74
PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012 ISSN 1675-7432 JABATAN PERANGKAAN MALAYSIA DEPARTMENT OF STATISTICS, MALAYSIA

RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

  • Upload
    ledang

  • View
    221

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

PERANGKAAN PETROLEUMDAN GAS ASLI

PETROLEUM AND NATURAL GASSTATISTICS

PE

RA

NG

KA

AN

PE

TR

OLE

UM

DA

N G

AS

AS

LI 2012

2012

ISSN 1675-7432

JABATAN PERANGKAAN MALAYSIADEPARTMENT OF STATISTICS, MALAYSIA

HARGA :PRICE :

BOLEH DIPEROLEH DARI : OBTAINABLE FROM :

Jabatan Perangkaan Malaysia(Department Of Statistics, Malaysia)Unit Khidmat Pengguna,Blok C6, Kompleks C, Pusat Pentadbiran Kerajaan Persekutuan,62514 Putrajaya,MALAYSIA

Tel. : 03-88857000Faks / Fax : 03-88889248E-mel / E-mail : [email protected] Web : http://www.statistics.gov.myHomepage

RM20.00

DITERBIT DAN DICETAK OLEH JABATAN PERANGKAAN MALAYSIA

Page 2: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

PERANGKAAN PETROLEUM DAN

GAS ASLI

PETROLEUM AND NATURAL GAS STATISTICS

2012

JABATAN PERANGKAAN MALAYSIA DEPARTMENT OF STATISTICS, MALAYSIA

MALAYSIA

Page 3: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

i

Penerbitan ini mempersembahkan perangkaan industri perlombongan petroleum dan gas asli

berdasarkan data yang diperoleh daripada Banci Industri Perlombongan Minyak Mentah dan

Gas Asli Tahunan yang dijalankan bagi tahun rujukan 2011. Laporan ini turut memuatkan data

sekunder yang diperoleh daripada Petroliam Nasional Berhad (PETRONAS).

Objektif utama laporan ini adalah untuk menerbitkan data berkenaan perangkaan utama

industri petroleum dan gas asli iaitu output, input perantaraan, nilai ditambah, jumlah pekerja,

gaji & upah yang dibayar dan nilai harta tetap yang dimiliki. Ringkasan penemuan banci ini

dibentangkan di bahagian pertama laporan manakala bahagian kedua memberi fokus kepada

aspek teknikal banci seperti skop dan liputan, metodologi, definisi dan konsep yang

digunakan. Jadual-jadual perangkaan yang terperinci juga turut dipersembahkan bagi

membantu pengguna membuat analisis.

Jabatan Perangkaan Malaysia mengambil kesempatan ini untuk merakamkan penghargaan

kepada semua pihak, terutamanya kepada syarikat yang membekalkan data dan menyumbang

kepada merealisasikan penerbitan ini. Sebarang cadangan dan pandangan ke arah

menambahbaik laporan ini pada masa hadapan amatlah dihargai.

DR. HAJI ABDUL RAHMAN BIN HASAN

Ketua Perangkawan

Malaysia

Disember 2012

KATA PENGANTAR

Page 4: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

ii

This publication presents statistics on the petroleum and natural gas mining industry based on

data collected from the Annual Census of Crude Oil and Natural Gas Mining Industry for

reference year 2011. This report also consists of secondary data obtained from Petroliam

Nasional Berhad (PETRONAS).

The main objective of the report is to publish data pertaining to principal statistics of the

petroleum and natural gas industry i.e. output, intermediate input, value added, total number of

persons engaged, salaries & wages paid and value of fixed assets owned. The summary

findings of the census is contained in the first part of the report while the second part focuses on

the technical aspects of the census such as scope and coverage, methodology, definitions and

concepts used. Detailed statistical tables are presented to assist users in their analysis.

The Department of Statistics, Malaysia takes this opportunity to express sincere appreciation to

all parties concerned, in particular, to the companies for providing the data and their contributions

in realising this publication. All comments and suggestions towards improving future reports

would be greatly appreciated.

DR. HAJI ABDUL RAHMAN BIN HASAN

Chief Statistician

Malaysia

December 2012

PREFACE

Page 5: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

iii

Muka surat

Page

Kata pengantar i

Preface

Ringkasan penemuan 3

Summary findings

Senarai jadual

List of tables

Jadual

Table

1. Perangkaan utama industri perlombongan petroleum dan gas asli, 2002 - 2011 41

Principal statistics of petroleum and natural gas mining industry, 2002 – 2011

2. Perangkaan utama industri perlombongan petroleum dan gas asli mengikut

taraf sah

42

Principal statistics of petroleum and natural gas mining industry by legal status,

2011

3. Perangkaan utama industri perlombongan petroleum dan gas asli mengikut

hak milik, 2011

43

Principal statistics of petroleum and natural gas mining industry by ownership, 2011

4. Perangkaan utama industri perlombongan petroleum dan gas asli mengikut

saiz pekerja, 2011

44

Principal statistics of petroleum and natural gas mining industry by employment

size,2011

5. Perangkaan utama industri perlombongan petroleum dan gas asli mengikut

saiz output, 2011

45

Principal statistics of petroleum and natural gas mining industry by output size, 2011

Page 6: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

iv

Muka surat

Page

6. Perangkaan utama industri perlombongan petroleum dan gas asli mengikut

saiz harta tetap, 2011

46

Principal statistics of petroleum and natural gas mining industry by fixed assets size,

2011

7. Pekerja bergaji, gaji & upah dalam industri perlombongan petroleum dan gas

asli mengikut kategori pekerja, 2011

47

Paid employees, salaries & wages in the petroleum and natural gas mining industry

by category of workers, 2011

8. Bilangan pekerja dalam industri perlombongan petroleum dan gas asli

mengikut kelulusan akademik, 2011

48

Number of employees in the petroleum and natural gas mining industry by academic

qualification, 2011

9. Variabel terpilih dalam industri perlombongan petroleum dan gas asli,

2002- 2011

49

Selected variables in the petroleum and natural gas mining industry, 2002 - 2011

10. Nilai harta tetap dalam industri perlombongan petroleum dan gas asli

mengikut jenis harta tetap, 2011

50

Value of fixed assets in the petroleum and natural gas mining industry by type of

fixed assets, 2011

11. Penggunaan komputer, internet dan web presence dalam industri

perlombongan petroleum dan gas asli bagi tahun 2010 dan 2011

53

Usage of computer, internet and web presence in the petroleum and natural gas

mining industry for the year 2010 and 2011

12. Jenis rangkaian komputer yang digunakan dalam industri perlombongan

petroleum dan gas asli bagi tahun 2010 dan 2011

53

Types of computer network used in the petroleum and natural gas mining industry

for the year 2010 and 2011

Page 7: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

v

Muka surat

Page

13. Jenis capaian internet dalam industri perlombongan petroleum and gas asli

bagi tahun 2010 dan 2011

54

Types of internet access in the petroleum and natural gas mining industry for the

year 2010 and 2011

14. Pertubuhan yang terlibat dalam pembelian dan jualan internet dalam industri

perlombongan petroleum dan gas asli 2010 dan 2011

54

The establishments involved in purchased and sales via the internet in the petroleum

and natural gas mining industry for the year 2010 and 2011

15. Penggunaan internet dalam industri perlombongan petroleum dan gas asli

bagi tahun 2010 and 2011

55

Internet usages in the petroleum and natural gas mining industry for the year 2010

and 2011

16. Harga purata ‘lifting’ berpemberat minyak mentah, 2002 - 2011 56

Weighted average lifting price of crude oil, 2002 – 2011

17. Pengeluaran bulanan minyak mentah dan gas asli, 2011 57

Monthly production of crude oil and natural gas, 2011

18. Pengeluaran minyak mentah dan gas asli, 2002 - 2011 58

Production of crude oil and natural gas, 2002 – 2011

19. Eksport dan import produk berasaskan petroleum, 2002 - 2011 59

Export and imports of petroleum - based products, 2002 - 2011

20. Pengeluaran produk petroleum bertapis, 2003 - 2011 60

Production of refined petroleum products, 2003 - 2011

Page 8: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

vi

Muka surat

Page

21A. Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga

semasa - RM Juta

61

Gross Domestic Product by kind of economic activity at current price - RM Million

21B. Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga

semasa - perubahan peratusan tahunan

62

Gross Domestic Product by kind of economic activity at current price - annual

percentage change

21C. Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga

semasa - pembahagian peratusan KDNK

63

Gross Domestic Product by kind of economic activity at current price - percentage

share of GDP

22A. Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga

malar 2005 - RM Juta

64

Gross Domestic Product by kind of economic activity at constant 2005 prices

- RM Million

22B. Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga

Malar 2005 - perubahan peratusan tahunan

65

Gross Domestic Product by kind of economic activity at constant 2005 prices

- annual percentage change

22C. Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga

Malar 2005 - pembahagian peratusan KDNK

66

Gross Domestic Product by kind of economic activity at constant 2005 prices

- percentage share of GDP

Maklumat tambahan 69

Additional information

Page 9: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

RINGKASAN PENEMUAN SUMMARY FINDINGS

Page 10: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

3

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Jadual 1 : Perangkaan utama industri petroleum dan gas asli, 2010 dan 2011

Angkubah 2010 2011 Kadar pertumbuhan tahunan,

%

Output kasar (RM bilion) 98.1 109.2 11.3

Input perantaraan (RM bilion) 11.1 16.1 45.1

Nilai ditambah (RM bilion) 87.0 93.1 7.0

Jumlah pekerja (bilangan) 12,919 13,304 3.0

Gaji dan upah (RM bilion) 2.5 2.8 11.9

Nilai harta tetap (RM bilion) 141.2 146.5 3.8

1. Pendahuluan

Penerbitan ini mempersembahkan data bagi industri perlombongan petroleum dan gas asli untuk

tahun rujukan 2011, berdasarkan Banci Industri Perlombongan Minyak Mentah dan Gas Asli Tahunan

yang telah dijalankan pada tahun 2012. Turut dimuatkan di dalam penerbitan ini adalah data

sekunder yang diperoleh dari Petroliam Nasional Berhad (PETRONAS).

2. Prestasi keseluruhan

Sumbangan industri perlombongan petroleum dan gas asli kepada Keluaran Dalam Negeri Kasar

(KDNK) pada tahun 2011 adalah sebanyak 8.7 peratus (pada harga malar 2005) berbanding

9.7 peratus pada 2010. Prestasi industri petroleum dan gas asli di Malaysia bagi tahun rujukan 2011

berbanding tahun rujukan 2010 yang diperoleh daripada Banci ditunjukkan dalam Jadual 1.

Jadual 1 menunjukkan nilai output kasar pada tahun 2011 berjumlah RM109.2 bilion peningkatan

sebanyak RM11.1 bilion atau 11.3 peratus berbanding RM98.1 bilion pada tahun 2010. Nilai output

kasar dinilai pada harga unit di telaga. Nilai input perantaraan juga mencatatkan peningkatan

45.1 peratus pada tahun 2011. Sehubungan itu, nilai ditambah, iaitu perbezaan antara nilai output

kasar dan input perantaraan meningkat sebanyak RM6.1 bilion atau 7.0 peratus. Manakala, jumlah

guna tenaga menunjukkan peningkatan sebanyak 385 orang pekerja atau 3.0 peratus kepada 13,304

orang pekerja berbanding 12,919 orang pekerja pada tahun 2010.

Page 11: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

4

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

3. Guna tenaga

Pada tahun 2011, industri perlombongan minyak mentah dan gas asli mencatatkan jumlah pekerja

seramai 13,304 orang. Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah

yang dibayar ditunjukkan dalam Jadual 2. Pekerja pengurusan dan profesional merupakan kategori

pekerja terbesar dengan catatan sebanyak 57.8 peratus (7,696 orang) pekerja dalam tahun rujukan.

Mereka menerima gaji & upah tertinggi iaitu sebanyak RM2.2 bilion atau 77.4 peratus daripada

jumlah gaji & upah dibayar. Sementara itu, sebanyak 24.7 peratus atau 3,282 orang merupakan

pekerja teknik dan penyeliaan dan 7.2 peratus atau 958 orang adalah pekerja perkeranian dan

pekerjaan yang berkaitan.

Jadual 2 : Bilangan pekerja mengikut kategori pekerja, 2011

Kategori pekerja

Pekerja Gaji & Upah

Purata

gaji

setahun

diterima

setiap

pekerja

(RM)

Bilangan % (RM ’000) %

a. Pengurusan dan profesional

b. Teknik dan penyeliaan

c. Perkeranian dan pekerjaan berkaitan

d. Pekerja am

e. Pekerja pengeluaran/ operatif diambil

bekerja secara langsung

f. Pekerja pengeluaran/ operatif diambil

bekerja melalui kontraktor buruh

7,696

3,282

958

327

621

420

57.8

24.7

7.2

2.5

4.7

3.2

2,177,155

383,171

59,026

16,055

142,454

33,756

77.4

13.6

2.1

0.6

5.1

1.2

282,889

116,749

61,614

49,098

229,394

80,371

Jumlah 13,304 100.0 2,811,577 100.0 211,333

Nilai harta tetap yang dimiliki pada 2011 meningkat kepada RM146.5 bilion, peningkatan sebanyak

3.8 peratus berbanding RM141.2 bilion yang dilaporkan pada tahun sebelumnya. Perbelanjaan modal

terbesar adalah bagi jentera dan kelengkapan yang menyumbang kira-kira 46.6 peratus daripada

keseluruhan perbelanjaan modal dalam tahun rujukan.

Page 12: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

5

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Jantina Ijazah Lanjutan

Ijazah Universiti /

yang setaraf

Diploma / yang setaraf

STPM / yang setaraf

SPM / yang setaraf

Jumlah Di bawah SPM/SPMV

Lelaki 682 4,734 1,608 1,335 1,515 10,046 172

Perempuan 197 1,842 588 227 379 3,258 25

Bil

an

ga

n o

ran

g (

%)

Analisis guna tenaga mengikut kelulusan akademik seperti yang ditunjukkan dalam Carta 1

menunjukkan bahawa kumpulan terbesar pekerja adalah daripada golongan pemegang ijazah

universiti atau setaraf dengan 49.4 peratus, diikuti oleh diploma atau setaraf, 16.5 peratus dan SPM

atau setaraf, 14.2 peratus. Dari segi guna tenaga mengikut jantina, pekerja lelaki secara signifikan

lebih dominan dalam industri perlombongan petroleum dan gas asli, dengan catatan sebanyak

75.5 peratus (10,046 orang) daripada jumlah pekerja, manakala selebihnya iaitu 24.5 peratus

(3,258 orang) adalah pekerja perempuan. Pekerja lelaki juga mendominasi industri ini pada setiap

peringkat kelulusan.

Seperti yang dipaparkan di atas, pekerja lelaki yang memiliki kelulusan ijazah universiti atau yang

setaraf adalah yang tertinggi iaitu sebanyak 72.0 peratus (4,734 orang) berbanding 28.0 peratus

(1,842 orang) pekerja perempuan.

Kategori pengurusan dan profesional mencatatkan purata gaji tahunan yang tertinggi iaitu sebanyak

RM282,889 diikuti oleh pekerja pengeluaran/ operatif diambil bekerja secara langsung

(RM229,394), pekerja teknik dan penyeliaan (RM116,749) dan pekerja pengeluaran/ operatif diambil

bekerja melalui kontraktor buruh (RM80,371) seperti yang dipaparkan dalam Jadual 2.

Page 13: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

6

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Sumber : PETRONAS

MMSCF: (Juta) Kaki Padu Standard

To

ng

(ju

ta)

MM

SC

F

Tahun

4. Pengeluaran minyak mentah, peluwap dan gas asli

Prestasi pengeluaran minyak mentah dan gas asli untuk tempoh 2001 hingga 2011 ditunjukkan dalam

Carta 2. Pengeluaran minyak mentah paling tinggi dicatatkan pada tahun 2004 iaitu sebanyak 279 juta

tong, menurun kepada 257 (-8.0 peratus) dan 243 (-5.2 peratus) juta tong pada tahun 2005 dan 2006.

Namun, pada tahun 2007 dan 2008, pengeluaran minyak mentah masing-masing meningkat

sebanyak 2.4 dan 1.1 peratus. Pada tahun 2009, pengeluaran minyak mentah kembali jatuh sebanyak

4.5 peratus daripada 252 juta tong pada tahun 2008. Pada tahun 2010 dan 2011, pengeluaran minyak

mentah terus menunjukkan penurunan masing-masing sebanyak 3.1 peratus dan 10.7 peratus

berbanding tahun sebelumnya. Pengeluaran gas asli pula menunjukkan peningkatan yang positif

bermula tahun 2001 dengan kemuncaknya pada tahun 2008. Walau bagaimanapun, pada tahun 2009

pengeluaran gas asli menunjukkan penurunan sebanyak 1.7 peratus dan kembali meningkat

sebanyak 1.9 peratus pada tahun 2010 dengan catatan sebanyak 2,159 juta kaki padu standard

(MMSCF). Pada tahun 2011, pengeluaran gas asli terus menunjukkan peningkatan sebanyak

0.3 peratus kepada 2,165 juta MMSCF.

Produk

2009

2010

2011

Peratusan Perubahan Tahunan

Minyak mentah (juta tong) 240 233 207 (3.1) (10.7)

Gas asli (MMSCF) 2,119 2,159 2,165 1.9 0.3

2010 2011

Nota: Jumlah pengeluaran minyak mentah merujuk kepada pengeluaran minyak mentah dan peluwap, sementara jumlah pengeluaran gas asli merangkumi pengeluaran gas asli bersekutu dan gas asli tidak bersekutu.

Page 14: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

7

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Australia, India, Thailand dan Jepun merupakan negara pembeli utama petroleum mentah dari

Malaysia pada tahun 2011. Australia merupakan pengimport terbesar petroleum mentah dari

Malaysia iaitu sebanyak 31.4 peratus. Ini seterusnya diikuti oleh India (18.8 peratus), Thailand

(16.6 peratus) dan Jepun (7.5 peratus), seperti yang dipaparkan dalam Carta 3.

Carta 3 : Eksport petroleum mentah Malaysia mengikut negara, 2011

Australia

Thailand

China

India

Negara lain

Jepun

Jumlah :

RM32.5 bilion

5. Eksport dan import produk berasaskan petroleum

Seperti yang ditunjukkan dalam Jadual 3, eksport produk berasaskan petroleum (termasuk

dieksport semula) pada tahun 2011 adalah berjumlah RM117.5 bilion atau 16.8 peratus daripada

jumlah eksport Malaysia. Gas asli cecair merupakan komoditi eksport terbesar iaitu sebanyak

RM52.0 bilion (44.3 peratus) pada tahun 2011. Manakala, eksport produk petroleum mencatatkan

nilai RM33.0 bilion (28.1 peratus) dan petroleum mentah pula sebanyak RM32.5 bilion

(27.6 peratus).

Komoditi import yang terbesar pada tahun 2011 adalah import produk petroleum yang bernilai

RM32.7 bilion (57.7 peratus), diikuti petroleum mentah bernilai RM24.0 bilion (42.3 peratus).

Jadual 3: Eksport dan import produk berasaskan petroleum, 2011

Produk Eksport (RM bilion) Import (RM bilion) % %

a. Petroleum mentah

b. Produk petroleum

c. Gas asli cecair

32.5

33.0

52.0

24.0

32.7

-

42.3

57.7

-

27.6

28.1

44.3

Jumlah 117.5 56.7 100.0 100.0

Sumber : Perangkaan Perdagangan Luar Negeri, Jabatan Perangkaan Malaysia

Page 15: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

8

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

6. Eksport Gas Asli Cecair

Pada tahun 2011, negara Jepun kekal mendominasi hasil eksport gas asli cecair terbesar dari

Malaysia dengan catatan sebanyak 68.3 peratus daripada jumlah eksport komoditi ini, seperti dalam

Carta 5. Ini diikuti oleh Taiwan dan Republik Korea, masing-masing 15.5 peratus dan 11.6 peratus.

Carta 5 : Eksport gas asli cecair Malaysia mengikut negara, 2011

Jepun 68.3%

Republik Korea 11.6%

Taiwan 15.5%

Jumlah : RM52.0 bilion

Negara lain

4.6 %

Seperti yang dipaparkan dalam Carta 4, Arab Saudi dan Qatar merupakan dua negara pengeksport

utama petroleum mentah ke Malaysia, iaitu sebanyak 38.4 peratus, diikuti oleh Vietnam

(15.1 peratus) dan Gabon (12.1 peratus).

Negara lain Arab Saudi

Qatar

Carta 4 : Import petroleum mentah Malaysia mengikut negara, 2011

Jumlah :

RM24.0 bilion

Vietnam

Gabon

Emiriah Arab Bersatu

Iran

Australia

Page 16: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

9

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

7. Harga purata bulanan minyak mentah, 2011

Carta 6 menunjukkan harga purata bulanan dan harga purata terkumpul minyak mentah yang

dicatatkan pada 2011. Harga purata bulanan bagi se tong minyak mentah menunjukkan aliran yang

tidak sekata sepanjang tahun. Harga purata bulanan minyak mentah terendah dicatatkan pada

bulan Januari 2011 iaitu sebanyak USD94.13 se tong. Harga purata minyak mentah mencapai

harga purata tertinggi pada bulan April 2011 dengan nilai sebanyak USD124.07 se tong.

8. Penggunaan ICT

Penggunaan ICT dalam industri perlombongan minyak mentah dan gas asli adalah penting kerana

ia banyak melibatkan penggunaan sistem teknologi yang tinggi dalam melaksanakan proses

pengekstrakan minyak mentah dan gas asli. Ini selari dengan maklumat yang dilaporkan dalam

Banci dengan 100 peratus pertubuhan yang menjalankan aktiviti pengekstrakan minyak mentah dan

gas asli dilaporkan menggunakan komputer, internet dan web presence pada tahun 2011

(Carta 7).

Carta 6 : Harga purata bulanan dan harga purata terkumpul minyak mentah, 2011

90

95

100

105

110

115

120

125

130

Jan Feb Mac Apr Mei Jun Jul Ogos Sep Okt Nov Dis

Harga purata bulanan Harga purata terkumpul

Sumber : PETRONAS Bulan

USD124.07

USD94.13

US

D s

e t

on

g

Page 17: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

10

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Seperti yang dipaparkan dalam Carta 8, pertubuhan dalam industri perlombongan minyak mentah

dan gas asli 100 peratus menggunakan rangkaian intranet, rangkaian kawasan setempat dan

rangkaian kawasan luas di dalam industri ini dan hanya 50 peratus sahaja pertubuhan yang

menggunakan rangkaian extranet. Extranet adalah merujuk kepada rangkaian tertutup yang

menggunakan protokol internet untuk keselamatan iaitu berkongsi maklumat perusahaan dengan

pembekal, vendor, pelanggan atau rakan kongsi perniagaan lain.

Carta 7 : Penggunaan komputer, internet dan web presence, 2011

Carta 8 : Jenis penggunaan rangkaian komputer dalam industri perlombongan minyak mentah dan gas asli, 2011

Page 18: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

11

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Dalam industri perlombongan minyak mentah dan gas asli, sebanyak 94.0 peratus pekerja

dilaporkan menggunakan komputer dan 68.2 peratus pekerja dilaporkan menggunakan internet

pada tahun 2011. Berdasarkan kepada Jadual 4, kumpulan pertubuhan dengan saiz pekerja kurang

daripada 1,000 orang merupakan kumpulan yang paling ramai menggunakan komputer (95.2%).

Manakala, kumpulan pertubuhan dengan saiz pekerja 1,000 orang dan lebih mencatatkan

penggunaan internet yang tertinggi iaitu sebanyak 69.9 peratus.

Pada tahun 2011, penggunaan akses internet dalam industri minyak mentah dan gas asli adalah

lebih tertumpu kepada penggunaan akses internet menggunakan jalur lebar tetap dengan catatan

sebanyak 93.8 peratus, diikuti oleh jalur lebar mudah alih (37.5 peratus) dan jalur sempit

(25.0 peratus) (Carta 9).

Jadual 4 : Kadar pekerja yang menggunakan komputer dan internet dalam industri perlombongan minyak mentah dan gas asli, 2011

Carta 9 : Jenis penggunaan akses internet dalam industri perlombongan minyak mentah dan gas asli, 2011

Page 19: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

12

RINGKASAN PENEMUAN

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Jadual 5 menunjukkan peratus pertubuhan yang membuat dan menerima pesanan melalui internet

pada tahun 2010 dan 2011. Seperti dipaparkan dalam Jadual, 37.5 peratus pertubuhan membuat

pesanan untuk pembelian melalui internet pada tahun 2010 dan 2011.

Manakala 18.8 peratus menerima pesanan barangan atau perkhidmatan melalui internet pada tahun

2011, penurunan sebanyak 6.2 peratus berbanding tahun 2010. Daripada jumlah pendapatan yang

diterima berjumlah RM28.5 bilion pada tahun 2011, RM3.7 bilion adalah nilai jualan yang diperoleh

melalui jualan internet.

Jadual 5 : Pembelian atau barangan perkhidmatan dalam industri perlombongan minyak mentah dan gas asli, 2010 dan 2011

Page 20: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

13

SUMMARY FINDINGS

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Variables 2010 2011 Annual growth rate

%

Gross output (RM billion) 98.1 109.2 11.3

Intermediate input (RM billion) 11.1 16.1 45.1

Value added (RM billion) 87.0 93.1 7.0

Total persons engaged (number) 12,919 13,304 3.0

Salaries & wages (RM billion) 2.5 2.8 11.9

Value of fixed assets (RM billion) 141.2 146.5 3.8

Table 1 : Principal statistics of petroleum and natural gas mining industry, 2010 and 2011

1. Introduction

This publication presents data on the petroleum and natural gas mining industry for reference year

2011, based on the Annual Census of Crude Oil and Natural Gas Mining Industry conducted in

2012. Secondary data obtained from Petroliam Nasional Berhad (PETRONAS) are also presented in

this publication.

2. Overall performance

The share of the petroleum and natural gas mining industry to the Gross Domestic Product (GDP) in

2011, was 8.7 per cent (at constant 2005 prices), while the comparative figure in 2010 was

9.7 per cent. The performance of the petroleum and natural gas mining industry in Malaysia for

reference year 2011 as compared to 2010 which was obtained from the Census is shown in Table 1.

Table 1 showed the total value of gross output in 2011 was RM109.2 billion, an increase of

RM11.1 billion or 11.3 per cent from RM98.1 billion in 2010. The value of gross output is valued at

ex-well unit price. The value of intermediate input also recorded an increase of 45.1 per cent in

2011. Thus, value added, which is the difference between value of gross output and intermediate

input, increased by RM6.1 billion or 7.0 per cent. Total employment registered an increase of

385 employees or 3.0 per cent to record 13,304 as compared to 12,919 employees in 2010.

Page 21: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

14

SUMMARY FINDINGS

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

3. Employment

In 2011, the petroleum and natural gas mining industry recorded a total of 13,304 employees. The

distribution of full-time employees by category of workers and salaries & wages paid is shown in

Table 2. The largest category of workers is managerial and professional accounted for 57.8 per cent

(7,696 persons) of all employees in the reference year. They received the highest salaries & wages

at RM2.2 billion, or 77.4 per cent from the total salaries & wages paid. Meanwhile, 24.7 per cent or

3,282 were employed as technical and supervisory workers and 7.2 per cent or 958 were

clerical and related occupations.

Table 2 : Number of employees by category of workers, 2011

Category of workers

Employees Salaries & wages Average

annual salary

received per

employee

(RM) Number % (RM ’000) %

a. Managerial and professional

b. Technical and supervisory

c. Clerical and related occupations

d. General workers

e. Production/ operative workers directly employed

f. Production/ operative workers employed

through labour contractors

7,696

3,282

958

327

621

420

57.8

24.7

7.2

2.5

4.7

3.2

2,177,155

383,171

59,026

16,055

142,454

33,756

77.4

13.6

2.1

0.6

5.1

1.2

282,889

116,749

61,614

49,098

229,394

80,371

Total 13,304 100.0 2,811,577 100.0 211,333

The managerial and professional category also recorded the highest average annual salary of

RM282,889 followed by production/ operative workers directly employed (RM229,394), technical and

supervisory (RM116,749), and production/ operative workers employed through labour contractors

(RM80,371), as shown in Table 2.

The value of fixed assets owned in 2011 rose to RM146.5 billion, an increase of 3.8 per cent

compared to RM141.2 billion reported in the previous year. The largest capital expenditure incurred

was machinery and equipment, representing 46.6 per cent of total capital expenditure in the reference

year.

Page 22: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

15

SUMMARY FINDINGS

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Nu

mb

er

of

pe

rso

ns

(%

)

Gender Post-graduate

University degree/

equivalent

Diploma / equivalent

STPM / equivalent

SPM / equivalent Total

Below SPM/SPMV

Male 682 4,734 1,608 1,335 1,515 10,046 172

Female 197 1,842 588 227 379 3,258 25

An analysis of employment by academic qualification as shown in Chart 1 indicates that the largest

group of employees were a university degree holders or equivalent with 49.4 per cent, followed by

diploma or equivalent, 16.5 per cent and SPM or equivalent, 14.2 percent. In terms of employment by

gender, male employees were significantly dominant constituting 75.5 per cent (10,046 persons) of

total employment while the remaining 24.5 per cent (3,258 employees) were females. Males

employees also dominated the industry at every level of qualifications (Chart 1) .

As shown above, male employees with university degree or equivalent were the highest, accounted

for 72.0 per cent (4,734 persons) as compared with 28.0 per cent (1,842 persons) of female

employees.

Page 23: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

16

SUMMARY FINDINGS

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

Barr

el (m

illio

n)

Source : PETRONAS

MMSCF: Million Standard Cubic Feet

Year

Product

2009

2010

2011

Annual percentage change

Crude oil (million barrel) 240 233 207 (3.1) (10.7)

Natural gas (MMSCF) 2,119 2,159

2,165 1.9 0.3

2010 2011

MM

SC

F

4. Production of crude oil, condensate and natural gas

The performance of production of crude oil and natural gas for the period 2001 to 2011 is shown in

Chart 2. Production of crude oil peaked to 279 million barrels in 2004 and dropped to

257 (-8.0 per cent) and 243 (-5.2 per cent) million barrels in 2005 and 2006 respectively. However,

in 2007 and 2008, production of crude oil increased by 2.4 and 1.1 per cent respectively. In 2009, it

decreased by 4.5 per cent from 252 million barrels in 2008. In 2010 and 2011, it continued to

decline by 3.1 per cent and 10.7 per cent respectively as compared to the previous year. On the

other hand, production of natural gas shows a positive upward trend since 2001 and peaked in

2008. However, in 2009 it decreased by 1.7 per cent and subsequently rose by 1.9 per cent in 2010

to record a production of 2,159 million standard cubic feet (MMSCF). In 2011, it continued to

increase by 0.3 per cent to record 2,165 MMSCF.

Notes: Total production of crude oil refers to the production of crude oil and condensate, while the total production of natural gas includes associated natural gas and non-associated natural gas.

Page 24: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

17

SUMMARY FINDINGS

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

The largest import commodity in 2011 was petroleum products with a value of RM32.7 billion

(57.7 per cent) followed by imports of crude petroleum, RM24.0 billion (42.3 per cent).

Australia, India, Thailand and Japan were the major buyers of crude petroleum from Malaysia in

2011. Australia was the biggest importer of crude petroleum from Malaysia with a share of

31.4 per cent. This was followed by India (18.8 per cent), Thailand (16.6 per cent) and Japan

(7.5 per cent), as shown in Chart 3.

Australia

Thailand

India

Other countries

Japan

Total : RM32.5 billion

China

Chart 3 : Malaysia’s exports of crude petroleum by country, 2011

5. Exports and imports of petroleum-based products

As shown in Table 3, exports of petroleum-based products (including re-export) in 2011 amounted to

RM117.5 billion or 16.8 per cent of total exports in Malaysia. Liquefied natural gas was the largest

export commodity accounted for RM52.0 billion (44.3 per cent) in 2011. Meanwhile, the exports of

petroleum products registered a value of RM33.0 billion (28.1 per cent) and crude petroleum was

RM32.5 billion (27.6 per cent).

Table 3 : Exports and imports of petroleum-based products, 2011

Product Exports (RM billion) Imports (RM billion) % %

a. Crude petroleum

b. Petroleum products

c. Liquefied natural gas

32.5

33.0

52.0

24.0

32.7

-

27.6

28.1

44.3

42.3

57.7

-

Total 117.5 56.7 100.0 100.0

Source : External Trade Statistics, Department of Statistics, Malaysia

Page 25: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

18

SUMMARY FINDINGS

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

6. Exports of Liquefied Natural Gas (LNG)

In 2011, Japan remained as the largest importer of liquefied natural gas from Malaysia registered

68.3 per cent of the total exports of this commodity as shown in Chart 5. This was followed by

Taiwan and Republic of Korea which registered 15.5 per cent and 11.6 per cent respectively.

As shown in Chart 4, Saudi Arabia and Qatar were the two primary exporter countries of crude

petroleum to Malaysia, accounting for 38.4 per cent, followed by Vietnam (15.1 per cent) and Gabon

(12.1 per cent).

Chart 4 : Malaysia’s imports of crude petroleum by country, 2011

Gabon

Saudi Arabia

Vietnam

Other countries

Total : RM24.0 billion

Iran

Qatar

Australia

United Arab Emirates

Chart 5 : Malaysia’s exports of liquified natural gas by country, 2011

Japan 68.3%

Republic of Korea 11.6%

Taiwan 15.5%

Total : RM52.0 billion

Other countries

4.6 %

Page 26: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

19

SUMMARY FINDINGS

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

7. Monthly average price of crude oil, 2011

Chart 6 illustrates the monthly average price and cumulative average price of crude oil recorded in

2011. Throughout the year the monthly average price per barrel of crude oil shows a volatile trend.

The lowest average price of crude oil was USD94.13 per barrel recorded in January 2011. The

average price of crude oil reached its peak in April 2011 with the value of USD124.07 per barrel.

8. Usage of ICT

The usage of ICT in the crude oil and natural gas mining industry is crucial because it involves the

use of high technology systems in performing the extraction of crude oil and natural gas. This is

consistent with the information reported in the Census with a 100 per cent usage of computers,

internet and web presence for the establishments engaged in extraction of crude oil and natural

gas in 2011 (Chart 7).

90

95

100

105

110

115

120

125

130

Jan Feb Mar Apr May June Jul Aug Sep Oct Nov Dec

Chart 6 : Monthly average price and cumulative average price of crude oil, 2011

Cumulative average price

Source : PETRONAS Month

US

D p

er

ba

rrel

USD124.07

USD94.13

Monthly average price

Page 27: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

20

SUMMARY FINDINGS

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

As shown in Chart 8, 100 per cent of the establishments in the crude oil and natural gas mining

industry used intranet network, local area network (LAN) and wide area network (WAN), while only

50 per cent of establishments used extranet network. An extranet network refers to a closed network

that uses internet protocol to securely share an enterprise’s information with suppliers, vendors,

customers or other businesses partners.

In 2011, 94.0 per cent of employees in this industry reported using computers and 68.2 per cent of

employees reported using the internet. Based on Table 4, the group of establishments with less than

1,000 employees recorded the largest proportion of computer use (95.2 per cent). Meanwhile, the

groups of establishments with 1,000 employees and above registered the highest usage of internet,

accounting at 69.9 per cent .

Chart 7 : Usage of computer, internet and web presence, 2011

Chart 8 : Type of computer network used in the crude oil and natural gas mining industry, 2011

Page 28: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

21

SUMMARY FINDINGS

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS

2012

In 2011, the type of internet access mainly used in the crude oil and natural gas mining industry was

fixed broadband which recorded 93.8 per cent, followed by mobile broadband (37.5 per cent) and

narrowband (25.0 per cent) (Chart 9).

Table 5 shows the proportion of establishments involved in purchases and sales for goods and

services via the internet in 2010 and 2011. As shown in the Table, 37.5 per cent of establishments

used the internet to make purchase for 2010 and 2011.

Meanwhile 18.8 per cent received an order for goods or services via the internet in 2011, a decrease

of 6.2 per cent compared to 2010. Out of the total revenue received which was RM28.5 billion in

2011, RM3.7 billion was obtained from sales via the internet.

Table 4 : Proportion of employees using computer and internet in the crude oil and natural gas mining industry, 2011

Chart 9 : Types of internet access used in crude oil and natural gas mining industry, 2011

Table 5 : Purchases and sales for goods or services in crude oil and natural gas mining industry, 2010 and 2011

Page 29: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

NOTA TEKNIKAL TECHNICAL NOTES

Page 30: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

25

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

NOTA TEKNIKAL

Pendahuluan Laporan ini memuatkan maklumat industri perlombongan petroleum dan gas asli

bagi tahun rujukan 2011. Banci ini telah dijalankan pada tahun 2012.

Objektif Objektif utama Banci adalah untuk mengumpul maklumat tentang pertumbuhan,

sumbangan, komposisi dan taburan output, nilai ditambah, guna tenaga dan

pemboleh ubah lain bagi sektor ini untuk membantu kerajaan dalam perancangan

pembangunan dan penggubalan dasar. Maklumat tersebut boleh juga digunakan

oleh pihak swasta serta individu bagi tujuan membuat analisis ekonomi.

Kuasa Banci / penyiasatan dilaksanakan di bawah Akta Perangkaan 1965 (Disemak 1989).

Di bawah Akta ini, kandungan soal selidik yang diterima adalah sulit. Selaras

dengan keperluan Akta ini, hanya angka agregat diterbitkan.

Skop dan Banci ini meliputi semua pertubuhan yang terlibat dalam menjalankan aktiviti

eksplorasi perlombongan minyak mentah dan gas asli. Data sekunder diperoleh dari

Petroliam Nasional Berhad (PETRONAS) di mana ianya adalah merupakan sumber

utama rangka bagi banci ini.

Konsep dan Konsep dan definisi yang digunakan berasaskan kepada syor United Nations

Statistics Division. Konsep tersebut adalah mengikut amalan yang telah diterima

pakai dan dengan itu memudahkan perbandingan data di peringkat antarabangsa.

Takrif perlombongan yang digunakan dalam banci ini adalah seperti berikut:

“Perlombongan adalah ditakrifkan sebagai pengekstrakan, pembersihan dan

pemanfaatan mineral-mineral semulajadi, berbentuk pepejal seperti arang batu dan

bijih, cecair seperti minyak mentah dan berbentuk gas seperti gas asli.

Perlombongan termasuk lombong bawah tanah dan lombong permukaan, kuari dan

telaga-telaga dan semua kegiatan tambahan untuk pembersihan dan pemanfaatan

bijih dan mineral mentah lain seperti pemecahan, penapisan, pembasuhan,

pembersihan, penggredan, pengilangan, pengapungan, peleburan, penggentelan,

pengkacipan dan persiapan-persiapan lain yang diperlukan bagi menyediakan

bahan-bahan ini untuk membolehkannya dipasarkan. Aktiviti perlombongan juga

dikelaskan kepada kumpulan-kumpulan berdasarkan mineral utama yang

dikeluarkan.”

perundangan

liputan

definisi

Page 31: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

26

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

NOTA TEKNIKAL

Tahun rujukan Tahun rujukan bagi banci adalah tahun takwim 2011. Walau bagaimanapun, bagi

pertubuhan yang tahun kewangannya berbeza kurang daripada enam bulan

berbanding tahun takwim, angka tahun kewangan diterima pakai sebagai mewakili

tahun takwim.

Metodologi Banci dilaksanakan secara mel dengan menggunakan borang soal selidik yang

standard. Responden diberi tempoh sehingga dua bulan untuk melengkap dan

mengembalikan borang soal selidik tersebut kepada Jabatan ini.

Unit melapor Banci ini dilaksanakan berasaskan pendekatan pertubuhan. Pertubuhan ditakrifkan

sebagai:

“Secara ideal, sebagai satu unit ekonomi yang bergiat di bawah satu hak milik atau

penguasaan tunggal, iaitu di bawah satu entiti yang sah. Ia menjalankan satu jenis

aktiviti ekonomi atau mempunyai satu jenis aktiviti ekonomi utama di satu tempat /

lokasi fizikal.

Taraf sah Taraf sah sesebuah pertubuhan ditakrifkan seperti berikut:

(i) Syarikat sendirian berhad : Ia merupakan sebuah perbadanan swasta yang

ditubuhkan untuk menjalankan perniagaan dengan matlamat mencari

keuntungan. Sahamnya dipegang secara tertutup (closely held) oleh

pemegang-pemegang saham yang mempunyai kawalan terhadap operasi

syarikat. Ia didaftarkan dengan tanggungan berhad (with limited liability).

Sesebuah syarikat sendirian berhad mempunyai Memorandum dan Artikel

Persatuan sendiri, yang antara lain:

(a) menghadkan hak untuk memindahkan sahamnya;

(b) menghadkan bilangan pemegang sahamnya di antara dua hingga lima

puluh orang (tidak termasuk pekerja syarikat itu dan bekas pekerja yang

masih menjadi ahli);

(c) melarang sebarang penawaran kepada orang ramai untuk membeli

apa-apa saham atau debentur syarikat itu; dan

(d) melarang sebarang pelawaan kepada orang ramai supaya menyimpan

wang di syarikat itu bagi sesuatu tempoh yang ditetapkan ataupun untuk

dibayar bila dituntut, sama ada dengan faedah atau tidak.

Page 32: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

27

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

NOTA TEKNIKAL

(ii) Syarikat awam berhad : Syarikat awam berhad juga merupakan sebuah

perbadanan swasta yang ditubuhkan, dengan tanggungan berhad, oleh

sekurang-kurangnya dua orang untuk menjalankan perniagaan dengan tujuan

mencari keuntungan. Saham syarikat awam berhad dipegang secara terbuka

(openly held) dan bagi sesebuah syarikat yang disenaraikan di Bursa Saham,

sahamnya boleh bertukar milik secara bebas. Syarikat tersebut dianggap

sebagai entiti yang sah dan ditubuhkan mengikut Memorandum dan Artikel

Persatuan.

(iii) Lain-lain : Ia merujuk kepada semua pertubuhan lain yang tidak termasuk di

mana-mana kategori yang tersebut di atas, umpamanya syarikat sendirian

bukan berhad, misalnya syarikat yang diperbadankan di Malaysia, dsb.

Hak milik Hak milik sesebuah pertubuhan dikelaskan mengikut taraf pemastautin

pemilik-pemilik modal berbayar terbesar (melebihi 50%) dan bukannya mengikut

taraf kewarganegaraan mereka. Dalam kes di mana setiap pihak (Residen Malaysia

dan Bukan Residen Malaysia) memegang bilangan saham yang sama dalam

perniagaan berkenaan maka pertubuhan tersebut akan dikelaskan di bawah ‘Hak

Milik Bersama’.

Residen ditakrifkan sebagai individu, pertubuhan atau organisasi lain yang lazimnya

berada di Malaysia untuk jangka masa sekurang-kurangnya satu tahun. Residen

meliputi:

Cawangan dan anak syarikat asing yang didaftarkan di Malaysia

Warganegara asing yang menetap atau bekerja di Malaysia lebih daripada

setahun

Bukan Residen ialah individu, pertubuhan atau organisasi lain yang lazimnya terle-

tak di luar negara. Bukan residen terdiri daripada:

Cawangan dan anak syarikat Malaysia di luar negara

Rakyat Malaysia yang bekerja atau menetap di luar negara

Page 33: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

28

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

NOTA TEKNIKAL

Bilangan Bilangan pekerja dalam sesebuah pertubuhan merujuk kepada bilangan orang

bekerja yang bekerja pada bulan Disember atau pada tempoh pembayaran gaji terakhir

tahun rujukan. Ia termasuk pekerja bergaji (tetap / sambilan), pemilik yang bekerja

dan rakan niaga yang aktif, dan pekerja keluarga tidak bergaji. Mereka yang

sedang bercuti juga diambil kira.

i) Pemilik yang bekerja dan rakan niaga yang aktif merujuk kepada semua

pemilik perseorangan dan rakan niaga, sambilan atau sepenuh masa, yang

bekerja dengan aktif dalam pertubuhan itu. Ia tidak termasuk rakan niaga yang

tidak aktif.

ii) Pekerja keluarga tidak bergaji ditakrifkan sebagai semua ahli isi rumah

kepada pemilik pertubuhan yang melaksanakan kerja tertentu (sepenuh masa

atau sambilan) dan bekerja sekurang-kurangnya satu pertiga daripada waktu

bekerja biasa yang diamalkan oleh pertubuhan berkenaan tanpa mendapat

bayaran secara regular, sama ada dalam bentuk wang tunai atau mata benda

bagi kerja yang dilakukan. Biasanya pekerja berkenaan mendapat makanan,

tempat tinggal dan bantuan lain sebagai sebahagian daripada ahli isi rumah

pemilik tersebut dan terus mendapatnya sama ada ia bekerja keras atau tidak

di pertubuhan itu.

iii) Pekerja sepenuh masa ditakrifkan sebagai semua pekerja bergaji yang

bekerja sekurang-kurangnya enam jam sehari dan sekurang-kurangnya 20 hari

sebulan.

iv) Pekerja sambilan meliputi semua pekerja bergaji yang bekerja kurang

daripada enam jam sehari dan atau kurang daripada 20 hari sebulan.

Gaji & upah Merujuk kepada emolumen kasar yang dibayar kepada pekerja pada tahun 2011

yang dibayar termasuk gaji, upah, bonus, komisen, bayaran lebih masa dan elaun-elaun

lain yang dibayar sebelum dipotong sumbangan pekerja untuk skim keselamatan

sosial, KWSP, cukai pendapatan, insuran dan potongan lain.

Page 34: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

29

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

NOTA TEKNIKAL

Nilai output Nilai output kasar ditakrifkan dengan memasukkan unsur berikut:

kasar

Nilai output minyak mentah / gas asli (nilai di telaga) pada harga asas

+ Nilai jualan (dalam keadaan yang sama seperti dibeli);

- Kos barang yang dijual dalam keadaan yang sama seperti dibeli;

+ Pendapatan daripada perkhidmatan perindustrian yang diberikan

kepada pihak lain;

+ Pendapatan daripada komisen dan komisen pembrokeran;

+ Perbelanjaan modal ke atas binaan sendiri;

- Stok pembuka barangan yang diproses;

+ Stok penutup barangan yang diproses;

+ Bayaran perkhidmatan (nilai yang diberi);

+ Penerimaan daripada jualan tenaga elektrik kepada pihak lain;

dan

+ Nilai semua output lain (seperti penerimaan daripada

perkhidmatan bukan perindustrian, misalnya bayaran pengurusan

yang diterima, pendapatan sewa harta, dll.).

Nilai Nilai pengeluaran di telaga ditakrifkan seperti berikut:

pengeluaran Nilai pengeluaran di telaga = Harga unit di telaga x Kuantiti pengeluaran, di mana:

di telaga Harga unit di telaga = Hasil jualan se unit TOLAK (-)

i) diskaun dan elaun-elaun

ii) bayaran untuk pengangkutan keluar

iii) komisen kepada agen jualan

iv) bayaran cukai eksport

v) bayaran-bayaran tambahan

vi) ses menyelidik

Kuantiti Pengeluaran = Semua pengeluaran termasuk bayaran tunai kepada

kerajaan, kos bagi pengembalian minyak dan Bahagian PETRONAS

Nilai input Nilai input perantaraan merujuk kepada harga pembeli semasa dan ditakrifkan

dengan memasukkan unsur berikut:-

Nilai bahan dan bekalan yang digunakan (termasuk bayaran pengangkutan, serta

cukai dan duti yang dibayar)

perantaraan

Page 35: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

30

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

NOTA TEKNIKAL

+ Kos kerja perindustrian yang dibuat oleh orang lain (seperti

pembaikan dan penyelenggaraan);

+ Tenaga elektrik dan air yang dibeli;

+ Nilai bahan pembakar, pelincir dan gas yang digunakan;

+ Perbelanjaan penyelidikan dan pembangunan;

+ Pembayaran terhadap perkhidmatan bukan perindustrian (termasuk

bayaran pengiklanan, bayaran guaman, bayaran pos, bayaran

telekomunikasi dll.); dan

+ Semua kos input lain yang digunakan (termasuk kos latihan dan nilai

pakaian percuma yang disediakan kepada pekerja).

Nilai ditambah Nilai ditambah ialah tambahan kepada nilai barang dan perkhidmatan yang

dikeluarkan oleh sesebuah pertubuhan. Nilai ditambah diperoleh daripada

perbezaan antara nilai output kasar dan kos input.

Nilai harta Harta tetap meliputi semua barang, baru atau terpakai, ketara atau tidak ketara yang

mempunyai hayat produktif lebih daripada setahun. Ia termasuk tanah, bangunan

dan struktur, peralatan pengangkutan, komputer dan peralatan periferal, peralatan

serta perabot dan pemasangan lain. Nilai harta tetap bagi pembuka dan penutup

2011 adalah berasaskan nilai buku bersih. Pembelian, pindaan dan pembaikan

major atau perbelanjaan modal pada tahun berkenaan dikira pada nilai sebenar

yang dibayar. Nilai harta tetap yang dijual dalam tahun semasa juga dikira pada nilai

sebenar.

Pembentukan Pembentukan modal tetap kasar diukur dengan mengambil kira jumlah nilai

perolehan pengeluar, tolak pelupusan aset tetap semasa tempoh perakaunan,

ditambah dengan sesetengah perbelanjaan perkhidmatan tertentu yang menambah

nilai aset yang tidak dikeluarkan.

Stok Merujuk kepada nilai buku stok yang dimiliki oleh pertubuhan dan meliputi barang

perniagaan, bahan mentah, peralatan dan aksesori yang digunakan untuk memberi

perkhidmatan kepada orang lain.

modal tetap

kasar

tetap

Page 36: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

31

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

NOTA TEKNIKAL

Purata Purata pertumbuhan tahunan, r bagi sesuatu pemboleh ubah bagi tempoh

pertumbuhan setahun adalah seperti berikut :

tahunan

Penyelesaian bagi r ,

Di mana,

yt = Nilai pada tahun semasa

y0 = Nilai pada tahun sebelum

t = Bilangan tahun, yt - y0

r = Purata pertumbuhan tahunan

Pembundaran Penjumlahan komponen-komponen mungkin berbeza dengan jumlah besar dalam

jadual penerbitan ini disebabkan pembundaran angka.

Simbol dan Simbol dan singkatan berikut telah digunakan dalam keseluruhan penerbitan:

- Tiada

} Dicantumkan

RM Ringgit Malaysia

USD Dolar Amerika

% Peratus

MSCF (Ribu) Kaki Padu Standard

MMSCF (Juta) Kaki Padu Standard

F.O.B Free on board

dll dan lain-lain

singkatan

t

t ryy )1(0

10

ln1

y

y

t

t

er

Page 37: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

32

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

TECHNICAL NOTES

Introduction This report contains information on petroleum mining and natural gas industry for

reference year 2011. This Census was carried out in 2012.

Objective The main objective of the Census is to collect information pertaining to growth,

contribution, composition and distribution of output, value added, employment and

other variables of the sector to assist the government in development planning and

policy formulation. The data can also be used by the private sector and individuals

for economic analysis.

Legal authority The census / survey was conducted under the Statistics Act 1965 (Revised 1989).

Under the Act, the contents of individual returns received are kept confidential. In

conformity with the requirements of this Act, only aggregated figures are published.

Scope and The census covers all establishments known to be engaged in exploration petroleum

and natural gas mining activities. Secondary data were obtained from Petroliam

Nasional Berhad (PETRONAS), which is also the main source of frame for the

census.

Concepts and Concepts and definitions are based on the recommendations of the United Nations

definitions Statistics Division. These concepts adhere to accepted practices, thereby facilitating

international comparability of data. The definition of mining used in the census is

as follows:

“Mining is defined as the extraction, dressing and beneficiating of minerals occurring

naturally as solids, such as coal and ores; liquids, such as crude oil; or gases, such

as natural gas. Mining also includes underground and surface mines, quarries and

wells and all supplemental activities for dressing and beneficiating ores and other

crude minerals such as crushing, screening, washing, cleaning, grading, milling,

flotation, melting, pelleting, topping and other preparations needed to render the

material marketable. Mining activities are classified into groups on the basis of the

principal mineral produced.”

Reference year The reference period for the census is the calendar year 2010. However, for

establishments whose accounting year differed by less than six months from the

calendar year, the accounting or financial figures were accepted as representative of

the data for the calendar year.

coverage

Page 38: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

33

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

TECHNICAL NOTES

Methodology The census was conducted by mail inquiry using the standard questionnaire form.

Respondents were given two months to complete and return the questionnaire to the

Department.

Reporting unit The census was conducted on an establishment basis. An establishment is defined

as:

“Ideally, as an economic unit that engages, under a single legal entity, in one, or

predominantly one, kind of economic activity at a single physical location“.

Legal status The legal status of an establishment has been defined as follows:

(i) Private Limited Company: This is a private corporation established to

undertake a business with the objective of making a profit. The shares are

closely held by shareholders of the corporation who has control over its

operation. It is registered with limited liability.

A private limited company has its Memorandum and Articles of Association,

which among others:

(a) restricts the right to transfer its shares;

(b) limits the number of its shareholders between two to fifty (not including

employees of the company and past employees who are currently members);

(c) prohibits any invitation to the public to subscribe for any share or debenture

of the company; and

(d) prohibits any invitation to the public to deposit money with the company for

fixed periods or payable at call with or without interest.

(ii) Public Limited Company: A public limited company is also a private corporation

established, with limited liability, by a minimum of two persons to operate the

business with the objective of making a profit. The shares in a public limited

company are openly held and in the case of a company listed on the Stock

Exchange, the shares are freely transferable. The company is regarded as a

legal entity and is constituted by the Memorandum and Articles of Association.

Page 39: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

34

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

TECHNICAL NOTES

persons

engaged

(iii) Others refer to all other establishments which do not fall under any of the

mentioned above, e.g., private unlimited company such as company

incorporated in Malaysia, etc.

Ownership The ownership of an establishment is classified by the residential status of the

owner(s) of the majority (more than 50%) of the paid-up capital and not by their

citizenship status. In instances where each party (Malaysian Residents and

Non-Malaysian Residents) held equal shares in the business, the establishments

were classified under ‘Joint Ownership’.

Resident is defined as any individual, enterprise or other organization ordinarily

located in Malaysia for a period of at least one year. Resident consist of:

Branches and incorporated subsidiaries of foreign company in Malaysia

Foreign citizen stay or work in Malaysia more than one year

Non-Resident is defined as any individual, establishment or other organization

ordinarily located abroad. Non-resident consist of:

Foreign branches and subsidiaries of Malaysian companies

Malaysian citizen stay or work abroad

Number of Number of persons engaged in an establishment refers to the total number of

persons working during December or the last pay period of the reference year.

Included are employees (full-time / part-time), working proprietors, active business

partners and unpaid family workers. Those temporarily away on leave are also

included.

(i) Working proprietors and active business partners refer to all individual

proprietor and partners, part-time or full-time, who are actively engaged in the

work of the establishment. It therefore excludes silent and inactive partners.

(ii) Unpaid family workers is defined as all persons (full-time or part-time) of the

household of any of the owners of the establishment who perform a specified job

and work for a minimum of one third of the normal working time of the

establishment, but do not receive regular payment either in cash or in kind for the

work done. Such workers generally receive food, shelter and other support as

part of the household of an owner but these provisions would continue whether

Page 40: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

35

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

NOTA TEKNIKAL

they worked in the establishment or not.

(iii) Full-time employees is defined as all paid workers who work for at least six

hours a day and for at least 20 days a month.

(iv) Part-time employees include all paid workers who work for less than six hours a

day and/or less than 20 days a month.

Salaries & This refers to gross emoluments paid to employees during 2011 inclusive of salaries,

wages, bonuses, commission, overtime pay and other allowance contribution to

social security scheme, EPF, income tax, insurance or any other deductions.

Value of The value of gross output is defined to include the following elements:

gross output

Value of output of crude oil/natural gas (ex-well) at basic price

+ Value of goods sold (in the same condition as purchased);

- Cost of goods sold in the same condition as purchased;

+ Income from industrial services rendered to others;

+ Commission and brokerage earned;

+ Capital expenditure on own construction;

- Opening stock of goods-in-process;

+ Value of services rendered;

+ Closing stock of goods-in-process;

+ Receipts from electricity sold to others; and

+ All other output (such as receipts of non-industrial services for

example, management fees received, incomes from rental of

property, etc.)

Ex-well value Ex-well value of production is defined as follow:

of production Ex-well value of production = Ex-well unit price x Quantity produces, where

Ex-well unit price = Sales price per unit MINUS (-)

i) discounts and allowances v) supplementary payments

ii) charges for carriage outwards vi) research cess

iii) commission to selling agent(s)

iv) export duties paid

wages

paid

Page 41: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

36

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

TECHNICAL NOTES

Quantity produced = All production including cash payments payable to government,

cost of oil recovery and share of PETRONAS

Value of The value of intermediate input in current purchasers’ price is defined to include the

following elements:

Value of materials and supplies consumed (including transport charges

incurred and taxes and duties paid)

+ Cost of industrial work done by others (such as repairs and

maintenance);

+ Electricity and water purchased;

+ Value of fuels, lubricants and gas consumed;

+ Research and development expenditure;

+ Payment for non-industrial services (including advertising fees, legal

fees, postage, telecommunication, etc).

+ All other input costs (including training and value of free wearing

apparel for workers).

Value added Value added is the increment to the value of commodities and services contributed

by the establishment. This value is derived from the difference between the value of

gross output and cost of input.

Value of Fixed assets cover all goods, new or used, tangible or intangible that have a normal

economic life span of more than one year. Included land, buildings and

structures; transport equipment; computer and peripheral equipment; other

machinery, equipment and furniture and fittings. Value of fixed assets as at the

beginning and end of 2011 was based on net book value. Purchases, alterations and

major repairs or capital expenditure during the year were valued at actual costs

incurred. Value of fixed assets sold during the year refers to the realized value.

Gross fixed Gross fixed capital formation is measured by the total value of a producer’s

acquisitions, less disposal of fixed assets during the accounting period plus certain

specified expenditure of services that adds to the value of non-produced assets.

fixed assets

capital

formation

intermediate input

Page 42: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

37

PERANGKAAN PETROLEUM DAN GAS ASLI PETROLEUM AND NATURAL GAS STATISTICS 2012

TECHNICAL NOTES

Stocks This item refers to the book value of stocks owned by the establishment and

comprises merchandise, raw materials, parts and accessories for rendering services

to others.

Average The average annual growth, r in the value of a variable over the period of a year is

annual growth based on :

Solving for r,

Where,

yt = Value at current year

y0 = Value at previous year

t = Number of years, yt - y0

r = Average annual growth

Rounding The sum of the components may not add up to the totals in the tables presented in

this publication due to rounding

Symbols & The following symbols & abbreviations have been used throughout the publication:

- Nil

MSCF (Thousand) Standard Cubic Feet

MMSCF (Million) Standard Cubic Feet

} Combined

RM Ringgit Malaysia

USD American Dollar

% Percentage

F.O.B Free on board

i.e. that is

t

t ryy )1(0

10

ln1

y

y

t

t

er

abbreviations

Page 43: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

JADUAL TABLES

Page 44: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

41

Jadual 1: Perangkaan utama industri perlombongan petroleum dan gas asli, 2002 - 2011

Table 1: Principal statistics of petroleum and natural gas mining industry, 2002 - 2011

Tahun Nilai input Nilai Jumlah pekerja pada bulan Disember atau

pada tempoh gaji

terakhir

Gaji & upah

yang dibayar Nilai harta tetap Nilai output

Year perantaraan yang dimiliki pada kasar ditambah

Value of gross output

Value of Value added Salaries & wages paid

akhir tahun

intermediate Value of fixed

input Total number of persons engaged during December

or the last pay period

assets owned as at

end of the year

(RM'000) (RM'000) (RM'000) (RM'000) (RM'000)

2011 109,193,006 16,126,193 93,066,813 13,304 2,811,577 146,523,251

2010 98,121,543 11,113,339 87,008,205 12,919 2,512,070 141,161,063

2009 91,215,729 7,987,974 83,227,755 12,184 2,372,613 93,785,495

2008 130,361,614 7,642,099 122,719,515 10,458 1,969,296 76,276,198

2007 98,676,787 6,854,182 91,822,605 9,649 1,667,965 52,748,745

2006 92,121,516 6,267,971 85,853,545 9,008 1,258,548 35,985,346

2005 80,001,934 4,519,767 75,482,167 7,907 955,571 29,795,585

2004 61,569,636 4,353,365 57,216,271 7,427 789,507 29,339,044

2003 46,892,044 4,123,468 42,768,576 9,663 953,632 18,794,926

2002 37,235,959 3,134,615 34,101,344 9,563 883,895 17,012,546

Page 45: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

42

Jadual 2: Perangkaan utama industri perlombongan petroleum dan gas asli mengikut taraf sah, 2011

Table 2: Principal statistics of petroleum and natural gas mining industry by legal status, 2011

Taraf sah Nilai output Nilai input Nilai ditambah Jumlah pekerja pada Gaji & upah yang Nilai harta tetap Legal status perantaraan Value added bulan Disember atau dibayar yang dimiliki kasar

Value of gross output

Value of pada tempoh gaji Salaries & wages paid

pada akhir tahun

intermediate terakhir Value of fixed

input Total number of persons engaged during

December or the last pay period

assets owned as at

end of the year

(RM'000)

(RM'000)

(RM'000)

(RM'000)

(RM'000)

Jumlah 109,193,006

16,126,193

93,066,813

13,304

2,811,577

146,523,251

Total

Syarikat Sendirian Berhad 74,693,400 12,800,863 61,892,537 9,851 2,036,357 128,103,886

Private Limited Company

Syarikat Awam Berhad

34,499,606

3,325,330

31,174,276

3,453

775,220

18,419,365

Public Limited Company

Lain-lain

Others

Page 46: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

43

Jadual 3: Perangkaan utama industri perlombongan petroleum dan gas asli mengikut hak milik, 2011

Table 3: Principal statistics of petroleum and natural gas mining industry by ownership, 2011

Hak milik Nilai output Nilai input Nilai ditambah Jumlah pekerja pada bulan Disember atau

pada tempoh gaji

terakhir

Gaji & upah yang Nilai harta tetap Ownership perantaraan Value added yang dimiliki kasar dibayar

Value of gross output

Value of Salaries & wages paid

pada akhir tahun

intermediate Value of fixed input Total number of persons

engaged during December or the

last pay period

assets owned as at

end of the year

(RM'000)

(RM'000)

(RM'000)

(RM'000)

(RM'000)

Jumlah 109,193,006

16,126,193

93,066,813

13,304

2,811,577

146,523,251

Total

Residen Malaysia

Malaysian residents

33,745,483

4,954,494

28,790,989

7,406

1,640,163

96,379,594

Hak Milik Bersama

Joint Ownership

Bukan residen Malaysia 75,447,523 11,171,698 64,275,825 5,898 1,171,414 50,143,657

Non-Malaysian residents

Page 47: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

44

Jadual 4: Perangkaan utama industri perlombongan petroleum dan gas asli mengikut saiz pekerja, 2011

Table 4: Principal statistics of petroleum and natural gas mining industry by employment size, 2011

Saiz pekerja Nilai output Nilai input Nilai ditambah Jumlah pekerja pada bulan Disember atau

pada tempoh gaji

terakhir

Gaji & upah yang

dibayar Nilai harta tetap

Employment size perantaraan Value added yang dimiliki kasar

Value of gross output

Value of Salaries & wages paid

pada akhir tahun

intermediate Value of fixed input Total number of persons

engaged during December or the

last pay period

assets owned as at

end of the year

(RM'000)

(RM'000)

(RM'000)

(RM'000)

(RM'000)

Jumlah 109,193,006

16,126,193

93,066,813

13,304

2,811,577

146,523,251

Total

Di bawah 1,000 orang 41,998,808 8,757,182 33,241,626 3,581 676,030 50,333,966

Below 1,000 persons

1,000 orang dan lebih 67,194,198 7,369,011 59,825,187 9,723 2,135,547 96,189,286

1,000 persons and above

Page 48: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

45

Jadual 5: Perangkaan utama industri perlombongan petroleum dan gas asli mengikut saiz output, 2011

Table 5: Principal statistics of petroleum and natural gas mining industry by output size, 2011

Saiz output Nilai output Nilai input Nilai ditambah Jumlah pekerja pada Gaji & upah yang Nilai harta tetap Output size perantaraan Value added yang dimiliki kasar dibayar bulan Disember atau

Value of gross output

Value of Salaries & wages pada akhir tahun pada tempoh gaji intermediate Value of fixed terakhir paid

input Total number of persons engaged during

December or the last pay period

assets owned as at

end of the year

(RM'000)

(RM'000)

(RM'000)

(RM'000)

(RM'000)

Jumlah 109,193,006

16,126,193

93,066,813

13,304

2,811,577

146,523,251

Total

Kurang daripada RM5 bilion 22,758,949 6,137,084 16,621,865 1,911 412,902 20,301,653

Below RM5 billion

RM5 bilion dan lebih 86,434,057 9,989,109 76,444,948 11,393 2,398,675 126,221,598

RM5 billion and above

Page 49: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

46

Jadual 6: Perangkaan utama industri perlombongan petroleum dan gas asli mengikut saiz harta tetap, 2011

Table 6: Principal statistics of petroleum and natural gas mining industry by fixed assets size, 2011

Saiz harta tetap Nilai output Nilai input Nilai ditambah Jumlah pekerja pada Gaji & upah yang Nilai harta tetap Fixed assets size perantaraan Value added yang dimiliki kasar bulan Disember atau dibayar

Value of gross output

Value of Salaries & wages paid

pada akhir tahun pada tempoh gaji

intermediate Value of fixed terakhir input Total number of persons

engaged during December or the

last pay period

assets owned as at

end of the year

(RM'000)

(RM'000)

(RM'000)

(RM'000)

(RM'000)

Jumlah 109,193,006

16,126,193

93,066,813

13,304

2,811,577

146,523,251

Total

Kurang daripada RM3 bilion 13,214,334 2,090,854 11,123,480 1,032 209,779 2,032,446

Below RM3 billion

RM3 bilion dan lebih 95,978,672 14,035,339 81,943,333 12,272 2,601,798 144,490,806

RM3 billion and above

Page 50: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

47

Jadual 7: Pekerja bergaji, gaji & upah dalam industri perlombongan petroleum dan gas asli mengikut kategori pekerja, 2011

Table 7: Paid employees, salaries & wages in the petroleum and natural gas mining industry by category of workers, 2011

Kategori pekerja Jumlah pekerja pada bulan Disember

atau pada tempoh gaji terakhir Gaji & upah

Category of workers yang dibayar

Total number of persons engaged during

December or the last pay period Salaries &

wages paid

Jumlah Lelaki Perempuan

Total Male Female (RM'000)

Jumlah / Total 13,304 10,046 3,258 2,811,577

Pengurusan dan profesional 7,696 5,618 2,078 2,177,115

Managerial and professional

Teknik dan penyeliaan 3,282 2,827 455 383,171

Technical and supervisory

Perkeranian dan pekerjaan yang berkaitan 958 396 562 59,026

Clerical and related occupations

Pekerja am 327 273 54 16,055

General workers

Pekerja pengeluaran/ operatif diambil bekerja secara langsung 621 603 18 142,454

Production/ operative workers directly employed

Pekerja pengeluaran/ operatif yang diambil bekerja melalui kontraktor buruh 420 329 91 33,756

Production/ operative workers employed through labour contractors

Page 51: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

48

Jadual 8: Bilangan pekerja dalam industri perlombongan petroleum dan gas asli mengikut kelulusan akademik, 2011

Table 8: Number of employees in the petroleum and natural gas mining industry by academic qualification, 2011

Kelulusan akademik Jumlah pekerja pada bulan Disember atau pada tempoh

gaji terakhir

Academic qualification

Total number of persons engaged during December or the

last pay period

Jumlah Lelaki Perempuan

Total Male Female

Jumlah / Total 13,304 10,046 3,258

Ijazah lanjutan 879 682 197

Post-graduate

Ijazah universiti atau yang setaraf 6,576 4,734 1,842

University degree or equivalent

Diploma atau yang setaraf 2,196 1,608 588

Diploma or equivalent

STPM atau yang setaraf 1,562 1,335 227

STPM or equivalent

SPM/ SPMV atau yang setaraf 1,894 1,515 379

SPM/ SPMV or equivalent

Di bawah taraf kelulusan SPM/ SPMV 197 172 25

Below SPM/ SPMV qualification

Page 52: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

49

Jadual 9: Variabel terpilih dalam industri perlombongan petroleum dan gas asli, 2002 - 2011

Table 9: Selected variables in the petroleum and natural gas mining industry, 2002 - 2011

Tahun Jumlah pekerja Jumlah pekerja pada bulan Pampasan pekerja Pembentukan modal

Year pengeluaran Disember atau pada tempoh Compensation of employees tetap kasar

Total production gaji terakhir Gaji & upah dan bayaran Caruman Gross fixed capital

workers Total number of persons majikan berbentuk benda kepada formation

engaged during December or the pekerja bergaji Employer's

last pay period Salaries & wages and contribution

payment in kind to employees

(RM'000) (RM'000) (RM'000)

2011 1,041 13,304 3,094,590 319,419 28,340,232

2010 1,914 12,919 2,730,867 275,829 29,390,368

2009 1,934 12,184 2,563,395 269,593 24,585,134

2008 1,515 10,458 2,127,768 212,459 27,208,428

2007 1,449 9,649 1,801,667 160,340 13,887,138

2006 1,421 9,008 1,365,407 132,874 8,911,030

2005 746 7,907 1,098,188 84,496 5,715,632

2004 1,013 7,427 886,083 104,811 5,247,831

2003 1,110 9,663 1,019,331 69,723 5,606,538

2002 1,220 9,563 933,383 42,119 5,487,758

Nota : Jumlah pekerja pengeluaran merujuk kepada pekerja pengeluaran/ operatif diambil bekerja secara langsung dan pekerja

pengeluaran/ operatif yang diambil bekerja melalui kontraktor buruh.

Note : Total production workers refer to production/ operative workers directly employed and contractor production/operative workers

employed through labour.

Page 53: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

50

Jadual 10: Nilai harta tetap dalam industri perlombongan petroleum dan gas asli mengikut jenis harta tetap, 2011

Table 10: Value of fixed assets in the petroleum and natural gas mining industry by type of fixed assets, 2011

Perbelanjaan modal dan nilai aset

Capital expenditure and value of assets

Nilai buku Perbelanjaan modal dalam tahun 2011 Aset yang Keuntungan / Susut nilai Nilai buku Sewa yang

bersih Capital expenditure during 2011 dijual atau kerugian tahun bersih dibayar

seperti pada Pembelian Membuat/ dilupuskan daripada jualan / semasa seperti pada dalam

Jenis harta tetap 01.01.2011 membina dalam tahun penilaian Current 31.12.2011 tahun Purchases

Type of fixed asset Net book Baru Terpakai sendiri 2011 Semula asset year Net book 2011

value as at New Used Built / Assets sold Gain / losses depreciation value as at Rent paid

01.01.2011 self produced or disposed from sales / 31.12.2011 during

off during revaluation 2011

2011 of assets

Jumlah / Total 130,092,106 29,034,554 - 1,703 696,025 9,852,078 21,761,165 146,523,251 1,167,920

Tanah / Land

12,378 - - - - - 1,134 11,244 7,670

Bangunan dan pembinaan lain:

Buildings and other construction:

Tempat kediaman / Residential

- - - - - - - - 1,046

Bukan tempat kediaman (misalnya stor,

pejabat, dll.) 199,623 35,034 - - - 451 9,432 225,676 171,693

Non-residential ( e.g. stores, offices, etc.)

Pembinaan lain kecuali

pembangunan tanah 97,925 72,038 - - - - 28,185 141,778 -

Other construction except land improvement

Pembangunan tanah / Land improvement

- - - - - - - - -

(RM’000)

Page 54: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

51

Jadual 10: Nilai harta tetap dalam industri perlombongan petroleum dan gas asli mengikut jenis harta tetap, 2011 (samb.)

Table 10: Value of fixed assets in the petroleum and natural gas mining industry by type of fixed assets, 2011 (cont’d)

Perbelanjaan modal dan nilai aset

Capital expenditure and value of assets

Nilai buku Perbelanjaan modal dalam tahun 2011 Aset yang Keuntungan / Susut nilai Nilai buku Sewa yang

bersih Capital expenditure during 2011 dijual atau kerugian tahun bersih dibayar

seperti pada Pembelian Membuat/ dilupuskan daripada jualan / semasa seperti pada dalam

Jenis harta tetap 01.01.2011 membina dalam tahun penilaian Current 31.12.2011 tahun Purchases

Type of fixed asset Net book Baru Terpakai sendiri 2011 Semula asset year Net book 2011

value as at New Used Built / Assets sold Gain / losses depreciation value as at Rent paid

01.01.2011 self produced or disposed from sales / 31.12.2011 during

off during revaluation 2011

2011 of assets

Alat pengangkutan / Transport equipment :

Kenderaan perdagangan (misalnya lori,

van, pikap, dll.) 2,484 124 - - 147 - 903 1,558 1,499

Commercial vehicles (e.g. lorries, vans, pick-ups, etc.)

Kenderaan bukan perdagangan

(misalnya kereta) 3,054 1,072 - - 94 - 2,222 1,809 3,563

Commercial vehicles (e.g: cars.)

Lain-lain / Others - - - - - - - - 72,964

Helikopter / Helicopter - - - - - - - - 149,949

Bot, bot laju, katamaran dll. - - - - - - - - 590,698

Bot, speedboat, catamaran etc.

Komputer / Computers :

Perkakasan komputer/ Computer hardware

82,506 19,637 - - 111 932 25,668 77,297 10,139

Sofwer komputer / Computer software

117,696 11,166 - 1,703 600 2,237 13,029 119,173 883

(RM’000)

Page 55: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

52

Jadual 10: Nilai harta tetap dalam industri perlombongan petroleum dan gas asli mengikut jenis harta tetap, 2011 (samb.)

Table 10: Value of fixed assets in the petroleum and natural gas mining industry by type of fixed assets, 2011 (cont’d)

Perbelanjaan modal dan nilai aset

Capital expenditure and value of assets

Nilai buku Perbelanjaan modal dalam tahun 2011 Aset yang Keuntungan / Susut nilai Nilai buku Sewa yang

bersih Capital expenditure during 2011 dijual atau kerugian tahun bersih dibayar

seperti pada Pembelian Membuat/ dilupuskan daripada jualan / semasa seperti pada dalam

Jenis harta tetap 01.01.2011 membina dalam tahun penilaian Current 31.12.2011 tahun Purchases

Type of fixed asset Net book Baru Terpakai sendiri 2011 Semula asset year Net book 2011

value as at New Used Built / Assets sold Gain / losses depreciation value as at Rent paid

01.01.2011 self produced or disposed from sales / 31.12.2011 during

off during revaluation 2011

2011 of assets

Jentera dan kelengkapan / Machinery and equipment

Kemudahan minyak dan gas 66,057,547 13,530,422 - - 276 9,655,829 15,547,949 73,695,573 63,796

Oil and gas facilities

Jentera dan kelengkapan lain 583,757 5,820 - - 276 42 17,306 572,037 76,173 Others machinery and equipment

Perabot dan pemasangan / Furniture and fittings

99,218 10,222 - - 115 6,287 12,614 102,998 3,028

Mencarigali mineral / Mineral exploration

19,521,711 3,939,326 - - 569,060 - 1,004,609 21,887,368 -

Aset-aset lain / Other assets 43,314,207 11,409,692 - - 125,346 186,301 5,098,114 49,686,740 14,818

(RM’000)

Page 56: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

53

Jadual 11: Penggunaan komputer, internet dan web presence dalam industri perlombongan petroleum

dan gas asli bagi tahun 2010 dan 2011

Table 11: Usage of computer, internet and web presence in the petroleum and natural gas mining industry for the year 2010

and 2011

Tahun Year

Penggunaan komputer Computer usage in business

Penggunaan internet Internet usage in business

Penggunaan web presence

Web presence usage in business

(%) (%) (%)

2010 100.0 100.0 100.0

2011 100.0 100.0 100.0

Jadual 12: Jenis rangkaian komputer yang digunakan dalam industri perlombongan petroleum dan gas asli bagi tahun 2010 dan 2011

Table 12: Types of computer network used in the petroleum and natural gas mining industry for the year 2010 and 2011

Tahun Year

Intranet dalam perniagaan Intranet within your business

Extranet di antara perniagaan Extranet between business and other

organisations

Rangkaian kawasan setempat

Local area network (LAN)

Rangkaian kawasan luas Wide area network (WAN)

(%) (%) (%) (%)

2010 100.0 50.0 100.0 100.0

2011 100.0 50.0 100.0 100.0

Page 57: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

54

Jadual 13: Jenis capaian internet dalam industri perlombongan petroleum dan gas asli bagi

tahun 2010 dan 2011

Table 13: Types of internet access in the petroleum and natural gas mining industry for the year 2010 dan 2011

Tahun Year

Jalur sempit

Jalur lebar tetap Jalur lebar mudah alih

Fixed broadband Mobile broadband

(%) (%)

2010 18.8 100.0 12.5

2011 25.0 93.8 37.5

Jadual 14 : Pertubuhan yang terlibat dalam pembelian dan jualan internet dalam industri perlombongan petroleum dan gas asli bagi

tahun 2010 dan 2011

Table 14: The establishments involved in purchased and sales via the internet in the petroleum and natural gas mining industry for the year 2010 and 2011

Tahun Year

Pertubuhan yang membuat Pertubuhan yang menerima Jumlah pendapatan Nilai jualan melalui Peratus nilai pesanan

pesanan (pembelian) pesanan (jualan) Total income internet jualan melalui internet

barangan atau perkhidmatan barangan Value of sales via the ke atas jumlah

menggunakan internet atau perkhidmatan internet pendapatan

Establishments that have menggunakan internet Percentage of sales via

placing purchases for goods Establishments that have the internet by total

and services via the internet placing sales for goods and income

services via the internet

(%) (%) (RM'000) (RM'000) (%)

2010 37.5 25.0 28,384,654 3,444,527 49.0

2011 37.5 18.8 28,464,916 3,700,439 39.0

Page 58: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

55

Jadual 15: Penggunaan internet dalam industri perlombongan petroleum dan gas asli bagi tahun 2010 dan 2011

Table 15: Internet usages in the petroleum and natural gas mining industry for the year 2010 and 2011

Tahun Year

Menghantar Telefon Menghantar Mendapatkan Mendapatkan Berhubung Perbankan

atau menerima melalui informasi atau maklumat maklumat dari dengan melalui

e-mel internet pesanan dengan berkenaan organisasi kerajaan organisasi internet

Sending or Telephoning segera barangan atau Getting kerajaan Internet

receiving e-mail over the Posting perkhidmatan information from Interacting with banking

internet information or Getting information government government

instant about goods or organisations organisations

messaging services

(%) (%) (%) (%) (%) (%) (%)

2010 100.0 87.5 68.8 93.8 75.0 68.8 81.3

2011 100.0 75.0 62.5 87.5 68.8 62.5 81.3

Jadual 15 : Penggunaan internet dalam industri petroleum dan gas asli bagi tahun 2010 dan 2011 (samb.)

Table 15: Internet usages in the petroleum and natural gas mining industry for the year 2010 and 2011 (cont'd)

Tahun Year

Mengakses Penyediaan Penghantaran Pemberitahuan Latihan untuk Lain- lain

perkhidmatan perkhidmatan produk secara jawatan kosong kakitangan (aplikasi Others

kewangan pelanggan atas talian dalaman atau e-pembelajaran)

yang lain Providing Delivering luaran Staff training

Accessing customer products Internal or (e-learning

other financial services online external application)

services recruitment

(%) (%) (%) (%) (%) (%)

2010 43.8 25.0 25.0 87.5 87.5 6.3

2011 43.8 18.8 6.3 87.5 87.5 18.8

Page 59: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

56

Jadual 16: Harga purata 'lifting' berpemberat minyak mentah*, 2002 - 2011

Table 16: Weighted average lifting price of crude oil*, 2002 - 2011

Bulan 2011 2010 2009

2008

2007

2006

2005 2004 2003 2002 Month

Jan./Jan. 94.13 75.04 40.45 97.63 57.45 66.82 41.63 32.45 33.33 19.45

Feb./Feb. 100.13 72.91 50.11 95.68 65.94 67.84 48.36 35.54 34.48 19.93

Mac/Mar. 116.13 76.99 48.49 103.92 70.16 66.80 58.12 38.09 32.03 22.46

Apr./Apr. 124.07 84.03 45.42 120.46 72.25 72.99 57.73 36.77 27.50 24.33

Mei/May 123.38 70.28 53.80 128.97 77.61 76.31 51.00 39.01 27.00 25.55

Jun/June 118.95 74.91 72.07 134.16 79.22 71.26 53.75 37.52 26.98 24.42

Jul./July 121.46 76.68 71.94 141.84 76.80 72.85 57.78 40.76 28.08 26.09

Ogos/Aug. 116.49 75.64 73.62 123.37 71.78 75.51 66.58 53.72 29.94 27.51

Sept./Sept. 117.80 79.09 67.31 107.07 81.11 71.66 69.77 47.64 32.12 28.55

Okt./Oct. 115.04 87.95 76.14 73.94 86.01 64.74 64.40 46.66 29.05 26.53

Nov./Nov. 117.51 84.01 85.49 56.70 98.94 61.24 57.46 49.20 32.03 26.27

Dis./Dec. 117.14 88.35 79.25 40.44 102.23 59.22 57.96 38.62 31.14 30.85

Purata 114.42

78.90

63.08

100.85

78.47

68.77

57.15

41.29

30.29

25.24

Average

Nota: * Harga purata lifting dikira dengan membahagikan jumlah nilai jualan tempatan dan nilai eksport f.o.b. dengan

jumlah kuantiti jualan 'lifting' sebenar dalam tong. Sumber: PETRONAS

Source:

Note: * Weighted average lifting price is calculated by dividing the sum of local sales value and exports f.o.b. value by total actual lifting sales quantities in barrels.

USD se tong / USD per barrel

Page 60: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

57

(’000)

Jadual 17: Pengeluaran bulanan minyak mentah dan gas asli, 2011

Table 17: Monthly production of crude oil and natural gas, 2011

Minyak mentah dan peluwap Gas asli - pengeluaran bersih (a)

Crude oil and condensate Natural gas - net production (a)

Gas asli Gas asli tidak Jumlah

Minyak mentah Peluwap Jumlah bersekutu bersekutu Total

Crude oil Condensate Total

Associated Non -

natural gas

Bulan Tong Tan Metrik Tong Tan Metrik Tong Tan Metrik MSCF (b)

MSCF (b)

MSCF (b)

Month Barrel Metric Tonne Barrel Metric Tonne Barrel Metric Tonne

Jan./Jan. 15,593 2,052 3,627 477 19,220 2,529 29,140 167,307 196,447

Feb./Feb. 14,084 1,853 3,304 435 17,388 2,288 25,760 149,688 175,448

Mac/Mar. 14,818 1,950 3,596 473 18,414 2,423 27,900 164,641 192,541

Apr./Apr. 13,890 1,828 3,390 446 17,280 2,274 26,550 155,220 181,770

Mei/May 12,152 1,599 3,007 396 15,159 1,995 26,443 132,184 158,627

Jun/June 11,940 1,571 3,390 446 15,330 2,017 25,230 157,650 182,880

Jul./July 14,322 1,884 2,976 392 17,298 2,276 23,901 146,227 170,128

Ogos/Aug. 14,601 1,921 3,379 445 17,980 2,366 25,482 152,985 178,467

Sept./Sept. 13,350 1,757 3,180 418 16,530 2,175 23,430 154,680 178,110

Okt./Oct. 14,136 1,860 3,348 441 17,484 2,301 26,195 157,263 183,458

Nov./Nov. 13,920 1,832 3,180 418 17,100 2,250 25,830 152,580 178,410

Dis./Dec. 15,407 2,027 3,379 445 18,786 2,472 25,885 162,812 188,697

Jumlah 168,213

22,133

39,756

5,231

207,969

27,364

311,746

1,853,237

2,164,983

Total

(a) Pengeluaran bersih = Pengeluaran kasar - (Kegunaan dalam operasi + Suntikan semula + Sumber : PETRONAS

Cecair tercicir & pengecutan + Pembakaran) Source :

Net production = Gross production - (Utilised in operation + Gas reinjection +

Liquid dropout & shrinkage + Flaring)

(b) MSCF - (Ribu) Kaki Padu Standard / (Thousand) Standard Cubic Feet

Page 61: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

58

Jadual 18: Pengeluaran minyak mentah dan gas asli, 2002 - 2011

Table 18: Production of crude oil and natural gas, 2002 - 2011

Minyak mentah dan peluwap Gas asli - pengeluaran bersih (a)

Crude oil and condensate Natural gas - net production (a)

Gas asli Gas asli tidak Jumlah

Minyak mentah Peluwap Jumlah bersekutu bersekutu Total

Crude oil Condensate Total Associated Non-associated

natural gas natural gas

Tahun Tong Tan Metrik Tong Tan Metrik Tong Tan Metrik MSCF (b)

MSCF (b)

MSCF (b)

Year Barrel Metric Tonne Barrel Metric Tonne Barrel Metric Tonne

2011 168,213 22,133 39,756 5,231 207,969 27,364 311,746 1,853,237 2,164,983

2010 190,231 25,030 42,734 5,623 232,965 30,653 358,375 1,801,158 2,159,533

2009 195,667 25,746 44,813 5,896 240,480 31,642 337,291 1,782,064 2,119,355

2008 205,908 27,093 45,903 6,040 251,811 33,133 364,180 1,790,673 2,154,853

2007 201,729 26,543 47,461 6,245 249,190 32,788 356,830 1,790,975 2,147,805

2006 196,088 25,801 47,340 6,229 243,428 32,030 373,013 1,734,667 2,107,680

2005 207,451 27,296 49,331 6,491 256,782 33,787 395,289 1,721,737 2,117,026

2004 228,370 30,049 50,640 6,663 279,010 36,712 303,807 1,598,082 1,901,889

2003 226,994 29,868 42,324 5,569 269,318 35,437 290,220 1,539,365 1,829,585

2002 217,620 28,634 37,319 4,910 254,939 33,545 244,337 1,462,509 1,706,846

(a) Pengeluaran bersih = Pengeluaran kasar - (Kegunaan dalam operasi + Suntikan semula + Sumber : PETRONAS

Cecair tercicir & pengecutan + Pembakaran) Source :

Net production = Gross production - (Utilised in operation + Gas reinjection +

Liquid dropout & shrinkage + Flaring)

(b) MSCF - (Ribu) Kaki Padu Standard / (Thousand) Standard Cubic Feet

(’000)

Page 62: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

59

Jadual 19: Eksport dan import produk berasaskan petroleum, 2002 - 2011

Table 19: Exports and imports of petroleum - based products, 2002 - 2011

Eksport/ Exports Import/ Imports

Tahun Petroleum Mentah Keluaran Petroleum Gas Asli Cecair Petroleum Mentah Keluaran Petroleum

Year Crude Petroleum Petroleum Products Liquefied Natural Gas Crude Petroleum Petroleum Products

2011 32,451,686 33,037,703 52,048,817 24,009,726 32,724,503

2010 30,764,665 25,542,094 38,741,631 18,006,837 25,134,558

2009 25,360,055 19,400,280 29,017,686 14,553,255 14,252,998

2008 43,582,080 29,092,992 41,475,300 23,359,591 24,050,295

2007 32,865,338 19,729,803 26,936,477 18,824,571 20,674,143

2006 31,983,489 18,403,894 23,674,855 17,782,836 19,306,226

2005 29,653,503 15,128,174 21,340,259 12,825,480 17,578,620

2004 21,855,599 12,059,433 17,215,090 7,723,570 13,469,614

2003 15,658,530 8,291,607 13,357,664 6,305,269 8,442,595

2002 11,599,805 6,679,389 9,888,395 4,777,483 7,330,310

Sumber: Perangkaan Perdagangan Luar Negeri, Jabatan Perangkaan Malaysia Source : External Trade Statistics, Department of Statistics, Malaysia

(RM’000)

Page 63: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

60

Jadual 20: Pengeluaran produk petroleum bertapis, 2003 - 2011

Jadual 20: Production of refined petroleum products, 2003- 2011

Produk petroleum

Petroleum products

Tahun Minyak bahan api Minyak diesel Minyak tanah Gas petroleum cecair Gasolin Nafta Jumlah

Year Fuel oil Diesel oil Kerosene Liquefied petroleum gas Gasoline Naptha Total

2011

2,790,140 9,999,539 3,559,679 3,036,305 5,510,132 3,396,606 28,292,401

2010 2,087,644 8,598,640 3,352,095 3,147,723 4,170,882 3,937,680 25,294,664

2009 2,610,116 9,245,314 3,702,430 3,256,817 4,196,902 3,992,347 27,003,926

2008 2,416,316 9,597,854 3,939,478 3,534,478 4,787,257 4,145,185 28,420,568

2007 1,597,959 8,805,514 3,306,890 3,397,040 5,758,577 4,183,324 27,049,304

2006 1,790,177 9,056,565 3,420,405 3,516,948 6,089,249 3,459,850 27,333,194

2005 1,836,545 8,951,869 3,149,344 3,269,545 5,800,423 3,441,347 26,449,073

2004 1,519,278 8,998,650 3,165,461 3,231,987 5,399,775 3,388,894 25,704,045

2003 1,355,098 9,599,521 3,045,097 3,277,515 4,709,432 3,325,280 25,311,943

Sumber: Perangkaan Pembuatan Bulanan, Jabatan Perangkaan Malaysia

Source : Monthly Manufacturing Statistics, Department of Statistics, Malaysia

Tan Metrik/ Metric Tonne

Page 64: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

61

Jadual 21A: Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga semasa - RM Juta

Table 21A: Gross Domestic Product by kind of economic activity at current prices - RM Million

Jenis Aktiviti Ekonomi 2005 2006 2007 2008 2009 2010

e 2011

p

Kind of Economic Activity

1. Pertanian 44,912 51,383 66,446 76,753 65,719 82,612 104,581

Agriculture

2. Perlombongan dan kuari 72,111 81,759 88,332 120,170 81,342 86,545 91,786

Mining and quarrying

2.1 Pengeluaran minyak mentah 43,204 48,842 52,828 67,814 41,497 45,099 49,916

Crude petroleum production

2.2 Pengeluaran gas asli dan kondensat 28,326 32,318 34,847 51,654 39,090 40,614 40,989

Natural gas and condensate production

2.3 Penggalian lain dan kuari 582 600 657 703 755 832 882

Other mining and quarry

3. Pembuatan 149,754 164,510 173,804 189,105 169,661 195,280 214,626

Manufacturing

4. Pembinaan 16,107 16,451 18,739 21,156 23,187 25,893 28,306

Construction

5. Perkhidmatan 254,322 277,022 312,050 355,233 365,984 397,035 433,070

Services

6. campur Duti import 6,372 5,659 5,969 7,531 6,964 7,672 8,711

plus Import duties

KDNK pada Harga Pembeli 543,578 596,784 665,340 769,949 712,857 795,037 881,080

GDP at Purchasers' Prices

Sumber: Akaun Negara Tahunan, Jabatan Perangkaan Malaysia Source : Annual National Accounts, Department of Statistics, Malaysia

Nota/ Notes: e: anggaran/ estimate p: permulaan/ preliminary

Page 65: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

62

Jadual 21B: Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga semasa - perubahan peratusan tahunan

Table 21B: Gross Domestic Product by kind of economic activity at current prices - annual percentage change

Jenis Aktiviti Ekonomi 2005 2006 2007 2008 2009 2010

e 2011

p

Kind of Economic Activity

1. Pertanian 14.4 29.3 15.5 -14.4 25.7 26.6

Agriculture

2. Perlombongan dan kuari 13.4 8.0 36.0 -32.3 6.4 6.1

Mining and quarrying

2.1 Pengeluaran minyak mentah 13.0 8.2 28.4 -38.8 8.7 10.7

Crude petroleum production

2.2 Pengeluaran gas asli dan kondensat 14.1 7.8 48.2 -24.3 3.9 0.9

Natural gas and condensate production

2.3 Penggalian lain dan kuari 3.1 9.5 7.1 7.5 10.1 6.0

Other mining and quarry

3. Pembuatan 9.9 5.6 8.8 -10.3 15.1 9.9

Manufacturing

4. Pembinaan 2.1 13.9 12.9 9.6 11.7 9.3

Construction

5. Perkhidmatan 8.9 12.6 13.8 3.0 8.5 9.1

Services

6. campur Duti import -11.2 5.5 26.2 -7.5 10.2 13.6

plus Import duties

KDNK pada Harga Pembeli 9.8 11.5 15.7 -7.4 11.5 10.8

GDP at Purchasers' Prices

Sumber: Akaun Negara Tahunan, Jabatan Perangkaan Malaysia Source : Annual National Accounts, Department of Statistics, Malaysia

Nota/ Notes: e: anggaran/ estimate p: permulaan/ preliminary

Page 66: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

63

Jadual 21C: Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga semasa - pembahagian peratus KDNK

Table 21C: Gross Domestic Product by kind of economic activity at current prices - percentage share of GDP

Jenis Aktiviti Ekonomi 2005 2006 2007 2008 2009 2010

e 2011

p

Kind of Economic Activity

1. Pertanian 8.3 8.6 10.0 10.0 9.2 10.4 11.9

Agriculture

2. Perlombongan dan kuari 13.3 13.7 13.3 15.6 11.4 10.9 10.4

Mining and quarrying

2.1 Pengeluaran minyak mentah 7.9 8.2 7.9 8.8 5.8 5.7 5.7

Crude petroleum production

2.2 Pengeluaran gas asli dan kondensat 5.2 5.4 5.2 6.7 5.5 5.1 4.7

Natural gas and condensate production

2.3 Penggalian lain dan kuari 0.1 0.1 0.1 0.1 0.1 0.1 0.1

Other mining and quarry

3. Pembuatan 27.5 27.6 26.1 24.6 23.8 24.6 24.4

Manufacturing

4. Pembinaan 3.0 2.8 2.8 2.7 3.3 3.3 3.2

Construction

5. Perkhidmatan 46.8 46.4 46.9 46.1 51.3 49.9 49.2

Services

6. campur Duti import 1.2 0.9 0.9 1.0 1.0 1.0 1.0

plus Import duties

KDNK pada Harga Pembeli 100.0 100.0 100.0 100.0 100.0 100.0 100.0

GDP at Purchasers' Prices

Sumber: Akaun Negara Tahunan, Jabatan Perangkaan Malaysia Source : Annual National Accounts, Department of Statistics, Malaysia

Nota/ Notes: e: anggaran/ estimate p: permulaan/ preliminary

Page 67: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

64

Jadual 22A: Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga malar 2005 - RM Juta

Table 22A: Gross Domestic Product by kind of economic activity at constant 2005 prices - RM Million

Jenis Aktiviti Ekonomi 2005 2006 2007 2008 2009 2010

e 2011

p

Kind of Economic Activity

1. Pertanian 44,912 47,533 48,188 50,036 50,063 51,263 54,299

Agriculture

2. Perlombongan dan kuari 72,111 71,276 72,758 70,996 66,386 66,122 62,334

Mining and quarrying

2.1 Pengeluaran minyak mentah 43,204 42,741 43,767 41,916 38,699 36,695 32,706

Crude petroleum production

2.2 Pengeluaran gas asli dan kondensat 28,326 27,947 28,349 28,428 26,995 28,696 28,872

Natural gas and condensate production

2.3 Penggalian lain dan kuari 582 587 643 652 693 731 756

Other mining and quarry

3. Pembuatan 149,754 160,880 165,879 167,148 152,150 170,258 178,333

Manufacturing

4. Pembinaan 16,107 16,022 17,391 18,151 19,270 20,428 21,370

Construction

5. Perkhidmatan 254,322 272,555 299,933 325,712 335,027 359,215 384,272

Services

6. campur Duti import 6,372 5,671 5,937 7,523 6,989 7,660 8,653

plus Import duties

KDNK pada Harga Pembeli 543,578 573,936 610,087 639,565 629,885 674,946 709,261

GDP at Purchasers' Prices

Sumber: Akaun Negara Tahunan, Jabatan Perangkaan Malaysia Source : Annual National Accounts, Department of Statistics, Malaysia

Nota/ Notes: e: anggaran/ estimate p: permulaan/ preliminary

Page 68: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

65

Jadual 22B: Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga malar 2005 - perubahan peratusan tahunan

Table 22B: Gross Domestic Product by kind of economic activity at constant 2005 prices - annual percentage change

Jenis Aktiviti Ekonomi 2005 2006 2007 2008 2009 2010

e 2011

p

Kind of Economic Activity

1. Pertanian 5.8 1.4 3.8 0.1 2.4 5.9

Agriculture

2. Perlombongan dan kuari -1.2 2.1 -2.4 -6.5 -0.4 -5.7

Mining and quarrying

2.1 Pengeluaran minyak mentah -1.1 2.4 -4.2 -7.7 -5.2 -10.9

Crude petroleum production

2.2 Pengeluaran gas asli dan kondensat -1.3 1.4 0.3 -5.0 6.3 0.6

Natural gas and condensate production

2.3 Penggalian lain dan kuari 1.0 9.5 1.3 6.3 5.5 3.4

Other mining and quarry

3. Pembuatan 7.4 3.1 0.8 -9.0 11.9 4.7

Manufacturing

4. Pembinaan -0.5 8.5 4.4 6.2 6.0 4.6

Construction

5. Perkhidmatan 7.2 10.0 8.6 2.9 7.2 7.0

Services

6. campur Duti import -11.0 4.7 26.7 -7.1 9.6 13.0

plus Import duties

KDNK pada Harga Pembeli 5.6 6.3 4.8 -1.5 7.2 5.1

GDP at Purchasers' Prices

Sumber: Akaun Negara Tahunan, Jabatan Perangkaan Malaysia Source : Annual National Accounts, Department of Statistics, Malaysia

Nota/ Notes: e: anggaran/ estimate p: permulaan/ preliminary

Page 69: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

66

Jadual 22C: Keluaran Dalam Negeri Kasar mengikut jenis aktiviti ekonomi pada harga malar 2005 - pembahagian peratus KDNK

Table 22C: Gross Domestic Product by kind of economic activity at constant 2005 prices - percentage share of GDP

Jenis Aktiviti Ekonomi 2005 2006 2007 2008 2009 2010

e 2011

p

Kind of Economic Activity

1. Pertanian 8.3 8.3 7.9 7.8 7.9 7.6 7.7

Agriculture

2. Perlombongan dan kuari 13.3 12.4 11.9 11.1 10.5 9.8 8.8

Mining and quarrying

2.1 Pengeluaran minyak mentah 7.9 7.4 7.2 6.6 6.1 5.4 4.6

Crude petroleum production

2.2 Pengeluaran gas asli dan kondensat 5.2 4.9 4.6 4.4 4.3 4.3 4.1

Natural gas and condensate production

2.3 Penggalian lain dan kuari 0.1 0.1 0.1 0.1 0.1 0.1 0.1

Other mining and quarry

3. Pembuatan 27.5 28.0 27.2 26.1 24.2 25.2 25.1

Manufacturing

4. Pembinaan 3.0 2.8 2.9 2.8 3.1 3.0 3.0

Construction

5. Perkhidmatan 46.8 47.5 49.2 50.9 53.2 53.2 54.2

Services

6. campur Duti import 1.2 1.0 1.0 1.2 1.1 1.1 1.2

plus Import duties

KDNK pada Harga Pembeli 100.0 100.0 100.0 100.0 100.0 100.0 100.0

GDP at Purchasers' Prices

Sumber: Akaun Negara Tahunan, Jabatan Perangkaan Malaysia Source : Annual National Accounts, Department of Statistics, Malaysia

Nota/ Notes: e: anggaran/ estimate p: permulaan/ preliminary

Page 70: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

MAKLUMAT TAMBAHAN ADDITIONAL INFORMATION

Page 71: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

69

Untuk Mendapatkan Maklumat Lanjut

Sebarang pertanyaan berhubung penerbitan ini dan statistik atau perkhidmatan lain yang

berkaitan boleh dikemukan kepada:

Bahagian Perangkaan Pengeluaran Industri dan Binaan,

Jabatan Perangkaan Malaysia,

Aras 5, Blok C6, Kompleks C,

Pusat Pentadbiran Kerajaan Persekutuan,

62514 Putrajaya,

Malaysia.

Tel: 603-8885 7371, Faks: 603-8888 9215, E-mel: [email protected]

Penerbitan ini boleh diperoleh dari:

Unit Khidmat Pengguna,

Jabatan Perangkaan Malaysia,

Aras 1, Blok C6, Kompleks C,

Pusat Pentadbiran Kerajaan Persekutuan,

62514 Putrajaya,

Malaysia.

Tel : 603 - 8885 7000

Faks : 603 - 8888 9248

E-mel : [email protected]

Page 72: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

70

Contacts for Further Information

Any enquiries regarding this publication and related statistics or services should be directed to:

Industrial Production and Contruction Statistics Division,

Department of Statistics, Malaysia,

Level 5, Block C6, Complex C,

Federal Government Administrative Centre,

62514 Putrajaya,

Malaysia.

Tel: 603-8885 7371, Fax: 603-8888 9215, E-mail: [email protected]

This publication can be obtainable from:

Customer Service Unit,

Department of Statistics, Malaysia,

Level 1, Block C6, Complex C,

Federal Government Administrative Centre,

62514 Putrajaya,

Malaysia.

Tel : 603 - 8885 7000

Fax : 603 - 8888 9248

E-mail : [email protected]

Page 73: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

71

PERTANYAAN BERHUBUNG DENGAN PENERBITAN INI DAN PENERBITAN LAIN BOLEH JUGA DIBUAT

DI PEJABAT PERANGKAAN NEGERI BERIKUT:

ENQUIRIES ABOUT THIS AND OTHER PUBLICATIONS CAN ALSO BE MADE AT THE FOLLOWING STATE STATISTICS OFFICES:

Pengarah Pengarah Jabatan Perangkaan Malaysia Negeri Johor Jabatan Perangkaan Malaysia Negeri Pulau Pinang Tingkat 14, Menara Tabung Haji, Tingkat 6, Bangunan Persekutuan, Jalan Air Molek, 10400 Jalan Anson, 80000 Johor Bharu, Johor. Pulau Pinang. Tel : 07- 2253700 Tel : 04 - 2266244 Fax : 07 - 2249972 Fax : 04 - 2299499 E-mel : [email protected] E-mel : [email protected] Pengarah Pengarah Jabatan Perangkaan Malaysia Negeri Kedah Jabatan Perangkaan Malaysia Negeri Perak Aras 1, Zon C, Wisma Persekutuan, Tingkat 3, Blok A, Pusat Pentadbiran Kerajaan Persekutuan, Bangunan Persekutuan Ipoh, Bandar Muadzam Shah, Jalan Dato’ Seri Ahmad Said (Greentown), 06550 Anak Bukit, 30450 Ipoh, Perak. Kedah. Tel : 05 - 2554963 Tel : 04 - 7001240 Fax : 05 - 2551073

Fax : 04 - 7338412 E-mel : [email protected] E-mel : [email protected] Pengarah Pengarah Jabatan Perangkaan Malaysia Negeri Kelantan Jabatan Perangkaan Malaysia Negeri Terengganu Tingkat 8, Bangunan Persekutuan, Tingkat 9, Wisma Persekutuan, Jalan Bayam, Jalan Sultan Ismail, 15514 Kota Bharu, Kelantan. 20200 Kuala Terengganu, Terengganu.

Tel : 09 - 7419449 Tel : 09 - 6223062 Fax : 09 - 7482142 Fax : 09 - 6229659 E-mel : [email protected] E-mel : [email protected] Pengarah Pengarah Jabatan Perangkaan Malaysia Negeri Melaka Jabatan Perangkaan Malaysia Negeri Sabah Aras 7 & 8, Wisma Persekutuan, Tingkat 1 - 3, Blok C, Jalan MITC, Hang Tuah Jaya, Kompleks Pentadbiran Kerajaan Persekutuan Sabah,

75450, Ayer Keroh, Jalan UMS, Beg Berkunci 2046, 88999 Kota Kinabalu, Melaka. Sabah Tel : 06 - 2522725 Tel : 088 - 484602 Fax : 06 - 2522711 Fax : 088 - 484659 E-mel : [email protected] E-mel : [email protected] Pengarah Pengarah Jabatan Perangkaan Malaysia Negeri Sembilan Jabatan Perangkaan Malaysia Negeri Sarawak

Tingkat 12, Wisma Persekutuan, Tingkat 7 & 8, Bgn. Tun Datuk Patinggi Tuanku Haji Bujang, Jalan Dato’ Abdul Kadir, Jalan Simpang 3, 70000 Seremban, Negeri Sembilan. 93514 Kuching, Sarawak. Tel : 06 - 7655000 Tel : 082 - 240287 Fax : 06 - 7655002 Fax : 082 - 242609 E-mel : [email protected] E-mel : [email protected] Pengarah Pengarah Jabatan Perangkaan Malaysia Negeri Pahang Jabatan Perangkaan Malaysia Negeri Selangor Tingkat 7, Bangunan Persekutuan, Tingkat 9, Bangunan Darul Ehsan, Jalan Gambut, Jalan Indah, Seksyen 14, 25000 Kuantan, Pahang. 40000 Shah Alam, Selangor. Tel : 09 - 5163931/7 Tel : 03 - 55150200 Fax : 09 - 5144636 Fax : 03 - 55180408 E-mel : [email protected] E-mel : [email protected]

Pengarah Pengarah Jabatan Perangkaan Malaysia Jabatan Perangkaan Malaysia Negeri Perlis Wilayah Persekutuan Tingkat 4, Bangunan KWSP, Tingkat 19, Wisma KWSG, Jalan Bukit Lagi, Jalan Kg. Attap, 01000 Kangar, Perlis. 50604 Kuala Lumpur. Tel : 04 - 9771221 Tel : 03 - 22672400 Fax : 04 - 9771223 Fax : 03 - 22745075 E-mel : [email protected]

E-mel : [email protected]

Page 74: RM20 - 大马经济网 · Jadual-jadual perangkaan yang ... Angkubah 2010 2011 Kadar ... Taburan pekerja sepenuh masa mengikut kategori pekerja dan gaji & upah …

PERANGKAAN PETROLEUMDAN GAS ASLI

PETROLEUM AND NATURAL GASSTATISTICS

PE

RA

NG

KA

AN

PE

TR

OLE

UM

DA

N G

AS

AS

LI 2012

2012

ISSN 1675-7432

JABATAN PERANGKAAN MALAYSIADEPARTMENT OF STATISTICS, MALAYSIA

HARGA :PRICE :

BOLEH DIPEROLEH DARI : OBTAINABLE FROM :

Jabatan Perangkaan Malaysia(Department Of Statistics, Malaysia)Unit Khidmat Pengguna,Blok C6, Kompleks C, Pusat Pentadbiran Kerajaan Persekutuan,62514 Putrajaya,MALAYSIA

Tel. : 03-88857000Faks / Fax : 03-88889248E-mel / E-mail : [email protected] Web : http://www.statistics.gov.myHomepage

RM20.00

DITERBIT DAN DICETAK OLEH JABATAN PERANGKAAN MALAYSIA