REKAPITULASI RENCANA ANGGARAN BIAYA GEDUNG FUTSAL TJILIK RIWUT PALANGKARAYA PROVINSI KALIMANTAN TENGAH TAHUN ANGGARAN 2013 NO U RAIAN PEKERJAAN 615,405,842.37 TOTAL PEKERJAAN STANDARD 7,289,652,460.07 TOTAL PEKERJAAN NON STANDARD - TOTAL PEKERJAAN BANGUNAN PENDUKUNG - Palangkaraya, 10 November 2013 Dibuat Oleh Konsultan Perencana PT. TINGANG INTER NUSA Direktur utama SUB TOTAL (RP.) TOTAL (RP.) I. II . A. C. D. E. F. PEKERJAAN PERSIAPAN PEKERJAAN STANDARD PEKERJAAN STRUKTUR PEKERJAAN ATAP PEKERJAAN ARSITEKTUR PEKERJAAN MEKANIKAL & SANITARY PEKERJAAN ELEKTRIKAL 2,858,823,322.97 2,695,726,478.32 1,708,309,215.56 26,793,443.22 - III. A. B. C. D. E. F. PEKERJAAN NON STANDARD BANGUNAN GENSET & RUMAH POMPA PEKERJAAN PAGAR SAMPING DAN BELAKANG PEK. PAGAR DEPAN, GERBANG & PAPAN NAMA PEK. SARANA PARKIR ,SALURAN & TAMAN PEK. ELEKTRIKAL NON STANDARD PEK. MEKANIKAL NON STANDARD - - - - - - IV. A. B. C. PEKERJAAN BANGUNAN PENDUKUNG PEK.PEMBUATANPOSJAGA(3Unit) PEK. PEMBANGUNAN MUSHOLA& KANTIN PEK. RUANG CETAK PLAT & R.PENJAGA KANTOR - - - JUMLAH TOTAL PPN (10%) JUMLAH + PPN DIBULATKAN 7,905,058,302.44 790,505,830.24 8,695,564,132.69 8,695,564,000.00 Terbilang: # TUJUH MILYAR RUPIAH #

Rab Futsal

  • Upload
    ed-vict

  • View
    135

  • Download
    8

Embed Size (px)

DESCRIPTION

Biaya

Citation preview

Page 1: Rab Futsal

REKAPITULASIRENCANA ANGGARAN BIAYA

GEDUNG FUTSAL TJILIK RIWUTPALANGKARAYAPROVINSI KALIMANTAN TENGAHTAHUN ANGGARAN 2013

NO U RAIAN PEKERJAAN

615,405,842.37

TOTAL PEKERJAAN STANDARD 7,289,652,460.07

TOTAL PEKERJAAN NON STANDARD -

TOTAL PEKERJAAN BANGUNAN PENDUKUNG -

Palangkaraya, 10 November 2013

Dibuat Oleh

Konsultan Perencana

PT. TINGANG INTER NUSA

Direktur utama

SUB TOTAL(RP.)

TOTAL(RP.)

I.II.A.C.D.E.F.

PEKERJAAN PERSIAPANPEKERJAAN STANDARD

PEKERJAAN STRUKTUR PEKERJAAN ATAPPEKERJAAN ARSITEKTUR PEKERJAAN MEKANIKAL & SANITARY

PEKERJAAN ELEKTRIKAL

2,858,823,322.972,695,726,478.321,708,309,215.56

26,793,443.22-

III.A.B.C.D.E.F.

PEKERJAAN NON STANDARDBANGUNAN GENSET & RUMAH POMPA PEKERJAAN PAGAR SAMPING DAN BELAKANGPEK. PAGAR DEPAN, GERBANG & PAPAN NAMAPEK. SARANA PARKIR ,SALURAN & TAMAN PEK. ELEKTRIKAL NON STANDARDPEK. MEKANIKAL NON STANDARD

------

IV.A.B.C.

PEKERJAAN BANGUNAN PENDUKUNGPEK.PEMBUATANPOSJAGA(3Unit)PEK. PEMBANGUNAN MUSHOLA& KANTINPEK. RUANG CETAK PLAT & R.PENJAGA KANTOR -

--

JUMLAH TOTALPPN (10%)

JUMLAH + PPNDIBULATKAN

7,905,058,302.44 790,505,830.24 8,695,564,132.69 8,695,564,000.00

Terbilang:

# TUJUH MILYAR RUPIAH #

Page 2: Rab Futsal

RINCIANRENCANA ANGGARAN BIAYA

PEMBANGUNAN GEDUNG AULA ALFA OMEGAUNIVERSITAS KRISTEN PALANGKARAYA (UNKRIP)PROVINSI KALIMANTAN TENGAHTAHUN ANGGARAN 2013

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4 5 6=5X3

I. PEKERJAAN PERSIAPAN

1 Pek. Pengukuran kembali lokasi site 4,256.00 1,000.00 4,256,000.00

2 Pek. Pembersihan Lokasi Site 4,256.00 5,357.73 22,802,516.76

3 Pek. Pemasangan Pagar Sementara keliling site plan 500.00 218,748.45 109,374,223.26

4 Pek. Pembuatan Kantor Direksikeet 240.00 1,507,621.26 361,829,102.35

5 Pek. Pengadaan Air & Listrik kerja 1.00 Ls 10,000,000.00 10,000,000.00

6 Pek. Pembersihan sisa bekas pekerjaan 1.00 Ls 5,000,000.00 5,000,000.00

7 Biaya Perijinan (IMB) 4,256.00 25,000.00 106,400,000.00

TOTAL PERSIAPAN 615,405,842.37

II. PEKERJAAN STANDARDA. PEKERJAAN STRUKTUR

I. PEKERJAAN GALIAN & URUGAN

1 Pek. Pasang Papan Bouplank 264.00 49,591.55 13,092,169.21

2 Pek. Galian Tanah Pondasi Plat Setempat 315.76 30,635.94 9,673,602.92

3 Pek. Galian Tanah Sloof 20/30 185.69 23,340.86 4,334,094.57

4 Pek. Galian Tanah Pondasi Batu kali menerus 285.58 23,340.86 6,665,566.55

5 Pek. Urugan Pasir Bawah Pondasi Plat & Sloof t=10cm 53.45 125,095.72 6,686,366.31

6 Pek. Urugan Pasir Bawah Pondasi batu kali t=10cm 76.57 125,095.72 9,578,204.10

7 Pek. Urugan Tanah Kembali bks Galian 367.57 11,184.51 4,111,091.93

8 Pek. Urugan Tanah Peninggian Bangunan t=40 cm(Tanah dari luar) 458.43 153,235.72 70,247,851.76

9 Pek. Urugan Tanah Peninggian Bangunan (Tanah bks galian) 544.52 11,184.51 6,090,209.63

JUMLAH - I 130,479,156.97

II. PEKERJAAN PONDASI, POER & SLOOF

1 Pek. Aanstamping Batukali 20.33 585,263.45 11,897,235.47

2 Pek. Pondasi Batu kali camp. 1 Pc:4Psr 53.36 852,004.36 45,463,804.70

3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 245.09 95,920.05 23,508,804.08

4 Pekerjaan Beton Pondasi PlatType P-1 (1,00X1,00X0,40)m 1.75 4,679,526.96 8,189,172.18

5 Pekerjaan Beton Pondasi Plat Type P-2 (1,25X1,25X0,40)m 23.63 4,679,526.96 110,553,824.39

6 Pekerjaan Beton Pondasi PlatType P-3(1,50X1,50X0,40)m 51.98 4,679,526.96 243,218,413.67

7 Pekerjaan Beton Pondasi Tangga (1,00X1,50X35)m 3.28 4,679,526.96 15,354,697.83

8 Pekerjaan Beton Dinding Pedestal Tangga ,t=15cm 1.58 6,842,619.39 10,777,125.54

9 Beton SloofSL1 20/40 27.82 5,936,714.33 165,164,142.12

10 Beton SloofSL2 15/25 6.35 4,035,423.35 25,635,026.85

JUMLAH - II 659,762,246.82

III. PEKERJAAN BETON LANTAI BAWAH

1 Pekerjaan kolom Beton K1- D60,Beton K-225,tulangan 108,05 kg/m3 33.60 6,805,306.23 228,658,289.35

2 Pekerjaan kolom Beton K2-30/30,Beton K-225,tulangan 184,19 kg/m3 3.78 4,538,000.00 17,153,640.00

3 Pek Beton Kolom Praktis KP 11/11, Beton K. 1 75,tulangan 168,57 kg/m3 546.00 91,471.88 49,943,646.64

4 Pek. Beton Balok B1 30/60 cm, Elevasi +4,20,Beton K-225,tulangan 151,84 kg/m3 22.30 5,552,811.01 123,838,791.07

5 Pek. Beton Balok B2 25/50 cm, Elevasi +4,20,Beton K-225,tulangan 177,78 kg/m3 6.04 5,552,811.01 33,525,096.45

6 Pek. Beton Balok Bordes Tangga B4 20/30 cm, Elv. +1,80,K-225,tulangan.232,21 kg/m3 0.76 5,552,811.01 4,197,925.12

7 Pek.Beton Plat Lantai t=12 cm , Elevasi +3,50,/Atap Selasar - 6,062,411.35 -

8 Pek.Beton Plat Dak t=10 cm , Elevasi +4,20,Beton K-225 - 4,035,423.35 -

9 Pek Beton Plat , Step Tangga -(2 Unit) ,Beton K-225 3.13 6,062,411.35 18,986,599.35

10 Pek.Beton Plat Bordes Tangga t=12 cm (2 Unit),Beton K-225 2.27 6,062,411.35 13,749,548.93

11 Pek.Beton PlatTribun t=12 cm (2 Unit),Beton K-225 241.34 6,062,411.35 1,463,102,354.14

12 Pek Beton Balok Lintle Kusen, Beton K. 175 68.73 107,211.25 7,368,200.23

13 Pek Beton Luifel Jendela t= 10 cm, Beton K.175 3.67 5,514,265.78 20,259,136.75

14 Pek Beton Meja Wasstafel t=10 cm, Beton K.175 0.58 5,514,265.78 3,196,068.44

JUMLAH - III 1,983,979,296.48

HARGA SATUAN(RP.)

TOTAL JUMLAHHARGA

(RP.)

m2

m2

m1

m2

m2

m1

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m '

m3

m3

m3

m3

m3

m3

m3

m3

m '

m3

m3

Page 3: Rab Futsal

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4 5 6=5X3

IV. PEKERJAAN BETON LANTAI ATAS

1 Pekerjaan Beton Kolom K1-D60,Beton K-225 - 6,805,306.23 -

2 Pekerjaan kolom Beton K2-30/30,Beton K-225 - 4,538,000.00 -

3 PekKolom Praktis KP 15/15, Beton K.175 - 91,471.88 -

4 Pek. Beton Balok B1 - 30/60 cm, Elevasi +7 - 5,552,811.01 -

5 Pek. Beton Balok B3 -20/40 cm, Elevasi +8,56 - 5,552,811.01 -

6 Pek. Beton Balok BL - 10/40 cm, Elevasi +8,56 - 5,552,811.01 -

7 Pek. Beton Plat Dak Atap t=10 cm,Elv. + 5,5 - 5,514,265.78 -

8 Pek. Beton Balok B1 - 30/60 cm, Elevasi +9,56 - 5,552,811.01 -

9 Pek. Beton Balok B2 -25/50 cm, Elevasi +9,56 - 5,552,811.01 -

10 Pek. Beton Balok B3 -20/40 cm, Elevasi +9,56 - 5,552,811.01 -

11 Pek. Beton Balok B4 -20/30 cm, Elevasi +9,56 - 5,552,811.01 -

12 Pek. Beton Balok BL - 10/40 cm, Elevasi +9,56 - 5,552,811.01 -

13 Pek. Beton Plat Dak Atap t=10 cm,Elv. + 6.5 15.34 5,514,265.78 84,602,622.69

14 Pekerjaan kolom Beton K2-30/30,Elv. + 9,56,Beton K-225 - 4,538,000.00 -

15 Pek. Beton Balok RB1 - 15/30 cm, Elevasi +10,56 - 5,552,811.01 -

16 Pek Beton Luifel Jendela t= 10 cm, Beton K.175 - 5,514,265.78 -

17 Pek Beton Meja Wasstafel t=10 cm, Beton K.175 - 5,514,265.78 -

JUMLAH - IV - 84,602,622.69

SUB TOTAL STRUKTURE 2,858,823,322.97

C. PEKERJAAN ATAP

1 Pekerjaan Kuda-kuda & Rangka atap Pipa SCH 80 4,195.20 462,000.00 1,938,182,400.00

2 Pekerjaan Kuda-kuda & Rangka atap Baja WF 760.00 275,000.00 209,000,000.00

3 Pekerjaan Kuda-kuda & Rangka atap Baja Ringan "Zinkalum" - 250,000.00 -

4 Pasang Glasswoll - 25,000.00 -

5 Pasang Aluminium Foil - 108,883.35 -

6 Penutup atap Zincalume 4,521.76 117,155.86 529,750,680.16

7 BubungZincalume 86.50 m 116,964.14 10,117,398.16

8 Lisplang Plat GRC Lbr.30cm tebat 12 mm 108.45 m 80,000.00 8,676,000.00

SUB TOTAL ATAP 2,695,726,478.32

D. PEKERJAAN ARSITEKTUR

I. PEKERJAAN DINDING & PLESTERAN

I.a LANTAI BAWAH

1 Pasangan dinding 1/2 bata 1:2 985.25 181,941.94 179,258,300.82

2 164.21 37,431.32 6,146,533.91

3 Pasangan dinding 1/2 bata 1: 5 - 169,646.78 -

4 Pekerjaan plesterdan acian dinding 1:5 1,970.50 32,034.22 63,123,421.35

5 Pekerjaan plester dan acian Profil Tali air dinding 98.53 6,500.00 640,412.50

6 Pekerjaan plester dan acian Ban-banan dinding - 15,000.00 -

7 Pekerjaan Pasang dinding Batu alam Andesit - 350,000.00 -

8 Pekerjaan dinding aluminium Voil 60X60 164.21 199,033.57 32,682,970.87

9 Pekerjaan Border dinding keramik 1 0X20 - m 25,000.00 -

10 Pekerjaan Plin dinding Kayu L=10 cm (Partisi) - m 103,500.00 -

11 Pekerjaan Railling Tangga (Depan & Belakang) Pipa Stainlesstel 78.00 m 750,000.00 58,500,000.00

SUB JUMLAH 340,351,639.45

II.b LANTAI ATAS

1 Pasangan dinding 1/2 bata 1:2 - 181,941.94 -

2 - 37,431.32 -

3 Pasangan dinding 1/2 bata 1: 5 - 169,646.78 -

4 Pekerjaan plester dan acian dinding 1: 5 - 32,034.22 -

5 Pekerjaan plester dan acian Profil Tali air dinding - 6,500.00 -

6 Pekerjaan plester dan acian Ban-banan dinding - 15,000.00 -

7 Pekerjaan Pasang dinding Batu alam Andesit - 350,000.00 -

8 Pekerjaan dinding keramik 20X25 h= 2m - 199,033.57 -

9 Pekerjaan Border dinding keramik 1 0X20 - m 25,000.00 -

SUBJUMLAH -

JUMLAH - I 340,351,639.45

HARGA SATUAN(RP.)

TOTAL JUMLAHHARGA

(RP.)

m3

m3

m

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

m2

Pekerjaan plesterdan acian dinding 1 :2 m2

m2

m2

m1

m1

m2

m2

m2

Pekerjaan plester dan acian dinding 1 :2 m2

m2

m2

m1

m1

m2

m2

Page 4: Rab Futsal

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4 5 6=5X3

II. PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP ASSESORIES

II.a LANTAIBAWAH

1 Pasang Kusen+Pintu Type PD1(Pintu Utama) 9.00 Unit 14,612,300.00 131,510,700.00

2 Pasang Kusen+Pintu Type PD2 3.00 Unit 4,204,400.00 12,613,200.00

3 Pasang Kusen+Pintu Type P1 12.00 Unit 3,941,700.00 47,300,400.00

4 Pasang Kusen+Pintu Type P2 - Unit 3,645,300.00 -

5 Pasang Kusen+Pintu Type P3 - Unit 2,409,400.00 -

6 Pasang Kusen+jendelaTypeJ1 10.00 Unit 2,871,600.00 28,716,000.00

7 Pasang Kusen+jendela Type J6 - Unit 2,871,600.00 -

8 Pasang Kusen+jendela Type J7 - Unit 2,871,600.00 -

9 Pasang Kusen+jendela Type J8 - Unit 2,837,100.00 -

8 Pasang Kusen+jendela Type BV1 - Unit 2,871,600.00 -

SUB JUMLAH 220,140,300.00

II.b LANTAI ATAS

1 Pasang Kusen+Pintu Type PD2 - Unit 4,204,400.00 -

2 Pasang Kusen+Pintu Type P1 - Unit 3,941,700.00 -

3 Pasang Kusen+Pintu Type P2 - Unit 3,645,300.00 -

4 Pasang Kusen+Pintu Type P3 - Unit 2,409,400.00 -

5 Pasang Kusen+jendelaTypeJ1 - Unit 2,871,600.00 -

6 Pasang Kusen+jendela Type J7 - Unit 2,871,600.00 -

7 Pasang Kusen+jendela Type BV1 - Unit 496,400.00 -

SUBJUMLAH - -

JUMLAH - II 220,140,300.00

III. PEKERJAAN PLAFOND

III.a LANTAI BAWAH

1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 546.00 250,000.00 136,500,000.00

2 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Toilet+KM) 89.00 245,000.00 21,805,000.00

3 Pekerjaan profil gipsum 1,140.00 m 13,000.00 14,820,000.00

4 Pekerjaan profil kayu 345.00 m 13,500.00 4,657,500.00

SUB JUMLAH - 173,125,000.00

III.b LANTAI ATAS

1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 - 250,000.00 -

2 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Toilet+KM) - 245,000.00 -

3 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Overstek atap) - 245,000.00 -

4 Pekerjaan profil gipsum - m 13,000.00 -

5 Pekerjaan profil kayu - m 13,500.00 -

SUBJUMLAH -

JUMLAH - III 173,125,000.00

HARGA SATUAN(RP.)

TOTAL JUMLAHHARGA

(RP.)

m2

m2

m2

m2

m2

Page 5: Rab Futsal

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4 5 6=5X3

IV. PEKERJAAN LANTAI

IV.a LANTAI BAWAH

1 Urugan pasirbawah lantai t=10 cm 353.00 125,095.72 44,158,789.65

2 Lantai kerja t = 5cm 354.00 95,920.05 33,955,696.00

3 Pekerjaan lantai keramik 40X40 ( Diagonal) - 203,397.87 -

4 Pekerjaan lantai keramik 40X40 ( Border Diagonal) - 213,567.76 -

5 Pekerjaan Border Lantai List Pinggir 20X40 (Warna Coklat) - 213,567.76 -

6 Pekerjaan lantai keramik 40X40 4,408.00 203,397.87 896,577,790.46

7 Pekerjaan lantai keramik 40X40 (Tangga) - 203,397.87 -

8 Pekerjaan Plin lantai keramik 10X40 - m' 25,717.29 -

9 Pekerjaan lantai keramik KM 20X20 - 185,797.87 -

10 Pekerjaan Step Nozing tangga - m' 25,717.29 -

11 Pek. Lantai Rabat t = 5 cm (Keliling Bangunan) - 95,920.05 -

SUB JUMLAH 974,692,276.12

IV.b LANTAI ATAS

1 Uruganpasirbawahlantai t=10cm - 125,095.72 -

2 Pekerjaan lantai keramik40X40 (Diagonal) - 213,567.76 -

3 Pekerjaan Border Lantai List Pinggir 10X40 - 213,567.76 -

4 Pekerjaan lantai keramik 40X40 - 203,397.87 -

5 Pekerjaan Plin lantai keramik 10X40 - m' 25,717.29 -

6 Pekerjaan lantai keramik KM 20X20 - 185,797.87 -

SUBJUMLAH -

JUMLAH - IV 974,692,276.12

V. PEKERJAAN FINISHING & PENGECATAN

V.a LANTAI BAWAH

1 Pekerjaan Finishing Opening Kusen pada dinding bata - 7,500.00 -

2 Pekerjaan pengecatan dinding Exterior Watershiel - 21,158.82 -

3 Pekerjaan pengecatan dinding bata & partisi (Interior) - 16,927.06 -

4 Pekerjaan pengecatan plafond - 16,927.06 -

5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood - 75,109.49 -

SUB JUMLAH SUB JUMLAH -

V.b LANTAI ATAS

1 Pekerjaan Finishing Opening Kusen pada dinding bata - 7,500.00 -

2 Pekerjaan pengecatan dinding Exterior Watershiel - 21,158.82 -

3 Pekerjaan pengecatan dinding bata & partisi (Interior) - 16,927.06 -

4 Pekerjaan pengecatan plafond - 16,927.06 -

5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood - 75,109.49 -

6 Pekerjaan pengecatan lisplang kayu - 32,397.14 -

SUBJUMLAH -

JUMLAH-V -

SUB TOTAL ARSITEKTURE 1,708,309,215.56

E. PEKERJAAN MEKANIKAL & SANITARY

I PEKERJAAN INSTALASI AIR BERSIH

- PPR dia 1/2 inc 56.00 m 66,102.69 3,701,750.49

- PPR dia 3/4 inc 45.00 m 81,816.69 3,681,750.93

23.00 m 119,562.69 2,749,941.81

- Gate valve dia 3/4 inc 45.00 unit 100,000.00 4,500,000.00

- Gate valve dia 1 inc 76.00 unit 160,000.00 12,160,000.00

SUB JUMLAH 26,793,443.22

- PPR dia 1/2 inc - m 66,102.69 -

- PPR dia 3/4 inc - m 81,816.69 -

- m 119,562.69 -

- Gate valve dia 3/4 inc - unit 100,000.00 -

- Gate valve dia 1 inc - unit 160,000.00 -

SUB JUMLAH -

JUMLAH - I 26,793,443.22

HARGA SATUAN(RP.)

TOTAL JUMLAHHARGA

(RP.)

m3

m2

m2

m2

m2

m2

m2

m2

m2

m3

m2

m2

m2

m2

m1

m2

m2

m2

m2

m1

m2

m2

m2

m2

m2

1.a.

LANTAI-1PIPA AIR BERSIH (PPR PN 16)

b.

- PPRdia 1 incValve (Class 125 psi)

2.a.

LANTAI -2PIPA AIR BERSIH (PPR PN 16)

b.

- PPR dia 1 incValve (Class 125 psi)

Page 6: Rab Futsal

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4 5 6=5X3

II. PEKERJAAN INSTALASI AIR KOTOR

- PVC dia 2 inc - m 43,007.42 -

- PVC dia 3 inc - m 118,335.89 -

- PVC dia 4 inc - m 150,432.91 -

- PVC dia 6 inc - m 176,979.89 -

SUB JUMLAH -

- PVC dia 2 inc - m 43,007.42 -

- PVC dia 3 inc - m 118,335.89 -

- PVC dia 4 inc - m 150,432.91 -

SUB JUMLAH -

JUMLAH-II -

1 Floor drained ' TOTO' - bh 58,159.90 -

2 Kran air 1/2' - bh 49,469.82 -

3 Closet Duduk' TOTO' - bh 2,433,810.52 -

4 Urinoir U57M ' TOTO' - bh 1,228,523.07 -

5 Sekat Urinoir Porselin ' TOTO' - bh 350,000.00 -

6 Washtafel Bulat + Accecories ' TOTO' - bh 729,228.09 -

SUB JUMLAH -

b. LANTAIATAS

1 Floor drained ' TOTO' - bh 58,159.90 -

2 Kran air 1/2' - bh 49,469.82 -

3 Closet Duduk' TOTO' - unit 2,433,810.52 -

4 Urinoir U57M ' TOTO' - bh 1,228,523.07 -

5 Sekat Urinoir Porselin ' TOTO' - bh 350,000.00 -

6 Washtafel Bulat + Accecories ' TOTO' - unit 729,228.09 -

7 Bak. Kitchen zing lengkap meja beton+keramik - unit 3,500,000.00 -

SUB JUMLAH -

JUMLAH-III -

SUB TOTAL PEK.MEKANIKAL STANDARD & SANITARY 26,793,443.22

F. PEKERJAAN ELEKTRIKAL

I. ELEKTRIKAL LANTAI DASAR

- Panel box (800x600x250) mm - bh 2,750,000.00 -

- Busbar+Wiring Material - lot 1,950,000.00 -

Input

- MCCB 3P 32 A - bh 325,000.00 -

- Pilot Lamp Tlmq+MCB 1 P 2A - set 80,500.00 -

Output -

- MCB 1 P 6A - bh 70,000.00 -

- MCB 1P 16A - bh 70,000.00 -

b

- bh 285,000.00 -

- Panel box (800x600x250) mm - bh 2,750,000.00 -

- Busbar+Wiring Material - lot 1,950,000.00 -

Input

- MCB 3P 80 A - bh 825,000.00 -

- Pilot Lamp Tlmq+MCB 1 P 2A - set 80,500.00 -

Output

- MCB 3P 32A - bh 325,000.00 -

SUBJUMLAH -

2 PASANG KABEL TRAY

kabel tray elektrikal (300 x 50) mm - m 222,000.00 -

kabel ladder elektrikal (300 x 100) mm - m 218,000.00 -

SUBJUMLAH -

3 PASANG GROUNDING SYSTEM

Grounding system max. 2 Ohm + Box Control - titik 2,950,000.00 -

SUBJUMLAH -

HARGA SATUAN(RP.)

TOTAL JUMLAHHARGA

(RP.)

1.c.

LANTAI-1PIPA AIR KOTOR (PVC Class 10 kg/cm2)

2.c.

LANTAI -2PIPA AIR KOTOR (PVC Class 10 kg/cm2)

III.a.

PEKERJAAN SANITARY LANTAI BAWAH

1.a PEMASANGAN PANEL PP-D/LP-D

- MCB 3P 6A SDP

Page 7: Rab Futsal

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4

4 PEMASANGAN INSTALASI PENERANGAN/LAMPU

1 Installasi

RM TL 2x36 W - titik

Down Light 14W - titik

Down Light 18W - titik

Baret Lamp 20W - titik

stop kontak - titik

2 Material -

RM TL 2x36 W - bh

Down Light 14W - bh

Down Light 18W - bh

Baret Lamp 20W - bh

Stop kontak - bh

Saklarganda - bh

Saklartunggal - bh

SUBJUMLAH

JUMLAH-I

II. ELEKTRIKAL LANTAI ATAS

- Panel box (800x600x250) mm - bh

- Busbar+Wiring Material - lot

Input

- MCCB 3P 32 A - bh

- Pilot Lamp Tlmq+MCB 1 P 2A - set

Output -

- MCB 1 P 6A - bh

- MCB 1P 16A - bh

- MCB 3P 6A - bh

SUBJUMLAH

5 PASANG KABEL TRAY

kabel tray elektrikal (300 x 50) mm - m

kabel ladder elektrikal (300 x 100) mm - m

SUBJUMLAH

7 PEMASANGAN INSTALASI PENERANGAN/LAMPU LT.ATAS

1 Installasi

RM TL 2x36 W - titik

Down Light 14W - titik

Down Light 18W - titik

Baret Lamp 20W - titik

stop kontak - titik

2 Material

RM TL 2x36 W - bh

Down Light 14W - bh

Down Light 18W - bh

Baret Lamp 20W - bh

Stop kontak - bh

Saklarganda - bh

Saklartunggal - bh

SUBJUMLAH

JUMLAH-II

III. PENANGKAL PETIR

Cable BC 50 mm2 - m

Road Protection - bh

Installasi & accessories - titik

Grounding system max. 2 Ohm + Box Control - titik

1a

PEMASANGAN PANEL PP-ATAS/LP-ATAS

Page 8: Rab Futsal

JUMLAH-III

SUB TOTAL PEK. ELEKTRIKAL STANDARD

TOTAL JUMLAH PEKERJAAN GEDUNG

Page 9: Rab Futsal

5 6=5X3

196,260.22 -

196,260.22 -

196,260.22 -

196,260.22 -

225,699.25 -

422,600.00 -

350,000.00 -

315,000.00 -

375,000.00 -

24,100.00 -

24,100.00 -

18,100.00 -

-

-

2,750,000.00 -

1,950,000.00 -

325,000.00 -

80,500.00 -

70,000.00 -

70,000.00 -

285,000.00 -

-

222,000.00 -

218,000.00 -

-

196,260.22 -

196,260.22 -

196,260.22 -

196,260.22 -

225,699.25 -

422,600.00 -

350,000.00 -

315,000.00 -

375,000.00 -

24,100.00 -

24,100.00 -

18,100.00 -

-

-

65,000.00 -

200,000.00 -

250,000.00 -

2,950,000.00 -

HARGA SATUAN(RP.)

TOTAL JUMLAHHARGA

(RP.)

Page 10: Rab Futsal

-

-

7,289,652,460.07