Brokopondo ReservoirSuriname
The dam was closed in 1965 but the lake did not reach its optimal water level until 1971. The dam spanning the river is 54 m tall, and it is built near the small town of Brokopondo. The watershed which feeds the reservoir has 12.200 km² The dam was constructed to provide electricity to aluminium plants (Alcoa). About 75% of the dam's electricity is used to power these plants, and the remaining portion is used to power Suriname's capital city, Paramaribo.