    Tennessee Concrete Pavement and Cement

    Based Solutions Conferenceased Solutions Conference

    Nashville TN February 1 2013

    Design and Construction

    Stan Bland, PE

    Portland Cement Association, Southeast Region

  • 7/24/2019 SBland - Carolinas RCC

    2/91

    Definition

    - -

    that is compacted by vibratory rollers.

    Zero slump (consistency of dense graded aggregate)

    No forms

    No finishing

    Concrete pavement placed in a different way!

  • 7/24/2019 SBland - Carolinas RCC

    3/91

  • 7/24/2019 SBland - Carolinas RCC

    4/91

    Un-compacted RCC

  • 7/24/2019 SBland - Carolinas RCC

    5/91

  • 7/24/2019 SBland - Carolinas RCC

    6/91

  • 7/24/2019 SBland - Carolinas RCC

    7/91

  • 7/24/2019 SBland - Carolinas RCC

    8/91

    S f Aurface Appearance

    conventionalconcrete

    Important to

    recognize difference

    Similar appearance

    to asphalt only light

    grey instead of black

  • 7/24/2019 SBland - Carolinas RCC

    9/91

    Surface Texture

  • 7/24/2019 SBland - Carolinas RCC

    10/91

    Engineering Properties

    ompress ve s ren c

    4,000 to 10,000 psi

    Flexural strength (MR)

    500 to 1 000 si

    MR = C(fc)1/2 where C = 9 (up to 11)

    o u us o e as c y

    3,000,000 to 5,500,000 psi

    E = CE(fc)1/2 where CE = 57,000 (up to

    67,000)

  • 7/24/2019 SBland - Carolinas RCC

    11/91

    A lications

  • 7/24/2019 SBland - Carolinas RCC

    12/91

    Saluda Dam - Columbia, South Carolina

  • 7/24/2019 SBland - Carolinas RCC

    13/91

    D C R iam Crest Raise

    Alabama Power - Rattlesnake Hollow

    Crest of Exist ing earthen dam raised by 30 feet.RCC used to provide vertical face due to width restraints.

  • 7/24/2019 SBland - Carolinas RCC

    14/91

    Log Sort Yards

    Vancouver Island, BC, 1978

  • 7/24/2019 SBland - Carolinas RCC

    15/91

    Military Facilities

    Ft. Carsons, CO, 2008

    Ft. Lewis, WA ,1986

    Ft. Drum, NY, 1990

  • 7/24/2019 SBland - Carolinas RCC

    16/91

    Intermodal Facilities

    Burlington Northern, Denver, CO

    , ,

  • 7/24/2019 SBland - Carolinas RCC

    17/91

    CN Intermodal Yard, Calgary

    RCC decreased

    ruc wa me rom

    8 to 2 hours

    Unsurfaced aggregateis difficult to maneuver

    hazard

  • 7/24/2019 SBland - Carolinas RCC

    18/91

  • 7/24/2019 SBland - Carolinas RCC

    19/91

    Distribution Centers

    18 acre distribution

    center in Austin, TX

    10 years after construction

  • 7/24/2019 SBland - Carolinas RCC

    20/91

    GM Saturn Plant

    Spring Hill, Tennessee

  • 7/24/2019 SBland - Carolinas RCC

    21/91

    Honda Plant

    Lincoln, Alabama

  • 7/24/2019 SBland - Carolinas RCC

    22/91

    M d B Plercedes-Benz Plant

    Vance, Alabama

  • 7/24/2019 SBland - Carolinas RCC

    23/91

    Streets Interchanges

    Calgary, AB

    Residential street

    Columbus, OH

  • 7/24/2019 SBland - Carolinas RCC

    24/91

    Columbus, Ohio Area

  • 7/24/2019 SBland - Carolinas RCC

    25/91

    Hi h Sh ldighway Shoulders

    I-285 Highway

    Atlanta GA

  • 7/24/2019 SBland - Carolinas RCC

    26/91

    Construction

  • 7/24/2019 SBland - Carolinas RCC

    27/91

  • 7/24/2019 SBland - Carolinas RCC

    28/91

    Mixing Plants

    Generally three types of

    1. Dry Batch Plant2. Rotary Drum Mixing Plant

    3. Continuous Flow Pugmill

  • 7/24/2019 SBland - Carolinas RCC

    29/91

    Mixing Plants

    Rotary Drum Plant Available at some locations.

    Mobilization issues.

    Capacity reduced due to low water

    content of mixture.

  • 7/24/2019 SBland - Carolinas RCC

    30/91

    Continuous Mix Pug Mill

    High-volumeapplications

    xce ent m x ng

    efficiency for dry

    materials

    250 to 900+ tons/hr

    Mobile, erected on site

    Mobilization costs

  • 7/24/2019 SBland - Carolinas RCC

    31/91

    Transporting

  • 7/24/2019 SBland - Carolinas RCC

    32/91

    RCC Pavement Placement

  • 7/24/2019 SBland - Carolinas RCC

    33/91

    Placing

    Layer Thickness

    4 in. Minimum Thickness.

    . .

    Timing Sequence

    Multiple lifts placed within 60 minutes for fresh joint

    Production should match paver capacity

    Continuous forward motion for best smoothness

  • 7/24/2019 SBland - Carolinas RCC

    34/91

  • 7/24/2019 SBland - Carolinas RCC

    35/91

    Roller Compaction

    (rubber-coated drum)

  • 7/24/2019 SBland - Carolinas RCC

    36/91

    Compaction-Final Density

    Final density is critical for

    strength and durability

    ompacte to o e

    Proctor

    Combination Roller

    Rubber coated steel drum

    roller

  • 7/24/2019 SBland - Carolinas RCC

    37/91

    Compaction Very Important

  • 7/24/2019 SBland - Carolinas RCC

    38/91

  • 7/24/2019 SBland - Carolinas RCC

    39/91

  • 7/24/2019 SBland - Carolinas RCC

    40/91

  • 7/24/2019 SBland - Carolinas RCC

    41/91

    Bituminous Curing Compound

    Excellent moisture barrier

    Common compounds:SS-1, RC-250, MC-250

    Moisten surface

    . .

    Good for asphalt cap

  • 7/24/2019 SBland - Carolinas RCC

    42/91

    Quality Control

  • 7/24/2019 SBland - Carolinas RCC

    43/91

  • 7/24/2019 SBland - Carolinas RCC

    44/91

  • 7/24/2019 SBland - Carolinas RCC

    45/91

  • 7/24/2019 SBland - Carolinas RCC

    46/91

    OPENING TO TRAFFIC

  • 7/24/2019 SBland - Carolinas RCC

    47/91

  • 7/24/2019 SBland - Carolinas RCC

    48/91

  • 7/24/2019 SBland - Carolinas RCC

    49/91

    SCDOT Specifications

    Traffic:

    Protect the RCC from vehicular traffic during the

    curing period. Completed portions of the RCCpavement may be opened to automotive and light

    truck traffic as soon as the strength is sufficient to

    preven amage o e . e pavemen may

    be opened to unrestricted traffic after 4 days.

  • 7/24/2019 SBland - Carolinas RCC

    50/91

    Why are we using it?

    (Andy Johnson SCDOT State Pavement Engineer)Andy Johnson SCDOT State Pavement Engineer)

    Most or all of pavement structure can be placed in.

    Does not require the curing time or adjacent lane

    encroachment of traditional PCC.

    Can handle heavy loads and high traffic volumes.

    ,

    if you can get it installed.

    Overall structure cost is very competitive with otherpavement types.

  • 7/24/2019 SBland - Carolinas RCC

    51/91

    RCC Projects in South Carolina

  • 7/24/2019 SBland - Carolinas RCC

    52/91

    SC Projects

    , .

    SC 5, York County

    US 78 Charleston Count

    New State Road, Lexington County

    Greystone Boulevard, Richland County

    S. Beltline Boulevard, Richland County

    Richland Street (US78), Aiken County

    SC 9, Horry County

    S-11-171, Cherokee County

    - ou ers, aurens oun y

    I-385 Shoulders, Greenville County

  • 7/24/2019 SBland - Carolinas RCC

    53/91

    Projects in SC

    Rt 21 Alb i ht R d R k Hill SCt 21 Albright Road Rock Hill SC

    Rt 72 By Pass Chester SC

  • 7/24/2019 SBland - Carolinas RCC

    54/91

    Rt 72 Bypass Chester SC

    ons ruc e n ep em er

    Milled 10 inches off of asphalt pavement

    Placed 8 inch RCC

    ver ay w t nc es sp a t oncrete

    Surface Course

  • 7/24/2019 SBland - Carolinas RCC

    55/91

  • 7/24/2019 SBland - Carolinas RCC

    56/91

  • 7/24/2019 SBland - Carolinas RCC

    57/91

  • 7/24/2019 SBland - Carolinas RCC

    58/91

  • 7/24/2019 SBland - Carolinas RCC

    59/91

  • 7/24/2019 SBland - Carolinas RCC

    60/91

  • 7/24/2019 SBland - Carolinas RCC

    61/91

  • 7/24/2019 SBland - Carolinas RCC

    62/91

  • 7/24/2019 SBland - Carolinas RCC

    63/91

  • 7/24/2019 SBland - Carolinas RCC

    64/91

  • 7/24/2019 SBland - Carolinas RCC

    65/91

  • 7/24/2019 SBland - Carolinas RCC

    66/91

  • 7/24/2019 SBland - Carolinas RCC

    67/91

  • 7/24/2019 SBland - Carolinas RCC

    68/91

  • 7/24/2019 SBland - Carolinas RCC

    69/91

  • 7/24/2019 SBland - Carolinas RCC

    70/91

  • 7/24/2019 SBland - Carolinas RCC

    71/91

  • 7/24/2019 SBland - Carolinas RCC

    72/91

    Powell Pond Road

    (S-2-2304) Aiken County SCS-2-2304), Aiken County, SC

  • 7/24/2019 SBland - Carolinas RCC

    73/91

  • 7/24/2019 SBland - Carolinas RCC

    74/91

  • 7/24/2019 SBland - Carolinas RCC

    75/91

  • 7/24/2019 SBland - Carolinas RCC

    76/91

  • 7/24/2019 SBland - Carolinas RCC

    77/91

  • 7/24/2019 SBland - Carolinas RCC

    78/91

  • 7/24/2019 SBland - Carolinas RCC

    79/91

  • 7/24/2019 SBland - Carolinas RCC

    80/91

  • 7/24/2019 SBland - Carolinas RCC

    81/91

  • 7/24/2019 SBland - Carolinas RCC

    82/91

  • 7/24/2019 SBland - Carolinas RCC

    83/91

  • 7/24/2019 SBland - Carolinas RCC

    84/91

  • 7/24/2019 SBland - Carolinas RCC

    85/91

  • 7/24/2019 SBland - Carolinas RCC

    86/91

    c an venue , en,c an venue , en,

  • 7/24/2019 SBland - Carolinas RCC

    87/91

    The Morgan Co

    Greenville Co. SC

  • 7/24/2019 SBland - Carolinas RCC

    88/91

    Morgan Co

    Greenville Co. SC

  • 7/24/2019 SBland - Carolinas RCC

    89/91

    II--385 RCC Shoulder385 RCC Shoulder

  • 7/24/2019 SBland - Carolinas RCC

    90/91

    Benefits of RCC Pavements

    Economical (both initial and life-cycle costs)

    Eliminates rutting

    Excellent overall durability

    Sim le fast construction

    No forms or finishing

  • 7/24/2019 SBland - Carolinas RCC

    91/91

    R ll C t d C toller Compacted Concrete

    Questions ???uestions ???

    D A t I d t Pl tams

    Intermodal Facilities

    Auto Industry Plants

    Streets and Local Rds

    Military Bases

    Port Terminals

    State Highway System

    Nuclear Power Plantsort Terminals

    Interstate Shoulders

    Nuclear Power Plants

    Logging Yards