9
Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 Chicago, USA

Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA

Embed Size (px)

DESCRIPTION

ISO-DICOM Joint Meeting WG02 1)IHE Integration Profiles (TR 28380) - draft of Part 2 (Integration and Content Profiles) was approved. - WG02 Requested TC to proceed with publication of the amended text. - NWIP for Phase II (Use Cases and Integration Profiles) would be prepared at the next meeting.

Citation preview

Page 1: Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA

Report on ISO/TC215 WG02

Makoto SuzukiJIRA

2008/ Dec /0 4Chicago, USA

Page 2: Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA

ISO TC215 WG02

2008/JUN/29 Goteborg, Sweden

2008/OCT/12 Istanbul, Turkey

2009/APR/27 Edinburgh, Scotland, UK

Page 3: Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA

ISO-DICOM Joint Meeting WG021) IHE Integration Profiles (TR 28380) - draft of Part 2 (Integration and Content

Profiles) was approved. - WG02 Requested TC to proceed with

publication of the amended text. - NWIP for Phase II (Use Cases and

Integration Profiles) would be prepared at the next meeting.

Page 4: Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA

ISO-DICOM Joint Meeting WG022) Genomic Sequence Variation Markup

Language (GSVML) (ISO 25720) - Ballot comments were reviewed, and it was

agreed to proceed directly to publication.

Page 5: Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA

3) HL7 Version 2.5 (ISO 27931) - Ballot finished on 2008-06-10 and the draft

was approved. - Japan pointed some minor errors.

(corrected in v2.6.) It was agreed that HL7 requested to issue technical corrections for these errors.

- Following these corrections, it was agreed that the document should be sent for publication

ISO-DICOM Joint Meeting WG02

Page 6: Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA

ISO-DICOM Joint Meeting WG024) Web Access to DICOM Persistent Objects by

means of Web Services - The NWIP ballot completed successfully

although a number of issues had been raised.

- The document will be reviewed at a joint meeting of WG 02 and DICOM on 2009/Jan/16 in Orlando.

Page 7: Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA

ISO-DICOM Joint Meeting WG02Future meetings - There will be the usual joint meeting with

DICOM, HL 7 and TC 215/WG 7 at the HL7 winter meeting in Orlando, Florida, USA

(the WG 2 meeting will be held on 2009/Jan/16-17). - The next TC 215 Joint Working

Groups/Plenary meeting will be held on 2009/Apr/27-30 in Edinburgh, Scotland, UK.

Page 8: Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA
Page 9: Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA

END