Quantity Surveying

Embed Size (px)

DESCRIPTION

Pelatihan Quantity Survey

Citation preview

  • fufi'''

    PELATIHANQUANTITY SURVEYING

    (rN-HOUSE TRAINING)11-13 OKTOBER 2000

    PT WIJAYA KARYAJL. DI PANJAITAN KAV, 9 JAKARTA TIMUR

  • r'i.i1ii

    i,l.itr

    T;{

    :

    MATERI PELATIHANQUANT|TY SURVEYTNG

    DISUSUN OLEH :

    lR. IRIANTO PURWOSUNU M.Eng.Sc.AGUS PITIHANTOAGUS PRASETIOFAISYAL SYAHRIT

    MOCH. RrFQr HERU MARYONOSTAMET RIYADI

  • FI

    DAFTAR ISI

    L.4*,'BAB 1 PENGANTAR

    1.1. PENGERTIAN UMUM

    1.2. PROFESI

    1

    1

    2tt

    BAB 2 LINGKUP KERJA QUANTITY SURVEYING

    2.1. TAHAPAN PRATENDER

    2.2. TAHAPAN TENDER

    2,3. TAHAPAN PASCATENDER

    3

    3

    4

    4

    BAB 3 BILL OF QUANTITIES 73.1. FUNGSI 73.2. BAGIAN-BAGIAN BILL OF QUANTITIES BUILDING WORKS 93.3. BAGIAN.BAGIAN BILL OF QUANTITIES CIVIL WORKS 14

    BAB4 METHOD OF MEASUREMENT

    4.1. FORMAT'DIRECT BILLING PAPER'

    4.2. STANDARD METHOD OF MEASUREMENT FORBUILDING WORKS

    4.3. CIVIL ENGINEERING STANDARD METHOD OFMEASUREMENT (CESMM)

    LAMPIRAN

    17

    17

    20

    21

    28

  • PELATIHAN QUANTIry SURVEYING

    i'i

    ,i

    i

    QUANTITY SURVEYING

    BAB 1PENGANTAR

    1.1. PENGERTIAN UMUM

    Pada awalnya Quantity Surveying merupakan suatu lingkup pekerjaanprofesional yang memfokuskan diri pada bidang perhitungan kuantitas danpenentuan item-item pekerjaan suatu proyek konstruksi yang kemudiandituangkan dalam bentuk Daftar Kuantitas (Bills of Quantities / BQ) dimana BQ inimenjadi bagian dari dokumen tender. Sedangkan orang yang melaksanakanpekerjaan tersebut dikenal dengan nama Quantity Surveyor (disingkat : QS).Sebagai konsultan, QS ini juga membuat estimasi biaya proyek (di sini dikenaldengan istilah Engineer Estimate) dalam konteks proyek konstruksi, dan bidangpengendalian biayanya. Pengendalian yang dimaksud di sini mencakuppengendalian pada saat perencanaan dan pelaksanaan. Sehingga obyektif utamapembangunan yaitu prqyek yang mempunyai nilai ekonomi dapat tercapai.Kualitas yang dihasilkan memenuhi harapan, biaya pembangunan yangekonomis, serta jadwal pelaksanaan yang tepat waktu.Pengetahuan Quantity Surveying ini mulai dikembangkan pertama kalinya dilnggris, kemudian menyebar ke negara - negara persemakmurannya.. Di AmerikaSerikat dan benr-ra Erooa lail$rt spesialisasi di bidang Quantity Surveying inilebih populer dengan istilah "Qbst Estimating". Di lndonesia, spesialisasi di bidang

    ..

    Quantity Surveying ini, dikengl melalui konsultan - konsultan QS yang datang dariSingapura, Malaysia dan Australia. Mereka umumnya bekerja untuk perusahaan-perusahaan konsultan yang. berskala internasional untuk proyek - proyekkomersial swasta, yakni : bangunan gedung bertingkat tinggi, seperti : hotel,pusat perbelan.jaan dan apartemen. Proyek - proyek sejenis ini umumnya dikelola

    proyek konstruksi milik pemerintah, peran"satu atap" dengan konsultan ManajemenMereka biasanya dikenal sebagai Quantity

    oleh investor swasta lang tetkait dengan porsi pendanaan dari investor asingataupun kreditor asing. Untukiilroyek -Quantity Surveyor biasanya di.jadikanKonstruksi atau Konsultan Perencana.

    Engineer.

  • PELATIHAN QUANTITY SURVEYING

    1.2. PROFESI

    Dalam perkembangannya, Quaritity l,surveying menjadi suatu bentuk keahlianprofesional yang berhubungan dengan aspek - aspek ekonomi bangunan, dimana Quantity Surveyor dikenal sebagai Konsultan Biaya pembangunan(Building Cost Consultant / Building Economist). QS disini berperan dalamperencanaan dan pengendalian biaya suatu proyek konstruksi, besertapenanganan aspek - aspek konfaktualnya. Sesuai dengan spesialisasiprofesinya, QS menawarkan jasa kdnsultasinya kepada investor proyek atau

    ' r,pemilik proyek untuk kepentingan petgendalian biaya pelaksanaan proyek agarpembiayaan proyek optimal dan tidak'melebihi anggaran yang direncanakan. qqg-Pelaksana Pekeriaan / Kontraktor, 'Q-S berperan sebagai perencana biaya--''-'-_---pelaksanaan proyek konstruksi dan pengendali Kontrak / Perjanjian. Kerja. Dalamhal menciptakan peluang klaim, QS berperan sebagai perintis dan sekaligus

    Guna menunjang efektivitas pekerjaan ulama QS dalam hal perhitungan kuantitasdan penentuan item-jtem pekerjaan suatu proyek konstruksi, maka perluditerapkan suatu Metoda Penghitungein Kuantitas yang baku/standar, misalnya.:SMM (Standard Method of Measurei;i;pnt) for Bulding Works dan CESMM (CivilEngineering Standard Method of liiiasurement). Standar ini dapat menjadialternatif acuan untuk standarisasi perhitungan kuantitas yang terkait denganrtem-item peker.jaan bangunan gedungi btaupun bangunan sipil.

    -7

    j9lgglabtY\sehingga keberhasildrt klaim akan sangat tergantung pada[ "keterampilagT QS menyajikan detaili, perhitungan dan analisa serta data-data\?"---}/

    ben-d[k-u ng nya.

  • FPELATIHAN QUANTITY SURVEYING

    BAB 2LINGKUP KERJA QUANTIW SURVEYING

    Sebagai Konsultan Biaya bidang jasa konstruksi, lingkup kerja eS dimulai sejakproyek masih dalam tahap konsep sampai dengan selesainya pelaksanaankonstruksi proyek yang dibangun oleh kontraktor dan diserahkan kembali kepadapemilik proyek untuk digunakan.Secara umum, lingkup kerja QS dipandang dari sisi konsullan dapat dibagimenjadi 3 (tiga) tahapan :

    2.,1. TAHAPAN PRA TENDER

    Dalam tahapan ini setidaknya adatanggungjawab QS, yaitu :

    5 (lima) item kegiatan yang menjadi tugas dan

    '1. Menyusun anggaran proyek. QS menyajikan gambaran kuantitatif proyek,yaitu berupa rencana biaya proyek. Berdasarkan input dari feasibility studydan perencanaan / desain, ada beberapa alternatif rencana biaya yang dapatdiajukan oleh QS yang akan dipilih dan diputuskan oleh pemilik proyek danditetapkan sebagai anggaran proyek atau dikenal dengan istilah ,,budget',.

    2. Memberi sumbang saran untuk alternatif desain proyek sehubungan denganoptimalisasi biaya proyek.

    3. Menyusun Bill of Quantities berdasarkan klasifikasi pekerjaan yang telahdisiapkan sebelumnya.

    4. Memberi rekomendasi pendanaan proyek.5. MenyiBpkan dokumen tender berserta format - format administratifnya.

  • II.i.]

    PELATIHAN QUANTITYSURVEYING

    2.2. TAHAPAN TENDER

    Dalam tahapan ini ada 2 (dua) item kegiatan utama eS, yaitu :1. Evaluasi lender, yakni evaluasi terhada'p proposal _ proposal penawaran

    peserta tender, serta memberi rekomendasi kepada panitia tender tentangpeserta tender yang layak untuk ditunjuk sebagai pemenang tender.

    2. Menyiapkan format Kontrak/perjanjian Kerja antara pemilik proyek dengankontraktor pemenang tender, berikut persyaratan _ persyaratanadministratifnya.

    2.3. TAHAPAN PASCATENDER

    setidaknya ada 7 (tujuh) item kegiatan yang meribatkan es dalam tahapan ini,yaitu :1 . Menyusun rencana Cash-Flow I Disbursement untuk pemilik proyek.2. Memberi rekomendasi pembayaran prestasi fisik pekerjaan yang

    dilaksanakan oleh Kontraktor daram bentuk Interim payment sampai Fina!Payment.

    3. Menghitung dan menilai Pekerjaan Tambah atau pekerjaan Kurang.4. Memeriksa dan menilai sumber daya material, alat dan pekerja yang tersedia

    dan/atau terpakai di lapangan.5. Evaluast dan negosiasi klaim yang diajukan Kontraktor.6. Menyusun Laporan prestasi dan keuangan proyek untuk pemilik proyek,

    berikut penyerapan dana untuk proyek yang diarokasikan dari pihak lnvestor /Bank / lnstitusr K6uangan tertentu.

    7. Menyiapkan administrasi serah-terima pekerjaan besertapendokumentasiannya untuk keperluan pembayaran akhir kepada kontraktor.

    Selain daripada itu, terdapat beberapa bidang kerja atau pekerjaan yang bisadiserahkan kepada QS untuk dilaksanakan, yaitu :'1. Menyusun Studi Kelayakan proyek, ditinjau dari segi finansial dan nilai

    ekonomi.2. Menengahi perselisihan berkenaan dengan pelaksanaan proyek (arbritrase).3. Menyusun Life Cycle Cosfrng suatu proyek konstruksi.

  • f,

    PELATIHAN QUANTITY SURVEYING

    6.

    7.

    B.

    Bagi Kontraktor, peran QS sangat dominan dalam beberapa lingkup pekerjaan,terutama yang berkaitan dengan penghitung_an k!_an.U!aqpkerjan lgrengelggn.ery9lgry4Fn p19vg_pere$e]]1ellpe!_etexn, dan- !! m t9[lq3!]q1gfeyq qeuatau. perpanjangan waktu pelaksanaan pekerjaan. Lingkup kerja yang dimaksud,antara lain adalah :1. Review kuantitas pekerjaan dan estimasi harga satuan pekerjaan untuk

    proposal penawaran, termasuk didalamnya review syarat - syarat kontraktual.2. Melengkapi format Bill of Quantities.3. Menyiapkan RAB Tender dan RAB Pelaksanaan.4, Pengendalian kontrak baik dengan pemilik proyek ataupun dengan

    subkontraktor, termasuk didalamnya adalah pengajuan variation orders ataupekerjaan tambah / kurang.

    5. Menyiapkan dan mengajukan tagihan prestasi bulanan.Kiaim tambahan biaya dan waktu pelaksanaan akibat perubahan kerja.Negosiasi nilai akhir seluruh pekerjaan.Menyiapkan Laporan Proyek Selesai.

    Secara terpisah, lingkup kerja QS pada butir - butir 1 ( review syarat - syaratkontraktual ), 4, 6 dan 7 dapat djtangani oleh Adminislrator Kontrak. Untuklingkup kerja butir 3,5 dan butir 8 dapat ditungr;;;-frng;-Komersiat,sedangkan butir 1 & 2 ditangani oleh begian estimasi.Guna mengoptimalkan pelaksanaan peieffiffialseorangdirinya dengan ilmu pengetahuan dan pemahaman aplikasidimensi proyek, yattu : teknologi, ekonomi, legal , dan manajemen.

    " Teknologi

    Menguasai metode - metode kerja yang terkini dalam industri konstruksi secaraumum, serta mengikuti pengalaman

    - pengalaman aplikasinya, aktual di

    lapangan dalam kondisi yang berbeda -

    beda,

    QS perlu membekaliterhadap 4 (empat)

  • PELATIHAN QUANTITY SURVEYING

    ..t

    'i

    ti

    l

    . Ekonomi

    Memahami konsep Conslruction Financing, Cost planning & Control, Life CycleCostjng, serta Value Engineering untuk menciptakan suatu proyek konstruksiyang ekonomis.

    . Legal

    Memahami segala bentuk perundang-undangan negara yang berkaitan denganjasa pekerjaan pemborongan / konstruksj, serta menguasai aspek - aspekkontraktual pada pekerjaan yang ditanganinya.

    . . Manajemen

    Memahami dan menguasi aspek - aspek manajemen proyek konstruksi.

    :.

  • PELATIHAN QUANTITY SURVEYING

    d-

    I

    'III

    II1.

    iiII

    i

    :'I

    lr!.lrt:ti:i:f'i.

    I:

    I

    :

    I!.t:I

    ,

    :

    i.lliI

    iIi

    I!;Ir.Iii.i't,Ilit.L

    Il.

    r

    T.Etli&liiit't,tsH

    iii,,;I

    BAB 3BILL OF QUANTITIES

    Bill of Quantities berfungsi sebagai wacana penawaran harga yang menjadibagian utama dalam proposal penawaran harga. Dalam format tabular, Bill of

    Quantities merangkum semua item pekerjaan yang masuk bagian dalamPekerjaan yang ditenderkan. Komponen utamanya adalah daftar item pekerjaanbeserta uraian teknisnya, dan kuantitas masing-masing item pekerjaan. ltem -item pekerjaan yang dicantumkan harus diindikasikan sesuai dengan Gambar /Desain Rencana dan Spesifikasi Teknis Dokumen Tender.

    3.1. Fungsi

    Dalam tahapan Pra Tender, Bill of Quantities, menyajikan rangkaian itempekerjaan yang secara keseluruhan merupakan Pekerjaan yang ditenderkan'Konsultan QS yang bekerja untuk Pemberi Tugas atau Pemilik Proyek bertugasuntuk menyiapkan perangkat Bill of Quantities Pekerjaan yang akan ditenderkan.Bill of Quantities disusun berdasarkan desain / gambar rencana dan spesifikasiteknis yang sudah distapkan oleh team perencana / konsultan teknik' Format Billof Quantities yang teknis-kredibel, adalah format BQ yang secara lengkapmeliputi semua item pekerjaan berikut semua sub-item pekerjaan terkait, sesuaidengan desain rencana dan spesifikasi teknis yang ditentukan; sebagai contoh,

    Pekerjaan Suplai Beton Cor, harus diuraikan atas beberapa sub-itemnya, yangdibedakan atas beberapa kelas / nrutu beton. Disamping itu, BQ harus pulamencerminkan tipe kontrak pekerjaan yang akan diberlakukan dalam Pekerjaanyang ditenderkan, misalnya: kontrak harga satuan, atau kontrak lump sum. Uraian

    mengenai tipe - tipe kontrak pekerjaan secara terinci akan disajikan dalam sesipelatihan Manajemen Kontrak di waktu mendatang. Komponen penting BQlainnya, adalah jenis mata uang yang diberlakukan dalam Pekerjaan, baik dalamtipe harga satuan ataupun tipe lump sum. Kuantitas yang tercantum dalam tabel

    BQ adalah sesuai kuantitas desain / gambar rencana.Dalam tahapan Tender, Bill of Quantities, setelah dilengkapi dengan harga satuanpenawaran dan harga total penawaran oleh Peserta Tender, mencerminkan

  • .."':iaPELATIHAN OUANTITY SURVEYING

    kualitas penawaran dari Peserta Tender yang mengajukannya. Beberapa aspekstrategi penawaran dapat "dibaca" melalui BQ yang diajukan dalam tahapan ini,seperti misalnya : tingkat kewajaran harga satuan pekerjaan, apakah over-estimated atau under-estimated, atau bahkan mis-estimated. Ada beberapa faktorteknis maupun non teknis yang dapat "mewarnai" stralegi penawaran ini.Mengingat terbatasnya thema yang diberikan dalam sesi Pelatihan QS ini, seluk-beluk mengenai strategi penawaran tidak dibahas. BQ versi Tender inilah yangmenjadi acuan fundamental dalam evaluasi tender oleh Panitia Tender, dengantanpa mengabaikan aspek - aspek lainnya, seperti : metoda kerja, penjadwalantahap pekerjaan, syarat-syarat pembayaran, dan lain{ainnya. Tingkat kompetisidiantara para nominasi Pemenang Tender dapat dilihat dari komparasi item - itemPekerjaan dominan yang ditunjukan dalam BQ. ltem pekerjaan dominan inimemegang "kartu truf'dalam posisi tawar-menawar dengan Pemberi Kerja atauPemilik Proyek.

    Tahapan terakhir, yaitu tahapan Pasca Tender, dimana pada tahapan ini semuaproposal penawaran dibuka, dlperiksa dan diumumkan oleh Panitia Tender. Padatahapan ini, biasanya 3 (tiga) peringkat pertama Peserta Tender memiliki peluangyang reiatif sama besarnya untuk memenangkan Tender. Di samping aspek -aspek non teknis, aspek teknis menjadi salah satu kriteria pokok dalam prosesnegosiasi penentuan Pemenang Tender. Dalam hal espek inilah, BQ menjadisalah satu "tool" yang "berbicara" dalam proses evaluasi tender; sehingga kualitasBQ yang ditampilkan dalam proposal penawaran akan sangat menentukan besar-kecilnya nilai tambah bagi nominator Pemenang Tender. Setelah penentuanPemenang Tender, BQ Tender dikembangkan menjadi BQ Pelaksanaan.Kelemahan - kelemahan pada BQ Tender seperti : over/under estimated price,ataupun mis-estimated price seyogyanya dapat dikoreksi dalam BQ Pelaksanaanuntuk mencapai optimalisasi RAB Pelaksanaan.

  • PELATIHAN QUANTITY SURVEYING

    3.2. Bagian-Bagian Bill of Quantities Building Works.

    Secara umum item/ bagian-bagian didalam Bill of Quantities untuk konstruksi

    bangunan gedung adalah :

    a. preliminaries.b. Building Works & External Workc. Prime Cost Sum & Provisional Sum

    a. Preliminaries.Dalam Standard Method of Measurement (SMM) Section ll telah memberi garispanduan secaTa umum item-item preliminaries yang harus dibuat oleh seorang

    Quantity Surveyor. Susunan preliminaries terdiri dari sub-bagian bagian yang

    merinci semua jenis pekerjaan persiapan yang akan dilaksanakan dalam proyektersebut. Dengan demikian harga yang ditawarkan akan menjadi lebih kompetitivekarena item-item pekerjaan persiapan sudah ditentukan tersendiri tanpamemasukan kedalam harga satuan setiap pekerjaan.Adapun sub-bagian antara lain :

    a. Lingkup/ jenis pekerjaan.Menerangkan lingkup/ jenis pekerjaan yang akan dilaksanakan olehkontraktor sesuai dengan kondisi kontrak, termasuk pengadaanbahan/material dan prasarana-prasaTana lain yang diperlukan

    b. Site inspection.Menerangkan kondisi umum lapanganpekerjaan.

    I

    dan menjelaskdn lokasi

    c. Condition of GontractMenerangkan syarat-syarat kontrak yang digunakan dalam proyektersebut item-item dalam syarat-syarat kontrak yang mempunyaiimplikasi pada biaya perlu diperhitungkan sebagai pekerjaanpreliminanes. Masuk dalam klasifikasi ini antara lain : Asuransi,performance bond.

  • ---F

    F:PELATIHAN OUANTITY SURVEYING

    I

    ,i

    d. General matterDalam bagian ini menguraikan beberapa ketentuan/persyaratanadministrasi menyangkut beberapa materi seperti : Prasaranaproyek, cara pembayaran, setting out, sub letting, variation,protection, watet and electric, removal of rubbish dan sebagainya.

    yang penting dalam setiap pekerjaan preliminaries ini adalah strategiestimator untuk mengestimasi item=item preliminaries tersebut, mengingatbeberapa item preliminaries merupakan "unpriced" ltem. Oleh karena itupengalaman dan keahlian dalam menganalisa setiap projek yang dikerjakansangat dituntut untuk menghargakan pekerjaan Preliminaries.

    b. BUILDING WORKBill of Quantities untuk "Building work" adalah disusun berdasarkan "ElementalWork" . Setiap elemen tersebut akan memperinci item-item pekerjaan yangterdapat dalam ruang lingkupnya, sehingga dalam setiap perhitungan kuantitiyang dilakukan tidak akan terjadi "overlap" perhitungan. hal ini karena setiap"Taker Off' tahu batasan setiap elemen yang dihitung .secara garis besar susunan elemen yang dalam format BQ secara lengkapnya

    adalah sebagai berikut :

    Daftar Elemen

    1. SUB.STRUCTUREYang meliputi :

    '1A. Piling.Meliputi semua pekerjaan piling didalam konstruksi.

    18. Pekerjaan Finishing lantai paling bawah (Work Below Lowest FloorFinish)Meliputi semua pekerjaan bagian bawah lantai dasar ("ground floor") danpekerjaan penggalian yang berkaitan. Termasuk dalam lingkup ini juga pekerjaanuntuk kolom bases, pile cap, slop, colum stump serta lantai bawah sertapekerjaan penggalian untuk basemen.

  • PELATIHAN OUANTITY SURVEYING

    I

    I

    l,i.iI

    2. SUPER-STRUCTURE

    2A. Kerangka (Frame )Meliputi pekerjaan kerangka ; termasuk kolom, Floor Beam, Roof Beam.

    28. Lantai atas (Upper Floor)Meliputi pekerjaan Lantal bagian atas, balcony dan sejenisnya.

    2C. Atap ( Roof )Meliputi pekerjaan Konstruksi atap termasuk didalamnyabagian-bagian pelengkap atau accessories atap.

    penutup atap dan

    20. Tangga ( Stairs )meliputi semua pekerjaan yang terdiri atas tangga dan "Landing stairs"termasuk juga finishing /a$essories yang terdapat di tangga.

    .J

    2E. Dinding bagian Luar (External Wall )meliputi bagian dinding bagian luar termasuk jugawalling".

    "Cladding, dan Curtain

    2F. Jendela dan Pintu bagian luar (Window and External Door. )Meliputi pekerjaan jendela dan pintu luar yang terdiri frame, ironmongery, kacadan lintel.

    2G. Dinding bagian dalam dan dinding pembagi (lnternal Wall and Partition)Dinding bagian dalam (tern'suk didalamnya dinding beton yang tidak dihitungdalam bagian kerangka atau dinding bagian luar (lihat 2A dan 2E)'

    2H. Pintu dalam ( lnternal Door )lMeliputi bagian pintu bagian dalam yang terdiri atas frame, ironmongery' kacadan lintel.

  • FPELATIHAN QUANTITY SURVEYING

    I

    3. FINISHES3A. Finishing dinding dalam (lnternal Wall Finishes')Meliputi pekerjaan finishing permukaan dinding dan tiang pada bagian

    dalam'

    3B. Finishing lantai dalam (lnternal Floor Finishes)Meliputi Pekerjaan plaster, Skirting dan Finishing permukaan lantai (tidak

    termasuk item yang terdapat pada bagian tangga )

    3C. Finishing plafond dalam (lnternal Ceiling Finishes')Meliputi peker.laan plaster dan kemasan bagian bawah

    plafond (tidak termasuk

    item yang terdapat pada bagian tangga' tetapi termasuk pada bagian tepi dan

    bagian bawah beam.

    3D.Finishing Luar (External Finishes )Meliputi pekerjaan Finishing pada bagian permukaan dinding luar ' sertapermukaan lantai dan plafond bagian luar'

    4. KELENGKAPAN (FIfiING DAN FURNISHING )Meliputi pekerjaan sepertr Fitting and Fixture (shelving'

    (item ini tidak termasuk dalam pekerjaan finishingperalatan mekanik seperti : Gymnasium equipment)

    .

    cupboard, Pekerjaan senidiatas), Peralatan (bukan

    s. FASILITAS (SERVIcES)Meliputi :

    5A. Kelengkapan kebersihan (Sanitary appliance)'seperti : Bath ' basin' Sink'

    Urinal and accessories lainYa'

    58. Pekerjaan pipa air bersih dan kotor (Plumbing lnstallation) seperti : Hot and

    cold waler services, soil, waste and vent pipe)

    5C. Pembuangan (Refuse Disposal) seperti :waste compactor' waste bin'

    5D'Airconditiondansistempengudaraan(Air-conditioningandVentilationSystem) seperti : Air conditioning' and mechanical ventilation'

    5E. Pemasangan listrik (Electrical lnstallation)5F. Pemasangan pencegah kebakaran (Fire Protection installation) seperti :Fire

    fighting and warning installation : dry riser' sprinkles)'

    5G.PemasanganLiftdankonveyor(Liftandconveyorinstallation)Seperti:lift,Escalator, travelators, conveyor'

    t2

  • PELATIHAN QUANTITY SURVEYING

    5H.Pemasangan alat telekomunikasiseperti:telephone .

    (Communication installation)

    51. Pemasangan khusus (Special lnstallation) seperti : security system .

    Note : Pekerjaan Services pada item ( 5D, 5E, 5F, 5G, 5H, 51) merupakanpekerjaan dalam Prime cost Sum ( pekerjaan yang diberikan kepada NominatedSub-Contractor).

    C. PEKERJAAN LUAR (EXTERNALWORK)Meliputi :1A .Pekerjaan Lapangan.

    Meliputi pekerjaan Pembersihan Lapangan (site) dan pekerjaan merobohkanbangunan(demolition work).Retaining Wall, Jalan, Landscape, turfing, Fencingdan Gate.

    28. Saluran air permukaan (Surface Water Drainage)3C. Fasilitas luar (External Services) seperti :fire Hydrant, Site Lighting.4D. Fasilitas pendukung (Ancilary buiiding) seperti :Sub-station, stores.5E. Fasilitas rekreasi ( Recreasional facilities) seperti :PlayEround, outdoorgames.

    P. PRIMECOST SUM & PROVISIONAL SUMPengertian Pnme Cost Sum merupakan sejumlah biaya yang digunakanuntuk pekerjaan-pekerjan khusus/spesialis seperti : pekerjaan untuk ,'Mechanical & Electrical Jenis pekerjaan ini pada umumnya akandilaksanakan oleh sub-kontraktor. Sedangkan Provisional Sum merupakansejumlah cadangan biaya yang yang tidak dapat ditentukan atau diketahui

    -__-'-'--'--..-_\secara pasli s_qqrasa tender dilaksanakan. Oleh sebab itu biaya provisional

    __,----.'-

    Sum ini akan dievaluasi kembali sewaktu pelaksanaan kerja apakahdigfnakan untuk pelaksanaan pekerjaan ataupun tidak.

    Untuk cara perhitungan setiap item pekerjaan akan disampaikan dalam topik"Methode Of Measurement for Building Work"Sebagai gambaran bentuk format preliminaries dan format Bill of Quantitiesberdasarkan elemen seperti dalam lampiran 1

  • w.

    IPELATIHAN QUANTITY SURVEYING

    -__-T

    3.3. Bagian'Bagian Bill of Quantities Civil Works

    Dalam format yang standar untuk BQ pekeriaan Sipil ada terdapat beberapa

    bagial Yang utama Yaitu :

    1 . List of PrinciPal Quantities

    2. Preamble3. DaYwork Schedule4. Work ltem ( dikelompokkan ke dalam beberapa bagian' teramasuk disini

    adalah General ltem atau Preliminary Works)

    5. Grand Summary'

    3.3.1. List of PrinciPal ltem

    Berupa tabel item-item pekerjaan beserta sub-sub itemnya' dan dilengkapi

    dengankuantitasmasing-masing.Tabelinimerupakanpetunjukpraktisyangberguna untuk memberi gambaran umum mengenai kuantitas

    pekerjaan'

    sehingga kontraktor dapat menilai kemampuannya sendiri apakah ia mampu

    melaksanakan pekerjaan tersebut dengan kemampuan sumber daya yang

    dimilikinYa.

    3.3.2. PreamblePreamble atau penjelasan yang terdapat dalam BQ Civil Engineering Works

    adalah untuk memberikan penjelasan tentang metoda atau cara perhitungan

    kuantitas/volurne pekerjaan yang cara atau metodanya tidak mengikut standar

    perhitungan atau CESMM' Penjelasan ini diperlukan untuk menyamakan persepsi

    dan interpretasi setiap kontraktor yang mengikuti tender dalam mengestimasi ttem

    pekerjaan tesrebut.

    3.3.3. Daywork ScheduleBagian ini, apabila disyaratkan dalam dokumen tender' harus mengikuti

    salah

    satu dari (2) dua persyaratan sebagai berikut :

    . Tabel varian klasifikasi pekerja' material dan peralatan yang diperlukan untuk

    melaksanakan pekerjaan harian (daywork basis)' Kontraktor diminta untuk

    melengkapinya dengan harga-harga satuan sumber dayanya beserta kondisi-

    ' kondisinYa, atau

    T4

  • PELATIHAN QUANTITY SURVEYING

    . Tabel tarif standar pekerjaan harian, dengan menambahkan persentaseallowance tertentu untuk sumber daya- sumber daya : pekerja, material danperalatan. Sebagai contoh : Schedule of Dayworks, yang diterbitkan olehFederation of Civil Engineering Contractors, diterbitkan di lnggris dandiberlakukan di lnggris serta negara-negara persemakmuran.

    3.3.4. ltem-item PekerjaanTermasuk dalam bagian ini, beberapa sub bagian yang dapat diuraikan sebagaiberikut:

    = Pengelompokkan

    Item-item pekerjaan dikelompokkan berdasarkan kondisi alam, lokasi dan urutanpekerjaan yang dapat menentukan pola Metoda Kerja yang dipilih.

    = Heading dan Sub-Heading

    Setiap item pekerjaan harus dipisahkan atas bagian heading dan sub-headingnya.

    :t DescriptionsMengindentifikasikan jenis pekerjaan yang disebutkan dalam item pekerjaanterkait. lndentifikasi pekerjaan di sini harus mengacu pada Spesifikasi Teknis danDesain/Gambar rencana.

    = Range of Dimension

    Eatasan dimensi yang berlaku bagi setiap komponen item pekerjaan.

    :r KuantitasKuantitasA,/olume djhitung dari gambar rencana dengan mengikut aturan maindari Civil Engineering Standard Method of Measurement (CESMM) atau kecualiditentukan lain yang telah dijelaskan dalam Preamble atau penjelasan.

    General ltemGeneral ltem adalah merupak bagian dari Work item yang biasanyadikelompokkan tersendiri. General item ini dalam CESMM d jklasifikasikan dalam"Class" A yaitu item-item pekerjaan diiuar atau tidak termasuk dalam pekerjaanutama (permanent works). General item ini juga biasa disebut sebagaiPreliminaries Item.

    15

  • PELATIHAN OUANTIry SURVEYING

    Dalam BQ Civil Works, General item ini adalah item-item yang dikehendaki dalamkontrak yang harus kontraktor laksanakan atau sediakan selama kontrak. DalamBQ, general item dikelompokkan atau terdiri dari beberapa bagian :1. Contractual Requirement2. Specified Requirement3. Method Related Charges.

    Contractual Requirement adalah kewajiban kontraktor untuk melaksanakanatau menyediakan karena disyaratkan dalam kontrak. Contoh Contractualrequirement: Peformance Bond, lnsurance of the Works, Third Party lnsuranceetc.

    Specified Requirement item yang ditentukan oleh Klien atau Engineer dimanakontraktor harus melaksanakan atau menyediakannya. Salah satu contoh dariSpecified requirement ini adalah akomodasi untuk Engineer seperti kantorlapangan, laboratorium dan lain-latn.

    Method Related Charges adalah item-item yang harus diisi oleh kontraktor didalanr space/ruangan yang telah disediakan dalam BQ. Dalam BQ, MethodRelated Charges ini ruangannya diblarkan kosong dan diserahkan kepadakontraktor untuk mengisikan item-item yang menurulnya adalah item yangdiperlukan dalam melaksanakan pekerjaan akan tetapi tidak dapat dimasukkandalam komponen harga dalam harga satuan karena tidak proporsional dengankuantitas pekerjaan tersebut. Sebagai contoh Method Related Charges,kontraktor mengisikan item peralatan (Plant) untuk pekerjaan beton yaitu TowerCrane. Biaya transport, sewa dan pemeliharaan peralatan tersebut tidaksebandjng atau proporsional dengan jumlah kuantitas beton dalam pekerjaantersebut, artinya jika biaya tower crane tersebut dijadikan komponen harga satuanbeton, maka harga satuan pekerjaan beton tersebut akan sangat tinggi. Sebagaialternatif tower crane tersebut dimasukkan dalam ttem Method Related Charges.

    3.3.5. Grand SummaryMerupakan rangkuman dari total setiap bagiannantjnya ditotalkan, jumlah akhir iersebut adalah nilai poleh kontraktor untuk Pekerjaan tersebut.

    16

  • PELATIHAN QUANTIry SURVEYING

    BAB IVMETHOD OF MEASUREMENT

    Bab ini memberikan gambaran terinci mengenai Method ,of Measurement dalamkaitannya dengan penyusunan Bill of Quantities. Method of Measurement yangdimaksud adalah metoda penghitungan kuantitas pekerjaan untuk item - itempekerjaan yang akan ditampilkan dalam format Bill of Quantities. Metodapenghitungan int dibedakan untuk pekerjaan bangunan Sipil dan pekerjaanBangunan Gedung. Untuk pekerjaan bangunan Sipil metoda penghitungan yangakan diipakai dan diterangkan adalah mengacu pada Civil Engineering StandardMethod of Measurement 3rd edition (CESMM3) yang diterbitkan oleh Thelnstitution of Civil Engineers yang berkedudukan di lnggris. Sedangkan untukpekerjaan bangunan Gedung metoda penghitungannya mengacu kepadaMalaysian Standard Method of Measurement of Building Works yang diterbitkanoleh lnstitution of Surveyors Malaysia (lSM).Disamping itu juga akan diterangkan mengenai format - format standarperhitungan yang.'bisa dipakai didalam proses penghitungan suatu kuantitaspekerjaan. ;

    ,a'

    4.1. Format oir"$ailting Rup"r.I'

    Perhitungan kuantitas pekerjaan suatu proyek konstiuksi pada dasarnya hanyamembutuhkan penggtahuan ilmu geometri ( bentuk bangunan ) dan aritmatikdengan rumus - rurius luas dan isi suatu bentuk bangunan yang ada pada bagian

    '.".i istruktur bangunan;,iyang mana tiap - tiap individu orang mempunyai cara dan+'pandangan yang brirlainan dalam proses peng hitungannya..

    INamun permasalahannya adalah membuat format perhitungan yang sedemikianrupa sehingga memudahkan untuk dilakukan pemeriksaan / pengontrolan ulanghasil perhitungan tersebut. Terlebih apabila perhitungan kuantitas tersebutmelibatkan proyelt konstruks' dengan bentuk dan besaran yang kompleks,

    'ffrkomponennya banyqk, maka harus dilakukan dengan format yang terstruktur.Oleh karena itu sborang QS atau Estimator harus dapat menyusun perhitungan -perhitungan tersebut dalam suatu format dan prosedur yang jelas sehinggamudah dikoreksi / pengecekan ulang dan akurat.

    t7

  • PELATIHAN QUANTITY SURVEYING, ^)

    , v^ r,!..,. !,Terdapat beberapa format teknik /peng hitungan kuantitasoleh seorang QS, diantaranya adalah :- iraditional Dimerlsion / Taking off paper.- Slip Short Paper .- Direct Billing Papbr.Dalam kesempatan ini pembahasan adalah memperkenalkan mengenai formatDirect Billing Paper dengan pertimbangan lebih efektif dan relatif mudahdipahami.

    Format Direct Billing Paper berfungsi sebagai wacana unluk mendokumentasikanpenghitungan kuantitas per item pekerjaan. Format ini terdiri atas 6 ( enam )kolom, yang masing - masing (secara berurutan dari kiri ke kanan ) berfungsisebagai berikut :

    . Kolom 1Kolom ini disebut juga "timesing column" atau kolom pengali. Menyatakanjumlah bagian pekerjaan yang berdimensi sama ; misalnya pilar bangunandengan ukuran panjang, lebar dan tinggi yang sama sebanyak 6 (enam) buah,maka angka 6 (enam) ditulis pada kolom ini.

    . Kolom 2Kolom ini disebut juga "dimension column" . Menyatakan dimensi satu buahpilar tersebut, misalnya : 3.00 x 0.75 x 0.50 m.

    . Kolom 3Kolom ini disebut juga "squaring column". Menyatakan kuantitas seluruh bagianitem pekerjaan hasil dari perkalian antara data kolom 1 dan kolom 2, dalamcontoh ini adalah sebesar = 6 x (3.00 x0.75 x 0.50 ) m3 = 6.75 m3.

    yang bisa digunakan

    , !;':

    ...

    t9

  • PELATIHAN

    . Kolom 4Kolom ini disebut sebagai "description column" atau kolom keterangan /deskripsi item pekerjaan. Menguraikan data teknis bagian pekerjaan yangdihitung.

    l9

  • PELATIHAN QUANTITY SURVEYING

    4.1 STANDARD METHOD OF MEASUREMENT FOR BUILDING WORKUntuk bangunan gedung, metode perhitungan yang dipakai adalah berdasarkanSMM for Building Work (Standard Method of Measurement). Dalam SMM inimengandungi 3 bagian utama yang dikelompokan sebagai berikut: '

    a. Prinsip-prinsip Umum Perhitungan.b. Prillminariesc. Klasifikasi Pekerjaan.

    a. Prinsip-prinsip UmumPrinsip-prinsip umum ini mengandung ketetntuan-ketentuan mengenai Bill OfQuantities, metode perhitungan, dan batasan perhitungan kuantitas. Disampingitu ada beberapa ketentuan seperti : pengurangan kuantitas, satuan kuantitasyang digunakan serta pekerjaan PROVISIONAL (jika tidak diketahui denganpasti).

    b. PreliminariesDalam bagian preliminaries telah dUelaskan dalam sesi sebelumnya dalam sub-topik Bill of quantity. ic. Klasifikasi Pekerja;n

    Pada bagian ini mendraikan item-item pekerjaan, ruang lingkupnya, bentuk-bentuk konstruksi yanqferkaitserta pekerjaan-pekerjaan penunjangnya diuraikandengan jelas. Klasifika$ pekeiaan sebagaimana didalam SMM Building Wor.ksf,radalah :

    a. pekerjaan galian (excavatot) Ib. Pekerjaan Betorf (concretor)c. Pekerjaan bata (SricklayeQd. Pekerjaan atap (roofer!,e. Pekerjaan pavior.f. Pekerjaan konstruksi baja.g. Pekerjaan plumbing.h. Pekerjaaan listrik.dll.

    :

    Lebih lanjut , SMM membagi kAsifikasi pekerjaan .atas Elemen-elemen sepertiyartg diterangkan dalam topik "Bill of Quantity for tsuilding Works"

    20

  • PELATIHAN QUANTITY SURVEYING

    4.2.: CESMM ( Givil Engineering Slandard Method of Measurement )

    CESMM dipakaii sebagai acuan untuk menghitung kuantitas pekerjaan _pekerjaan; bangunan Sipil, sebagai ,,aturan main" dalam penyusunan Bill of

    ClassiflcatidS

    Tanah, Beton, Pepipaan, PekerjBan Metal, pekerjaan Jalan,iferowongan, dan

    dari : Geneial

    pekerjaan ini dapat dSetiap klasifikasisebagai ltemcontoh, PekerjaanDivition) berupaDivilion) berunaberuga strata k

    ;:dilengkapi beberapa

    ipeke{jaan, batas/limit

    ICara'pengh itu ngan:Menghuraikan

    ""ru purilhitu

    an Salur,{r Air. Untuk lengkapnya, daftar klastfikasirada lampjfal makalah presentasi ini.n terdiri. {ta_s 3 (tiga) bagian/divlsions yang disebut',", O"rrpi$n"ran teknis item pekerjaan. Sebagaifanafr (eir$works): bagian uraian pertama ( =First

    atas 25 buah klasjfikasj pekerjaan, yang antara lainPenyelidikan Tanah, Pembersihan Lahan, pekerjaan

    n,i gglian tanah, bagian kedua (=gs6en6

    setiap klasifikasi pekerjaansepqrti: caia penghitungan, definisi item

    [, dan uraian pelengkap.

    "

    ltuantitas berdasarkan Spesifikasi Teknik,":;!

    Ir.i ,,;:

    klasifikasi pekerjaan terkait.

    21

  • .BMenguraikuantitas.

    . Urai

    Gambaradiberikan

    Didalam

    Selain itu

    item

    eMDidalam

    peng

    henda

    asumsr

    Sebagai

    dikenal

    masuk dalam penghitungan

    Item Descriptions.Work Glassification tersebut

    h selama proses penghitungantruksi sipil (Taking off process )

    niities adalah sebagai berikut :

    lai proses penghitungan kuantitasyang diberikan oleh Arsitek atau

    Paper, Penggaris Berskala, alat tulis

    secara

    ran" proyek

    ngetahui dtersebut.

    spesrfikasi .serta standar metodeu "tidak terbaca" dan tidak tercantum

    kan dan/atau diberikan asumsi -a Klien /L Konsultan Perencana.

    dibuatlah. dbftar pertanyaan yangQuerry Lisladalah seperti berikut:

    14'

    .{&'11

    keseluruhan besertasecara keseluruhan.

    memilah-milah item -

    L""t"II

    tnl

  • LI

    II:PROJECI1 : Proposed R.C. Retaining WallELEMENT : External WorkDATE :1.0-10-2000TO ; Mr. Richar.d - Graha Karya Consultant

    Prepared by:

    (Mr. Sanjaya )

    QUERY LIST'

    r i,i

    ;?I;4

    t,,r

    .'

    Answered by:

    i\lr. Richard

    FROM

    ITEM QIJERRY ':, ASUMPTION/ANSWER REMARKS1 Giade of cohcrete not

    ist?ted| 'c

    .t.,i

    tI

    ,.lDepth of toe;' beam,: notstated

    'I

    Asuntmed Grade C15 fori.lean .concrete and . GradeC25 .for Retaining wallstructures. Both used20mm aggregate.

    The d'epth is 600mm

  • 17

    PELATIHAN QUANTITY SURVEYING

    . Membuat Taking off list (daftar item pekerjaan)Berdasarkan gambar, spesifikasi, CESMM dan Querry List, disusunlah item - itempekerjaan berdasarkan klasifikasi item pekerjaan ( works classification ) yangterdapat dalam CESMM. Contoh Taking off tist adalah seperti berikut :

    ProjectElement

    Dwg. No.

    Job No.

    : Proposed R.C. Retaining Wall: External Work :i

    : J U B/QSV30 1 /o KT99 I Pzl 2

    Taker off : Sanjaya

    Date :10/10/2000:1

    TAKING OFF LIST

    . Proses Penghitungan (Taking off)''Langkah selanjutnya ad3lah melakuk$n penghitungan kuanlitas item pekerjaan

    yang terdaftar dalam "taking off list" yang dituangkan dalam'Direct billingPada prinsipnya adalah merupakan proses penghitungan geometri dan

    hanya penuangannnya dalam kertas menggunakan "gaya bahasaoff QS". Mengenai gaya bahasa taking off QS ini akan diterangkan dalam

    secara tersendiri. Sedangkan untuk uraian item pekerjaan mengacu

    r''

    i'.'

    ITEM DESCRIPTION UNITln-Situ Concrete : \/

    1 Provision of Concrete-ddsigned mix C15 (F233) m32 Provision of Concrete-ddsigned mix C25 (F253) m3

    Placing of concrete mass bli{rding (F51 1) m34 Placing of concrete reinforced beams (F663) m3

    Placing of concrete reinforced bases (F624) m36 Placing of concrele reinfoiced wall (F643) m3

    Concrete Ancillaries:7 Formwork wqll (G145) m2

    Reinforcemeht deformed h.y. nom. size 12mm dia.(G524) t

    24

  • /PELATIHAN QUANTITY SURVEYING

    kepada CESMM. Contoh penampilan proses penghitungan adalah sepertiberikut:

    Lcan Concrete 50nrm Tlr.

    Provision (Q Placina Concrete ILensht Width1.20.000 (a) 2.500 .05 0

    (b) 0.600of concrete desigrcd mix

    15 20rrm aggregate cement to BSl2 ol BS 146 all accordance rvith BS5323

    (F233)&

    Dg 01' concrctc nrass blinclingtltickness not exceeding l5Ornm

    (F511)120.002.5 0

    0.05

    DIRI]CT BIT,LING PAPERProjcct : Proposed RC Retrining Wall Taker off: Sanjaya Job No :Element : Extemal Works Calculated: Date

    t0/10/200Dwg No. : ruB/QSV301/OKT99/P2/2 Checked:

    In-sitlr Concrctc: -t,rK(

    .);srtrcatlon \

    ; Description of work )\ item based on I\ CESMM & specs. i

    I

    __li Code of ,uork (I itern based on ;'tCssriaira----J

    25

  • PELATIHAN QUANTITY SURVEYING

    Dalam contoh diatas adalah dua item pekerjaan berbeda yang mana dari segilokasi dan penghitungannya sama sehingga bisa digabung dengan menggunakantanda "&" (dan), tetapi nantinya dalam urainya di BQ harus dibedakan mengikutiklasifikasi item pekerjaannya.

    . Menyusun Bill of QuantitiesSetelah semua proses taking off / penghitungan selesai, maka item - itempekerjaan dalam format direct billing paper dipindahkan ke format BQ . Sebagaicontoh adalah sepedi berikut :

    26

  • PELATIHAN QUANTITY SURVEYING

    P roj ectElement

    Bill No.

    Bill of Ouantities: Proposeil RC Retaining Wall: External Works

    :1Page : I

    Nunrbcr Dcscription lJnit Quantity llatc(Rp)

    Anrount(Rp)

    F233

    F253

    F5ll

    Ir663

    F 624

    PART I : IN SITU CONCRETE

    nrJ

    nrJ

    nr]

    mJ

    m3

    t9

    426

    i9

    22

    2?s

    Provision of concrctc

    Dcsignccl nrix Cl5 20nrnraggregate cenrcnt to BS l2 or BS146 all accordancc rvith BS 5328

    Designcd nrix C25 20mrlagglcgate cen]ent to BS l2 or BSl.l6 all accorclance wilh BS 5323

    Placinq Concrete:

    Nlass blindiug thickncss.excccdiug 15Omm

    Rcirtlblced bcanrs cross scctionalalea 0.1 - 0.25 m2 to be placedagaints on cxcavated surfaces

    Reinforccd bascs thicknessexceedin-q 500nrn

    Total

    27

  • Element No. '1 - Work Belgw Lowest Floor Levelrllem Dpccridtion

    Excavale oversite to reduce level average150mm deep commencing from platform jevel(tlnished ground level) and gel out, deposit andspread in making up levels where directedand remainders load and cart away from siie

    Excavale pit tor pile cap notexceeding 1.50m deep

    Excavatc trcnch for 0round bcam not cxcceding1.5m deep

    qEADE 1.s .cq\qBEIE 4! DElq8lqE-q:

    50mm lhick blindinO under pilc cap.

    50mm thick ditto uirder ground beam.

    READY-MIX GRADE 25 CONCRETE AS DISCRIBED:

    6 Pile cap7 Column stump8 Ground Beam.

    HIGH TENSILE STEEL ROD REINFORCEMENTTO BS 444S AS DESCRTBED tN:-Pile Cao

    12mm Diameter bar

    Colunrn Slumo

    12mm Diameter bar

    Ground Beam.

    '1zmm Diameler bar-!

    '16mm Dilto

    NlILD STEEL ROD REINFORCEI\,4ENT TO BS4449 AS DESCRIBED lNr-

    Column Slump

    6mn Diarneter links.

    Ground Beam.

    2

    {3M3

    M2

    M2

    M3

    t\,13

    M3

    4

    5

    11

    12

    Kg

    Kg

    Kg

    Kg

    Kg

    I

    I

    l4 6mm Diameter slrirrup.

    TO COLLECTION

  • BILL NO. 1 - DEWAN SERBAGUNA--'

    Element No. 1 - Work Below Lowest Floor Level

    SAWN FORMWORK AS DESCRIBED TO:

    Sides of pale cap.

    Ditto column stump

    Ditto ground beam.

    ANTI-TERMITE TREATMENT ALL AS DESCIBEDAND STRICTLY IN ACCORDANCE TO THETHE IVANUFACTURER'S INSTRUCTIONS TO THETHE UNDERSIDES AND STDES OF!

    Pile cap

    Ground beam

    '150mm Thick bed of hardcore as described,spread, levelled, well watered and consolidatedunder slab.

    Ditto, to Apron

    50mm thick lean concrele as described under slaband apaon

    Ditlo, to apron

    READY-I\,IIX GRADE 25 CONCRETE ASDESCRIBEO:

    125mm Thrck ground slab

    oitto, to apron slab

    TWO LAYER OF BRC A7 OR OTHER EQUALAPPROVED SIEEL FABRIC REINFORCEI\4ENT.WELLLAPPEDAT JOINIS AND NOTCHING ROUNDOESTRUCTIONS (MEASURED NETT . NOALIQIVANCE MApE FOR LAPS) EMBEDDED tNl-l25mm Thick ground stab

    Ditto lo apron slab

    DEWAN SERBA GUNA

  • BILL NO. 1 . DEWAN SERBAGUNA

    Element No. 1 - Work Below Lowest Floor Level

    SAWN FORMWORK AS DESCRIBED:-

    DEWAN SERBA GUNA

    M

    M

    M2

    2.

    3

    4

    5

    125mm High sawn formwork as described to edgeof concrele

    50mm high lo drop

    120mm high to drop

    o.25mmThick polythene sheet damp proofmembrane well lapped at joints laid on sand blinding(measured nett - no allowance made for laps).

    Anti Termite Treatment to ground floor slab all asdescribed and strictly in accordance to themanLrfacturers insttuclion

    M2

    iP.0o:G/4/1i3 TO COLLECTION

  • AN SERBAGUNA

    - Work Below Lowest Floor Level DEWAN SERBA GUNA

    COLLECTION

    FROM PAGE G/4/1/1

    FROI\,,I PAGE G/4/i/2

    FROM PAGE G/4/1/3

    . TOTAL CARRIED TO SUMMARY OF DEWAN SERBA-GUNA

  • READY-MIX GRADE 25 CONCRETE ASDESCRIBED lNt

    1

    2

    3

    Columns.

    Stiffeners (Provisional)

    Roof beam

    HIGH IENSILE STEEL ROD REINFORCEMENITOBS 4449 AS DESCRIBEDT-

    Columns

    12mm Diameter Bar

    Stiffeners {P.ovisional)

    5 12mm Oiameler RarFloor Beam.

    6 12mm Diameter Bar7 16mm Ditto

    MILD STEEL ROD REINFORCEMENT TO BS444S AS DESCRIBED:-

    Columns.

    8 6mm Diameter BarStiffeners {Provisional)

    I 8mm Diameter as llnks.Floor Beam.

    l0 6mm Diameter as links.

    t3M3

    M3

    K9

    Kg

    Kg

    Kf

    Kg

    Kg

    TO COLLECTION

    i

  • SAWN FORMWORK AS DESCRIBED TO:

    11

    13

    Sides of columns.

    Sides of stiffeners (Provisionat)

    Sides and softltf roof beam

    M2

    M2

    M2

  • NO. 1 - DEWAN SERBAGUNA

    No. 2 - Frame

    COLLECTION

    FROM PAGE G4l2/1

    FROM PAGE G4/2/2

    oesci[iio-

    l.-.1.

    TOTAL CARRIED TO SUMMARY OF DEWAN SERBA.GUNA

  • CONTOHPRELI MI NARI ES

    BILL 1 . PRELIMINARIES

    Preliminarv ltems

    The Preliminary ltems as set out hereunder are deemed to apply to thewhole of the Works and the Contractor must allow for any cost incurredin connection therewith. The amount inserted by the Contractor for suchPreliminary ltems shall be deemed to apply to the whole of the Workscarried out under this Contract.

    The monetary vaiue of any items which are left unpriced shall bedeemed to have been included in the rates in the Bills of euantitiesagainst each item of work.

    For the basis of progress paymenls only, the following broad principleshall be adopted for preliminary principle items :-

    a) Generally the cosls of the Preliminary ltems less initjal and final costshall be spread throughout the progress of lhe work related to theperiod of the Contract, or related to the percentage of workexecuted.

    b) Only in certain cases, Preiiminary ltems shall be paid as a LumpSum at a define time in the Contract period.

    The method for paying Prelirninary ltems shall be at the discretion of theS.O. lt shall be the Contractor's responsibility to provlde all informationrequired by the S.O. to substantiate the initial cost and to provide detailworking of Preliminary ltem build up when requested by the S.O.

    Method of B:llinq

    The Contractor's attention is drawn to the fact that these Bills ofQuantities have been arranged in an ELEMENTAL FORM i.e. the itemsare grouped under Elements and within each Element, the items havebeen set out, as far as possible,in Trade Order.

    The description of work and materials in the Bills of euantities are to beread in conjunction with the "Preambles To All Trades and theSpecification" contained in the tender document.

    (M'rIl/ K I NRARA/P32,/ 95 )

    TO COLI,ECTION :

  • CONTOHPRELIMINARIES

    Definitions (Gont'd)

    Employer

    Architect

    Structural Engineers

    Civil Engineers

    Quantity Surveyors

    Government

    !

    Contractor

    Nominated Sub-Contractor

    TETUAN PERUMAHAN KINRARABHD.

    MAS OTHMAN ASSOCIATES.9'136, Jalan Bandar 4,Taman Melawati,53100 Kuala Lumpur.

    IKTISAS IilIGENIETJRS SDN, BHD.

    Lot 303,Lorong Selangor,Fasa4B,l"rrsat Banclar Melawati,Taman Meiawati,53100 Kuala l-umpur.

    RANHILL BEITSEKUTU SDN.BHD.Wisma Ranhill, No. 2-12,Jalan Setiaurangsa 10,Taman Setiarvangsa,54200 Kuala L.umpur'.

    KSK ASSOCIATES SDN Bi.ID,298, Jalan S$4 Ci 5Taman Raszr Sayang47301 Petaling JayaSelangor Daru j Ehsan

    Wherever iitc ierin "Government"appears in the Contract Document,this shall be ieacl as PerumaharrKinrara Bhd.

    The Party contracting lbr the Worksand to whom the Contract for theBuilding Works is awarded

    The person, persons or firmnominated by the Employer tocarry out specific sections of worksunder the direction and supervisionof the Contractor

    TO COLI,ECTTONtvrM/xmnene.u p:z /gs )

  • tII

    CONTOHPRELIMINARIES

    Nominated Supplier

    Site

    Works

    Approved

    As Directed

    The person, persons or firmnominated by the Employer tosupply specified articles ormaterials for incorporation into theworks by the Contractor

    The land or other places, under, inor through which the Works are tobe executed and any other land orplaces provided by the Employerfor the purposes of this Contract

    The whole of the materials, labour,plant and other things necessaryand requisite for the properexeculion of the Contract asshown on the drawings and in theContract Documents and asrequired of the Contractor tocomplete the Contract

    shall mean as approved by the S.O.

    shall mean as directed by the S.O.

    The Work comprises the construction and completion of thePembangunan 99 unit rumah berangkai 2 tingkat, fasa 4C14, diSektor 3, Bandar Kinrara, diatas lot-tot ,l}O4,3jg7 A 3198 MukimPetaling, Selangor Darul Ehsan.The Works include the following wjth associated External Works andServices :-

    The construction and completion of the following:_

    i. Rumah Berangkai 2 tingkat - 99 Unit

    The construction and completion of external work comprisingsite preparation, road hardstanding and paving, surface water

    Scope And General Description Of Works

    a)

    b)

    (MTM/KINRARA/P32l95 )TO COLI,ECTION :

  • CONTOIIPRELIMINARIES

    drainage, sewerage and external waler reticulation

    c) Prime Cost Sums have been included ContigenciesDrawing showing the overall dimensions and sizes relating to theworks are supplied together with the Tender Documents.

    The contractor shall study the Tender Drawings and Tender Documentsand satisfy himself as to the full extent, character and nature of theworks. No claims resulting from failure to do so will be admitted.

    "Site"

    The site of the proposed Works is located at lot-lot 1804,3197 & 3198Mukim Petaling, Selangor Darul Ehsan.The Contractor shall be deemed to have visited the site of the Worksand make h jmself thoroughly acquainted with the location, facilities ofaccess, type of soil to be excavated, jocal conditions as to supply oflabour, materiais, services, etc. existing neighbouring structures,weather conditions, water table level, flood waters, etc. and other siteconditions which may affect their tender. No claims will be allowed onthe grounds of ignorance of the conditions under which the Works willbe executed.

    The Contractor shall be deemed to have taken note of the restrictivenature of the site and its effect on their attendance upon the NominatedSub-Contractors especially on the provision of storage spaces (seeClause on "Nominated Su b-Contractors,,). lt should be noted that itis the sole responsibility of the Contractor to provide space only for thestorage of the Nominated Sub-Contractor,s materials, tools andequipment and if due to site restriction and/or objection by the S.O. toallow bulk storage on the suspended floor (which may not have beendesigned to take such loading), the Contractor shall be deemed to haveallowed in his tender for providing alternative storage spaces elsewhereaway from the site and pay for all the necessary storage charges, costof additional security, insurance premiums, double handling cost,transport and all other costs and expenses involved in complying withthese CIauses.

    Access And Eqress

    The Contractor shall aliow for providing and maintaining the sitecommon access roads within and adjacent to the site.

    0.{TM/ K I NRARA/ P3 2 / 9 5 )

    TO COLI,ECTION :

  • t PRELIMINARIES

    A Form Of Contract

    The amount appearing as the total of the General Summary at the endof these Bills and marked "Carried to Form of Tender" shall betransferred to the Tender Form without any alteration or rounding off.

    The Form of Contract will be the P.W.D Form 2034 (1O/83)StandardForm of Contract where Quantities form part of the Contract. A mpy ofthe said Form which forms part of the Tender Table Documents isavailable for inspection by the Tenderer during normal office hours onany working day up to the time appointed for receiving tenders.

    A summary of the Schedule of Contract Conditions is listed below andthe Contractor is to allow against each Clause Title or in his prices foranything in these Conditjons considered to have monetary value.

    Amplification Notes, Amendments And Modifications ToConditions Of Contract

    Amplification notes, amendments and modifications to the variousClauses of the Conditions of Contract are given here below for theattention and compliance of the Contractor. The amplification notes,amendments and modiflcations shall be compiementary to and be readconjointly with the general provision of the Conditions of Contract. TheContractor shall have allowed and be deemed to have allowed in theContract Sum for all expenses in compliance with the amplificationnotes, amendments and modifications to the Conditions of Contractcontained here below.

    (Note: The words added to the headings of the Clause of theConditions of Contract listed below are inserted purelyfor the guidance of the Contractor who will, nevertheless,be fully responsible for taking all the implications of theConditions of Contract into account).

    Clause 1 Definition and lnterpretation

    The initial "S.O." means the "Superintending Officei'who shall be S.O.or his representatives delegated by him to act on his behalf.

    ( MTM/KI NRARA/ P3 2,/ 9 5 )

    TO COLI,ECTION :

  • CONTOHPRELI MINARI ES

    The Contractor is reminded that it is an obligation for him to check fordiscrepancies in or between all Architectural, Structural, Civil drawingsand other details as shown as drawings are issued and shall reportiothe S.O. of any discrepancies and request for further instruction. TheContractor shall absorb all additional cost due to his failure to complywith these requirements and/or to co-ordinate the various constructionrequirements and/or to request for instruction on time.

    Clause 2

    Clause 3

    Clause 4

    Clause 5

    Clause 6

    Clause 7

    Clause I

    Clause 9

    Clause '10

    Clause 1 1

    Clause 12

    Clause 13

    Clause 14

    Duties of S.O. and S.O.,s Representative

    S.O.'s Right to Take Action

    Scope of Contract

    S.O.'s lnstructions

    Notices

    Contract Documenls

    Sufficiency of Contract Documenls

    Materials and Workmanship

    Unfixed Materials and Goods

    Statutory Obligations

    Fossils etc.

    Patent Rights and Royaltles

    Setting out

    The Contractor is to allow for giving all requisite notices to the LocalAuthorities and all other Authorities and for conforming in all respectsto their requirements and for obtaining all licences and'paying ali feesor charges including any rates or taxes legally demandabie.

    a) The Contractor is to allow for providing all necessary labour,rods, pegs, instruments, etc. required for setting out the whole

    (MTM,/KI NFARA,/ P3 2 /95 )

    TO COLLECTION :

  • CONTOIIPRELIMINARIES

    b)

    c)

    d)

    of the works, also all labour and attendance required by theS.O. for checking this work.

    Provide for engaging a Licensed Land Surveyor to prepare andexecute all survey works.

    Establish bench marks approved by the S.O. and such benchmarks must be tied up to an existing Government bench mark.

    Check and confirm actual boundaries of site (where they relatelo this contract) and agree same with the S.O. and the ;le;antLocal Authorities, Form and leave permanent marteri loitypeto be approved by the S.O.) indicating actual confines of site.

    Provide for notifying the S.O. when the excavations are readyfor filling.

    Aliow for providing theodolites, level and such like instrumentsand attendance for the S.O. in recording and checking of levelsand setting out of the Works throughout the contraciperiod.

    The Contractor will be responsible for the accuracy of locatingand positioning each pile cap position and verify the setting upupon completion of pile cap.

    Any errors in setting out and any consequential loss to theEmployer will be made good at the Contracior's expense tt ihesatisfaction of the S.O..

    Any assistance given by the S.O. in sefiing out will not relievethe Contractor of his responsibili{y to iet out me WoiXsaccurately.The Contractor shall conduct separate surveys of the Site andWorks as follows :-

    i) lmmediately after taking possession of the Site andbefore commencing any work the Contractor shall surveythe levels of the Site, the positions and levejs of allWorks on the Site and submit to S.O the survey planenclosed by Lisence Surveyor for.approved piior toproceed.

    e)

    s)

    h)

    i)

    (MTM/KINRARA/ P3 2 /95 )TO COLLECTION :

  • CONTOHPRELIMINARIES

    Damaqe To Existinq Adioininq And Adiacent Buildinqs OrProperties

    The issue of the Final Certificate of Completion shall not be taken torelieve the Contractor of the liability for any damage caused to existingadjoining and adjacent buildings or other properties due to thenegligence of the Contractor in carrying out the Works.

    Cover Up And Protect

    The Contractor is to cover up and protect the Works from the weatherand suspend all operations during adverse or inclement weatherconditions, which, in the S.O.'s opinion, will be detrimental to the Works.

    Temporary Buildinqs

    The Contractor shall provide, maintain, alter, shift and adapt (as andwhen necessary during progress of the Works) on the site in positionsdirected by the S.O. adequate, secure and watertrght temporarybuilCings for use during the execution of the Contract. These buildingsshall be erected by the Contractor and approved by the S.O. within twoweeks of taking possession of the site and shall be removed, clearedaway and their sites cleared and cleaned and reinstated to their originalcondition within one week of receipt of orders from the S.O. for theirremoval. .All temporary buildings shall be constructed and maintained accordingto the requirements of Local and other relevant Authorities and theContractor is to pay all charges in connection therewith.

    Provide and maintain adequate lock-up weatherproof sheds forsafestorage of buildings materials including lhe materials of Sub-Contractorsand Suppliers whether nominated or olherwise. Floors to cementstores shall be raised at least 300mm above ground level.

    Provide and maintain a well lit and ventilated portable cabin for use ofthe General Foreman including proper storage facilities fordrawings, documents, etc.

    (T4TM /I{ I NRARA/ P3 2 / 95 ]

    TO COLI,ECTTON :

  • CONTOHPRELIMINARIES

    Provide and maintain for the use of the Clerk_of_Works, S.O.,s and otherConsultants' representative, a lock-up, air_conditioned and well litportable cabin/site office of not less than 30 sq. metres with 3 No. deskcomplete with lockable drawers, 12 chairs, 1 No. plan chest, 1 No.drawing board, 1 No.tee square, 2 No. chairs pin boards,white board 6,x 4'with black pen etc. all as instructed by the S.O.

    Provide, fix in approved position and maintain two (2) new split air_conditioning units of 1 /z horse power size complete with starter,sampleboard and rack and all ancillary electrical woiks and pay all chargesincluding electricity consumed throughout the duration of ihe Contract_Provide and erect all sanitary conveniences comprising 2 Nos. W.C.and 2 No. urinal bowls for the operatives, supervisory aid site staff inan approved position and in conformity with the requirements of theLocal Authorities; maintain in a clean condition and deodorise groundafterremoval.

    Temporarv Buildinos

    Upon completion, remove all temporary buildings off site includingcutting off power and water supplies and make good existing ground tothe satisfaction of the S.O.

    Temporary Site DrainaqeThe Contractor shall provide, maintain, alter, adapt as required andmove as necessary and clear away when no longer required andl1k^e. Sood lhereafter temporary earthdrain with 2 nos.silt trap size4800rhmx 48mm . including 1 no.wash hough size 6000m x 3600mmall as instructed by the S.O. and ali necessary temporarypumps,drainage, culvert etc., within and around the site io adequatelykeep the site free from water including flood water

    Siqnboard

    The Contractor shall provide and majntain a signboard in accordanceto the S.O.'s drawings and details as instructed by the S.O. and allowfor the removal of the signboard on compjetion of the Contract.

    {MTM/KINRARA/P32,/95 )

    TO COILECTION :

  • CONTOHPRELIMINARIES

    The Contractor shall erect it in a position where directed, obtain allnecessary licences and permits and pay all charges in connectiontherewith.

    The Contractor shall also alter and adapt from time to time as requiredby the S.O. and Local Authorities and pay all fees and charges.

    Advertisement

    The Employer reserves the sole right of advertising upon or adjacent tothe Works. The Contractor shall nol allow and must ensure that noadvertisement is displayed without the written consent of the S.O..Permission will only be given for the erection of signs by Sub-Contractors and Suppliers and all such signs shall be to thl approval ofthe S.O..

    Water For The Works

    Provide clean, fresh water for the Works including that required by theNominated Sub-Contractors.

    The Contractor shall provide, install and maintain all necessarytemporary distrjbution around the site (including that required by theNominated Sub-Contractors), to tap from exiiting mains all waterrequired for use in the Works including provision of 'all necessarytemporary meters and plumbing, storage, etc. and clearing away oncompletion. All charges on consumptionby sub contractor / nominated sub contractor shall bedealt solely by the Contractor.

    ,

    Pay all cost and charges in connection therewith. Alter, shift and adaptfrom time to time as necessary.

    Provrde temporary artificial lighting and electric power necessary for theexecution of the Works including that requlred by the Nominated Sub_Contractors.All electrical installation shall be carried out under lhe responsibility oflicensed electrical workers.

    (MTM/KINRARA/P32 / 95 )

    TO COI,TECTION :

  • rCONTOIIPRELIMINARIES

    Watchinq And Securitv

    Provide for the employment of efficient watchmen or the services of aSecurity Patrol Group registered licensed as may be consideredreasonable or necessary on the works by day and night and provide allnecessary lighting, warning iamps, guards, barriers ind all safeguardsfor the prevention of fire, accidents and losses for the whole peiiod otthe Works in hand.

    The Contractor shall solely be held responsible for the safety fromdamage or theft of all fixed and unfixed materials, plant, machinery,tools and scaffolding, etc. The Contractor shall also be responsible forall Nominated Sub-Contractors, fixed and unfixed materials, goods, etc.delivered and stored on the site. However, the Contractor shall not beresponsible for Nominated Sub-Contractors' plant, tools, equipment andthe like (see Clause on "Nominated Su b-Contractors").Safetv Precautions

    Allow here for complying with the relevant Acts or Statutes ofParliament, regulations, etc. relating to safety of persons on or aboutthe site.

    Provide sufficient safety helmets for the use of the Consultants andother authorised persons visiting the site.

    Ensure that all tools and tackje, gear, staging, scaffolding, ladders,machines, etc. used by the Contractor or any others in connection withthe Works are of adequate strength and safe for use.

    The Contractor shall note that all constructional plant used on site musthave the Certificate of Fitness issued by the relevant approvingauthorities and the Contractor shall ensure that all constructional planlare in good working condition and safe for use.

    lmmediately discontinue or remove any equipment which becomes orljkely to become unsafe.

    The .

    Conlractor shall promp y remove from the Works any of hisemployees or representatives or those of any Sub_Contractor or otherparty whose conduct tends to create any danger to themselves orothers or lo the Works.

    lI4TM/KTNRARA/ P 32 // 95 )

    TO COUJECTION I

  • CONTOHPREL]MINARIES

    First Aid Kit

    The Contractor shall be required to provide at his own cost a twocomplete set First Aid Kit which shall be kept and properly maintainedin the contractor and S.O/consultant Site Office. The kit at theConsultant's Site Office shall be in the charge of either the Contracto/ssite representative or some other responsible person who will be on thesite during all working hours to ensure that the First Aid facilities areavailable without delay at ail tjmes when work is in progress. Oneresponsible member of the Contractor's staff shall be trained in simplefirst aid duties.

    Helmets And Boots

    The Contractor shall provide lhe following items within one(1) month ofthe award of the Contract of a standard and quantity lo be approved bythe S.O. for the sole use of the Employer, S.O., Supervisory Staffs andOfficial Visitors throughout the full duration of this Contraci:-

    i) Safety Helmets (StRlM approved)ii) Safety boots (nail proof )iii) Wellington bootsThe above equipment shall remain the property of the Conhador upot.lCompletion of the Contract.

    Site Fire Prevention And Fire Fiqhtinq Facilities

    The Contractor shall ensure that proper precautions are taken to reducethe risks of fire while the building is under conslruction. Building debrisshall be removed periodically and inflammable goods and fuel areproperly stored. Allow for the provision of fire extinguishers (3 nos. drypowder and 3 nos.Cor)_

    MoSquito Prevention

    All excavations and portion of the site where water stagnates oraccumulates shall be kept dry by pumping, baling or other operations.

    (url.r/rirnem/p:z/gs )TO COLI,ECTION :

  • i rj tr; .:i 7;,, rr 4+L , i ?- !

    _ ; .Lri -r, , 63 .i. .:i_$-; *j

    , i T !; iE 4E .5 HE3:,- t !? 5a- id E d-j i I.s ?+E ?I ,.? F.iE Hg;g E$EE ! lII ; i; +:E iE isei: :3c;iili 5-ig:.' "a ;r ;;; ii EE f;: ;:;t :5!: ;i si

    , i ii ff ii jii i;i ii i'gr fi;i iiig it iilii; ii ;$ iflt; i;i iiijgi *i=F iEiie li iitr r": :i g" r-q.; !B; iyt EsE! Ft;a ;E:sj i$ --l'1"*FE Fi 'j u;i; i;i jg i;?E iigi gffi ;i !iib.9 a i t4 i g-EZ>! ds j j $ ji ;F, ; ;;; E i ii ;:,'i gi;iiiiEii,iia;,igllilgnEE;itigisgi

    ll ii lgiiii ffi ;i iislrii..eislu u;;iil oi s;i o niit9 3 iE g.bL&i

    _8E

    e64 257!09 ?

    ,9

    trrii1

  • $i:sji:gFI*i * ? ; -' $s 3IEie sii; r tiE5rg j ii ; I, i ; j'; Il:f,ri iirj j tiEii- ;+ j;,

    fi i ;t ;*i iiiiii iFj3, i, i3g:--q n I : ft d:I {':t{

    "'n 6! :F'E { C.E ,! 3 J.E "-*'E

    =l "r !E rq6;.a n lK *jEif :i;s s

    irEi i*;i j ?:i iste iij:ig ;:*i#i:iu::P.e BE !; - {;- S : si; E;E;ig 5fE.Ei EI Effre ii sj i li f r tii iigi;i, {iFiF :i igigiff, 5i if* ii ii i* i; gri, f!;iiii siiiE gg jiEsOsOsesodio

    iffff igi i' ii ii

    iiisggiiiiii3ilF'

    E69-l!!

    d r:

    ,:, .a I.rc;9;o ;g

    !i E3, ^ !E,6F i if: .r;5:E J -9e !c -;.i 9= a

    -d o ;4i..E ! 3 !eo 5.-5 ;.EEEs .4tpE i ;dE ri I:; E g .;5T.s !; >t 5 5

    E f:gE: e :i lEE e d ! EIEF'E 8 N.9 t 6o ? S 5td irBTE ;

    "ii Ei;i;t i t"

    r : 3 F.o 9;ii t+g;3i { j"i; ii;:*i i :;il Ei*ii i: j;;f 5s=5i: Ii -!i; ig;;;9 :E ;:j gaiii ii E$303e

    EZ-t

    ri

  • T.r.?6

    ?i:,8drgttiii;ilgi:,ilFE;;:

    ,gA gg"i ,;iij:i i! fi I; g,i:j agEt i!i iiSjf 3f ft ji ,fc?*FjE:s j i:;'12 r..;*llr; E! f i{{ii3'q iis

    j fi;, if ij fi ff: iil $E$ g$ ;j igiti.; TJE t;;g :Es+ *E* i $ l* ii i3is ii; jjf sf ii i::3

    .r. 3 ee o o e o 3 I e og;ciz

    i A .3d .! E,lP "?eii ; ;; i :;i :,ss' a;j I ;g 5 E !t s+gi E ii ; iE: i:i! v;-r: :: '": "'I li; j ;i i *;; ;;! F;EgE ;i 1 ;; *i!i f E; i 5Yr. i.q"tJ iSF; i'" d..E E +i- e!Ei : !5 i !i*: ;s; ; iji : '4 ;a z EEg EEEr q ? !!:;

    .!3.:r EEi t !! !tr* --i flE* .!ed[,i d i'r;ti;i!i =!i5r ;. EtF:,Ig;E,E!!,ii E E Hy=,ig;i;;g: i.i; iiq:i;,itSlllr i E: s sa=' i*;i , giig jf i: ::;" g;

    ="g i;tiiSi.i; ; ;i;; iEg:'FjiEt! i: ;;ii::iiE

    ii ?i ii ; if:' iii; {iii ii $i igs ;E Fti rlicii :; i; f; ii;! r;iie i:ii ir ii, 3;i ;5 $;i flfiji g! ;eE il i;il gtl;g 5t;j 5; ses

    ';E ir i;iirr5

    " 5p Fnr Ed; Fj9o o e o o o o s ;ig, o s:= \. s - =li,

    JE

    i8I

    .siq

    6,

    - *$ir- JYti.: i t

    is,ii 3 ,'rlJI

  • ?.sE'

    *ll\ tlll I i+l\\;-.

    -t I .\-8 tl |

    --+c 9ti\gi r\\ I!igId rrr- d.9 < &rf ;5I e*e: E- 96- cEc-'" ae! E,it E_5

    -oii -v=-2 "eE '-I E!; z!+gt E* ?sE ...EtEi *; E:q 9 !;Er ;

    'fo -:r .EE i 3. *o==; ?4

    -lE=-ig:99o

  • 3.i

    ()

    .

    '43F

    Et

    :;:+ r;+ jr; i :"s EE;3:j ;i: lr; i il {i.ssJ4 ti: u-:!; :

    -&g iieai i:e fri ; e:- ;;;[jE i;E ;;'g i iii t;

    - i;iE :i; ii+! i *f!" !ij i;!; ili. +Ei; j :;;;i;'1! ;;;g iirs ? Ejg 3l;i;i seE; !irji;s js:i ii;j j iii if;

    .o E.:: ?, 9 t= *- :-g Bn :?; E!q. 5

    .9 . ! rza *P! !Ed i; Fi: r5F !

    *3 i6t ;o'i,

    "a.! r*.3 .E

    = :E3 I?! Eq.i r95 .:{'EE i:8., :EA.: U- ! iii ;5EE .x$";

    g ii'del ;t,:: .s2!.9 orEq. E E:!-s iiI; ;'gE sesE .Ei

    : E F: :!!: : C:.!

    -liooobi!!'i.a d:Fe :q

    st s xi;

    -.Ei=l-=; | "!4 2 r-3!5BE3:-:;;ii!i:; E !

    ciib! g ir';o; 5irEg; f!,ror=E ,!-!1;5 E-I:r:tr: a".o-: !p !EE+t,t ;3-c 3

    -

    " Z a

    rlJoi- !!iqe?I i"!!5&c 3;EE5: da;';

    .iI

    Ii"

    Irii:

    ! : + F,5; g i E; + ; EjE E E g=

    9P ; E! e n . 5i E E s;=n' ; $;: r;.; e f y !- i 2 :;EI c E F! : ; --t *= ;l I

    ";. i i i;;! *e -: iE;E;;. gEoi.pin3;E :t S 4 alclI::;3 t'-;ti;";iE;t;

    E ;1 ; fi ;:rg ; l;igr f{ E zi H:i; I i3!if g dei =g." il 'lF e dsEAEt ;ed{ ig ;g iE3; i aoosoo i

    i9.;!t;!Eiti!: t g .i

    = e

    ii. I p in !"i: e ! ;i :i! I ; ;: ;!3:!.i;icsi.v E: tI xi 5! .E I I !I -ts a9!?c t ii a

    'l:! I{ * !; ciilE:;:; ii:Ei$.! Ir ! ; a E!iii"Flt ii F:liE g=i ii sl! H-' *.: Ed : !-i .E3lri ;z 3"{ l;i cEI c; Er !,9 a - EI.:. io x4

    = 6: .-,i

    l [t 5 5; i;! EEt l!flu^,:.^=29>o ,+ a s " < ' ',r

    :.,i: *i ;9 .rF'-s - -i -*

    :Ei

    ), '! r,J()ll]:()

    I Ei s;i$g;iI ir'a U: ?

  • -!

    ; 5!gE=+F!rEv 0. aa (,

    :: +jEgj + Ei r:i;9; ;i:e; j !i E:sjg5i ;f;+i E iE i E;t:.e_i !r;E- i

    =: .:

    .?.rEE*: ;; '+; ; ;i t :+:qip *,E;il , Et {',;'Z!:i

    _i-rq,r,i S _* "

    iEE@-- --8.:-

  • ;{ad.g !.E!Ed

    -9t

    :- o'c-.r!P

    .!l!d: io:Zzv,! ;.: !

    ff$;i ;i i{ ;f;;;lffi+ii;e r3sii ii ;s, ;i g !f jjj, F g i,:f fiis sFi i i *g; jj ; i! ;siF! i, i iif siEiiei 3{ {;f Ejs iF ji i:i:j gf f ilr *;iigci Pt sc+$:i*i;5 gE{:;;;i ;d;;giei:$f jg Fj r:! si ;i ::;T: ;; ; aFs Eiiiy;;; i; i:j ;jf ;i fl +E;Fi f; f- ifi etii;i$f $3:a J;F gg; fj Fg, if ljF :3 r; iFi; io 5 ,i. ^H-g 6{ JEt i+;ii gt .iE +i;5 ;,:,e .e o s , o ;.;,"- :*9'^i

    j-B -3 d .9.cev ;;ie-

    e 8EsE !!i _a; g: TfEbtr> ?e < .? >\x

    ii ; ? isi ii;E rj iiieg: ?;: ; ei: Ei; s : :r:E ::E; ; i;;s:; ,:jj-e EE-s;;; i i :gEi jila gji ,::;5't ;ir i tfi;;i ; : Ezil, sitg .Ei ;cEi:1 toa E :j:;ij; q : s=:; eli! ;cE ;it;;g iE!; E;3{ii i I E;!i i!;; e!! E;irsi. lEt i itsrJ.! 5 g :'5aE ii; i ; ri;* iEg ;iE n:i3fgf fij fl+ ijijf!f i ; t*: ;E;F ii; :-*=tEEie ;!5 '3i Eit'sir ' i ! i.E i !

    'i if rt, =.g5 *::ii;i i;F ;E i:;g;ii' ji : !;ii{ ifltia i:f g;-i:sr ;EE ii rjErr;is E'" E ,s;iEE EI#Ei fgE :;!Ei;{ l; E; figgso

    7,

    (,

    ..:,3 e soig

    E

    d

    Id)

  • Fo

    !.'9E: r,io dn

    s ir E EIt iT; Ai : ;" iE i EiE,= i ;i.l Is ii E;;! ;Elt; i ; eEs rr^

  • i '5:I 5:tPi.e,E3 !i !;eEiFrE; * l i!:5:s..:!9 ?: :=:.>! *b'i 't o? gE I5't_:,8 t? !t-lF:FiA Ei i;iii;E; i! ii;3-s.-sH! S .E5 ;Tsi=l3u-;

    g F;;r"eEiiy !: Fjyq;:.;F ;; ;;'i"9:riri .rE: tg:5.l!gE?E ,-:Fi zjtnitn6"o

    -ui EYsosi EgF; ;ti :i;jgIgB$ ;'-: lE:3d="rii; f ;E ieE;

    lr.i

    !:

    'o

    i,},oi?i

    i g -E g

    = iq i: ; 3 .E g$ ;

    .5 -' r

    - ? & i +t z

    - : i i ; + F ?g .ii 'e i g i q

    = 6ri E .; ; I :: 6 ao :

    : ; i ! ; i P io ei E i ry E E : :! yE iJ.=r;IA -

    -

    6 ct ! YA2 zz i I F .4 ! ; -1 5. 3: h'E r i3, t! E : ! a f" y ilE, i

    . ;- o : a + E .: .t 3! i.2 i- !g a f, L E i n : ri !;5_+?g;g5-r-*;

    :Eg! Fndj'8222 si; **E--! 1iR;i;i!il es::iiFrEtj

    =.

    B .? ; ,. aE E .3r i.E: Fiy 7i I t i 5.8 EH E E; ;.ti !ii 2". : ! E iv iE n qi -:Eb.i E26 3 ;i o. o- 9! O; d dt "q- It_;ii !aoe e os S;; j

    ,,rr a L- F ? a.t -:;

    6J;!i:i;

    :)

    6-;

    I

    :d

    r.a

    ';r,9

    l. z4

    'iE cc r:; s-a 9e* tc a9

    i2 b-3 9-z>9 !9 :::

    9 S .E i.2.a!o18. T:Sr5t =

    F 3::s ; f;d: i e 9t 2EiE a i tn g+ x r Eo*yt 3 a&g6 !1 ;-

    aX- !'c.c: n6 iI3 E E'5 O,5: $ Ei lE!: ii6tt 3:!M,: -i >iif : i!.g..= t 6 !'- ;F E.9 E A i E

  • a;9!: r gd6

    . J F E= 9,i: ; g.;;:s T cF..!oE!:o

    .-

    =!-ii' : Ee{'d.: I I i.,=r .: 9- -.!4 : :

    ^E;s, E g {jEg-; -' 9 ioFiis: j i EEfl:: P ! EE3!?i n' i -;1-o=-;i * I s;r: ! ; : E *F iF= ; t ,i' e " iie H!;"qg s e 5 i:Il ?

    ^ ^ ^ :93" xPil$ g

    " ";;; "

    g-{, e:;; dEJ;i - = =j; = EIF s!=-

    .

    ='= 9.9 ".3.!i .s b

    II

    .5

    3i:F..i :-cs J

    -: ii. .9!! .o a9 't89 i:8 dEFd dd6 ,;J EE d,

    !;Si E gJ.! ! qo?e Y aY;J; d 6dI

    rt,i9

  • a-:P -: ijEy -B j tsTdx ^ z4='i6 ! e:'t a i r*ie A :'! 1 z EEEE i *JF T E g;=; Z .q-2- e l,:ooF! a i:E Ez : ?,i? r= !.o? F-i:=E =r _! .f qi .-E i .&1'l i7 ? t; "i !, !-i E =ol3*

    -+ : alE P" ; Pts'5 =

    _:.:; jt i E;E tn F :f"!3; a; : :-i=

    -qi E i:E.=lE T; j F5i; 6E = 9*GLs j ;;.;--

    i t z e s d::.9 di

    aE -i N ; F_.;E 3i

    53

    ;)

    !:. : ;

    iri t 1E-;= i Frl

    =i'E

    .:E

    Fqi

    .

    E!

    {:;

    o.:

    : +?y ?z

    F : Yi .?*.sr .e!;: i;: :El:;i;i3 : 5;; !:=:si E;3. c E-:5 l;.qGEi JE._c : c:= , E,^

    -

    -: ; !,i t11 i? )!:;=-E ;E3 {E ;Ft litxi! s"i9a

    =::'-iE"- .2=E ;! .i3-s :fiir: E.!- t d ,,.": ! q o U>

    :* 0 o. -

    !.: ;.r ri4 j.,r'irE: EE'i :! -:?.I ii+;!E *;r t* JI; "E2l*e :j. < X -a 2E +.4 Y

    - , q ^

    * 3= t.i:5 6oe!:i r':i, :=; ii;l l;;?il ;*iH ;x:gri -i:!:;e l;iE :q

    'n-.t i.1i7 *_E

    a=:d c oo azr e,i i:9! !is_*i; jyF.5 t-.Z dJ&

  • Fio

    2

    J

    C-ESMCONTENTS

    Foi'e."icid io the first ediiicnForeword to the second edil;onSection 1. DefinitionsSection 2. General princiolesSection 3. Aaclication of the Work ClassificationSeciion q. Cociing anci numbering oi itemsSection 5. p;eparation of rhe Bill of OuantitiesSecrion 6. Completion, pricing and use of the Bill of OuantitiesSection 7. Method-Relared Charges

    iSectio n 8. Work Classificarion

    5_

    8

    'l) -

    1.1Ciass A: General items,Class g: Ground investigarion.Cless C: Georechnicai and other soecialisl Drocesses,C.;ss C: 0er,roliiion and sire clearance,Ujass c: EZnhworks,

    _

    Class F: ln siru concrete,Ci: ss G: Concrete anciltaries,.Class H: Precasl concrele,Class l: Pipevrork-pipes,Cless J: Pipervork-finings and valves,Class K: Pipework-ma niroles 3nd pipework ancillaries,Class L: pipework_suppons and protectior! anciilaries to layrng and

    ercJvatron,Cle ss M: Structural melatwork,Ciass N: lvliscellaneous meleiworkCjass O: Timber,Class P: Piles,Class Q: Piling ancillaries,Class R: Roacjs anC pavings,Cless S: Pail track,Cle ss T: Tu nnels,Ciass U: 6riciwoik, bioci*or j. ar,cl rn6sonry,Cla ss V: Painting,Class W: Waterpioofing,Class X: [4 iscellaneous work,Class \': Sevrer renovatioo and ancillary works,

    1620263032

    46

    50

    58606264'!AO't tl-^/t)80

    83,9092

  • oEARTHWORKS

    ?t

    Excavation, dredgir:g, fillinq, comtExcavation,or: - .ractioh, disposal and landscapinssite investigation (included in c,ass B)diaphragm walls and ground anchorages (;ncluded in class Clpipes and sewers. manhores, rrenche"-.;j;ii;;; ;;;;i"lino.. ;ioinring (included in

    "t".r"-J J.-x, r- "n,i yt - lhtusi boring and pipe jacking. and prpeprres (tnctuded in classes p and Ol

    I::l!:-ri:::j.,l,"ffic sisns (inctudcd in class R):',.::rict9, ihafis, hc:di.:s:nd ^-.er s.-.,Lto..o,roen r:vities {incturterl in cla-ss Tl"^1.._::^O-"-tlo".

    t:..Jenccs Ind gares iincIuded inHernstatemenl tollowing pipe laying iincfra"O in clrss kf

    by CredgingIor cLrniDgs

    ] se ccruo orvrsror.r THIRD DIVISION

    Maxirnum depth:

    1 icpsoil2 l\iarerial orner ihan iopsoii. rock or

    a.irrcra I hard maleriaj3 Acci4 S:::-"d z-1rr'cii, hard mare.relexooseo atl:e !omlrancinc Su rj2.e5 Si:iei aiijicr;i;ari m;ierial nor

    :xtcseo ai :ne Cor.me,.iaji.ra Sunace

    1

    23.1

    5

    not exceeciing 0.25 m0-2s-0.5;oitm I1-2 m

    -1-:0 rr.I0-;: m5ia rec exc?9dina 15 m

    J

    i

    'l

  • ihe Commncin9 Su rla cern lhc oreoaration ol the

    Cuant rcs sn all be acjoptedrneasuremgnl ol:he

    lxc3valion classed as bf'i the elll oi Ouanlities

    be measurec as by dreciorno

    C1 llems ior cxcavation shal be6eemed lc ;nclude uoholoinosi. es ot xcavalion, adciilron;te\cavalrcn ro pro!ide workings:rece anC removaloi erisling

    C2 ltems jor excavarrcn wrrnrnbo-ow piis shall be cleemec ioir clude rgmovaland repiacemenlo: rverburcien and unsuitebte

    EMENT RULES

    Measurement cf ercavation

    OEFINITION RULES

    D1 xcavateci mareriar si1rt1 be

    deemedta be mEretial athet hantoosoil, tock ct Etriliciat ttttomrre.;a/unless olhc r.!r s e si;i edin irem descrlolrons,D2 ExcavetiDn in or u.Cer a.embankmeii, gxecul:c cr:o- ioplac:n9 ol till. sha,t be ci. ssec esexcavaio^ iat cuninos.D3 Eicavarion irorn witiinborrowpits snallbe clessei as9eneral excav2rion.

    COVERAGE FULES

    33

    CLASS E

    ADOITIONALOESCRIPTION RULES

    Al The localion and lrm,rs oiexcavation bv .j.eoging sha |.esla r9d in item Cesc.:clions..v:teferls exlent wcuiC olhglvise be

    A2 llem desc:iorio.s i..exCavatlOn 5: CV/ : \C^v (Ji c^o-.ware. ice'ilii,eC :n ii: P:eam:is :naccorcjan.e.4iih p..3 c re ph 5 .10shall idenliiy ihe bodv ci h,2rerA3 The locerion anc timirs ojexcavation iat faunaat)ons shztlbe sialed in lleryr oesc.iationsh,here lhe limits wouid otne-,!isrbe uncena;n. :xa.:! eroi a.ounopile sh6hs anc :o. u.:.e.rinn,.:shalle6ch be so dcs.:rbed 6ncclasseC es 9r t? r, i, J. :or

    A4 The Co.::6enc,nc S u.ri]..shallbe idc.tiiic ir :;.descriolion oi' eecir ii.h ior v.,o.irinvolvin-o exc:vstion ;or !vh ic:the Commen.r:rg Su.;.ce is nolthe O.iginal Surrace. TheExcava!ed Sulace s;raI beidenlified in rhe desc.roi;on ofeach item lor work invoivinoexcavarion ior whj.i theExcavatec Sunace i5 noi ihe FinalSuriace.A5 llcm dscriprio.s iorexcavatioo rvrihin ic.rc\v pirs

    An irem shali be giveo lorseoirale siaoe c, excavat;on

    sha ll be made lrom

    sp;.are si: q es in the

    iire voiumc masured fo.alion of a strUcture or

    shall be lhe volumeIo be eithel occupied by

    above any pan ot the

    Ihe volume measured tor,rron below a body ol openthall be the volume below

    en ihe \4ater 5urface is aticr the higher ievel of

    isolated volume olhard hateti6lot tock

    il appiicable) showndraw;ng to wh;ch reference

    ;n rhe Preambte;ne v/ith pafagraph 5.20.

    wirhin other materiat lod shallnol be

    seoa.ally unlss itsexceecs 1 m3 excepl that

    volume shall bcwhere the net w;dth of

    is less rhan 2 m.vciume measured for

    on within bor.cw pilslhe nel volume measured

    ln accordance wilh5.18 the ou6nliries oisha ll be computed net

    rhe Drawings wirh nolor bulling. shrinkaoe

    ! /here bounCa.iesciiierenr materials are

    on Ihe Otaw.nos,r!mc.rs shail bc m:oc on

  • anc:llaries 'i Trimmrng oi xcavnieo s..jiiaces2 Preoaralion ci exa6./aier s!r'lacess D'ir?sdibllv?i'aiic;^::e.'a, -.1 iJoucre nancIna cr excz!:ted

    i11 S lerie I

    SECOND DIVISION

    mrl5 Dreisino io renov? siii ml6 :x:!varion ci rr:liier 5er.w lhe Final

    Suri2ce eno r9piac9fi'r-oni !\'rln siaied

    1 Topsoil2 Marerial other than roasoil. rock or

    anrrrcia r h aro ni6! er:e :,3 Aock4 Siated adificiel hard ;:areriai

    THTRO OTVTSTON

    I

    n_, a le ria I? iimoer suppo(s leir in3 \1etal sucDo.rs len in

    | 1 Tc srructL,.es rnl.2 i=l;n"menrs ----__ - _mji3 General mr' 4 To sialeo deoi:r or:ilcKn-.ss m_

    1

    23

    618

    EXcavated iopsoillmponed ropsoilNon-selecteci exc6v6tad rizier;al oiherrhan topsoii or.ockS!&!ie!Ler.?veleci-":3 r e iia I ot he r :ha.:r-topsoil or rock.lmpofted natural malerial olher lhanloosoilor rockExcavaled rocklmponecj rocklmported aniiiciai material

  • 5ha il be measured towhicn ar lo receive no

    O4 Disposaiciexcavatedmaler,s/shail oe Oemeo to Oe .disposat o,! i11e S;te unlessolhe^vrse siere c in irem

    is exo;essly reouired or

    snell be measured lowi:cii are lo recerve

    DS rtirr'. -. -."^..:!;-^.disoosel a^c a c!ble h anCtingshall be oeemec Io be carireo ouluPon m3rener other th:n loosoii,rock or enliic,.i Saro .netcierunless cih.M,ise slrled In r!em

    5 u rfnccs which a.e

    The voiume oi cf,sposa/o/

    lhe iifieience belweennel vojume of excavarron

    net voiume ol excavered

    oniy ro lhe exrent lhat itreouired. The volrme

    lhal ol !he void formed in

    meesureci onlY to theil is e:(oressly requirgd

    tlir ict, ec.umuiates aierSu,:ace bas beeoshallbe removed

    he area oi supponedior wh;ch the suppons

    rerequ;red lo be left in.

    only to the extent lhartilld is also measured

    io eccoroance with

    roaCs is subsequentlyby the Engineer for

    votume olaced sha norlrom the measure-

    ayin g malerial5hationly to the extenl rhat

    volumc ol impoftedmeasured shall be

    rce between lhe netfillin-c and lhe netexcavated marerial

    work whhin classesfor filling.rock f;llingis cjeoos-

    :6sured in the iransponlhe place ol deposition.

    t//irg is ro be depos-warer, and the quantitYmeasured satisfaclorily

    lneans, its volume3su.ed in thc !ransponlhe pl6ce of dcposirion.

    D6 Filling meterial shellbedeemed ro be nor-selerled,excdvateC marerial othe. rhanropsot or.oct, unless orhetuisesialed rn jtem OescriO(iOns,D7 Filling mEle.iatshatr beclassed as excavzled rocl on jywhere the use oi rock as filiing elslatcd loc6tions is expressty

    DA Filling sh6lj be classed es roslaleo depth or thicknesswhetemarerial is provided of uniiorrntoral compacled deplh or lhicknesssuch as io drainaoe btankets.topsoilino. oiichinq and beach;no.Bulk filJing sha lt nol be ctasseC a;to stated depth ot rhicknessnoMithsranding thal itcompacted io separ;ie

    3r head of class on pa''ae :3t

    DEFINITION RULES COVERAGE RULES

    CL,ASS E

    AOOITIONALDESCRIPTlON RULES

    A6 tiern descriDrions Iorexcp vet i o n a nci a.ie s inconneaiion w;th excavat|o^ bvdreoging shatt be so descfibecA7 ltem descriolrons lor,t,, t t, i"r t9 c, e,Ldrdtcr sut;acesani aregaGlion ol excev.tecisu-,acss shatt icjenriiv surrares

    (31 inclined ar in angte ot tO.-.tS.io lhe ilor;lonral{b} inciineO at an engte ol a5.--eO,lO lhe horizontal{cl venical.

    A8 Whe.e m;tEfiai ,s tor o;rooseton rhe Siie rhc iocarroo oi:hedisccsalareas shell be st6iec r.il.r': oescriplions icr disrcs6/ oiexcavarzd maretiat.

    AS ihe materiats shal be;denr,fied

    'n ,rern dsscfiolrcns 1.,lill^a wnh ,n1Do^ed n;tc.ial

    Ai0 .

    ythere cjiiierent comoaciion.equrremenrs 5re spec;ilecj ior rhesame iill,ng mat:riat rhey shatj beslaIeC ;n ite,.n descnprions ior

    A1 I Where the rate of deoosrlonof {,lling mareft.l ,s limireC rhelimitatioo sha be siated in ilemdescriprions !or /i//i!'_A12 The materi.ls sha beidentifiei in iiem descriptions forlill;ng ra siercC cjepth or thickncss.413 ltem descriptioos for ,l//irolo s:ated depth ot thickness st,?iidenrifywJrk upon su riaces which

    (ai inclired al an anste ol I O"-_45,lo the hori?ontal(bl incl;ned ar en ancie oi 45.-90.to the hcrizonlat .(c) venical.

    RULES I

    C3 ltms for ,'il/ing sha beoee.ned ro include cornpacrion.

  • Trimmif-rg of lilled surfacesPrepar;tion ol lilled surlaces

    ..

    anc;llarjes

    I I ruding'2 Hydrauijc mulch

    -orass seeding

    3 Orher gra ss seeding4 Planls. starco specics ano sire5 Shruos. sitred soecica and si:e6 Trees, sialed species and sire

    Hedges. sraied scecies, site andspacing

    SECOND DIVISION THIRD OIVISION

    1

    2

    4

    TopsoilMaleflal olher tnan lopsoil, rock oranificial hard malerialRockStaled anificial harc material

    Single rowOouble row

  • o 37 'l'.ta

    tr .ineadtbf.l??s on page 33i

    MFNT RULES

    .tDEFINITION FULES COVEBACE BULES

    CLASS

    ADOITIONALOESCRIPTION BULES

    ningol lillcd sudaces

    , receive no Permanentner Vimming isoui.ad or no!.

    zsur;c lo 5u riace s)reciive Perrnanenrher preparalion isquired or nor exceoiich die ro re.eive fillinging and surlaces ior

    D9 Tfimminganc'prepataionsha ll be dccnrco lo be carried ourupon marerial olidrlhan ropsoil.rock or aniticial hfidrqar

  • -F'.

    .ilio*IN SITU CONCRETE 'ln situ conciete tor:

    capping of boreholes lincluded in class B)diaph.agm walls (include{ in class C)excavation ancillar:ies (included in class E)granolithic and other applied flhishes (included in class G)drainage and pipework (iniluded in classes K and L)piles {included in classes P'and O)roads, pavings and kerbs {included in class R)runneland shah linings (irr'atuded in class Tliounoatrons tor fences and gar4s lrncluded in class X)

    slo N

    .,,: i;. t. ,! .sEcoND DtvtstoN THIBD DIVISION

    Provision oi cahc/e!eOrdinary p.escribed mix m3

    .

    ir ,.,1 Grede: C7.5 or C10:2 C12.53 C154 C20s c:56 c30l, cro

    tt!;r r{fii

    Cement to BS;2 or BS :a6l l0 mm aggregele2 14 mm aggreozle3 20 mm aggregate4 40 mm aggreeate

    Cement to BS 4027 lsulphate resistingj5 10 mm aggrecare6 14 mm aggreeaie7 20 rnm aggre-c?te8 40 mm eqcrecetg

    Cement to BS "2

    at eS 1461 10 mm aggregale2 14 mm a9gregzle3 20 mm aoorecale4 40 mm aggregate

    Othet stated cement5 10 mm aggregale6 1.1mrn aggre-o6ie7 2C mm aggre,caieI 40 rnm aoareoare

    1 lhiCklrssj-loi 3y.66.1i.9 l qn@fiL2 15G-300 mm3 300-500 mm4 exceeding 500 mrn

    Itl ,

    Cross-sect;onal area: nol exceeoing003m'O0H 1ri':0 i-0 25 m'?0.25-1 mr

    -------;i6

    e d in s-i m'Special beam secrions

    Proijsion ol cancreleOesiilned mix mrProiision of concrereSpedal prescriced i-rix ml

    Ii

    ,.jii'ii.ti

    .l

    ,i:,laciSg ol canctetelressiliii-orce direstiesseC

    1

    L'I

    !:, ;,i:--elb!!e-.2 8qpes, rootings, pile c':os and ground.:!l sldbsl; suf,pendecj slabsI wlttsFildt

    Coir-rmns and pie rsBeAmscaiing ro mctal secrions

    ..

    q' Oriler concreie formsa:,,

    ,,:

    I .'t.,i.1.,i.t ili,li

    ,iI; ,:i:i 'd ..'il. ;.r;i i

    ii

    I

    ,'iI

  • oRULES

    voiu.ne ol concrele5hallinclude rhal

    !

    ,.,1l.tl.li

    'i

    ':i,l

    .a

    i']|:rl:f.,;a

    t:

    lir:

    D EFINIT]ON

    D1 llems ior

    tii

    a:,

    CLASS FAODITIONALDESCRIPT]ON RULES

    A1 The specii;calion ol theconcrete mix in acco.dance withBS 5328 sh6ll be sieled in itemdesctiprions i ot p t ovis ;o n oicorcfeta onless a rnix referenc-. isslaled 10. which the soeciticarionis giveo elsewhere in rhe Contraci

    ,A2 llem cjescnplions lor p/ac,ngo/ conc.ere whjch :s e>.presslyrequired to be placed agaicst anexcavated sudace iother thenblinding) shall so siale_43 The cross-sectionaicjimensions ol specir/ beamsecrionsshallbe slared in hemdescriptions, except where abam rype or marl number issrar.d for which dimensions erc-o;vcn on the Drawin-os.

    44 kem descriplions ior corn.ponents cl3sseC as clher conatetetorms sha ll idenlify the comgonentand include one oi the folto!v;ng:{a) the principal dimensions of.

    the concrete componenl{b) a rype or mark number ol aconcrte component forwhich principat dimensionsare givcn on lhe Orawings(cJ a siatement locating aconcrele comf'onent torwhich principal dirnensionsare given on rhe Orawings.

    ,s O.i mr in votumegrooves,lh.oals,

    comDonenls each nol

    in cross-sectional arearhd holes which are

    tn accordance with iureclass G

    lornl componenlsadiacenl volumes ol

    each nor exceeding

    concrete.

    uha

    vdlume ot concrerer sha ll exclude rhar ol n ibs

    rolays each not601 m: in c;oss-

    D2 A concrele ;nix shatt be:.clzssed es. i-.iigned.nix wtlererhe mix prooodibns a. lo b4'selectec by the eonrractor. .D3 A co^cier: rhix shair becrasiec:ii soe-oli

    "i..i.. r,li.im/Y wnere Ine mrx orohodrdn