    2/13

    2

    Title

    MACHINING

    of

    EMD Crank Case

    12/17/2014 bipin

  • 8/10/2019 Ravi Gupta

    3/13

    MACHINING SEQUENCE OF GM CRANK CASE

    MACHINING OF GM CRANK

    CASE IS DONE IN 03(THREE)

    SET UP ON PORTAL MILLING

    MACHINE

    ANGULAR BORING OF

    RETAINER BORES AND

    DRILLING OF WATER

    JUMPER HOLES ARE DONE

    ON TAL ANGULAR BORINGMACHINE.

    12/17/2014 3bipin

  • 8/10/2019 Ravi Gupta

    4/13

    Ist Set Up

    Rough machining of MFM face.

    Rough & semi finish machining ofbase rail.

    Rough & semi finish machining ofPC pad.

    Rough & semi finish machining ofCSD &ACC End.

    Drilling and tapping of MFM.

    Drilling of both the base rail RS &LS.

    Drilling and tapping on both theside of PC pad.

    Base RailMFM

    CSD END12/17/2014 4bipin

  • 8/10/2019 Ravi Gupta

    5/13

    Ist Set Up

    Rough boring of crank case.

    Phantom milling of MFM.

    Thrust machining of center

    MFM. Tang slot (Shell lock) milling

    in all the MFM.

    Probing of Window RS & LS.

    Machining of both sidewindow (RS & LS)

    Window

    12/17/2014 5bipin

  • 8/10/2019 Ravi Gupta

    6/13

    Ist Set Up

    Drilling and tapping ofboth the end (CSD &ACC).

    Finish milling of boththe end (CSD & ACCend).

    Serration milling on all

    MFM face. Un clamp and unload

    the crank case.

    12/17/2014 6bipin

  • 8/10/2019 Ravi Gupta

    7/13

    Assembly Of Main Bearing Cap.

    Deburring and cleaning of

    serrations of MFM.

    Deburring and cleaning of

    serrations of Main bearing

    cap. Tighten all MB Caps at the

    torque 350 ft-lbs.

    Tighten all MB Caps at the

    torque 1100 ft-lbs. Re-open all the MB cap.

    Finally tighten all the MB caps

    at the torque 750 ft-lbs.

    12/17/2014 7bipin

  • 8/10/2019 Ravi Gupta

    8/13

    2ndset up

    Set up and align the Crank

    case on V-type fixture.

    Rough boring of all the

    bores.

    Semi finish boring of all the

    bores.

    Finish boring of all the

    bores.

    Un clamp and unload the

    cank case for 3rdset up.

    12/17/2014 8bipin

  • 8/10/2019 Ravi Gupta

    9/13

    3rdSet up

    Load,aligne and clamp the crankcase on 3rdset up fixture.

    Rough milling of Top deck centerand both the Top deck (RS&LS).

    Finish milling of Top deck center

    and both the Top deck (RS&LS). Drilling and tapping of Top deck

    center and both the Top deck(RS&LS).

    Clearance machining for crab hole

    and spline nut hole of both theTop deck.

    12/17/2014 9bipin

  • 8/10/2019 Ravi Gupta

    10/13

    3rdSet up

    Crab hole drilling of both the topdeck (RS&LS).

    Drilling and Reaming of spline nuthole of both the top deck (RS&LS).

    Key way (Slot) milling on both thetop deck.

    Rough, semi-finish and finishmilling of CRV pad of both theside (RS & LS).

    Drilling and reaming of CRV padof both the side (RS & LS).

    Un clamp and unload the Crankcase.

    12/17/2014 10bipin

  • 8/10/2019 Ravi Gupta

    11/13

    Angular boring of Retainer bores

    Angular boring of Retainerbores, drilling and reamingof water jumper holes aredone on TAL Angular boringmachine.

    Set and align the Crank caseon boring fixture.

    Rough boring of all theretainer bores.

    Semi-finish boring of all thebores.

    Finish boring of all thebores.

    12/17/2014 11bipin

  • 8/10/2019 Ravi Gupta

    12/13

    Attend Deficiencies And Send The Crank

    Case To Es.

    12/17/2014 12bipin