RAB 1
Rp 84,631,000.00 Terbilang :
Milyar 0 ratusan 84 0
Juta 84 80 4 puluhan DELAPAN PULUH
satuan EMPAT JUTA
ratusan 631 6 ENAM RATUS Ribu 31 30 1
puluhan TIGA PULUH satuan SATU
RIBU ratusan 0 0
Satu 0 0 0 puluhan
satuan
Delapan Puluh Empat Juta Enam Ratus Tiga Puluh Satu Ribu Rupiah
REKAPILTULASI ANGGARAN
Pekerjaan : Pembangunan Perumahan Type 37Lokasi : Padang Gelugur, Tapus Pasaman
NO URAIAN PEKERJAAN JUMLAH HARGA
A PEK PENDAHULUAN 2,724,440.00 B PEK PONDASI 7,189,385.00 C PEK BETON BERTULANG 12,957,809.24 D PEK DINDING 20,814,396.42 E PEK LANTAI 7,887,187.82 F PEK PLAFOND 4,306,200.00 G PEK ATAP 9,878,234.60 H PEK KOZEN PINTU/JENDELA 7,250,000.00 I PEK PENGGANTUNG 1,240,000.00 J PEK CAT 4,245,779.68 K PEK SANITARY 660,000.00 L PEK MEKANIKAL 898,000.00 M PEK ELEKTRIKAL 3,080,000.00 N PEK LUAR 1,500,000.00
JUMLAH FISIK 84,631,432.76 JUMLAH TOTAL 84,631,432.76 DIBULATKAN 84,631,000.00
Terbilang : Delapan Puluh Empat Juta Enam Ratus Tiga Puluh Satu Ribu Rupiah
RENCANA ANGGARAN BIAYA
Pekerjaan : Pembangunan Perumahan Type 37Lokasi : Padang Gelugur, Tapus Pasaman
NO URAIAN PEKERJAAN SAT VOL HARGA SAT JUML HARGA TOTAL HARGA
A PEK PENDAHULUAN 1 Pembersihan Lapangan M2 90.00 6,625.00 596,250.00 2 Pas. Bowplank M' 46.00 46,265.00 2,128,190.00
2,724,440.00 B PEK PONDASI
1 Galian Tanah M3 20.10 48,125.00 967,312.50 2 Pas Aanstampang Batu Kali M3 6.53 240,000.00 1,567,200.00 3 Pas Batu Kali 1:4 M3 10.20 450,000.00 4,590,000.00 4 Urugan Kembali 1/4 Galian M3 3.37 19,250.00 64,872.50
7,189,385.00 C PEK BETON BERTULANG
1 Pek Sloof 13/17 M3 0.80 ### 3,402,783.12 3 Pek Kolom Prktis 13/13 M3 0.28 ### 910,875.63 4 Pek Balok Latei 10/13 M3 0.54 ### 1,954,747.58 5 Pek Ring Balok 13/17 M3 0.80 ### 3,182,873.62 6 Pek Pet Beton T=8 CM M3 0.80 ### 3,049,155.90 7 Pek Plat Meja Dapur M3 0.12 ### 457,373.39
12,957,809.24 D PEK DINDING
1 Pas Bata 1:4 M2 119.20 90,022.50 ###2 Pek Plester 1:4 M2 238.40 34,928.00 8,326,835.20 3 Pas Keramik 20/25 KM/WC M2 7.53 135,874.00 1,023,131.22 4 Pas Keramik 20/25 Meja Dapur M2 2.00 135,874.00 271,748.00 5 Ventilasi Beton BH 21.00 22,000.00 462,000.00
20,814,396.42 E PEK LANTAI
1 Pek Tanah Timbunan M3 13.40 65,000.00 871,000.00 2 Pek Cor 1:3:5 T=7 CM M3 2.01 784,245.00 1,576,332.45 3 Pas Keramik Lantai 40X40 M2 34.00 152,712.50 5,192,225.00 4 Pas Keramik 20x20 KM/WC M2 1.82 135,874.00 247,630.37
7,887,187.82 F PEK PLAFOND
1 Pas Plafond gypsum M2 58.20 65,000.00 3,783,000.00 2 Pas List Plafond M' 87.20 6,000.00 523,200.00
4,306,200.00 G PEK ATAP
1 Pas Rangka Atap Baja Ringan M2 56.22 70,000.00 3,935,051.28 2 Pas Atap Genteng Metal M2 56.22 76,195.00 4,283,303.32 3 Pas Perabung Atap M' 7.00 105,340.00 737,380.00 4 Pas Listplank Kayu M' 16.40 56,250.00 922,500.00
9,878,234.60 H PEK KOZEN PINTU/JENDELA
1 Kozen Pintu LBG 4.00 250,000.00 1,000,000.00 2 Kozen Jendela LBG 7.00 250,000.00 1,750,000.00 3 Daun Pintu Panil UNIT 4.00 600,000.00 2,400,000.00
Sanggrahan Kencana - Tapus
4 Daun Jendela UNIT 7.00 300,000.00 2,100,000.00 7,250,000.00
I PEK PENGGANTUNG 1 Pas Kunci Tanam SET 4.00 85,000.00 340,000.00 2 Pas Engsel Pintu PSG 6.00 20,000.00 120,000.00 3 Pas Engsel Jendela PSG 7.00 20,000.00 140,000.00 4 Pas Gerendel Pintu BH 4.00 20,000.00 80,000.00 5 Pas Gerendel Jendela BH 7.00 20,000.00 140,000.00 6 Pas Kait Angin BH 14.00 20,000.00 280,000.00 7 Pas Tarikan Jendela BH 7.00 20,000.00 140,000.00
1,240,000.00 J PEK CAT
1 Cat Air M2 142.57 13,766.50 1,962,744.97 2 Cat Minyak M2 94.03 24,280.50 2,283,034.71
4,245,779.68 K PEK SANITARY
1 Pas Zinc BH 1.00 275,000.00 275,000.00 2 Pas Kloset Jongkok BH 1.00 90,000.00 90,000.00 3 Pas Bak Fiber Sudut BH 1.00 200,000.00 200,000.00 4 Pas Kran 1/2" BH 3.00 25,000.00 75,000.00 5 Pas Floor Drain BH 1.00 20,000.00 20,000.00
660,000.00 L PEK MEKANIKAL
1 Pas Pipa 4" PVC AW M' 9.00 51,250.00 461,250.00 2 Pas Pipa 2" PVC AW M' 9.00 33,750.00 303,750.00 3 Pas Pipa 1.5" PVC AW M' 2.00 24,500.00 49,000.00 4 Pas Pipa 1/2" PVC AW M' 12.00 7,000.00 84,000.00
898,000.00 M PEK ELEKTRIKAL
1 Pas Box Sekering BH 1.00 250,000.00 250,000.00 2 Pas Instalasi Lampu TTK 9.00 180,000.00 1,620,000.00 3 Pas Instalasi Stop Kontak TTK 5.00 180,000.00 900,000.00 4 Pas Saklar Ganda BH 2.00 20,000.00 40,000.00 5 Pas Saklar Tunggal BH 4.00 15,000.00 60,000.00 6 Pas Stop Kontak BH 5.00 15,000.00 75,000.00 7 Pas Fiting Lampu BH 9.00 15,000.00 135,000.00
3,080,000.00 N PEK LUAR
1 Pek Septic Tank UNIT 1.00 ### 1,500,000.00 1,500,000.00
JUMLAH TOTAL ###
MASTER SCHEDULEPEKERJAAN : Pembangunan Perumahan Type 37LOKASI : Padang Gelugur, Tapus PasamanT.A : 2013
NO. URAIAN PEKERJAANWAKTU PELAKSANAAN
BOBOT BULAN KE-1 BULAN KE-2 BULAN KE-3(%) M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11
A. PEKERJAAN LANTAI 1I. PEK PENDAHULUAN 3.22 3.22 II. PEK PONDASI 8.49 3.40 5.10 III. PEK BETON BERTULANG 15.31 1.53 3.06 4.59 1.53 0.77 2.30 1.53 IV. PEK DINDING 24.59 4.92 6.15 2.46 6.15 4.92 V. PEK LANTAI 9.32 0.93 3.73 VI. PEK PLAFOND 5.09 VII. PEK ATAP 11.67 3.50 8.17 VIII. PEK KOZEN PINTU/JENDELA 8.57 1.71 0.86 0.86 1.28 1.28 2.57 XI. PEK PENGGANTUNG 1.47 X. PEK CAT 5.02 XI. PEK SANITARY 0.78 0.16 0.31 0.23 0.08 XII. PEK MEKANIKAL 1.06 0.11 0.21 0.32 0.27 0.16 XIII. PEK ELEKTRIKAL 3.64 XIV. PEK LUAR 1.77
JUMLAH BOBOT 100.01 3.22 3.40 6.63 7.98 10.74 5.70 7.88 8.44 6.95 10.89 6.53 BOBOT RENCANA 3.22 6.62 13.25 21.23 31.97 37.67 45.55 53.99 60.94 71.82 78.36 BOBOT REALISASIDEVIASI ( +/- )
Keterangan :
MASTER SCHEDULE
WAKTU PELAKSANAANBULAN KE-3 BULAN KE-4 KET.
M12 M13 M14 M15 M16
100%
4.66 1.53 3.56
1.47 2.01 1.25 1.51 0.25
1.09 2.55 1.77
0% 7.96 6.66 5.27 1.51 0.25 86.32 92.98 98.24 99.75 ###
PayREKAPRABTm Schedul