Upload
adriano-costa
View
221
Download
0
Embed Size (px)
DESCRIPTION
Sahara Air Products - Sahara-Pak Model HC Theory of Operation and Specifications
Citation preview
SaharaPak HeatofCompression Air Dryer
Model HC Theory of Operation Left Tower Heating Hot air directly from the compressors enters the inlet of the HCand is directed by the inlet 2way valves into the regeneratingtower. This hot, thirsty air regenerates the bulk of the waterfrom the desiccant. The air is then directed into the aftercoolerwhere it is cooled, the coalescing separator where liquid wateris removed through the drain trap system, then into the dryingtower where the air is actually dried to its final low dew point.
Specifications
ModelLength = A(Inches)
Width = B(Inches)
Height = C(Inches)
Inlet/OutletSize
Lbs.Desiccant
WaterRequired @
SCFMRATING
Approx.Weight
Left Tower Stripping The heating cycle lasts 90 minutes. At the end of heating, the inlet valves shift position, directing the hot inlet air directly into theaftercooler, separator, and drying tower. We now begin stripping. The stripping phase of regeneration lasts 90 minutes. At thebeginning of stripping, the regenerating tower is depressurized through a muffler. During stripping, a small adjustable flow of dry air isused to remove the last little bit of moisture from the regenerating tower. The allows the HC dryer to provide exceptionally low dewpoints.
Left Tower Cooling At the end of stripping, the regenerating tower is repressurized. The outlet cooling cycle valves open and cooling begins. Duringcooling, a portion of the dry outlet air is directed into the regenerating tower to reduce the temperature of the bed prior to towershift. There is no air lost during cooling. Cooling and stripping combine to provide extremely low dew points and to eliminate dewpoint fluctuations during tower shift.
SaharaPak Information
Introduction to the SaharaPak
Features
SP Theory of Operation & Specifications
HC Theory of Operation & Specifications
Operating Cost of the SaharaPak
Optional Dew Point Demand System
SaharaPak Brochure
About Us Contacts Parts & Service Products Resource Center Site Map
Call toll free: 8005444379
Sahara Air Products, Div. of Henderson Engineering Co., Inc.95 N. Main St., Sandwich IL 60548
Phone: 8157869471 Fax: 8157866117Business Office Hours: Monday Friday 8:00 a.m. 4:30 p.m.
Receiving Dock Hours: Monday Thursday 7:30 a.m. 3:30 p.m.Copyright © 2014 Henderson Engineering Co., Inc. All rights reserved.
ISO 9001:2008 Certified
Certificate No. FM 589782
(Inches) per Tower 85F GPM* @ 100# (Lbs.)
HC100 82 38 78 1 66 6 100 2947
HC210 92 46 78 1 1/2 132 13 210 3509
HC350 99 50 87 2 220 21 350 4235
HC700 103 58 84 3 440 29 700 5052
HC770 128 63 84 3 484 31 770 5735
HC1540 142 71 94 4 968 63 1540 8550
HC2100 151 83 107 4 1320 86 2100 11070
HC2520 165 90 110 6 1585 103 2520 12330
HC3500 167 93 113 6 2220 107 3500 15050
HC4500 211 108 118 6 2860 138 4500 17300
HC5000 181 99 121 6 3180 153 5000 19600
HC5500 195 104 123 6 3500 168 5500 20900
HC6000 192 104 123 6 3820 183 6000 22580
HC6500 192 104 129 6 4140 199 6500 23240
HC7000 204 112 117 6 4455 214 7000 24290
HC7500 204 112 123 8 4775 229 7500 25305
HC8000 204 112 129 8 5095 244 8000 26130
HC8500 237 120 132 8 5400 260 8500 28940
HC9000 260 132 132 8 5720 275 9000 30520
HC10000 289 136 155 10 6360 306 10000 34180
Sahara reserves the right to make changes without notification. Some models not shown. Larger sizes available. Otherpressures available. Metric dimensions available upon request. Ratings are based on 100 PSIG, 100°F.* Assumes 350F air inlet temperature; for lower regeneration temperatures, less water is necessary.
Our sales engineers will help you select the right system for your application. They have the expertise toreview your plant air system and design the optimum engineered solution. We can build a dryer to meet your strict performance requirements.