-s - -i -*
:Ei
), '! r,J()ll]:()
I Ei s;i$g;iI ir'a U: ?
-!
; 5!gE=+F!rEv 0. aa (,
:: +jEgj + Ei r:i;9; ;i:e; j !i E:sjg5i ;f;+i E iE i E;t:.e_i !r;E- i
=: .:
.?.rEE*: ;; '+; ; ;i t :+:qip *,E;il , Et {',;'Z!:i
_i-rq,r,i S _* "
iEE@-- --8.:-
;{ad.g !.E!Ed
-9t
:- o'c-.r!P
.!l!d: io:Zzv,! ;.: !
ff$;i ;i i{ ;f;;;lffi+ii;e r3sii ii ;s, ;i g !f jjj, F g i,:f fiis sFi i i *g; jj ; i! ;siF! i, i iif siEiiei 3{ {;f Ejs iF ji i:i:j gf f ilr *;iigci Pt sc+$:i*i;5 gE{:;;;i ;d;;giei:$f jg Fj r:! si ;i ::;T: ;; ; aFs Eiiiy;;; i; i:j ;jf ;i fl +E;Fi f; f- ifi etii;i$f $3:a J;F gg; fj Fg, if ljF :3 r; iFi; io 5 ,i. ^H-g 6{ JEt i+;ii gt .iE +i;5 ;,:,e .e o s , o ;.;,"- :*9'^i
j-B -3 d .9.cev ;;ie-
e 8EsE !!i _a; g: TfEbtr> ?e < .? >\x
ii ; ? isi ii;E rj iiieg: ?;: ; ei: Ei; s : :r:E ::E; ; i;;s:; ,:jj-e EE-s;;; i i :gEi jila gji ,::;5't ;ir i tfi;;i ; : Ezil, sitg .Ei ;cEi:1 toa E :j:;ij; q : s=:; eli! ;cE ;it;;g iE!; E;3{ii i I E;!i i!;; e!! E;irsi. lEt i itsrJ.! 5 g :'5aE ii; i ; ri;* iEg ;iE n:i3fgf fij fl+ ijijf!f i ; t*: ;E;F ii; :-*=tEEie ;!5 '3i Eit'sir ' i ! i.E i !
'i if rt, =.g5 *::ii;i i;F ;E i:;g;ii' ji : !;ii{ ifltia i:f g;-i:sr ;EE ii rjErr;is E'" E ,s;iEE EI#Ei fgE :;!Ei;{ l; E; figgso
7,
(,
..:,3 e soig
E
d
Id)
Fo
!.'9E: r,io dn
s ir E EIt iT; Ai : ;" iE i EiE,= i ;i.l Is ii E;;! ;Elt; i ; eEs rr^
i '5:I 5:tPi.e,E3 !i !;eEiFrE; * l i!:5:s..:!9 ?: :=:.>! *b'i 't o? gE I5't_:,8 t? !t-lF:FiA Ei i;iii;E; i! ii;3-s.-sH! S .E5 ;Tsi=l3u-;
g F;;r"eEiiy !: Fjyq;:.;F ;; ;;'i"9:riri .rE: tg:5.l!gE?E ,-:Fi zjtnitn6"o
-ui EYsosi EgF; ;ti :i;jgIgB$ ;'-: lE:3d="rii; f ;E ieE;
lr.i
!:
'o
i,},oi?i
i g -E g
= iq i: ; 3 .E g$ ;
.5 -' r
- ? & i +t z
- : i i ; + F ?g .ii 'e i g i q
= 6ri E .; ; I :: 6 ao :
: ; i ! ; i P io ei E i ry E E : :! yE iJ.=r;IA -
-
6 ct ! YA2 zz i I F .4 ! ; -1 5. 3: h'E r i3, t! E : ! a f" y ilE, i
. ;- o : a + E .: .t 3! i.2 i- !g a f, L E i n : ri !;5_+?g;g5-r-*;
:Eg! Fndj'8222 si; **E--! 1iR;i;i!il es::iiFrEtj
=.
B .? ; ,. aE E .3r i.E: Fiy 7i I t i 5.8 EH E E; ;.ti !ii 2". : ! E iv iE n qi -:Eb.i E26 3 ;i o. o- 9! O; d dt "q- It_;ii !aoe e os S;; j
,,rr a L- F ? a.t -:;
6J;!i:i;
:)
6-;
I
:d
r.a
';r,9
l. z4
'iE cc r:; s-a 9e* tc a9
i2 b-3 9-z>9 !9 :::
9 S .E i.2.a!o18. T:Sr5t =
F 3::s ; f;d: i e 9t 2EiE a i tn g+ x r Eo*yt 3 a&g6 !1 ;-
aX- !'c.c: n6 iI3 E E'5 O,5: $ Ei lE!: ii6tt 3:!M,: -i >iif : i!.g..= t 6 !'- ;F E.9 E A i E
a;9!: r gd6
. J F E= 9,i: ; g.;;:s T cF..!oE!:o
.-
=!-ii' : Ee{'d.: I I i.,=r .: 9- -.!4 : :
^E;s, E g {jEg-; -' 9 ioFiis: j i EEfl:: P ! EE3!?i n' i -;1-o=-;i * I s;r: ! ; : E *F iF= ; t ,i' e " iie H!;"qg s e 5 i:Il ?
^ ^ ^ :93" xPil$ g
" ";;; "
g-{, e:;; dEJ;i - = =j; = EIF s!=-
.
='= 9.9 ".3.!i .s b
II
.5
3i:F..i :-cs J
-: ii. .9!! .o a9 't89 i:8 dEFd dd6 ,;J EE d,
!;Si E gJ.! ! qo?e Y aY;J; d 6dI
rt,i9
a-:P -: ijEy -B j tsTdx ^ z4='i6 ! e:'t a i r*ie A :'! 1 z EEEE i *JF T E g;=; Z .q-2- e l,:ooF! a i:E Ez : ?,i? r= !.o? F-i:=E =r _! .f qi .-E i .&1'l i7 ? t; "i !, !-i E =ol3*
-+ : alE P" ; Pts'5 =
_:.:; jt i E;E tn F :f"!3; a; : :-i=
-qi E i:E.=lE T; j F5i; 6E = 9*GLs j ;;.;--
i t z e s d::.9 di
aE -i N ; F_.;E 3i
53
;)
!:. : ;
iri t 1E-;= i Frl
=i'E
.:E
Fqi
.
E!
{:;
o.:
: +?y ?z
F : Yi .?*.sr .e!;: i;: :El:;i;i3 : 5;; !:=:si E;3. c E-:5 l;.qGEi JE._c : c:= , E,^
-
-: ; !,i t11 i? )!:;=-E ;E3 {E ;Ft litxi! s"i9a
=::'-iE"- .2=E ;! .i3-s :fiir: E.!- t d ,,.": ! q o U>
:* 0 o. -
!.: ;.r ri4 j.,r'irE: EE'i :! -:?.I ii+;!E *;r t* JI; "E2l*e :j. < X -a 2E +.4 Y
- , q ^
* 3= t.i:5 6oe!:i r':i, :=; ii;l l;;?il ;*iH ;x:gri -i:!:;e l;iE :q
'n-.t i.1i7 *_E
a=:d c oo azr e,i i:9! !is_*i; jyF.5 t-.Z dJ&
Fio
2
J
C-ESMCONTENTS
Foi'e."icid io the first ediiicnForeword to the second edil;onSection 1. DefinitionsSection 2. General princiolesSection 3. Aaclication of the Work ClassificationSeciion q. Cociing anci numbering oi itemsSection 5. p;eparation of rhe Bill of OuantitiesSecrion 6. Completion, pricing and use of the Bill of OuantitiesSection 7. Method-Relared Charges
iSectio n 8. Work Classificarion
5_
8
'l) -
1.1Ciass A: General items,Class g: Ground investigarion.Cless C: Georechnicai and other soecialisl Drocesses,C.;ss C: 0er,roliiion and sire clearance,Ujass c: EZnhworks,
_
Class F: ln siru concrete,Ci: ss G: Concrete anciltaries,.Class H: Precasl concrele,Class l: Pipevrork-pipes,Cless J: Pipervork-finings and valves,Class K: Pipework-ma niroles 3nd pipework ancillaries,Class L: pipework_suppons and protectior! anciilaries to layrng and
ercJvatron,Cle ss M: Structural melatwork,Ciass N: lvliscellaneous meleiworkCjass O: Timber,Class P: Piles,Class Q: Piling ancillaries,Class R: Roacjs anC pavings,Cless S: Pail track,Cle ss T: Tu nnels,Ciass U: 6riciwoik, bioci*or j. ar,cl rn6sonry,Cla ss V: Painting,Class W: Waterpioofing,Class X: [4 iscellaneous work,Class \': Sevrer renovatioo and ancillary works,
1620263032
46
50
58606264'!AO't tl-^/t)80
83,9092
oEARTHWORKS
?t
Excavation, dredgir:g, fillinq, comtExcavation,or: - .ractioh, disposal and landscapinssite investigation (included in c,ass B)diaphragm walls and ground anchorages (;ncluded in class Clpipes and sewers. manhores, rrenche"-.;j;ii;;; ;;;;i"lino.. ;ioinring (included in
"t".r"-J J.-x, r- "n,i yt - lhtusi boring and pipe jacking. and prpeprres (tnctuded in classes p and Ol
I::l!:-ri:::j.,l,"ffic sisns (inctudcd in class R):',.::rict9, ihafis, hc:di.:s:nd ^-.er s.-.,Lto..o,roen r:vities {incturterl in cla-ss Tl"^1.._::^O-"-tlo".
t:..Jenccs Ind gares iincIuded inHernstatemenl tollowing pipe laying iincfra"O in clrss kf
by CredgingIor cLrniDgs
] se ccruo orvrsror.r THIRD DIVISION
Maxirnum depth:
1 icpsoil2 l\iarerial orner ihan iopsoii. rock or
a.irrcra I hard maleriaj3 Acci4 S:::-"d z-1rr'cii, hard mare.relexooseo atl:e !omlrancinc Su rj2.e5 Si:iei aiijicr;i;ari m;ierial nor
:xtcseo ai :ne Cor.me,.iaji.ra Sunace
1
23.1
5
not exceeciing 0.25 m0-2s-0.5;oitm I1-2 m
-1-:0 rr.I0-;: m5ia rec exc?9dina 15 m
J
i
'l
ihe Commncin9 Su rla cern lhc oreoaration ol the
Cuant rcs sn all be acjoptedrneasuremgnl ol:he
lxc3valion classed as bf'i the elll oi Ouanlities
be measurec as by dreciorno
C1 llems ior cxcavation shal be6eemed lc ;nclude uoholoinosi. es ot xcavalion, adciilron;te\cavalrcn ro pro!ide workings:rece anC removaloi erisling
C2 ltems jor excavarrcn wrrnrnbo-ow piis shall be cleemec ioir clude rgmovaland repiacemenlo: rverburcien and unsuitebte
EMENT RULES
Measurement cf ercavation
OEFINITION RULES
D1 xcavateci mareriar si1rt1 be
deemedta be mEretial athet hantoosoil, tock ct Etriliciat ttttomrre.;a/unless olhc r.!r s e si;i edin irem descrlolrons,D2 ExcavetiDn in or u.Cer a.embankmeii, gxecul:c cr:o- ioplac:n9 ol till. sha,t be ci. ssec esexcavaio^ iat cuninos.D3 Eicavarion irorn witiinborrowpits snallbe clessei as9eneral excav2rion.
COVERAGE FULES
33
CLASS E
ADOITIONALOESCRIPTION RULES
Al The localion and lrm,rs oiexcavation bv .j.eoging sha |.esla r9d in item Cesc.:clions..v:teferls exlent wcuiC olhglvise be
A2 llem desc:iorio.s i..exCavatlOn 5: CV/ : \C^v (Ji c^o-.ware. ice'ilii,eC :n ii: P:eam:is :naccorcjan.e.4iih p..3 c re ph 5 .10shall idenliiy ihe bodv ci h,2rerA3 The locerion anc timirs ojexcavation iat faunaat)ons shztlbe sialed in lleryr oesc.iationsh,here lhe limits wouid otne-,!isrbe uncena;n. :xa.:! eroi a.ounopile sh6hs anc :o. u.:.e.rinn,.:shalle6ch be so dcs.:rbed 6ncclasseC es 9r t? r, i, J. :or
A4 The Co.::6enc,nc S u.ri]..shallbe idc.tiiic ir :;.descriolion oi' eecir ii.h ior v.,o.irinvolvin-o exc:vstion ;or !vh ic:the Commen.r:rg Su.;.ce is nolthe O.iginal Surrace. TheExcava!ed Sulace s;raI beidenlified in rhe desc.roi;on ofeach item lor work invoivinoexcavarion ior whj.i theExcavatec Sunace i5 noi ihe FinalSuriace.A5 llcm dscriprio.s iorexcavatioo rvrihin ic.rc\v pirs
An irem shali be giveo lorseoirale siaoe c, excavat;on
sha ll be made lrom
sp;.are si: q es in the
iire voiumc masured fo.alion of a strUcture or
shall be lhe volumeIo be eithel occupied by
above any pan ot the
Ihe volume measured tor,rron below a body ol openthall be the volume below
en ihe \4ater 5urface is aticr the higher ievel of
isolated volume olhard hateti6lot tock
il appiicable) showndraw;ng to wh;ch reference
;n rhe Preambte;ne v/ith pafagraph 5.20.
wirhin other materiat lod shallnol be
seoa.ally unlss itsexceecs 1 m3 excepl that
volume shall bcwhere the net w;dth of
is less rhan 2 m.vciume measured for
on within bor.cw pilslhe nel volume measured
ln accordance wilh5.18 the ou6nliries oisha ll be computed net
rhe Drawings wirh nolor bulling. shrinkaoe
! /here bounCa.iesciiierenr materials are
on Ihe Otaw.nos,r!mc.rs shail bc m:oc on
anc:llaries 'i Trimmrng oi xcavnieo s..jiiaces2 Preoaralion ci exa6./aier s!r'lacess D'ir?sdibllv?i'aiic;^::e.'a, -.1 iJoucre nancIna cr excz!:ted
i11 S lerie I
SECOND DIVISION
mrl5 Dreisino io renov? siii ml6 :x:!varion ci rr:liier 5er.w lhe Final
Suri2ce eno r9piac9fi'r-oni !\'rln siaied
1 Topsoil2 Marerial other than roasoil. rock or
anrrrcia r h aro ni6! er:e :,3 Aock4 Siated adificiel hard ;:areriai
THTRO OTVTSTON
I
n_, a le ria I? iimoer suppo(s leir in3 \1etal sucDo.rs len in
| 1 Tc srructL,.es rnl.2 i=l;n"menrs ----__ - _mji3 General mr' 4 To sialeo deoi:r or:ilcKn-.ss m_
1
23
618
EXcavated iopsoillmponed ropsoilNon-selecteci exc6v6tad rizier;al oiherrhan topsoii or.ockS!&!ie!Ler.?veleci-":3 r e iia I ot he r :ha.:r-topsoil or rock.lmpofted natural malerial olher lhanloosoilor rockExcavaled rocklmponecj rocklmported aniiiciai material
5ha il be measured towhicn ar lo receive no
O4 Disposaiciexcavatedmaler,s/shail oe Oemeo to Oe .disposat o,! i11e S;te unlessolhe^vrse siere c in irem
is exo;essly reouired or
snell be measured lowi:cii are lo recerve
DS rtirr'. -. -."^..:!;-^.disoosel a^c a c!ble h anCtingshall be oeemec Io be carireo ouluPon m3rener other th:n loosoii,rock or enliic,.i Saro .netcierunless cih.M,ise slrled In r!em
5 u rfnccs which a.e
The voiume oi cf,sposa/o/
lhe iifieience belweennel vojume of excavarron
net voiume ol excavered
oniy ro lhe exrent lhat itreouired. The volrme
lhal ol !he void formed in
meesureci onlY to theil is e:(oressly requirgd
tlir ict, ec.umuiates aierSu,:ace bas beeoshallbe removed
he area oi supponedior wh;ch the suppons
rerequ;red lo be left in.
only to the extent lhartilld is also measured
io eccoroance with
roaCs is subsequentlyby the Engineer for
votume olaced sha norlrom the measure-
ayin g malerial5hationly to the extenl rhat
volumc ol impoftedmeasured shall be
rce between lhe netfillin-c and lhe netexcavated marerial
work whhin classesfor filling.rock f;llingis cjeoos-
:6sured in the iransponlhe place ol deposition.
t//irg is ro be depos-warer, and the quantitYmeasured satisfaclorily
lneans, its volume3su.ed in thc !ransponlhe pl6ce of dcposirion.
D6 Filling meterial shellbedeemed ro be nor-selerled,excdvateC marerial othe. rhanropsot or.oct, unless orhetuisesialed rn jtem OescriO(iOns,D7 Filling mEle.iatshatr beclassed as excavzled rocl on jywhere the use oi rock as filiing elslatcd loc6tions is expressty
DA Filling sh6lj be classed es roslaleo depth or thicknesswhetemarerial is provided of uniiorrntoral compacled deplh or lhicknesssuch as io drainaoe btankets.topsoilino. oiichinq and beach;no.Bulk filJing sha lt nol be ctasseC a;to stated depth ot rhicknessnoMithsranding thal itcompacted io separ;ie
3r head of class on pa''ae :3t
DEFINITION RULES COVERAGE RULES
CL,ASS E
AOOITIONALDESCRIPTlON RULES
A6 tiern descriDrions Iorexcp vet i o n a nci a.ie s inconneaiion w;th excavat|o^ bvdreoging shatt be so descfibecA7 ltem descriolrons lor,t,, t t, i"r t9 c, e,Ldrdtcr sut;acesani aregaGlion ol excev.tecisu-,acss shatt icjenriiv surrares
(31 inclined ar in angte ot tO.-.tS.io lhe ilor;lonral{b} inciineO at an engte ol a5.--eO,lO lhe horizontal{cl venical.
A8 Whe.e m;tEfiai ,s tor o;rooseton rhe Siie rhc iocarroo oi:hedisccsalareas shell be st6iec r.il.r': oescriplions icr disrcs6/ oiexcavarzd maretiat.
AS ihe materiats shal be;denr,fied
'n ,rern dsscfiolrcns 1.,lill^a wnh ,n1Do^ed n;tc.ial
Ai0 .
ythere cjiiierent comoaciion.equrremenrs 5re spec;ilecj ior rhesame iill,ng mat:riat rhey shatj beslaIeC ;n ite,.n descnprions ior
A1 I Where the rate of deoosrlonof {,lling mareft.l ,s limireC rhelimitatioo sha be siated in ilemdescriprions !or /i//i!'_A12 The materi.ls sha beidentifiei in iiem descriptions forlill;ng ra siercC cjepth or thickncss.413 ltem descriptioos for ,l//irolo s:ated depth ot thickness st,?iidenrifywJrk upon su riaces which
(ai inclired al an anste ol I O"-_45,lo the hori?ontal(bl incl;ned ar en ancie oi 45.-90.to the hcrizonlat .(c) venical.
RULES I
C3 ltms for ,'il/ing sha beoee.ned ro include cornpacrion.
Trimmif-rg of lilled surfacesPrepar;tion ol lilled surlaces
..
anc;llarjes
I I ruding'2 Hydrauijc mulch
-orass seeding
3 Orher gra ss seeding4 Planls. starco specics ano sire5 Shruos. sitred soecica and si:e6 Trees, sialed species and sire
Hedges. sraied scecies, site andspacing
SECOND DIVISION THIRD OIVISION
1
2
4
TopsoilMaleflal olher tnan lopsoil, rock oranificial hard malerialRockStaled anificial harc material
Single rowOouble row
o 37 'l'.ta
tr .ineadtbf.l??s on page 33i
MFNT RULES
.tDEFINITION FULES COVEBACE BULES
CLASS
ADOITIONALOESCRIPTION BULES
ningol lillcd sudaces
, receive no Permanentner Vimming isoui.ad or no!.
zsur;c lo 5u riace s)reciive Perrnanenrher preparalion isquired or nor exceoiich die ro re.eive fillinging and surlaces ior
D9 Tfimminganc'prepataionsha ll be dccnrco lo be carried ourupon marerial olidrlhan ropsoil.rock or aniticial hfidrqar
-F'.
.ilio*IN SITU CONCRETE 'ln situ conciete tor:
capping of boreholes lincluded in class B)diaph.agm walls (include{ in class C)excavation ancillar:ies (included in class E)granolithic and other applied flhishes (included in class G)drainage and pipework (iniluded in classes K and L)piles {included in classes P'and O)roads, pavings and kerbs {included in class R)runneland shah linings (irr'atuded in class Tliounoatrons tor fences and gar4s lrncluded in class X)
slo N
.,,: i;. t. ,! .sEcoND DtvtstoN THIBD DIVISION
Provision oi cahc/e!eOrdinary p.escribed mix m3
.
ir ,.,1 Grede: C7.5 or C10:2 C12.53 C154 C20s c:56 c30l, cro
tt!;r r{fii
Cement to BS;2 or BS :a6l l0 mm aggregele2 14 mm aggreozle3 20 mm aggregate4 40 mm aggreeate
Cement to BS 4027 lsulphate resistingj5 10 mm aggrecare6 14 mm aggreeaie7 20 rnm aggre-c?te8 40 mm eqcrecetg
Cement to BS "2
at eS 1461 10 mm aggregale2 14 mm a9gregzle3 20 mm aoorecale4 40 mm aggregate
Othet stated cement5 10 mm aggregale6 1.1mrn aggre-o6ie7 2C mm aggre,caieI 40 rnm aoareoare
1 lhiCklrssj-loi 3y.66.1i.9 l qn@fiL2 15G-300 mm3 300-500 mm4 exceeding 500 mrn
Itl ,
Cross-sect;onal area: nol exceeoing003m'O0H 1ri':0 i-0 25 m'?0.25-1 mr
-------;i6
e d in s-i m'Special beam secrions
Proijsion ol cancreleOesiilned mix mrProiision of concrereSpedal prescriced i-rix ml
Ii
,.jii'ii.ti
.l
,i:,laciSg ol canctetelressiliii-orce direstiesseC
1
L'I
!:, ;,i:--elb!!e-.2 8qpes, rootings, pile c':os and ground.:!l sldbsl; suf,pendecj slabsI wlttsFildt
Coir-rmns and pie rsBeAmscaiing ro mctal secrions
..
q' Oriler concreie formsa:,,
,,:
I .'t.,i.1.,i.t ili,li
,iI; ,:i:i 'd ..'il. ;.r;i i
ii
I
,'iI
oRULES
voiu.ne ol concrele5hallinclude rhal
!
,.,1l.tl.li
'i
':i,l
.a
i']|:rl:f.,;a
t:
lir:
D EFINIT]ON
D1 llems ior
tii
a:,
CLASS FAODITIONALDESCRIPT]ON RULES
A1 The specii;calion ol theconcrete mix in acco.dance withBS 5328 sh6ll be sieled in itemdesctiprions i ot p t ovis ;o n oicorcfeta onless a rnix referenc-. isslaled 10. which the soeciticarionis giveo elsewhere in rhe Contraci
,A2 llem cjescnplions lor p/ac,ngo/ conc.ere whjch :s e>.presslyrequired to be placed agaicst anexcavated sudace iother thenblinding) shall so siale_43 The cross-sectionaicjimensions ol specir/ beamsecrionsshallbe slared in hemdescriptions, except where abam rype or marl number issrar.d for which dimensions erc-o;vcn on the Drawin-os.
44 kem descriplions ior corn.ponents cl3sseC as clher conatetetorms sha ll idenlify the comgonentand include one oi the folto!v;ng:{a) the principal dimensions of.
the concrete componenl{b) a rype or mark number ol aconcrte component forwhich principat dimensionsare givcn on lhe Orawings(cJ a siatement locating aconcrele comf'onent torwhich principal dirnensionsare given on rhe Orawings.
,s O.i mr in votumegrooves,lh.oals,
comDonenls each nol
in cross-sectional arearhd holes which are
tn accordance with iureclass G
lornl componenlsadiacenl volumes ol
each nor exceeding
concrete.
uha
vdlume ot concrerer sha ll exclude rhar ol n ibs
rolays each not601 m: in c;oss-
D2 A concrele ;nix shatt be:.clzssed es. i-.iigned.nix wtlererhe mix prooodibns a. lo b4'selectec by the eonrractor. .D3 A co^cier: rhix shair becrasiec:ii soe-oli
"i..i.. r,li.im/Y wnere Ine mrx orohodrdn