SaharaPak HeatofCompression Air Dryer Model HC Theory of Operation Left Tower Heating Hot air directly from the compressors enters the inlet of the HC and is directed by the inlet 2way valves into the regenerating tower. This hot, thirsty air regenerates the bulk of the water from the desiccant. The air is then directed into the aftercooler where it is cooled, the coalescing separator where liquid water is removed through the drain trap system, then into the drying tower where the air is actually dried to its final low dew point. Specifications Model Length = A (Inches) Width = B (Inches) Height = C (Inches) Inlet/Outlet Size Lbs. Desiccant Water Required @ SCFM RATING Approx. Weight Left Tower Stripping The heating cycle lasts 90 minutes. At the end of heating, the inlet valves shift position, directing the hot inlet air directly into the aftercooler, separator, and drying tower. We now begin stripping. The stripping phase of regeneration lasts 90 minutes. At the beginning of stripping, the regenerating tower is depressurized through a muffler. During stripping, a small adjustable flow of dry air is used to remove the last little bit of moisture from the regenerating tower. The allows the HC dryer to provide exceptionally low dew points. Left Tower Cooling At the end of stripping, the regenerating tower is repressurized. The outlet cooling cycle valves open and cooling begins. During cooling, a portion of the dry outlet air is directed into the regenerating tower to reduce the temperature of the bed prior to tower shift. There is no air lost during cooling. Cooling and stripping combine to provide extremely low dew points and to eliminate dew point fluctuations during tower shift. SaharaPak Information Introduction to the SaharaPak Features SP Theory of Operation & Specifications HC Theory of Operation & Specifications Operating Cost of the SaharaPak Optional Dew Point Demand System SaharaPak Brochure About Us Contacts Parts & Service Products Resource Center Site Map Call toll free: 8005444379

Sahara Air Products - Sahara-Pak Model HC Theory of Operation and Specifications

Embed Size (px)

DESCRIPTION

Sahara Air Products - Sahara-Pak Model HC Theory of Operation and Specifications

Citation preview

Page 1: Sahara Air Products - Sahara-Pak Model HC Theory of Operation and Specifications

Sahara­Pak Heat­of­Compression Air Dryer

Model HC Theory of Operation Left Tower Heating Hot air directly from the compressors enters the inlet of the HCand is directed by the inlet 2­way valves into the regeneratingtower. This hot, thirsty air regenerates the bulk of the waterfrom the desiccant. The air is then directed into the aftercoolerwhere it is cooled, the coalescing separator where liquid wateris removed through the drain trap system, then into the dryingtower where the air is actually dried to its final low dew point.

Specifications

ModelLength = A(Inches)

Width = B(Inches)

Height = C(Inches)

Inlet/OutletSize

Lbs.Desiccant

WaterRequired @

SCFMRATING

Approx.Weight

Left Tower Stripping The heating cycle lasts 90 minutes. At the end of heating, the inlet valves shift position, directing the hot inlet air directly into theaftercooler, separator, and drying tower. We now begin stripping. The stripping phase of regeneration lasts 90 minutes. At thebeginning of stripping, the regenerating tower is depressurized through a muffler. During stripping, a small adjustable flow of dry air isused to re­move the last little bit of moisture from the regenerating tower. The allows the HC dryer to provide exceptionally low dewpoints.

Left Tower Cooling At the end of stripping, the regenerating tower is repressurized. The outlet cooling cycle valves open and cooling begins. Duringcooling, a portion of the dry outlet air is directed into the regenerating tower to reduce the temperature of the bed prior to towershift. There is no air lost during cooling. Cooling and stripping combine to provide extremely low dew points and to eliminate dewpoint fluctuations during tower shift.

Sahara­Pak Information

Introduction to the Sahara­Pak

Features

SP Theory of Operation & Specifications

HC Theory of Operation & Specifications

Operating Cost of the Sahara­Pak

Optional Dew Point Demand System

Sahara­Pak Brochure

About Us Contacts Parts & Service Products Resource Center Site Map

Call toll free: 800­544­4379

Page 2: Sahara Air Products - Sahara-Pak Model HC Theory of Operation and Specifications

Sahara Air Products, Div. of Henderson Engineering Co., Inc.95 N. Main St., Sandwich IL 60548

Phone: 815­786­9471 Fax: 815­786­6117Business Office Hours: Monday ­ Friday 8:00 a.m. ­ 4:30 p.m.

Receiving Dock Hours: Monday ­ Thursday 7:30 a.m. ­ 3:30 p.m.Copyright © 2014 Henderson Engineering Co., Inc. All rights reserved.

ISO 9001:2008 Certified

Certificate No. FM 589782

(Inches) per Tower 85F GPM* @ 100# (Lbs.)

HC­100 82 38 78 1 66 6 100 2947

HC­210 92 46 78 1 1/2 132 13 210 3509

HC­350 99 50 87 2 220 21 350 4235

HC­700 103 58 84 3 440 29 700 5052

HC­770 128 63 84 3 484 31 770 5735

HC­1540 142 71 94 4 968 63 1540 8550

HC­2100 151 83 107 4 1320 86 2100 11070

HC­2520 165 90 110 6 1585 103 2520 12330

HC­3500 167 93 113 6 2220 107 3500 15050

HC­4500 211 108 118 6 2860 138 4500 17300

HC­5000 181 99 121 6 3180 153 5000 19600

HC­5500 195 104 123 6 3500 168 5500 20900

HC­6000 192 104 123 6 3820 183 6000 22580

HC­6500 192 104 129 6 4140 199 6500 23240

HC­7000 204 112 117 6 4455 214 7000 24290

HC­7500 204 112 123 8 4775 229 7500 25305

HC­8000 204 112 129 8 5095 244 8000 26130

HC­8500 237 120 132 8 5400 260 8500 28940

HC­9000 260 132 132 8 5720 275 9000 30520

HC­10000 289 136 155 10 6360 306 10000 34180

Sahara reserves the right to make changes without notification. Some models not shown. Larger sizes available. Otherpressures available. Metric dimensions available upon request. Ratings are based on 100 PSIG, 100°F.* Assumes 350F air inlet temperature; for lower regeneration temperatures, less water is necessary.